Text of the determination
Determination
Case No: 455233 Determination Page 1 of 13
Case number: 455233 30 August 2017
1 Overview
1.1 Dispute
The applicant claims the insured property sustained significant storm damage. She
also claims the FSP failed to immediately make proper repairs and as a result the
entire property and contents have been affected by mould.
The FSP says not all the claimed damage was caused by storm. The FSP says some
of the damage claimed was pre-existing and was due to age and lack of
maintenance. It says the likely cause of damage to the ceiling and walls was the
faulty drains, downpipes and flashings on the roof; the cracking damage was
attributable to natural changes occurring to the insured property‟s foundations; the
mould in the bathroom was caused by poor ventilation and water leaking through the
grouting into the walls; and the applicant failed to take reasonable care to protect the
insured property against loss as she failed to lodge the claim in a timely manner and
failed to prevent further damage to the property.
The FSP assessed the claim and submits its builder‟s scope of works and quotation
to reinstate water damage in certain ceilings on the property reflect the work required
to rectify the storm damage. It offered to cash settle the claim.
The applicant challenges the FSP‟s assessment, and provided her own quotations
and mould remediation assessment for payment under the claim. The applicant also
claims she is entitled to be compensated for mould damage to her contents,
temporary accommodation expenses, and loss of rent from her boarder, legal costs
and compensation for the FSP‟s claims handling.
1.2 Issues and key findings
Is the FSP required to increase its cash settlement offer for the building?
Given the FSP‟s builder (JL) is unwilling to carry out the repairs, it would be unfair for
the FSP to cash settle its liability based on JL‟s quotation, as its quotation is not
actionable. The FSP is required to increase its cash settlement offer to $27,159,
based on the applicant‟s quotation.
On the information provided, as the applicant has not established on the balance of
probabilities an insured event caused the remainder of the damage, the FSP is
entitled to maintain its denial of the remainder of the claim.
Case No: 455233 Determination Page 2 of 13
Is the applicant entitled to any other amounts?
The applicant is not entitled to further temporary accommodation expenses, loss of
rent or compensation.
The applicant has not provided sufficient information to establish her entitlement for
the amounts claimed for household contents damaged by water from a storm event.
The applicant has not established the FSP is liable to pay for any damage to
household contents caused by mould.
While the panel considers the circumstances of the claim and dispute are not
exceptional, the panel accepts the factual issues involved are complex. The panel is
satisfied it is fair in all the circumstances the FSP pay to the applicant $3,000 for
legal costs.
1.3 Determination
This determination is substantially in favour of the FSP.
Should the applicant accept this determination, then within seven days of acceptance
of the determination, the FSP is to pay to the applicant the following sums:
$27,159 for storm damage to the building
$3,000 contribution towards legal costs.
Should the applicant wish to pursue a claim for water damage to contents caused by
storm, the applicant is required to provide further information to the FSP to prove
household contents were damaged by water in a storm event within seven days of
acceptance of the determination. The FSP is to assess and manage the claim in
accordance with policy terms and conditions.
Otherwise, the FSP is not required to make any further payments in relation to the
claim or the dispute.
Case No: 455233 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP required to increase its cash settlement offer for the
building?
The applicant must establish an insured event caused the loss
The applicant must establish on the balance of probabilities that she has suffered a
loss caused by an event to which the policy responds. In the circumstances of this
dispute, she must establish storm caused the claimed loss.
The FSP must increase the settlement offer for the accepted storm damage
The FSP does not dispute there was some storm damage to some ceilings.
It offered to cash settle its liability for the storm damage (in lieu of repairs) based on
its builder‟s (JL) scope of works and quotation. It offered $16,113.96 based on JL‟s
quotation. As a result of a desktop estimate, the cost of repairs necessitated by storm
damage was updated to $17,193.12. This cash settlement offer was made but as it
was rejected by the applicant, the FSP withdrew this updated offer.
The applicant challenged the amount offered by the FSP. She submitted an itemised
scope of works and quotation from her builder (NP) for payment. The amount quoted
for storm damage was $27,159.
The fact the applicant‟s builder has quoted a higher amount for the repairs does not
of itself establish JL‟s quotation was inadequate. It is not uncommon for there to be
variation between quotations provided by different builders for the same work.
