Storm damage claim for collapsed brick fence denied under structural and gradual deterioration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2017-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A brick fence collapsed in a storm and the FSP denied the claim as structural defect or gradual deterioration. AFCA found the FSP had not established either exclusion and ordered it to indemnify the claim with interest from the denial date.

Gradual deterioration was not the proximate cause of the collapse, and the FSP did not show an inherent or structural defect existed at construction.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 459372 Determination Page 1 of 6 Case number: 459372 27 November 2017 1 Overview 1.1 Dispute The financial services provider (FSP) denied the applicant’s claim for a collapsed portion of a brick fence on the basis it was structurally inadequate and had sustained gradual deterioration. The applicant has disputed this. The applicant says the fence was structurally sound and the cause of damage was storm. 1.2 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim because:  the applicant has shown a prima facie claim given the wall collapsed following a storm  the evidence does not show the wall was structurally inadequate at the time of its construction or any deficiencies in this regard caused the collapse 1.3 Determination This determination is in favour of the applicant. The FSP is required to indemnify the applicant for the claim. The FSP is also to pay interest on any amount paid to the applicant pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) from 13 September 2016 until payment is made. Case No: 459372 Determination Page 2 of 6 2 Reasons for determination 2.1 Can the FSP deny the claim? Applicant has shown a prima facie claim The applicant is required to show, on the balance of probabilities, it has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. Once the applicant establishes a prima facie claim, the FSP is liable for the loss unless it shows an exclusion applies. The FSP has the onus of proof in establishing the application of the exclusion. There is no dispute the fence collapsed due to a storm, namely heavy winds. Therefore, the applicant has established a prima facie claim. FSP must show proximate cause of the loss falls within an exclusion The FSP engaged a builder (ML) and an engineer (PT) to report on the cause of the damage. The FSP is par ticularly relying on PT’s opinion and says that the applicant’s loss falls within the following exclusions: This policy does not cover: … b) loss or damage resulting fro m or caused by:  …  inherent defects, structural defects, faulty workmanship, faulty design or any gradual process  wear, tear, rust, corrosion, depreciation or gradual deteriorat ion” It is generally accepted that terms “caused by” or “resulting from” within an insurance policy requires a party to demonstrate the proximate cause of the loss falls within the relevant term. Proximate cause is the dominant, efficient or operative cause of the loss. Loss was not proximately caused by gradual deterioration or wear and tear Even if I accept PT’s evidence, it is clear he did not accept the deteriorated state of the fence was the proximate cause of its collapse. He described it as a contributing factor. Therefore, the exclusion for gradual deterioration is not applicable. In terms of the exclusion that begins with inherent defects, I do not accept a reasonable person in the position of the parties would interpret this to apply in context of current standards. To do so would result in an outcome that is inconsistent with its ordinary and natural meaning. This is particularly illustrated by the reference to faulty workmanship. A contractor who conducted building works in accordance with applicable standards at the time cannot be susceptible to an assertion of faulty workmanship because those practices subsequently changed. Case No: 459372 Determination Page 3 of 6 Accordingly, the exclusion can only apply if the FSP can show the following:  the wall was structurally or inherently defective, faultily designed or had faulty workmanship in accordance with the practices at the time  the extent of these issues were the proximate cause to the collapse Evidence does not show policy exclusion starting with inherent defects applies PT’s reports refers to the wall thickness being insufficient to withstand the wind loadings it is meant to handle. PT says this inadequacy was applicable at the time of construction. PT also referred to footings that were inadequate based on current standards. However, as PT does not say it was inadequate compared to standards at the time of construction, this is irrelevant to the applicable exclusion. FOS sought further clarification about the relevant standards applicable at the time the wall was constructed. PT quoted a number of provisions. These set out general requirements about how the wall should be designed. No specifics were quoted regarding the wall’s thickness and how the applicant’s wall breached those requirements. Further, it is not evident for what period of time the design or construction of a wall is meant to withstand the wind loadings. For instance, the standards do not say the wall must be constructed in a way that it can withstand wind loadings 30 or more years after its construction. As identified by PT, the wall did have elements of wear, tear and gradual deterioration that contributed to its collapse. It would appear apparent these factors would red uce the wall’s ability to withstand the design loadings. Particularly over a period of 30 years. In addition, I do not accept the fact the wall collapsed following winds of approximately 87km/hr