Home / Financial Firm (Unknown - Insurer) / Determination 460351
Determination 460351
Denial of damaged floor tiles claim as not caused by storm
Summary
The applicant claimed under her home policy for damaged floor tiles, saying a storm caused them. The FSP denied the claim. AFCA accepted the engineer's evidence that tile growth and substrate movement, not storm, was the proximate cause, and found the FSP entitled to deny the claim.
Under a storm cover requiring proximate cause, the applicant must show on balance that storm was the dominant cause, and the engineer's reasoning on the damage pattern was persuasive.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 460351 Determination Page 1 of 4
Case number: 460351 18 September 2017
1 Overview
1.1 Dispute
The financial services provider (FSP) denied the applicant‟s claim for damaged tiles
on the basis they did not occur due to an event insured for under the policy.
The applicant disputes this as she says the damage was due to a storm.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP can deny the claim because the evidence does not show the damaged tiles
were caused by a storm or another insured event.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny liability for the applicant‟s claim.
Case No: 460351 Determination Page 2 of 4
2 Reasons for determination
2.1 Can the FSP deny the claim?
Applicant must show a prima facie claim
The applicant is required to demonstrate that, on the balance of probabilities, she
suffered a loss caused by an event she is insured for under the policy (insured
event).
This is known as a prima facie claim.
In this case, the applicant says the damaged tiles was d ue to a storm. According to
the policy, this is covered in the following circumstances:
“ Your building and/or contents are covered for loss or damage caused by storm .”
It is generally accepted that the term “caused by” means proximate cause.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not
required to be the last in time or the sole cause. It is a question of fact that depends
on the circumstances of each case. It requires a common sense evaluation of the
evidence.
Therefore, in order for the applicant to establish a prima facie claim, the evidence
must show that the proximate cause of the damaged tiles was storm.
Evidence does not show the proximate cause of the damaged tiles was storm
The FSP is relying u pon the evidence of engineer PW. PW‟s evidence is set out in a
report dated 29 July 2016 and an email dated 31 October 2016. The latter was in
response to the FSP‟s enquires.
PW‟s evidence is summarised in section 3.1 of this Determination.
Having carefully considered all of the available evidence, I am not satisfied the
evidence shows the proximate cause of the damaged tiles was storm. This is due to
the following.
First, as an engineer, PW is clearly qualified to provide a valued opinion on this
substantive issue. This is supported by the fact the builder who initially inspected the
property (AS) recommended that an engineer be engaged to determine the likely
cause of damage.
Second, and of particular significance, PW provided a reasonable explanation as to
why the damage is inconsistent with the storm.
PW noted that the tenting of the tiles was due to a large, in-plane horizontal force
being applied to them. This is consistent with the nature and location of the damage.
PW considered the possibility of this force being due to rainwater affecting the slab
by wetting the perimeter soils. However, he dismissed this possibility because:
the surface has been tiled for 20 years and undergone similar environmental
factors with no issue
Case No: 460351 Determination Page 3 of 4
greater damage would have been sustained to the property
This reasoning is plausible, logical and consistent with the available evidence. It is
also not refuted by any other expert.
Applicant’s argument does not assist her
The applicant challenged PW‟s conclusion that the damage is associated with “tile
growth” as it cannot be tested and confirmed.
However, even if I accept the evidence is unclear in this regard, I am satisfied PW
has provided persuasive reasoning as to why storm was not the proximate cause.
Given this, I am not satisfied the evidence shows the applicant can establish a prima
facie claim. On this factor alone, the FSP is entitled to deny liability for the claim.
Case No: 460351 Determination Page 4 of 4
3 Supporting information
3.1 Expert evidence
Record Key points
FSP’s expert ( AS )
Report
29 - 06 - 2016
Caus e of damage is structural movement of the building from
substrate expansion and shrinkage related to weat her conditions.
Swelling of the substrate has occurred causing movement – this
has forced the floor tiles to expand creating a forc e against each
other a nd consequently “tenting”.
There were no water stains or water penetration of any kind during
the storm
FSP ’s expert ( PW )
Report
18 - 07 - 16
Tiles had become detached from the slab surface in two areas and
some tiles had peaked or tented.
No control joints could be found in the tiled surface.
It is quite apparent that prior to the tenting, the tiles were subjected
to a large, in - plane horiz ontal force – this is evident by the fact the
tented tiles will not return to their original position.
Horiz ontal forces could generate in the upper surface of the slab if
the slab developed a sagged shape.
If the soils around the perimeter of the building wet up, this could
cause the slab edges to lift. This in turn could induce horizont al
compressive forces in the tiles l aid on the slab surfac e.
However, the surface has been tiled for 20 years. The site will have
undergone several similar periods in its life when perimeter soils
were wet up by rainfall following dry periods of weather.
Further, if the slab had developed a curved shape, this would
cause damage to internal linings – this was not observed
Another possible cause for the build - up of compressive forces in
the tiled surface is a phenomenon known as „tile growth‟ – this is
the likely cause of the tenting.
Do not be lieve it is related to any defined weather event although
the final trigger may have been a temperature differential between
tiles and the slab.
FSP’s expert (PW)
Email
31 October 2016
No evidence of mechanical distortion (curvature) in the slab to
cause a large compressive force in slab surface and tiles.
Such curvature would caus e distress and damage to internal wall –
nothing to that extent was evident.
Shrinkage of the concrete slab will typically cause cracking in the
slab – can occasionally result in cracking in tiles laid to the surface
– no evidence of this.
Have observed „tile growth‟ problems on previous occasions in
similar situations of long runs without joints
No testing that can be conducted to check or confirm that tile
growth has occurred.