Summary

The applicant claimed storm and mould damage to her home along with temporary accommodation, loss of rent, contents and legal costs. The panel ordered the FSP to pay $27,159 for storm damage to the building and $3,000 towards legal costs, and declined the remaining claims.

The applicant had to prove storm caused each loss, and only the storm damage in the quoted scope of works was accepted, while moisture, mould and maintenance issues were excluded or unproven.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 455233 Determination Page 1 of 13 Case number: 455233 30 August 2017 1 Overview 1.1 Dispute The applicant claims the insured property sustained significant storm damage. She also claims the FSP failed to immediately make proper repairs and as a result the entire property and contents have been affected by mould. The FSP says not all the claimed damage was caused by storm. The FSP says some of the damage claimed was pre-existing and was due to age and lack of maintenance. It says the likely cause of damage to the ceiling and walls was the faulty drains, downpipes and flashings on the roof; the cracking damage was attributable to natural changes occurring to the insured property‟s foundations; the mould in the bathroom was caused by poor ventilation and water leaking through the grouting into the walls; and the applicant failed to take reasonable care to protect the insured property against loss as she failed to lodge the claim in a timely manner and failed to prevent further damage to the property. The FSP assessed the claim and submits its builder‟s scope of works and quotation to reinstate water damage in certain ceilings on the property reflect the work required to rectify the storm damage. It offered to cash settle the claim. The applicant challenges the FSP‟s assessment, and provided her own quotations and mould remediation assessment for payment under the claim. The applicant also claims she is entitled to be compensated for mould damage to her contents, temporary accommodation expenses, and loss of rent from her boarder, legal costs and compensation for the FSP‟s claims handling. 1.2 Issues and key findings Is the FSP required to increase its cash settlement offer for the building? Given the FSP‟s builder (JL) is unwilling to carry out the repairs, it would be unfair for the FSP to cash settle its liability based on JL‟s quotation, as its quotation is not actionable. The FSP is required to increase its cash settlement offer to $27,159, based on the applicant‟s quotation. On the information provided, as the applicant has not established on the balance of probabilities an insured event caused the remainder of the damage, the FSP is entitled to maintain its denial of the remainder of the claim. Case No: 455233 Determination Page 2 of 13 Is the applicant entitled to any other amounts? The applicant is not entitled to further temporary accommodation expenses, loss of rent or compensation. The applicant has not provided sufficient information to establish her entitlement for the amounts claimed for household contents damaged by water from a storm event. The applicant has not established the FSP is liable to pay for any damage to household contents caused by mould. While the panel considers the circumstances of the claim and dispute are not exceptional, the panel accepts the factual issues involved are complex. The panel is satisfied it is fair in all the circumstances the FSP pay to the applicant $3,000 for legal costs. 1.3 Determination This determination is substantially in favour of the FSP. Should the applicant accept this determination, then within seven days of acceptance of the determination, the FSP is to pay to the applicant the following sums:  $27,159 for storm damage to the building  $3,000 contribution towards legal costs. Should the applicant wish to pursue a claim for water damage to contents caused by storm, the applicant is required to provide further information to the FSP to prove household contents were damaged by water in a storm event within seven days of acceptance of the determination. The FSP is to assess and manage the claim in accordance with policy terms and conditions. Otherwise, the FSP is not required to make any further payments in relation to the claim or the dispute. Case No: 455233 Determination Page 3 of 13 2 Reasons for determination 2.1 Is the FSP required to increase its cash settlement offer for the building? The applicant must establish an insured event caused the loss The applicant must establish on the balance of probabilities that she has suffered a loss caused by an event to which the policy responds. In the circumstances of this dispute, she must establish storm caused the claimed loss. The FSP must increase the settlement offer for the accepted storm damage The FSP does not dispute there was some storm damage to some ceilings. It offered to cash settle its liability for the storm damage (in lieu of repairs) based on its builder‟s (JL) scope of works and quotation. It offered $16,113.96 based on JL‟s quotation. As a result of a desktop estimate, the cost of repairs necessitated