supports an inference it was improperly built or designed at its time of construction. Particularly given the following:  no explanation about how the wall was meant to be designed or built in accordance with building practices at the time  how this wall failed to meet those requirements  the fact it remained structurally intact between 20 and 30 years where it is likely subjected to wind loadings higher than 87km/hr during that period Therefore, I am not satisfied the FSP has shown on the balance of probabilities the wall contained any inherent or structural defect, faulty design or faulty workmanship. Alternatively, even if it was open to accept there may have been an issue in this regard, the FSP has not shown the extent of any such issue or why it should be considered the proximate cause of the wall’s collap se. FSP is to indemnify the applicant Accordingly, after careful consideration of all the evidence and arguments, I am not satisfied the FSP has shown either of the exclusions it is relying upon applies. Given this, the FSP is required to indemnify the applicant for the claim. Case No: 459372 Determination Page 4 of 6 The FSP is also to pay interest on any amount paid to the applicant pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 13 September 2016, being the date the FSP denied the claim, until payment is made. Case No: 459372 Determination Page 5 of 6 3 Supporting information 3.1 Expert Reports Record Key points FSP’s expert (ML) Report 15 August 2016  An inspection of the fenc e revealed a section had partially collapsed  The footings could not be inspected as they were not exposed.  The remaining free standing brick fence does show signs of cracking and sandstone capping is missing and/or cracked. FSP’s expert (PT) Report 01 September 2016  The property is of an open semi - rural and flat terrain.  Referenc e to the Australian Standard AS 4055 - 2012 Wind Lo ads for Housing identifies this area to be classed as wind class N2. This equates to a maximum wind gust speed of 144km/h.  Five decorative cast panels approximately 0.5m x 0.8m are located generally between the brick piers. Not e all panels have adjacent b rickwork with long term damage and repairs relat ed to foundation movement and lintel bar corrosion.  Many areas of the capping are detached or loose  Referenc e to the Moss Vale Bureau of Met eorology weat her station (about 3km away) records identify maximum wind gusts of 87km/h on 4 June 2016 and 80km/h on 5 June 2016.  Long term foundation movement has partly resulted in crack and repair damage  No brickwork control joints have been installed to accommodate brickwork growth and thermal movements  Fence thickness in relation to the height is not adequate for the design wind loadings of either the current standards or those at the time of fence construction  Footings do not satisfy current standards for this foundation material  Brick fence was not designed or built to an acceptable engineering standard of the day that included inadequacies in regard to footings, brick wall configuration, control joints and corrosion control FSP’s expert (PT) Report 23 - 11 - 2016  “The facts [as above] clearly show this brick wall was structurally undersized and included long term rotation and vertical movement that resulted in damage and repair at all feature panels which are the weakest link in this form of wall. This wall was vulnerable to storm and wind damage. The poor str ucture was the cause of the wall damage and not the wind. Accordingly, if the brick wall had been structurally sound and had been built to appropriate standards and maintained it would not have been damaged by the storm event where winds of the order of 87 km/hour were locally recorded”. FSP’s expert (PT) Report 18 - 01 - 2016  “In principle, my report determined the brick fence was not built to an acceptable engineering standard in regard the height and width of the wall not being sufficiently robust to resis t the wind loadings of this area. Other maintenance and detail contributed to the collapse, but the basic issue is the wall was not strong enough. Case No: 459372 Determination Page 6 of 6  “In basics, the downward force of the mass of brick fence and moment of resistance must be greater than the m oment [sic] created by the horizontal design wind loads (plus a factor of safety). If the wall is not heavy enough, a design wind will blow it over. That is what has occurred on this occasion.”  “My calculations identify this property should be designed to a wind loading related to a 144km/hr wind. The loc ally recorded highest wind during the storm event in question was 87 km/hr. In effect, the wall did not resist a wind load substantially less than the design speed of 144km/hr. I suggest the other deteriora ted elements within the wall such as long term footing movement, wall cracking and rust elements have contribut ed to the failure of the wall.” Applicant’s expert (CR) Report 30 March 2017  If one was to survey every brick garden boundary wall and retaining wall in NSW, 90% would not conform to Australian Standards  PT provided a number of legitimat e reasons as to why the wall might/should fall down – he does not explain though why the wall fell down that day after it has survived for 20 years FSP’s expert (PT) Email 25 September 2017  All structures must be designed to meet an engineering standard to resist various factors of safety the live, dead, wind and working loads a structure will be required to withstand  There was not enough brickwork for the height of the wall and it will blow over well before the design wind loads are reached.  The primary cause of the collapse of this wall was due to it not being thick enough with sufficient bricks.