However, the quotes are not for the same work. JL‟s scope of works for insurable
repairs refers to water damage to ceilings caused in May 2013 and work in the
master bedroom, front lounge, front study and hallway.
NP refers to water stains to plaster ceilings and walls consistent with different storm
events. The FSP‟s file notes show the applicant‟s representative refers also to water
damage caused by a storm event in December 2011. NP‟s quote therefore refers to
storm damage to additional rooms.
The information shows JL is unwilling to carry out the repair works. JL advised the
FSP on 10 July 2013 it cannot warrant the repair work because of the age of the
insured property and concern about repairs causing further cracking to the plaster. In
the circumstances, JL suggested to the FSP to cash settle the repairs.
Given JL is unwilling to carry out the repairs, it would be unfair for the FSP to cash
settle its liability based on JL‟s quotation, as this quotation is not actionable. Further,
JL appears to have quoted only for water damage caused in the storm on 31 May
2013.
On the material provided, the panel considers it is fair in all the circumstances the
FSP increase its cash settlement offer to $27,159, based on NP‟s quotation for water
damage resulting from storm events.
Case No: 455233 Determination Page 4 of 13
The applicant also claims $17,743 for work to be done in the bathroom. The scope of
works is described un der the heading “shower leak”.
For reasons set out hereunder, the material provided does not establish this claimed
damage was caused by a storm event.
The parties dispute the proximate cause of the rest of the damage
To decide whether the FSP is liable for the remainder of the damage, it is necessary
to determine the proximate cause of this damage. The proximate cause is the
effective or dominant or operative cause of the damage.
The applicant claims storms in December 2011 and/or May 2013 caused the
damage. The FSP disagrees.
The applicant has not established the rest of the damage was caused by storm
Both parties provided information in support of their positions.
On the information provided, the panel is not satisfied the applicant has established,
on the balance of probabilities that the remainder of the damage was caused by a
storm event. The information includes:
When the roofer inspected the roof in June 2013, he found inadequate repairs to
the tower above the study. The roofer said the internal downpipe of the tower was
disconnected. He said water entering the tower went directly onto the plaster
ceiling of the front room. This is supported by the infrared thermal report which
found high levels of moisture throughout the base and walls of the tower. JL also
found water had leaked through the tower into the front room. The panel is
satisfied the cause of the water leak into the front room was because of the
disconnected downpipe. The information provided does not show the pipe was
disconnected because of a storm.
When the builder JL inspected the damage later in June 2013, he noted similar
issues. He noted water ingress, and he identified flashing which needed to be
repaired in the front lounge room and master bedroom and also referred to the
inadequate repairs to the feature tower. The information provided does not these
issues were caused because of a storm.
The infrared thermal report undertaken in June 2013 also indicates, while there is
high level of moisture in various rooms in the insured property, the proximate
cause of water ingress is not storm but drainage problems, inadequate flashing
on the roof, inadequate flashing over the lounge bay window, lack of ventilation in
the bathroom, leaking in the wall and showerhead, and a breached water pipe
within the wall in the vicinity of the bathroom. The roofer also said the dampness
in the bathroom was not due to issues with the roof.
If there was a broken pipe near the shower area, and this caused further
damage, the leak report probably confirms there was no broken pipe (water line
was pressure tester to 84 psi and passed). The applicant‟s experts have not
conducted another pressure test report to challenge this report. Even if it was
established there is a broken pipe in the shower area, there is no evidence to link
the damage to a storm event.
Case No: 455233 Determination Page 5 of 13
In relation to the damage to the shower area, the leak expert found water is
drawn into the wall because the grouting in the shower recess wall is missing and
breaking down. The restorer also found there was a leak from the defective grout.
The information provided does not support the issue with the grout was caused
by a storm event.
While the restorer notes the plaster damage in the ceiling and therefore assume
water penetrated from above, he says further investigation is required. This
further investigation has been undertaken by the roofer as described above.
The engineer inspected the property in September 2013. Relevantly, the roof
space was dry. He only noted mould in the bathroom. The engineer said the
cracking damage is due to seasonal changes in moisture content of the
foundation material and not due to a storm event.
