Home / Financial Firm (Unknown - Insurer) / Determination 459070
Determination 459070
Scope of insurer's obligations under business policy after fire damage
Summary
The owner of a boarding house disputed the insurer's obligations after a 2015 fire. AFCA ordered insulation to all exposed walls and reimbursement of an engineer's report, but refused the bedroom window, bathroom window and bedroom downlights.
The insured must establish that the loss claimed is covered by the policy, and the insurer must meet its policy obligations for any covered damage proven.
Issues
- Claim denial primary · not upheld“I am not satisfied that the FSP is required to meet this aspect of the applicant's claim (bedroom window); downlights also refused”
- Repairs or contractors secondary · upheld“The FSP has not met its obligations under the terms and conditions of the policy and is required to fit insulation to all the exposed walls.”
Subjects and remedies
home or building damagesmall businesspay compensationprovide documentsrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 459070 Determination Page 1 of 5
Case number: 459070 11 January 2018
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under a Business Insurance Policy, held
with the financial services provider (FSP) in respect of a boarding house.
The applicant’s claim was accepted but a dispute continues as to the extent of the
FSP’s obligations under the terms of the policy and in respect to the claim and the
dispute.
1.2 Issues and key findings
Has the FSP met its obligations under the terms and conditions of the policy?
The FSP has not met its obligations under the terms and conditions of the policy and
is required to fit insulation to all the exposed walls.
The FSP is not required to meet the applicant’s claim for the b edroom window, the
bathroom window or the installation of downlights in the bedrooms.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is to meet its obligations under the terms and conditions of the policy for the
fitting of insulation to all the exposed walls.
The FSP may deny the applicant’s claim for the bedroom window, the bathroom
window and the installation of downlights in the bedrooms.
The parties are to work together and cooperate in the provision to the applicant of an
accurate electrical mud map.
The FSP is not required to change the building company.
The applicant is to clarify the details of the current ownership of the property.
The FSP is required to reimburse the applicant for the cost of the report obtained
from the consulting engineers (MJ), but not for legal costs.
Case No: 459070 Determination Page 2 of 5
2 Reasons for determination
This dispute has been the subject of a recommendation issued by the Service on 29
May 2017. It was the case manager’s recommendation that the FSP is required to
replace the ceiling batts, invert two bedroom doors and provide the electrical mud
map.
It was the case manager’s recommendation that the FSP was not required to replace
the bedroom window, the bathroom window, fit insulation to all exposed walls or
install downlights in the bedrooms.
The case manager also required the parties to work together co-operatively so that
the remaining issues could be resolved.
The FSP accepted the recommendation but the applicant has disputed the
recommendation.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Has the FSP met its obligations under the terms and conditions of
the policy?
As stated, the FSP accepted t he applicant’s claim but the dispute continued in
respect to the extent of damage caused by a fire at the insured premises on or about
7 June 2015 and the FSP’s obligations to the applicant under the term s and
conditions of the policy in respect to the damage caused by the fire.
The case manager’s recommendations required the FSP to replace the ceiling batts,
invert two bedroom doors and provide the electrical mud map. The FSP has
accepted the recommendation.
The FSP through its representatives had been conducting work at the insured
premises, however, it appears that the work ceased in or about July of 2017 and is
not continuing at the present time.
Subsequent to the recommendation the applicant provided a report from MJ.
Insulation to walls
The applicant provided a further submission in respect to this report and the FSP
says that the report and further submission specifically relate to the exposed walls
and insulation and repairs are unable to recommence until this issue has been
sorted.
The FSP says that as they have already had to take the walls down once, repairs
have been halted until the issue of insulation has been sorted as the insulation is the
foundation of repairs.
Case No: 459070 Determination Page 3 of 5
Within the recommendation, the case manager advised that he was not satisfied, on
the basis of the information he had at that time, that the applicant had established
that insulation was fitted to all the exposed walls before the fire incident.
I note from the report from MJ that:
‘By observation, the section of original (pre 2015) studwork between hallway leading to the
front door and bedroom 4, did show evidence of previous insulation being installed. Small
sections of fibrous insulation material was observe (sic) attached to both a vertical stud and
the soffit of a horizontal timber within the frame. Both remnants of insulation appeared to be
bonded to the timber, rather than loose deposits.’
On the basis of the report from MJ, I am satisfied that the applicant has established
that insulation was fitted to all the exposed walls and the FSP is required to fit
insulation into all exposed walls as part of its repairs, under the terms and conditions
of the policy.