by storm damage was updated to $17,193.12. This cash settlement offer was made but as it was rejected by the applicant, the FSP withdrew this updated offer. The applicant challenged the amount offered by the FSP. She submitted an itemised scope of works and quotation from her builder (NP) for payment. The amount quoted for storm damage was $27,159. The fact the applicant‟s builder has quoted a higher amount for the repairs does not of itself establish JL‟s quotation was inadequate. It is not uncommon for there to be variation between quotations provided by different builders for the same work. However, the quotes are not for the same work. JL‟s scope of works for insurable repairs refers to water damage to ceilings caused in May 2013 and work in the master bedroom, front lounge, front study and hallway. NP refers to water stains to plaster ceilings and walls consistent with different storm events. The FSP‟s file notes show the applicant‟s representative refers also to water damage caused by a storm event in December 2011. NP‟s quote therefore refers to storm damage to additional rooms. The information shows JL is unwilling to carry out the repair works. JL advised the FSP on 10 July 2013 it cannot warrant the repair work because of the age of the insured property and concern about repairs causing further cracking to the plaster. In the circumstances, JL suggested to the FSP to cash settle the repairs. Given JL is unwilling to carry out the repairs, it would be unfair for the FSP to cash settle its liability based on JL‟s quotation, as this quotation is not actionable. Further, JL appears to have quoted only for water damage caused in the storm on 31 May 2013. On the material provided, the panel considers it is fair in all the circumstances the FSP increase its cash settlement offer to $27,159, based on NP‟s quotation for water damage resulting from storm events. Case No: 455233 Determination Page 4 of 13 The applicant also claims $17,743 for work to be done in the bathroom. The scope of works is described un der the heading “shower leak”. For reasons set out hereunder, the material provided does not establish this claimed damage was caused by a storm event. The parties dispute the proximate cause of the rest of the damage To decide whether the FSP is liable for the remainder of the damage, it is necessary to determine the proximate cause of this damage. The proximate cause is the effective or dominant or operative cause of the damage. The applicant claims storms in December 2011 and/or May 2013 caused the damage. The FSP disagrees. The applicant has not established the rest of the damage was caused by storm Both parties provided information in support of their positions. On the information provided, the panel is not satisfied the applicant has established, on the balance of probabilities that the remainder of the damage was caused by a storm event. The information includes:  When the roofer inspected the roof in June 2013, he found inadequate repairs to the tower above the study. The roofer said the internal downpipe of the tower was disconnected. He said water entering the tower went directly onto the plaster ceiling of the front room. This is supported by the infrared thermal report which found high levels of moisture throughout the base and walls of the tower. JL also found water had leaked through the tower into the front room. The panel is satisfied the cause of the water leak into the front room was because of the disconnected downpipe. The information provided does not show the pipe was disconnected because of a storm.  When the builder JL inspected the damage later in June 2013, he noted similar issues. He noted water ingress, and he identified flashing which needed to be repaired in the front lounge room and master bedroom and also referred to the inadequate repairs to the feature tower. The information provided does not these issues were caused because of a storm.  The infrared thermal report undertaken in June 2013 also indicates, while there is high level of moisture in various rooms in the insured property, the proximate cause of water ingress is not storm but drainage problems, inadequate flashing on the roof, inadequate flashing over the lounge bay window, lack of ventilation in the bathroom, leaking in the wall and showerhead, and a breached water pipe within the wall in the vicinity of the bathroom. The roofer also said the dampness in the bathroom was not due to issues with the roof.  If there was a broken pipe near the shower area, and this caused further damage, the leak report probably confirms there was no broken pipe (water line was pressure tester to 84 psi and passed). The applicant‟s experts have not conducted another pressure test report to challenge this report. Even if it was established there is a broken pipe in the shower area, there is no evidence to link the damage to a storm event. Case No: 455233 Determination Page 5 of 13  In relation to the damage to the shower area, the leak expert found water is drawn into the wall because the grouting in the shower recess wall is missing and breaking down. The restorer also found there was a leak from the defective grout. The information provided does not support the issue with the grout was caused by a storm event.  