As for the ongoing moisture issues with the insured property, the FSP‟s engineer
submits this is not due to the storm event. The engineer says moisture from the
storm should have dissipated. As for moisture readings recorded in the brickwork,
he said this dampness is due to maintenance issues with the insured property.
These issues are not due to a storm event. The applicant has not provided an
expert opinion to challenge engineer‟s findings.
The applicant‟s own builder does not ascribe the mould damage to the st orm
event. Rather, he says moisture has built up from a leak in the bathroom and this,
together with poor ventilation, has caused mould in the bathroom and toilet.
The applicant‟s mycologist‟s view is not dissimilar about the cause of the ongoing
issues. The mycologist refers to a leaking roof and water leaks in the bathroom
allowing the mould contamination to spread. He thought there was strong
evidence of a broken pipe above the shower head in the bathroom because there
was still moisture even though the bathroom was not in use. The mycologist
described the mould/fungal type identified in the insured property as a „water
loving‟ type, and says this indicates it is thriving because there is a constant free
flow of water. The information provided from the mycologist does not support this
ongoing moisture issue is due to a storm event.
Whilst there is no dispute mould has now spread throughout the property, the panel
is not satisfied the applicant has established this was caused by a storm event.
Rather, the information provided shows the high moisture conditions (ongoing free
flow of water, disconnected pipe in the tower allowing water to leak, leak from the
defective grout) made for favourable conditions for the mould to spread.
On the information provided, the panel is not persuaded, on the balance of
probabilities that the applicant has established the proximate cause of the remainder
of the damage was due to a storm event.
The panel is also not persuaded the mould damage was caused by the FSP‟s failure
to make immediate proper repairs as contended by the applicant.
JL states mould was already present when he first inspected the property in June
2013. It appears the applicant took no substantive steps to repair the property since
the storm damage in December 2011.
The information provided also shows when a claim was eventually made in June
2013, the applicant already had material from a roofer and from the infrared moisture
Case No: 455233 Determination Page 6 of 13
detection report which showed maintenance issues in the property needed to be
addressed.
Once the claim was made, the panel is satisfied the material provided establishes the
FSP acted in a reasonable and timely manner and appointed numerous experts to
assess the amount of and cause of the damage.
The FSP is entitled to decline the remainder of the damage as it is excluded
As the applicant has not established an insured event caused the remainder of the
damage, the FSP is entitled to maintain its decline of the claim.
Furthermore, the panel is satisfied the remainder of the damage is caused by issues
which are excluded from cover, namely:
The leak from the tower was due to a disconnected internal pipe. The policy
requires the applicant to ensure the property is watertight and well maintained.
The applicant has not provided information to show she took any action to rectify
this issue or any other maintenance issues referred to in reports she obtained
before she made the claim.
The applicant says the insured property was damaged in a storm in December
2011. When the claim was made in 2013, her representative told the FSP water
was leaking into the property since this time. The available information shows the
applicant did not lodge a claim with the FSP until June 2013, and took no action
during the intervening period to mitigate the leak/damage. Given her knowledge
of the leak/damage and her inaction for 18 months to address an issue known to
her, the panel is not satisfied the applicant took all reasonable care to protect the
insured property against further loss or damage.
In all the circumstances, on the information provided, the panel is satisfied the extent
of the FSP‟s liability for the claim for storm damage is limited to payment to the
applicant in the sum of $27,159.
2.2 Is the applicant entitled to any other amounts?
The applicant is not entitled to further temporary accommodation expenses
The applicant seeks temporary accommodation expenses whilst she was not living in
the insured property. She claims $147,840.
Based on the available information, the panel is not satisfied the applicant is entitled
to the amount claimed or for any further amount for temporary accommodation.
The policy provides for temporary accommodation if an insured event causes loss or
damage, the FSP agrees the property cannot be lived in, and an insured needs to
move out so the property can be repaired.
The panel accepts an insured event caused loss and damage. However, the panel
does not accept the extent of the accepted damage caused by storm establishes that
the property cannot be lived in. The accepted damage is mainly water staining to
ceilings in various rooms. The panel is of the view the applicant is not entitled to
temporary accommodation expenses.
