Determination 459161

Popped patio tiles claim denied under faulty workmanship exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for popped patio tiles after an earthquake, and the insurer denied the claim as caused by faulty workmanship. AFCA accepted the building consultant's expert evidence and found the faulty workmanship exclusion applied, so the FSP was not liable.

The FSP established on the balance of probabilities that faulty workmanship in the tiled area caused the loss, which the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 459161 Determination Page 1 of 3 Case number: 459161 5 May 2017 1 Overview 1.1 Dispute The applicant’s claim for popped tiles on his patio was denied by his insurer, the financial services provider (FSP), on the basis they were due to faulty workmanship or happened gradually. The applicant has disputed this as he says the loss was due to an earthquake. 1.2 Issues and key findings Can the FSP deny the claim? The FSP can deny the claim because:  the evidence shows there was faulty workmanship  the damage was caused by this  the policy excludes loss or damage caused by faulty workmanship 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to deny liability for the claim. Case No: 459161 Determination Page 2 of 3 2 Reasons for determination 2.1 Can the FSP deny the claim? FSP relying upon an exclusion for faulty workmanship There is no dispute an earthquake occurred on 18 August 2016 at 2.30pm with a magnitude of 5.8. The location was offshore north-east from Bowen. The applicant’s property is located in Bowen. The damage is isolated to the tiles on his patio. The applicant maintains the damage was caused by the earthquake. The FSP disputes this and says the cause of damage falls within the following general exclusion: “Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; The FSP has the onus of proof in establishing the exclusion. The standard of proof is the balance of probabilities. Expert evidence The FSP engaged building consultant SJ to determine the cause of damage. SJ provided a report dated 6 September 2016 that said: “… The peak ed section of tiles had occurred at a grout joint which r an in an east west direction. A tap test of the majority of the floor area revealed that many of the floor tiles were drummy and were no longer bonded to the concrete slab floor. I observed that one of the grout joints, which ran parallel to and approximat ely 1.2m away from the peaked grout joint, had been partially filled with a flexible sealant. However, the joint was not completely filled with flexible sealant as I detected that grout was present to the underside of the sealant … … The tile joint in ques tion however does nots serve as a movement joint due to the presence f the hard and non- flexible grout. … I am of the opinion that the lack of proper movement joints to the floor tile surface area has resulted in the tiles delaminating from the floor and e vent ually popping up. … To further highlight the movement joint issue, I observed that there was cracking to the cement render of the concret e block walls whic h abutted the grout filled perimeter tile joints. The cracking has been caus ed, in my opinion, by the build-up of pressure through the tiled surface area. … If a flexible movement joint had been installed then the cracking would not have occurred.”[sic] SJ provided a second report in response to the FSP’s specific questions. The relevant comments made were: “During my inspection I did not observe any evidence which conclusively proved that the floor tiles had popped after the earthquake event. … I am of the opinion that the delamination issue had been ongoing for an extended period of time. Additionally, the existing damaged condition of the tiles would be, in my opinion, the same even if the earthquake event had never occurred. … No, in my opinion the earthquake has not contribut ed to the existing condition of the patio floor tiles.” The FSP has also r eferred to Geoscience Australia’s (GA) website. GA said this earthquake could have caused damage up to 30km away. The applicant’s home was outside this radius. The applicant provided a report from GM dated 3 December 2016 that said: “… I would agree the m inor movement that was experienced and would be the most likely cause the tiles to go drummy or at worse pop, particularly since the home was built some 12 years ago and no evidence of problems with the tiles prior to the earthquake. … Case No: 459161 Determination Page 3 of 3 I have consulted the tiler and he also agrees with my conclusions and has forwarded his findings for your information. The Australian Standards have not changed during the period of 12 years since completion. Most homes would not exceed 45sq mtrs of floor area on a patio and thus would only require 1 expansion joint filled wit h a silicon flexible sealant to allow for minimal movement. With rubber bas ed tile glues allowable movement would only be up to 1 millimetre anyway before the adhesion of tile to concrete floor would fail resulting in popping or becoming drummy. … The report stating the issue of tiles popping and becoming drummy from bad workmanship is incorrect given the period of no issues prior to the earthquake, also my tiler still tiling today is one of the most reputable tilers in the area and has been tiling homes for over 20 years and is offended at that statement.” Evidence shows there was faulty workmanship I have carefully reviewed all of the available evidence. I am persuaded by SJ’s opinion for the following reasons. SJ has referred to specific Australian Standards when assessing the workmanship. I am satisfied this is appropriate given they refer to standards since 1991, the home was built on or around 2004 and GM confirmed they have not changed. Upon physically inspecting the area, SJ observed there was no movement joints. Whilst he identified the use of a flexible sealant, its effect was negated by the fact there was grout in the joint. GM’s report acknowledged there should have been at least one expansion joint filled with flexible sealant. SJ also observed that the abutment of the tiled floor surface area to the concrete block walls ought to have been filled with expansion joints. They were not. SJ referred to an Australian Standard to support this. GM’s report is silent on this issue. I am therefore satisfied the FSP has established faulty workmanship to the tiled area pursuant to these two matters. Further, I am persuaded the damage was directly or indirectly connected with this faulty workmanship given the following:  SJ’s opinion  GA saying damage would have generally been limited to within 30km of the epicenter and the applicant’s home was outside this radius Applicant’s argument does not support his position The applicant argued GA does say damage may occur outside the 30km radius. However, it is clear this possibility is remote given how it was expressed. Further, the damage to the applicant’s home was limited to an area that had faulty workmanship. This supports the fact the dominant cause of the loss was the faulty workmanship. Given this, I am satisfied the FSP has shown on the balance of probabilities that the applicant’s loss was directly or indirectly caused by faulty workmanship. Accordingly, the FSP is entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.