While the restorer notes the plaster damage in the ceiling and therefore assume water penetrated from above, he says further investigation is required. This further investigation has been undertaken by the roofer as described above.  The engineer inspected the property in September 2013. Relevantly, the roof space was dry. He only noted mould in the bathroom. The engineer said the cracking damage is due to seasonal changes in moisture content of the foundation material and not due to a storm event.  As for the ongoing moisture issues with the insured property, the FSP‟s engineer submits this is not due to the storm event. The engineer says moisture from the storm should have dissipated. As for moisture readings recorded in the brickwork, he said this dampness is due to maintenance issues with the insured property. These issues are not due to a storm event. The applicant has not provided an expert opinion to challenge engineer‟s findings.  The applicant‟s own builder does not ascribe the mould damage to the st orm event. Rather, he says moisture has built up from a leak in the bathroom and this, together with poor ventilation, has caused mould in the bathroom and toilet.  The applicant‟s mycologist‟s view is not dissimilar about the cause of the ongoing issues. The mycologist refers to a leaking roof and water leaks in the bathroom allowing the mould contamination to spread. He thought there was strong evidence of a broken pipe above the shower head in the bathroom because there was still moisture even though the bathroom was not in use. The mycologist described the mould/fungal type identified in the insured property as a „water loving‟ type, and says this indicates it is thriving because there is a constant free flow of water. The information provided from the mycologist does not support this ongoing moisture issue is due to a storm event. Whilst there is no dispute mould has now spread throughout the property, the panel is not satisfied the applicant has established this was caused by a storm event. Rather, the information provided shows the high moisture conditions (ongoing free flow of water, disconnected pipe in the tower allowing water to leak, leak from the defective grout) made for favourable conditions for the mould to spread. On the information provided, the panel is not persuaded, on the balance of probabilities that the applicant has established the proximate cause of the remainder of the damage was due to a storm event. The panel is also not persuaded the mould damage was caused by the FSP‟s failure to make immediate proper repairs as contended by the applicant. JL states mould was already present when he first inspected the property in June 2013. It appears the applicant took no substantive steps to repair the property since the storm damage in December 2011. The information provided also shows when a claim was eventually made in June 2013, the applicant already had material from a roofer and from the infrared moisture Case No: 455233 Determination Page 6 of 13 detection report which showed maintenance issues in the property needed to be addressed. Once the claim was made, the panel is satisfied the material provided establishes the FSP acted in a reasonable and timely manner and appointed numerous experts to assess the amount of and cause of the damage. The FSP is entitled to decline the remainder of the damage as it is excluded As the applicant has not established an insured event caused the remainder of the damage, the FSP is entitled to maintain its decline of the claim. Furthermore, the panel is satisfied the remainder of the damage is caused by issues which are excluded from cover, namely:  The leak from the tower was due to a disconnected internal pipe. The policy requires the applicant to ensure the property is watertight and well maintained. The applicant has not provided information to show she took any action to rectify this issue or any other maintenance issues referred to in reports she obtained before she made the claim.  The applicant says the insured property was damaged in a storm in December 2011. When the claim was made in 2013, her representative told the FSP water was leaking into the property since this time. The available information shows the applicant did not lodge a claim with the FSP until June 2013, and took no action during the intervening period to mitigate the leak/damage. Given her knowledge of the leak/damage and her inaction for 18 months to address an issue known to her, the panel is not satisfied the applicant took all reasonable care to protect the insured property against further loss or damage. In all the circumstances, on the information provided, the panel is satisfied the extent of the FSP‟s liability for the claim for storm damage is limited to payment to the applicant in the sum of $27,159. 