Home / Financial Firm (Unknown - Insurer) / Determination 458054

Determination 458054

Mould damage claim declined under mould exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The applicants sought coverage for mould found in their home during a 2015 hot water leak claim, which the FSP declined under the mould exclusion. AFCA found the mould stemmed from inadequate drying after the 2013 storm claim, ordered rectification and temporary accommodation, $1,500 non-financial loss compensation, and reimbursement of report costs with interest.

The dominant cause of the mould was the covered 2013 storm event and inadequate remediation, so the mould exclusion did not defeat cover.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 458054 Determination Page 1 of 6 Case number: 458054 11 May 2017 1 Overview 1.1 Dispute This dispute arises from claims against an insurance policy, held with the financial services provider (FSP). In 2013 the applicants’ home was damaged during ex-Tropical Cyclone Oswald. The FSP accepted the claim and conducted repairs. The FSP accepted a further claim in 2015 following a hot water service bursting. During an inspection of the applicants’ home for the 2015 claim, mould was identified in the roof cavity. After assessing the property, the FSP declined liability for the mould and resultant damage. The applicants dispute the FSP’s decision and seek to have all mould related damages covered under a claim. 1.2 Issues and key findings Is the FSP required to conduct further works at the applicants’ home ? The FSP is required to conduct further works at the applicants ’ home, as the available material suggests the presence of mould stems from the 2013 claim. How should the claims be finalised? The claims are to be finalised as outlined in section 2.2 below. 1.3 Determination This determination is in favour of the applicants. Subject to the applicants accepting this determination, the FSP is to:  attend to rectification works at the property  provide temporary accommodation for the duration of repairs  pay $1,500 compensation for non-financial loss. Additionally, if the applicants have incurred costs for their reports (referred to in this determination), then:  the applicants are to furnish the FSP with a copy of the paid invoices for the reports  the FSP is to reimburse the cost of these reports, up to a maximum of $3,000  the FSP is to apply interest at the statutory rate from the date the applicants paid for the reports. Case No: 458054 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP required to conduct further works at the applicants’ home? 2013 claim for damage from tropical cyclone The parties accept the property sustained damage from a storm event on 27 January 2013. The FSP appointed an assessing firm (ST) to prepare a scope of works and manage the repair process. ST notes in its scope of works, preparation and repainting to water affected ceiling plaster was required to multiple rooms at the premises, including the master bedroom, kitchen, bar, lounge and rumpus room. ST confirmed the cause of water entry was a storm created opening to the roof capping. ST provided a variation to the scope on 26 March 2013, after the FSP authorised builder advised the need for the removal and replacement of insulation above the master bedroom and an ensuite. The available material suggests the 2013 claim repairs were completed on or around 30 April 2013, with the exception of a pergola which was completed at a later date. 2015 claim for damage from burst hot water service The parties accept the property sustained damage from a leak event on 25 December 2015. The FSP appointed another assessing firm (CL) to inspect the property and provide claim recommendations. CL considered the loss was consistent with the event and prepared a scope of works which included:  damage to the floors  lower wall areas of a laundry, home office, master and spare bedrooms  general contents. CL records the applicants raised concerns with the presence of mould at that time. CL ’s scope was provided to two of the FSP’s builders for consideration. The FSP’s builder AB was awarded the contract and authority to proceed with repairs. The FSP’s claim notations record a conversation on 29 December 2015 , stating the applicants’ concern with mould and effects on their family. A restoration firm attended on or around 31 December 2015, to undertake drying and antimicrobial treatments. Drying equipment was removed on or around 4 January 2016. During the course of drying and repairs, the applicants raised concern about the presence of mould in their home. The FSP appointed a mould expert to attend the property and provide a report. The expert identified mould at the premises that required remediation. On identifying mould at the premises, the FSP appointed a sanitation expert (EO) to attend the property and report on its findings , which it did on 28 January 2016. EO Case No: 458054 Determination Page 3 of 6 stated it identified mould in lower sections of walls at the right hand side of the property, as well as in upper wall cavities and the ceiling of the main bedroom. EO recommended all plasterboard wall linings in rooms on the right had side of the house be stripped to 1200mm. Further, all walls of the main bedroom be stripped to full height, including ceiling and any insulation. EO directed exposed wall cavities on the left hand side of the building to be cleaned and cleared as well. The FSP authorised AB to proceed with mould rectification works and arranged temporary accommodation from 22 March 2016 until approximately 1 June 2016. Expert reports The FSP’s mould remediatio n firm WR was engaged to undertake remediation works following the 2015 leak event. WR confirmed mould was identified in the ceiling cavity, noting this mould was not caused by the leak. WR considered mould spores in the lounge room of the property could have occurred from cross contamination. WR suggests the applicants advised insulation was not removed during the 2013 claim and considered this could have been a source of moisture for mould to grow. In an email of 12 May 2016, WR confirmed mould testing demonstrated proliferation of spores into a containment area housing the applicants’ contents. WR noted that while the results were elevated, they were lower than outside samples. The FSP’s assessor (SB) attended the site on 27 April 2016, in response to a variation request by AB. SB noted the dwelling’s wa lls lacked insulation wall wrap and considered trees along the side of the home hindered natural sunlight from entering the property. SB stated in his view, these issues allowed for moisture to be retained in the wall cavities and considered bricks felt damp from the inside. SB inspected the roof at that time, noting silicone was applied to flashings and screws and a capped chimney also had excessive silicone applied around the flashing. SB considered there was no evidence of storm damage to the roof when viewed above and when viewed from below, there was evidence of water staining to timbers adjacent to the chimney. The applicants engaged a mould expert (AO) to provide a report identifying areas of mould growth and airborne mould counts. AO states in its report 6 January 2017, it observed mould on timber furniture in the property’s lounge room, on window glass and frames and a leather chair located in an office. AO noted mould