Home / Financial Firm (Unknown - Insurer) / Determination 459161
Determination 459161
Popped patio tiles claim denied under faulty workmanship exclusion
Summary
The applicant claimed for popped patio tiles after an earthquake, and the insurer denied the claim as caused by faulty workmanship. AFCA accepted the building consultant's expert evidence and found the faulty workmanship exclusion applied, so the FSP was not liable.
The FSP established on the balance of probabilities that faulty workmanship in the tiled area caused the loss, which the policy excludes.
Issues
- Claim denial primary · not upheld“FSP can deny the claim because the evidence shows faulty workmanship and the policy excludes loss caused by faulty workmanship.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 459161 Determination Page 1 of 3
Case number: 459161 5 May 2017
1 Overview
1.1 Dispute
The applicant’s claim for popped tiles on his patio was denied by his insurer, the
financial services provider (FSP), on the basis they were due to faulty workmanship
or happened gradually.
The applicant has disputed this as he says the loss was due to an earthquake.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP can deny the claim because:
the evidence shows there was faulty workmanship
the damage was caused by this
the policy excludes loss or damage caused by faulty workmanship
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny liability for the claim.
Case No: 459161 Determination Page 2 of 3
2 Reasons for determination
2.1 Can the FSP deny the claim?
FSP relying upon an exclusion for faulty workmanship
There is no dispute an earthquake occurred on 18 August 2016 at 2.30pm with a
magnitude of 5.8. The location was offshore north-east from Bowen.
The applicant’s property is located in Bowen. The damage is isolated to the tiles on
his patio. The applicant maintains the damage was caused by the earthquake.
The FSP disputes this and says the cause of damage falls within the following
general exclusion:
“Under this policy there is no cover provided for any loss, damage or liability caused directly or
indirectly by or in any way connected with:
1. defects, structural or design faults, faulty workmanship or faulty design;
The FSP has the onus of proof in establishing the exclusion. The standard of proof is
the balance of probabilities.
Expert evidence
The FSP engaged building consultant SJ to determine the cause of damage. SJ
provided a report dated 6 September 2016 that said:
“… The peak ed section of tiles had occurred at a grout joint which r an in an east west direction.
A tap test of the majority of the floor area revealed that many of the floor tiles were drummy and
were no longer bonded to the concrete slab floor.
I observed that one of the grout joints, which ran parallel to and approximat ely 1.2m away from
the peaked grout joint, had been partially filled with a flexible sealant. However, the joint was not
completely filled with flexible sealant as I detected that grout was present to the underside of the
sealant …
… The tile joint in ques tion however does nots serve as a movement joint due to the presence f
the hard and non- flexible grout. …
I am of the opinion that the lack of proper movement joints to the floor tile surface area has
resulted in the tiles delaminating from the floor and e vent ually popping up. …
To further highlight the movement joint issue, I observed that there was cracking to the cement
render of the concret e block walls whic h abutted the grout filled perimeter tile joints. The
cracking has been caus ed, in my opinion, by the build-up of pressure through the tiled surface
area. … If a flexible movement joint had been installed then the cracking would not have
occurred.”[sic]
SJ provided a second report in response to the FSP’s specific questions. The
relevant comments made were:
“During my inspection I did not observe any evidence which conclusively proved that the floor
tiles had popped after the earthquake event.
… I am of the opinion that the delamination issue had been ongoing for an extended period of
time.
Additionally, the existing damaged condition of the tiles would be, in my opinion, the same even
if the earthquake event had never occurred. …
No, in my opinion the earthquake has not contribut ed to the existing condition of the patio floor
tiles.”
The FSP has also r eferred to Geoscience Australia’s (GA) website. GA said this
earthquake could have caused damage up to 30km away. The applicant’s home was
outside this radius.
The applicant provided a report from GM dated 3 December 2016 that said:
“… I would agree the m inor movement that was experienced and would be the most likely
cause the tiles to go drummy or at worse pop, particularly since the home was built some 12
years ago and no evidence of problems with the tiles prior to the earthquake. …
Case No: 459161 Determination Page 3 of 3
I have consulted the tiler and he also agrees with my conclusions and has forwarded his
findings for your information.
The Australian Standards have not changed during the period of 12 years since completion.
Most homes would not exceed 45sq mtrs of floor area on a patio and thus would only require 1
expansion joint filled wit h a silicon flexible sealant to allow for minimal movement.
With rubber bas ed tile glues allowable movement would only be up to 1 millimetre anyway
before the adhesion of tile to concrete floor would fail resulting in popping or becoming drummy.
… The report stating the issue of tiles popping and becoming drummy from bad workmanship is
incorrect given the period of no issues prior to the earthquake, also my tiler still tiling today is
one of the most reputable tilers in the area and has been tiling homes for over 20 years and is
offended at that statement.”
Evidence shows there was faulty workmanship
I have carefully reviewed all of the available evidence. I am persuaded by SJ’s
opinion for the following reasons.
SJ has referred to specific Australian Standards when assessing the workmanship. I
am satisfied this is appropriate given they refer to standards since 1991, the home
was built on or around 2004 and GM confirmed they have not changed.
Upon physically inspecting the area, SJ observed there was no movement joints.
Whilst he identified the use of a flexible sealant, its effect was negated by the fact
there was grout in the joint. GM’s report acknowledged there should have been at
least one expansion joint filled with flexible sealant.
SJ also observed that the abutment of the tiled floor surface area to the concrete
block walls ought to have been filled with expansion joints. They were not. SJ
referred to an Australian Standard to support this. GM’s report is silent on this issue.
I am therefore satisfied the FSP has established faulty workmanship to the tiled area
pursuant to these two matters.
Further, I am persuaded the damage was directly or indirectly connected with this
faulty workmanship given the following:
SJ’s opinion
GA saying damage would have generally been limited to within 30km of the
epicenter and the applicant’s home was outside this radius
Applicant’s argument does not support his position
The applicant argued GA does say damage may occur outside the 30km radius.
However, it is clear this possibility is remote given how it was expressed. Further, the
damage to the applicant’s home was limited to an area that had faulty workmanship.
This supports the fact the dominant cause of the loss was the faulty workmanship.
Given this, I am satisfied the FSP has shown on the balance of probabilities that the
applicant’s loss was directly or indirectly caused by faulty workmanship. Accordingly,
the FSP is entitled to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.