2.2 Is the applicant entitled to any other amounts? The applicant is not entitled to further temporary accommodation expenses The applicant seeks temporary accommodation expenses whilst she was not living in the insured property. She claims $147,840. Based on the available information, the panel is not satisfied the applicant is entitled to the amount claimed or for any further amount for temporary accommodation. The policy provides for temporary accommodation if an insured event causes loss or damage, the FSP agrees the property cannot be lived in, and an insured needs to move out so the property can be repaired. The panel accepts an insured event caused loss and damage. However, the panel does not accept the extent of the accepted damage caused by storm establishes that the property cannot be lived in. The accepted damage is mainly water staining to ceilings in various rooms. The panel is of the view the applicant is not entitled to temporary accommodation expenses. Case No: 455233 Determination Page 7 of 13 In any event, the FSP has already paid over $60,000 in temporary accommodation expenses while the claim was investigated. The FSP estimated it would take 3 to 4 weeks to complete the repairs and was prepared to pay a further $6,300 for temporary accommodation. In correspondence with FOS, the FSP made an ex gratia offer in March 2017 which included $6,300 for temporary accommodation expenses. The offer remained open for 14 days. The offer was not accepted and is no longer available for acceptance. The applicant has not provided sufficient information about the contents loss The applicant claims $90,000 for household contents damaged by mould and water damage from the storm events. For reasons set out above, the FSP is not liable to pay for any damage to household contents caused by mould. However, if household contents were caused by water ingress in a storm event, the FSP‟s policy provides cover for contents when certain things ha ppen. The applicant needs to establish the household contents were water damaged by storm. Pursuant to the policy terms, the applicant is also obliged to provide proof of loss and ownership. The FSP says the applicant has not provided any proof of loss and ownership for this claim. It appears the applicant has not claimed for this loss until later in the dispute process, and has not provided information to support her claim. Given this, should the applicant wish to pursue a claim for water damage to conte nts caused by storm, the applicant is required to provide further information to the FSP to prove household contents were damaged by water in a storm event. In the absence of any further information, the FSP is not required to pay the applicant for this claim. The applicant is not entitled to loss of rent The applicant claims $43,680 being loss of rent from a boarder. She provided a declaration from her former boarder stating he was paying $250 per week. The policy provides for loss of rent for landlords if an insured event damaged the insured property and the tenant cannot live in it and the tenant needs to move out so the property can be repaired. As already discussed herein, the panel accepts an insured event has occurred. However the panel considers the extent of the accepted damage caused by storm does not establish the insured property cannot be lived in. Furthermore, the policy excludes cover for loss of rent if the insured lives in the insured property. The applicant has already claimed for temporary accommodation because she claims she was living in the insured property. On the information provided, the panel is not satisfied the applicant is entitled to the amount claimed for loss of rent. Case No: 455233 Determination Page 8 of 13 The FSP is to pay to the applicant $3,000 legal costs The applicant claims $26,000 for legal costs in respect of the claim and dispute. The applicant has provided no material establishing the extent of her legal costs. Under paragraph 9.4 of the FOS Terms of Reference, FOS may require an FSP to contribute to legal costs incurred by an applicant in the course of their dispute. However, the FOS process is free and is designed to be accessible to an applicant without legal representation. Accordingly, FOS will not generally require an FSP to contribute to an appl icant‟s legal costs, unless the dispute is particularly complex or raises specific legal issues. Further, a financial services provider will generally not be required to contribute more than $3,000 to an applicant‟s legal costs unless exceptional circumsta nces apply. The FSP‟s claim notes show in June 2013 that the applicant indicated she had engaged a lawyer. The material shows she engaged a lawyer in August 2014 to advise on the FSP‟s offer. From the inception of the claim, the material establishes the applicant required assistance with the claim. She engaged a representative initially. She then engaged a lawyer. The panel considers the factual issues involved are complex. However, the panel considers the circumstances are not exceptional. In all the circumstances, the panel is satisfied it is fair the FSP pay to the applicant $3,000 for legal costs. The applicant is not entitled to compensation The applicant says she is dissatisfied with the manner in which the