testing provi ded results consistent with WR’s findings from May 2016. However, samples from the ceiling cavity returned high readings of mycotoxin producing mould. AO reviewed WR’s February 2016 spore results and considered all water damaged and mould affected plasterboard should have been cut out and removed, with drying works conducted prior to replacement of materials. Case No: 458054 Determination Page 4 of 6 AO recommended treatment and remediation once building issues were resolved and repaired. AO also recommended the purchase of a dehumidifier and air p urifier to keep internal building moisture levels down. The applicants also engaged a building consultant (BS) to provide a report detailing the condition of the property. BS states it inspected the applicants’ roof, and considered it well constructed with some surface rust, but with no holes. BS noted flashing around the chimney was in good condition, however, noted the brickwork had been sealed. BS noted while this was not recent, there was no reference to the works being undertaken as part of the 2013 c laim. BS conducted moisture testing to the chimney bricks, noting if bricks had been wet in the 24 hours prior, non-sun exposed areas would be expected to register a moisture reading. BS noted it was unable to find such a reading. BS inspected the ceiling cavity after conducting a rain simulation with a garden hose. It found there was no leaks detected internally, however, noted that moisture would discharge via weepholes and a damp proof course. BS further commented if this had deteriorated, evidence would not be visible until some hours later, although it considered such a leak would result in localised moisture only. BS commented that after reviewing the 2013 scope of works, there was no provision for the removal of wet plaster and insulation. BS says if internal building materials were left untreated for more than two days after becoming wet, mould would likely have developed. For this reason, BS considers the presence of mould to be attributed to the 2013 works. Mould issues most likely attributable to 2013 claim event Having carefully reviewed all available material, it is unclear if sanitation works were completed as part of the 2013 claim. However, the information establishes a number of ceilings sustained water damage during the storm event. BS states if building fabric was left wet for more than two days, mould would likely begin to develop. While the master bedroom scope allowed for removal of insulation, it appears the ceiling plaster remained in place. I note, however, ST’s report of 26 March 2013 allowed a variation for ceiling plaster bleeding and removal of wet insulation batts from a bedroom [3] and ensuite. The above suggests moisture was present in the ceiling cavity some two months after the storm event to a greater extent than considered, or allowed for, by ST. WR states in its report dated 13 April 2014 [sic] if moist insulation was not removed and replaced, this could have been a source of mould growth. EO identified the presence of mould in the appli cants’ ceiling in January 2016 . While SB’s report states additional works proposed by AB were unrelated to the 2015 leak claim, it does not comment on any relationship (or lack thereof) between the development of mould and the 2013 claim. I note the FSP ra ised concerns with the condition of the applicants’ roof through SB’s report. While SB draws attention to excessive silicone use, there is insufficient evidence establishing the condition of the roof at the time of the 2013 event. I further Case No: 458054 Determination Page 5 of 6 note BS suggests the condition of the roof (as it is presently) did not allow for moisture ingress. The FSP draws attention to the policy term which states loss or damage caused or arising in connection with mould is excluded from cover. However, having considered the available material as a whole, I am not satisfied mould was the proximate cause of the damage, rather, it was the result of water ingress. The material suggests the proximate or dominant cause of the damage was the 2013 storm event and the failure of trades to adequately rectify moisture issues at the property at that time. That is, the proliferation of mould throughout the ceiling, on the balance of probabilities, would not have occurred had the property been adequately remediated following the storm event. Given that the policy clearly provides coverage for loss caused by a storm event, the exclusion for mould does not apply. 2.2 How should the claims be finalised? FSP to attend to mould rectification works In order to bring finality to the claims, the FSP is, at its cost, to conduct mould testing to all areas of the applicants’ home. This testing is to include the ceiling cavity at the property. After receiving results, the FSP is to attend to mould sanitation works . Following this, the FSP is to prepare a scope of works for reinstatement, taking into account the mould and sanitation findings. At completion of repairs, further mould sampling is to be undertaken by the FSP. The FSP is to provide appropriate temporary accommodation for the duration of repairs. For clarity, this accommodation is being provided to allow for rectification of incomplete repairs, rather than in response to an insured event. As such, should the rectifications take longer than is provided for under the policy terms, the FSP will not be entitled to rely on policy limits regarding temporary accommodation. The FSP is also to attend to contents affected either directly or by cross - contamination. Should contents items be deemed non-restorable and the FSP elects to cash settle these items, interest is to be applied, in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 25 July 2016, being the date of the FSP’s final decision letter. FSP to reimburse costs for reports The applicant provided a number of reports, which have assisted this Service in reaching this decision. However, it is unclear whether the applicants incurred a cost in obtaining these reports. The Terms of Reference (TOR) to the Service provide: 9.4 Applicant ’s costs in pursuing the matter FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute. Unless Case No: 458054 Determination Page 6 of 6 exceptional circumstances apply, FOS will not require the Financial Services Provider to contribut e more than $3,000 to these costs. Given the applicants’ reports have assisted this decision, it is fair in the circumstances the FSP reimburse any costs incurred by the applicants’ in obtaining these reports, subject to provision of receipts establishing costs were incurred. The FSP is to apply interest at the statutory rate from the date the reports were paid for, until payment is made. For clarity, the FSP will not be required to reimburse more than $3,000 in this instance. FSP to pay compensation for non-financial loss The TOR also provides: 9.3 Other compensation … b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the applicant’s expectation of enjoyment or peace of mind has occurred; … Having considered the history of the claims, I am satisfied the applicants have endured an unusual degree of inconvenience, loss of enjoyment and interference with their peace of mind. Accordingly, I consider it fair in the circumstances the FSP should pay $1,500 compensation to the applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.