Home / Financial Firm (Unknown - Insurer) / Determination 459199
Determination 459199
Storm damage claim partly denied for faulty workmanship
Summary
The applicant's storm claim for a pergola and pavers was denied by the FSP for faulty workmanship and wear. AFCA upheld the denial for the pergola but found the paver damage was storm-related, requiring a cash settlement of $3,630.
Exclusions for faulty workmanship and gradual deterioration applied to the pergola, but storm water was the proximate cause of the paver subsidence in the northern area.
Issues
- Claim denial primary · upheld“The claim for damage to the pavers is covered in part because the proximate cause was the volume of water during the storm.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 459199 Determination Page 1 of 3
Case number: 459199 26 July 2017
1 Overview
1.1 Dispute
The applicant holds a home and contents insurance policy (Policy) issued by the
financial services provider (FSP). The Policy started on 1 July 2014 and renews
annually.
On 6 June 2016 the applicant lodged a claim for storm damage. The applicant says
that a pergola/carport and pavers were damaged as a result of the storm.
The FSP appointed a builder (H) and an engineer (S) to report on the cause of the
damage. Both H and S reported that the damage was not storm related but due to
faulty workmanship. As loss or damage caused by faulty workmanship is excluded
under the Policy, the FSP denied the claim.
The applicant disagrees with this decision. His builder (N) reports that the damage is
storm related.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is entitled to rely on the exclusions for faulty workmanship and gradual
deterioration to deny the claim for the pergola.
The claim for damage to the pavers is covered in part because I am satisfied that on
the information available the proximate cause of the damage to the northern end of
the pergola, rear garden bed and rear boundary fence was the volume of water that
inundated this area during the storm.
1.3 Determination
This determination is partly in favour of the FSP and partly in favour of the applicant.
If the applicant accepts this determination the FSP must pay the applicant $3,630.
Case No: 459199 Determination Page 2 of 3
2 Reasons for determination
2.1 Is the FSP entitled to deny the claim?
The Policy provides cover for insured events including storm
The Policy provides cover for loss or damage that is the result of an insured event
only. The applicant does not hold optional cover for accidental damage.
The applicant must establish, on the balance of probabilities, an insured event
occurred. The Policy provides storm cover. Storm is defined as:
A violent wind including tornado or named cyclone; or rain hail or snow of unusual volume, force
or duration. It is not persistent bad weather or heavy or persistent rain by itself.
There is no dispute that on 5 June 2016 an unusual amount of rain fell around the
insured address. A widely reported and destructive storm event effected a large part
of New South Wales including the area surrounding the insured address.
However, cover is limited by exclusions. Damage caused by faulty workmanship,
wear and tear and gradual deterioration is excluded under the Policy.
Faulty workmanship and wear and tear caused damage to pergola
The applicant says the pergola became unstable after the storm due the subsidence
of the pavers. His builder (N) reported that:
The ground has subsided and the pavers have dropped in such a manner due to the excessive
rain, that when the strong winds and further rain occurred the back yard flooded and the pergola
has partially collapsed.
The FSP’s builder (H) and an engineer (S) inspected the damage. I am persuaded by
the engineers report due S’s relevant experience and the deta il provided in the
report. S says:
based on historical google maps the pergola was constructed between 2004
and 2005
the applicable standard for construction at the time the pergola was built
required bracing to prevent horizontal movement
the pergola does not have the required bracing and is defective building work
the timber structure shows signs of long term deterioration (rotting)
the steel fastenings, plates and nails were in poor condition and corroded
S concludes that:
I am of the opinion that the deflection of the pergola structure was due to the long term rotting of
framing timbers, which has affected the structural adequacy of the timbers, rather than heavy
storm.
The report provided by H also concluded that the pergola had been constructed
without adequate bracing and the rafters were rotten and in a poor condition.
Based on the available reports and on the balance of probabilities I am satisfied that
the damage to the pergola was caused by faulty workmanship, wear and tear and
gradual deterioration. The FSP is entitled to rely on these exclusions to deny the
claim for the pergola.
Case No: 459199 Determination Page 3 of 3
Some areas of pavers damaged by the storm
Both H and S found that the pavers had sunk due to being lain on a substandard
base. The sand fill beneath the pavers had not been compacted and there was no
grout joints. S concluded that:
I am of the opinion that the washing away of the sand fill, which in turn caused subsidence of
the rear yard pavers, was due to incorrect preparation and compaction at the time of installation,
rather than heavy storm with torrential rain.
S also observed that due to vegetation growth between the pavers and sinking
throughout the yard it was likely that the washing away of the sand fill and resulting
damage was pre-existing to some degree.
The applicant’s builder N did not provide an opinion on why the ground under the
pavers had subsided.
S reported that:
However, it also my opinion that the washing away of the sand fill was exacerbated by the
extreme volume of wat er during the New South Wales Storm event on the 5 th June 2016, and
that the sudden subsidence of sand fill, which in turn resulted in subsidence of the pavers
adjacent to the northern end of the pergola and rear garden bed, occurred at this instance.
The FSP obtained a scope of works for repairing the paving in the northern area. The
quote for this work from H is $2,112.00. The FSP offered to cash settle the applicant
$3,630 to finalise the claim. I am satisfied that this offer is fair and reasonable in all of
the circumstances.
If the applicant accepts this determination the FSP must cash settle the applicant
$3,630 in full and final settlement of the claim. No further compensation is payable.
An award of interest on the cash settlement amount is not appropriate in the
circumstances.