Case No: 455233 Determination Page 7 of 13
In any event, the FSP has already paid over $60,000 in temporary accommodation
expenses while the claim was investigated.
The FSP estimated it would take 3 to 4 weeks to complete the repairs and was
prepared to pay a further $6,300 for temporary accommodation.
In correspondence with FOS, the FSP made an ex gratia offer in March 2017 which
included $6,300 for temporary accommodation expenses. The offer remained open
for 14 days. The offer was not accepted and is no longer available for acceptance.
The applicant has not provided sufficient information about the contents loss
The applicant claims $90,000 for household contents damaged by mould and water
damage from the storm events.
For reasons set out above, the FSP is not liable to pay for any damage to household
contents caused by mould.
However, if household contents were caused by water ingress in a storm event, the
FSP‟s policy provides cover for contents when certain things ha ppen. The applicant
needs to establish the household contents were water damaged by storm. Pursuant
to the policy terms, the applicant is also obliged to provide proof of loss and
ownership.
The FSP says the applicant has not provided any proof of loss and ownership for this
claim.
It appears the applicant has not claimed for this loss until later in the dispute process,
and has not provided information to support her claim. Given this, should the
applicant wish to pursue a claim for water damage to conte nts caused by storm, the
applicant is required to provide further information to the FSP to prove household
contents were damaged by water in a storm event.
In the absence of any further information, the FSP is not required to pay the applicant
for this claim.
The applicant is not entitled to loss of rent
The applicant claims $43,680 being loss of rent from a boarder. She provided a
declaration from her former boarder stating he was paying $250 per week.
The policy provides for loss of rent for landlords if an insured event damaged the
insured property and the tenant cannot live in it and the tenant needs to move out so
the property can be repaired.
As already discussed herein, the panel accepts an insured event has occurred.
However the panel considers the extent of the accepted damage caused by storm
does not establish the insured property cannot be lived in.
Furthermore, the policy excludes cover for loss of rent if the insured lives in the
insured property. The applicant has already claimed for temporary accommodation
because she claims she was living in the insured property.
On the information provided, the panel is not satisfied the applicant is entitled to the
amount claimed for loss of rent.
Case No: 455233 Determination Page 8 of 13
The FSP is to pay to the applicant $3,000 legal costs
The applicant claims $26,000 for legal costs in respect of the claim and dispute. The
applicant has provided no material establishing the extent of her legal costs.
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require an FSP to
contribute to legal costs incurred by an applicant in the course of their dispute.
However, the FOS process is free and is designed to be accessible to an applicant
without legal representation. Accordingly, FOS will not generally require an FSP to
contribute to an appl icant‟s legal costs, unless the dispute is particularly complex or
raises specific legal issues.
Further, a financial services provider will generally not be required to contribute more
than $3,000 to an applicant‟s legal costs unless exceptional circumsta nces apply.
The FSP‟s claim notes show in June 2013 that the applicant indicated she had
engaged a lawyer. The material shows she engaged a lawyer in August 2014 to
advise on the FSP‟s offer.
From the inception of the claim, the material establishes the applicant required
assistance with the claim. She engaged a representative initially. She then engaged
a lawyer. The panel considers the factual issues involved are complex. However, the
panel considers the circumstances are not exceptional.
In all the circumstances, the panel is satisfied it is fair the FSP pay to the applicant
$3,000 for legal costs.
The applicant is not entitled to compensation
The applicant says she is dissatisfied with the manner in which the claim was
handled by the FSP and the poor standard of care shown by the FSP in failing to
ensure her home would not be affected by mould.
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant‟s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
The panel acknowledges the circumstances of the loss and damage and the inability
to live in her own home would interfere with the applicant‟s peace of mind.
However, the panel is not satisfied the information provided establishes the FSP‟s
conduct caused the physical inconvenience or the interference with the applicant‟s
expectation of enjoyment or peace of mind.
This is because the material provided shows the FSP investigated the claim
thoroughly and engaged many experts to assess and establish the cause of damage.
While investigating the claim, the FSP paid $60,000 to the applicant for temporary
accommodation expenses. The FSP also paid for make safe repairs.
In all the circumstances, the panel is not satisfied the applicant is entitled to
compensation.
