Home / Financial Firm (Unknown - Insurer) / Determination 459070

Determination 459070

Scope of insurer's obligations under business policy after fire damage

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner of a boarding house disputed the insurer's obligations after a 2015 fire. AFCA ordered insulation to all exposed walls and reimbursement of an engineer's report, but refused the bedroom window, bathroom window and bedroom downlights.

The insured must establish that the loss claimed is covered by the policy, and the insurer must meet its policy obligations for any covered damage proven.

Issues

Subjects and remedies

home or building damagesmall businesspay compensationprovide documentsrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 459070 Determination Page 1 of 5 Case number: 459070 11 January 2018 1 Overview 1.1 Dispute This matter involves a claim by the applicant under a Business Insurance Policy, held with the financial services provider (FSP) in respect of a boarding house. The applicant’s claim was accepted but a dispute continues as to the extent of the FSP’s obligations under the terms of the policy and in respect to the claim and the dispute. 1.2 Issues and key findings Has the FSP met its obligations under the terms and conditions of the policy? The FSP has not met its obligations under the terms and conditions of the policy and is required to fit insulation to all the exposed walls. The FSP is not required to meet the applicant’s claim for the b edroom window, the bathroom window or the installation of downlights in the bedrooms. 1.3 Determination This determination is partially in favour of the applicant. The FSP is to meet its obligations under the terms and conditions of the policy for the fitting of insulation to all the exposed walls. The FSP may deny the applicant’s claim for the bedroom window, the bathroom window and the installation of downlights in the bedrooms. The parties are to work together and cooperate in the provision to the applicant of an accurate electrical mud map. The FSP is not required to change the building company. The applicant is to clarify the details of the current ownership of the property. The FSP is required to reimburse the applicant for the cost of the report obtained from the consulting engineers (MJ), but not for legal costs. Case No: 459070 Determination Page 2 of 5 2 Reasons for determination This dispute has been the subject of a recommendation issued by the Service on 29 May 2017. It was the case manager’s recommendation that the FSP is required to replace the ceiling batts, invert two bedroom doors and provide the electrical mud map. It was the case manager’s recommendation that the FSP was not required to replace the bedroom window, the bathroom window, fit insulation to all exposed walls or install downlights in the bedrooms. The case manager also required the parties to work together co-operatively so that the remaining issues could be resolved. The FSP accepted the recommendation but the applicant has disputed the recommendation. I have carefully considered all of the material provided both before and after the recommendation in the preparation of this determination. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. 2.1 Has the FSP met its obligations under the terms and conditions of the policy? As stated, the FSP accepted t he applicant’s claim but the dispute continued in respect to the extent of damage caused by a fire at the insured premises on or about 7 June 2015 and the FSP’s obligations to the applicant under the term s and conditions of the policy in respect to the damage caused by the fire. The case manager’s recommendations required the FSP to replace the ceiling batts, invert two bedroom doors and provide the electrical mud map. The FSP has accepted the recommendation. The FSP through its representatives had been conducting work at the insured premises, however, it appears that the work ceased in or about July of 2017 and is not continuing at the present time. Subsequent to the recommendation the applicant provided a report from MJ. Insulation to walls The applicant provided a further submission in respect to this report and the FSP says that the report and further submission specifically relate to the exposed walls and insulation and repairs are unable to recommence until this issue has been sorted. The FSP says that as they have already had to take the walls down once, repairs have been halted until the issue of insulation has been sorted as the insulation is the foundation of repairs. Case No: 459070 Determination Page 3 of 5 Within the recommendation, the case manager advised that he was not satisfied, on the basis of the information he had at that time, that the applicant had established that insulation was fitted to all the exposed walls before the fire incident. I note from the report from MJ that: ‘By observation, the section of original (pre 2015) studwork between hallway leading to the front door and bedroom 4, did show evidence of previous insulation being installed. Small sections of fibrous insulation material was observe (sic) attached to both a vertical stud and the soffit of a horizontal timber within the frame. Both remnants of insulation appeared to be bonded to the timber, rather than loose deposits.’ On the basis of the report from MJ, I am satisfied that the applicant has established that insulation was fitted to all the exposed walls and the FSP is required to fit insulation into all exposed walls as part of its repairs, under the terms and conditions of the policy. Bedroom window Within the recommendation the case manager confirmed that the FSP was not required to replace the bedroom window as the applicant had not discharged her onus to establish the window was damaged by the fire event. In a submission from the applicant’s representatives they say t hat there is no evidence of the window leaking prior to the fire and given that the fire damage cannot be ruled out as being the direct cause of the window leak and given there is evidence of some damage caused by the fire, the FSP is liable to replace the bedroom window. I do not agree. The law is clear in that the applicant carries the onus to show that the loss claimed is covered by the terms and conditions of the policy. I do not accept that there is information to show that the window leaks because of the fire. I am not satisfied that the FSP is required to meet this aspect of the applic ant’s claim. Bathroom window Within the recommendation, the case manager was of the view that the FSP had discharged its liability for the bathroom window as part of the settlement for bathroom repairs. Within its report, MJ confirmed on the basis of its observations that the bathroom window was part of the building fabric. On the basis of this report the further submission from the applicant’s representatives says that the bathroom window does not form part of the internal bathroom and is not therefore part of the settlement agreed to by the applicant. I do not agree. Whilst on a technical basis the bathroom window may be regarded as part of the building fabric and not the internal bathroom itself, in my view, the bathroom window Case No: 459070 Determination Page 4 of 5 is clearly part of the bathroom and on the basis of the information exchanged I am satisfied it was contemplated to be included as part of the cash settlement agreed to by the parties and paid by the FSP. Installation of downlights As stated in the recommendation, the FSP has agreed to install downlights in the hallway but declined to install downlights to the bedrooms due to its concerns about affecting the fire rating of the bedroom ceilings. The FSP is prepared to install oyster lights to match the existing light fittings. The case manager was not satisfied that the bedrooms were fitted with downlights before the fire incident. The further submission from the applicant’s representatives says that there is no photographic eviden ce to support this aspect of the applicant’s claim but submits that the FSP and its builders did agree to install the downlights to the bedrooms, however, they went back on this and have declined to do so. On the basis of the exchanged information, I am not satisfied that the applicant has established that the downlights in the bedroom should be installed as part of the FSP’s obligation under the terms and conditions of the policy. As previously stated, the applicant carries the onus to establish loss which is covered by the terms and conditions of the policy. I agree with the case manager to the extent that the FSP is not required to install downlights to the bedrooms and that the FSP’s offer to install light fittings to match the existing fittings is fair and reasonable in the circumstances. Provision of the electrical mud map I am satisfied that the FSP has agreed to provide the applicant with the electrical mud map. However, I note that the submission from the applicant’s representative indicate s that the electrical mud map is incorrect. Noting that the FSP is willing to provide the electrical mud map, it goes without saying that the electrical mud map should be accurate. I ask the parties to work together to ensure the electrical mud map is accurate and there is agreement regarding the map between the parties. This would seem to me to be a reasonable, fair and logical starting point. Change of building company Through its representative, the applicant has indicated she wishes to change the building company being used by the FSP. On the basis of the exchanged material, I am not satisfied that the FSP should be required to change the building company. Case No: 459070 Determination Page 5 of 5 Again, it needs to be said that the parties are required to cooperate and work together to ensure that the FSP is able to meet its obligations under the terms and conditions of the policy. Ownership of the insured premises The exchanged material confirms that the property was subject to some sort of repossession proceedings. The precise nature of which are unclear. The applicant has indicated that she has only been able to enter the property upon payment of a fee to the relevant financial institution. In a recent conversation with the case manager of the Service, the applicant ’s representative has said that the financial institution did send an email to the applicant in 2017, requesting that she remove belongings, the applicant requested a delay but the financial institution rejected the request for the delay. As the dispute involves repairs to be conducted by the FSP and its representatives at the insured premises, the issue of ownership and the right of the FSP’s representatives to enter the premises, needs to be clarified. Prior to any repairs proceeding or continuing, the applicant is to provide clarification of ownership and the terms under which the FSP is able to enter the premises to meet its obligations under the terms and conditions of the policy and in respect to this dispute. Costs Subsequent to the recommendation, as stated, the applicant provided a report from a consulting engineer, MJ and a submission from her legal representative. The FSP is to pay the reasonable cost of the report from MJ, upon provision by the applicant of a receipt. In the circumstances of this claim and this dispute, the FSP is not required to pay the applicant’s legal costs.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.