claim was handled by the FSP and the poor standard of care shown by the FSP in failing to ensure her home would not be affected by mould. FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. The panel acknowledges the circumstances of the loss and damage and the inability to live in her own home would interfere with the applicant‟s peace of mind. However, the panel is not satisfied the information provided establishes the FSP‟s conduct caused the physical inconvenience or the interference with the applicant‟s expectation of enjoyment or peace of mind. This is because the material provided shows the FSP investigated the claim thoroughly and engaged many experts to assess and establish the cause of damage. While investigating the claim, the FSP paid $60,000 to the applicant for temporary accommodation expenses. The FSP also paid for make safe repairs. In all the circumstances, the panel is not satisfied the applicant is entitled to compensation. Case No: 455233 Determination Page 9 of 13 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate, in accordance with the Operational Guidelines to the FOS Terms of Reference, to refer this matter directly to a panel due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. The panel consists of an ombudsman and two panel members with extensive experience in insurance industry matters and consumer complaints. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues co nsidered directly relevant to the outcome only. The applicant is represented. Any reference to the applicant in this determination includes a reference to the applicant‟s representative. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance o f probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the parties‟ submissions and in the FSP‟s Notice of Response dated 3 January 2017. T hese documents have been exchanged between the parties. 3.3 Key reports Record Key points Builder (JL) Report 24 - 06 - 2013  Attended and photographed property 24 June 2013.  Confirmed a storm event - referred to by applicant as storm water damage to ceiling and carpet on 31 May 2013 .  Make safe completed.  Mould present, which applicant is concerned about .  Noted damage to master bedroom, front bedroom 3, and bay window in the front lounge.  Water has leaked through the external flashing, into the front Case No: 455233 Determination Page 10 of 13 lounge room o ver the bay window (flashing needs to be repaired by applicant).  Water has leaked badly through the feature tower, into the front bedroom 3 (recently badly repaired by applicant - make safe to stop leaking carried out by JL).  Water has leaked through the f lashing around the small external feature gable, into the rear master bedroom. JL says this is a maintenance issue and applicant will need to repair prior to internal repairs.  Applicant s aid had a full roof report done.  JL noted other ceiling damage not ca used by the 31 - 05 - 2013 storm event.  Scope of works included work to master bedroom, front bedroom 3 and front lounge $2, 710. 07 . Builder (JL) Report 11 - 07 - 2013  Due to age of plaster, no warranty can be given for repair work .  Recommend cash settlement $6,268. Leak expert (AL) Report 17 - 07 - 2013  Inspected 15 July 2013.  Spray t est to shower wall tiles failed.  Water damage to the walls around the shower recess.  Water is running behind the wall tiles when the shower is in use. This caused mouldy silicone se alant in the bath base and walls tiles.  Water is drawn into the wall because the grouting in the shower recess wall is missing and breaking down.  Described work to apply a suitable membrane, make waterproof, re - tile and reseal.  Also poor ventilation when shower is in use wit h resulting condensation . Restorer (MP) Report 18 - 7 - 2013  Asked to evalua te water damage to the property.  Moisture around the tower can be attributed to storm/rain damage.  Moisture in the walls at kitchen, bathroom and hallway is due to a combination of falling damp and leak from defective grouting in the bathroom.  As there is plaster damage in the ceiling, assume wat er penetrated from above but further investigation as to the water ingress is required.  Moisture above damp proof course. Likely this is falling damp from excess rainwater which may be because of excessive rainfall. Mycologist (ML) Report 3 - 08 - 2013  Samples taken from property on 26 - 07 - 2013 .  Detected elevated and high levels of airborne mould in some samples .  Elevated in main bedroom and study and high in bedroom 2 .  Premises and contents require remediation. Case No: 455233 Determination Page 11 of 13 Infrared thermal reports (AP) 10 - 06 - 2013  Inspected 1 June 2013 with roofer .  High level of moisture detected in bedroom 3‟s wall, ceiling and pelmet. Likely cause the drain for the roof top look out.  High level of moisture at base of pillars entering the sitting area in the lounge bay window area and ceiling. Possible ingress via f lashing on the roof when encountering large volumes of rain.  Lead flas hing over the lounge bay window may be a little short, allowing moisture to ingress.  