Case No: 455233 Determination Page 9 of 13
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate, in accordance with the
Operational Guidelines to the FOS Terms of Reference, to refer this matter directly to
a panel due to the nature of the dispute. Accordingly, this dispute has not been the
subject of a FOS recommendation and has proceeded directly to determination.
The panel consists of an ombudsman and two panel members with extensive
experience in insurance industry matters and consumer complaints.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues co nsidered
directly relevant to the outcome only.
The applicant is represented. Any reference to the applicant in this determination
includes a reference to the applicant‟s representative.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance o f probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the parties‟ submissions and in the
FSP‟s Notice of Response dated 3 January 2017. T hese documents have been
exchanged between the parties.
3.3 Key reports
Record Key points
Builder (JL)
Report
24 - 06 - 2013
Attended and photographed property 24 June 2013.
Confirmed a storm event - referred to by applicant as storm
water damage to ceiling and carpet on 31 May 2013 .
Make safe completed.
Mould present, which applicant is concerned about .
Noted damage to master bedroom, front bedroom 3, and bay
window in the front lounge.
Water has leaked through the external flashing, into the front
Case No: 455233 Determination Page 10 of 13
lounge room o ver the bay window (flashing needs to be
repaired by applicant).
Water has leaked badly through the feature tower, into the
front bedroom 3 (recently badly repaired by applicant - make
safe to stop leaking carried out by JL).
Water has leaked through the f lashing around the small
external feature gable, into the rear master bedroom. JL says
this is a maintenance issue and applicant will need to repair
prior to internal repairs.
Applicant s aid had a full roof report done.
JL noted other ceiling damage not ca used by the 31 - 05 - 2013
storm event.
Scope of works included work to master bedroom, front
bedroom 3 and front lounge $2, 710. 07 .
Builder (JL)
Report
11 - 07 - 2013
Due to age of plaster, no warranty can be given for repair
work .
Recommend cash settlement $6,268.
Leak expert (AL)
Report
17 - 07 - 2013
Inspected 15 July 2013.
Spray t est to shower wall tiles failed.
Water damage to the walls around the shower recess.
Water is running behind the wall tiles when the shower is in
use. This caused mouldy silicone se alant in the bath base
and walls tiles.
Water is drawn into the wall because the grouting in the
shower recess wall is missing and breaking down.
Described work to apply a suitable membrane, make
waterproof, re - tile and reseal.
Also poor ventilation when shower is in use wit h resulting
condensation .
Restorer (MP)
Report
18 - 7 - 2013
Asked to evalua te water damage to the property.
Moisture around the tower can be attributed to storm/rain
damage.
Moisture in the walls at kitchen, bathroom and hallway is due
to a combination of falling damp and leak from defective
grouting in the bathroom.
As there is plaster damage in the ceiling, assume wat er
penetrated from above but further investigation as to the
water ingress is required.
Moisture above damp proof course. Likely this is falling damp
from excess rainwater which may be because of excessive
rainfall.
Mycologist (ML)
Report
3 - 08 - 2013
Samples taken from property on 26 - 07 - 2013 .
Detected elevated and high levels of airborne mould in some
samples .
Elevated in main bedroom and study and high in bedroom 2 .
Premises and contents require remediation.
Case No: 455233 Determination Page 11 of 13
Infrared thermal
reports (AP)
10 - 06 - 2013
Inspected 1 June 2013 with roofer .
High level of moisture detected in bedroom 3‟s wall, ceiling
and pelmet. Likely cause the drain for the roof top look out.
High level of moisture at base of pillars entering the sitting
area in the lounge bay window area and ceiling. Possible
ingress via f lashing on the roof when encountering large
volumes of rain.
Lead flas hing over the lounge bay window may be a little
short, allowing moisture to ingress.
High level of moisture throughout the base and walls of the
tower lookout. The drain of the roof has failed or
disconnected and releasing water into the room below.
No moisture det ected over master bedroom ceiling. There is
evidence of previous moisture damage.
Moderate moisture readings in bathroom ceilings and walls;
likely cause lack of ventilation. A lso identified likely issues
with leaking in the wall and showerhead.