Bedroom window
Within the recommendation the case manager confirmed that the FSP was not
required to replace the bedroom window as the applicant had not discharged her
onus to establish the window was damaged by the fire event.
In a submission from the applicant’s representatives they say t hat there is no
evidence of the window leaking prior to the fire and given that the fire damage cannot
be ruled out as being the direct cause of the window leak and given there is evidence
of some damage caused by the fire, the FSP is liable to replace the bedroom
window.
I do not agree.
The law is clear in that the applicant carries the onus to show that the loss claimed is
covered by the terms and conditions of the policy.
I do not accept that there is information to show that the window leaks because of the
fire.
I am not satisfied that the FSP is required to meet this aspect of the applic ant’s claim.
Bathroom window
Within the recommendation, the case manager was of the view that the FSP had
discharged its liability for the bathroom window as part of the settlement for bathroom
repairs.
Within its report, MJ confirmed on the basis of its observations that the bathroom
window was part of the building fabric.
On the basis of this report the further submission from the applicant’s representatives
says that the bathroom window does not form part of the internal bathroom and is not
therefore part of the settlement agreed to by the applicant.
I do not agree.
Whilst on a technical basis the bathroom window may be regarded as part of the
building fabric and not the internal bathroom itself, in my view, the bathroom window
Case No: 459070 Determination Page 4 of 5
is clearly part of the bathroom and on the basis of the information exchanged I am
satisfied it was contemplated to be included as part of the cash settlement agreed to
by the parties and paid by the FSP.
Installation of downlights
As stated in the recommendation, the FSP has agreed to install downlights in the
hallway but declined to install downlights to the bedrooms due to its concerns about
affecting the fire rating of the bedroom ceilings.
The FSP is prepared to install oyster lights to match the existing light fittings.
The case manager was not satisfied that the bedrooms were fitted with downlights
before the fire incident.
The further submission from the applicant’s representatives says that there is no
photographic eviden ce to support this aspect of the applicant’s claim but submits that
the FSP and its builders did agree to install the downlights to the bedrooms,
however, they went back on this and have declined to do so.
On the basis of the exchanged information, I am not satisfied that the applicant has
established that the downlights in the bedroom should be installed as part of the
FSP’s obligation under the terms and conditions of the policy.
As previously stated, the applicant carries the onus to establish loss which is covered
by the terms and conditions of the policy.
I agree with the case manager to the extent that the FSP is not required to install
downlights to the bedrooms and that the FSP’s offer to install light fittings to match
the existing fittings is fair and reasonable in the circumstances.
Provision of the electrical mud map
I am satisfied that the FSP has agreed to provide the applicant with the electrical
mud map.
However, I note that the submission from the applicant’s representative indicate s that
the electrical mud map is incorrect.
Noting that the FSP is willing to provide the electrical mud map, it goes without
saying that the electrical mud map should be accurate.
I ask the parties to work together to ensure the electrical mud map is accurate and
there is agreement regarding the map between the parties.
This would seem to me to be a reasonable, fair and logical starting point.
Change of building company
Through its representative, the applicant has indicated she wishes to change the
building company being used by the FSP.
On the basis of the exchanged material, I am not satisfied that the FSP should be
required to change the building company.
Case No: 459070 Determination Page 5 of 5
Again, it needs to be said that the parties are required to cooperate and work
together to ensure that the FSP is able to meet its obligations under the terms and
conditions of the policy.
Ownership of the insured premises
The exchanged material confirms that the property was subject to some sort of
repossession proceedings. The precise nature of which are unclear.
The applicant has indicated that she has only been able to enter the property upon
payment of a fee to the relevant financial institution.
In a recent conversation with the case manager of the Service, the applicant ’s
representative has said that the financial institution did send an email to the applicant
in 2017, requesting that she remove belongings, the applicant requested a delay but
the financial institution rejected the request for the delay.
As the dispute involves repairs to be conducted by the FSP and its representatives at
the insured premises, the issue of ownership and the right of the FSP’s
representatives to enter the premises, needs to be clarified.
Prior to any repairs proceeding or continuing, the applicant is to provide clarification
of ownership and the terms under which the FSP is able to enter the premises to
meet its obligations under the terms and conditions of the policy and in respect to this
dispute.
Costs
Subsequent to the recommendation, as stated, the applicant provided a report from a
consulting engineer, MJ and a submission from her legal representative.
The FSP is to pay the reasonable cost of the report from MJ, upon provision by the
applicant of a receipt.
In the circumstances of this claim and this dispute, the FSP is not required to pay the
applicant’s legal costs.