High level of moisture throughout the base and walls of the tower lookout. The drain of the roof has failed or disconnected and releasing water into the room below.  No moisture det ected over master bedroom ceiling. There is evidence of previous moisture damage.  Moderate moisture readings in bathroom ceilings and walls; likely cause lack of ventilation. A lso identified likely issues with leaking in the wall and showerhead.  High moisture readings in hallway dividing kitchen and bathroom indicating a possible breached water pipe within the wall.  Moderate moisture readings in the toilet walls. Indicated pos sible ingress via roof and residual moisture from bathroom. Roof expert (RS) 20 - 06 - 2013  Slate around the tower is in sound condition.  The tower has a new metal tray roofing and spout fitted.  The internal wall cladding and lead parapet capping of the tower was not repaired, and needs work.  The internal downpipe has been disconnected and water that enters the tower well goes directly onto the plaster ceiling of the front room. Roof expert (RS) 20 - 06 - 2013  The dampness in the bathroom is not due to the roof.  Provided costs to repair tower roof . Engineer (HW) Report 3 - 10 - 2013  Inspections on 11 - 9 - 2013 and 17 - 9 - 2013 to det ermine extent of str uctural damage related to storm.  Noted recent repairs carried out to tower to waterproof it .  Noted damage in various rooms in the house including water damage, cracking damage, high moisture readings.  High moisture readings noted in brickwork es pecially around the bay windows.  Roof space wa s dry and no damp timbers found.  Efflorescent noted to undersi de of large areas of slat e roof.  Metal valleys of slate roof showed varying degrees of rusting and corrosion particularly over main bedroom .  Only room where moul d was noted was in the bat hroom.  Cracking in the house is due to seasonal changes in moisture content of the foundation material, and not related to the rainstorm on around December 2011 and problems with the tower. Case No: 455233 Determination Page 12 of 13  Water stain to the ceilings to the rooms could have result ed from the heavy rainstorm around December 2011, however any water from this storm would have be held in the brick walls and would have dissipated by now due to the long time since the storm.  Very high moisture reading were recorded in large area of the brickwork, indicating an ongoing problem. This dampness is due to maintenance issue with a house of this age and type of construction.  Metal valleys to the slate roof show varying degree of rusting and corrosion.  Water is penetrating int o the slate roof. There is efflorescence on the underside of the slate and minor delamination. This damage is typical of slate roof of this age, and regular maintenance is required of a slate roof.  Recommended roof and damp proof course be checked which problems he described as normal maintenance issues with a house of th is age and type of construction.  Scope of works to reinstate water damaged area of the building due to rain storm on 25 December 2011 including ceil ings in front study area, main bedroom area, passage way and front lounge room and repainting . Mycologist (MY) Report 13 - 12 - 2013  Inspection on 17 - 09 - 2013 .  Property had previous moisture damage from multiple storm events .  Strong evidence of a broken pipe a bove the shower head in the bathroom because of fresh moisture even though the bathroom was not in use for a period of time.  Very high moisture reading on the back of the shower head of the kitchen wall and adjacent hallway shows moisture travels through the walls.  Presence of airborne and surface mould.  Fungal type identified on the surface is a „water loving‟ type. This indicates there is a constant free flow of water which keeps the fungi growing. Builder (NP) Report, scope of works and quotation 16 - 11 - 2014  Water stains to the plaster ceiling and walls throughout the property is consistent with different storm events.  Water leak in the shower head in the main bathroom has caused damaged to the walls, bathroom, and hallway and adjourning kitchen. Mo isture has built up from the leak, and a lack of ventilation in the area has caused a high amount of mould to the ceiling and walls of the bathroom and toilet. The leak has been repaired.  Provided the scope of works to repair storm damage to master bedroom , front bed/study, front lounge, front hallway, main hallway and rear hallway, bedroom 2 and dinin g room in the amount of $27,159.  Also provided scope of works to repair the shower leak . Case No: 455233 Determination Page 13 of 13 Mycologist (MY ) Report 6 - 02 - 2015  Furt her inspection 30 November 2014.  Presence of airborne and surface mould .  The underlying caus e of the wat er ingress, leaky roof and water leak in the bathroom has not been fix ed.  Favourable environmental conditions allowed the mould contamination to further spread. 3.4 Other relevant material considered and relied on  Parties‟ submissions, emails, reports, photographs and all attachments to submissions.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.