High moisture readings in hallway dividing kitchen and
bathroom indicating a possible breached water pipe within the
wall.
Moderate moisture readings in the toilet walls. Indicated
pos sible ingress via roof and residual moisture from
bathroom.
Roof expert (RS)
20 - 06 - 2013
Slate around the tower is in sound condition.
The tower has a new metal tray roofing and spout fitted.
The internal wall cladding and lead parapet capping of the
tower was not repaired, and needs work.
The internal downpipe has been disconnected and water that
enters the tower well goes directly onto the plaster ceiling of
the front room.
Roof expert (RS)
20 - 06 - 2013
The dampness in the bathroom is not due to the roof.
Provided costs to repair tower roof .
Engineer (HW)
Report
3 - 10 - 2013
Inspections on 11 - 9 - 2013 and 17 - 9 - 2013 to det ermine extent
of str uctural damage related to storm.
Noted recent repairs carried out to tower to waterproof it .
Noted damage in various rooms in the house including water
damage, cracking damage, high moisture readings.
High moisture readings noted in brickwork es pecially around
the bay windows.
Roof space wa s dry and no damp timbers found.
Efflorescent noted to undersi de of large areas of slat e roof.
Metal valleys of slate roof showed varying degrees of rusting
and corrosion particularly over main bedroom .
Only room where moul d was noted was in the bat hroom.
Cracking in the house is due to seasonal changes in moisture
content of the foundation material, and not related to the
rainstorm on around December 2011 and problems with the
tower.
Case No: 455233 Determination Page 12 of 13
Water stain to the ceilings to the rooms could have result ed
from the heavy rainstorm around December 2011, however
any water from this storm would have be held in the brick
walls and would have dissipated by now due to the long time
since the storm.
Very high moisture reading were recorded in large area of the
brickwork, indicating an ongoing problem. This dampness is
due to maintenance issue with a house of this age and type
of construction.
Metal valleys to the slate roof show varying degree of rusting
and corrosion.
Water is penetrating int o the slate roof. There is efflorescence
on the underside of the slate and minor delamination. This
damage is typical of slate roof of this age, and regular
maintenance is required of a slate roof.
Recommended roof and damp proof course be checked
which problems he described as normal maintenance issues
with a house of th is age and type of construction.
Scope of works to reinstate water damaged area of the
building due to rain storm on 25 December 2011 including
ceil ings in front study area, main bedroom area, passage way
and front lounge room and repainting .
Mycologist
(MY)
Report
13 - 12 - 2013
Inspection on 17 - 09 - 2013 .
Property had previous moisture damage from multiple storm
events .
Strong evidence of a broken pipe a bove the shower head in
the bathroom because of fresh moisture even though the
bathroom was not in use for a period of time.
Very high moisture reading on the back of the shower head of
the kitchen wall and adjacent hallway shows moisture travels
through the walls.
Presence of airborne and surface mould.
Fungal type identified on the surface is a „water loving‟ type.
This indicates there is a constant free flow of water which
keeps the fungi growing.
Builder (NP)
Report, scope of works
and quotation
16 - 11 - 2014
Water stains to the plaster ceiling and walls throughout the
property is consistent with different storm events.
Water leak in the shower head in the main bathroom has
caused damaged to the walls, bathroom, and hallway and
adjourning kitchen. Mo isture has built up from the leak, and a
lack of ventilation in the area has caused a high amount of
mould to the ceiling and walls of the bathroom and toilet. The
leak has been repaired.
Provided the scope of works to repair storm damage to
master bedroom , front bed/study, front lounge, front hallway,
main hallway and rear hallway, bedroom 2 and dinin g room in
the amount of $27,159.
Also provided scope of works to repair the shower leak .
Case No: 455233 Determination Page 13 of 13
Mycologist
(MY )
Report
6 - 02 - 2015
Furt her inspection 30 November 2014.
Presence of airborne and surface mould .
The underlying caus e of the wat er ingress, leaky roof and
water leak in the bathroom has not been fix ed.
Favourable environmental conditions allowed the mould
contamination to further spread.
3.4 Other relevant material considered and relied on
Parties‟ submissions, emails, reports, photographs and all attachments to
submissions.
Correspondence between the parties.