Home / Financial Firm (Unknown - Insurer) / Determination 455156
Determination 455156
Water damage claim denied under flood exclusion
Summary
The applicant's business premises were inundated during June 2016 storms and the FSP denied the water damage claim as flood, an excluded event. AFCA found the water was flood and that the FSP had no duty to provide the policy wording because a broker arranged the policy.
Water escaping from a river is flood under the policy definition regardless of blockages, and under section 37 and 71 of the Insurance Contracts Act the duty to inform fell on the broker.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny liability for the applicant's loss because the damage was due to water which escaped from the E River, which is flood.”
- Failure to disclose secondary · not upheld
“The FSP was not required to clearly inform the applicant of the flood exclusion within the policy because the policy was arranged by a broker.”
Subjects and remedies
broker or intermediarynatural disastersmall businessno remedy
Text of the determination
Determination
Case No: 455156 Determination Page 1 of 6
Case number: 455156 10 July 2017
1 Overview
1.1 Dispute
The applicant arranged a motor trade policy, underwritten by the financial services
provider (FSP) through his broker.
The applicant lodged a claim in June 2016 for water damage to his business
premises.
The FSP denied the claim on the basis that the cause of the damage was flood, an
event which is excluded from cover under the policy.
The applicant disagrees with the FSP’s decision. He says the major cause of his loss
was third party infrastructure (a railway bridge) which blocked the river and he
questions the conclusions reached by the FSP’s hydrologist with respect to the cause
of the inundation of his property.
The applicant also disputes having received the policy wording which explains the
flood exclusion upon which the FSP now relies to deny liability.
1.2 Issues and key findings
Has there been an insured event under the policy?
The applicant has established an insured event under the policy because:
Severe weather conditions, including heavy rainfall, affected the local area from
5 June to 7 June 2017 and the heavy rainfall associated with this event is
understood to have contributed to the inundation of the applicant’s property.
The policy provides cover for storm, tempest, rainwater and hail.
Can the FSP deny liability for the applicant’s loss?
The FSP is entitled to deny liability for the applicant’s loss because:
the available evidence confirms that the damage was due to water which
escaped from the E River, which inundated the applicant’s building and
contents
this water is regarded as flood, as defined in the policy
the proximate cause of the damage is therefore flood, which is excluded from
cover under the policy.
Case No: 455156 Determination Page 2 of 6
Did the FSP have a duty to clearly inform the applicant of the policy’s flood
exclusion?
The FSP was not required to clearly inform the applicant of the flood exclusion within
the policy because:
the policy was arranged by a broker, which acted as agent for the applicant
any onus to provide a copy of the policy wording, which would serve to clearly
inform the applicant of the exclusion, was therefore on the broker, not the FSP.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to t he pay the applicant’s claim.
Case No: 455156 Determination Page 3 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
This determination is made by a panel consisting of the Panel Chair Ombudsman
and two representatives with extensive experience in the insurance industry and
consumer claims.
On 21 June 2017, the Panel Chair Ombudsman attended on site where he met with
the applicant and two representatives of the FSP.
The information obtained during the course of the site visit has been used, together
with all information exchanged, in the preparation of this determination.
2.1 Has the applicant established a valid claim under the policy
It is established law that the applicant is first required to show that there has been an
insured event under the policy. Once an insured event has been established the
onus moves to the FSP to show that an exclusion applies to defeat the claim or the
FSP is otherwise entitled to refuse the claim.
Severe weather conditions affected the local area
It is not in dispute that severe weather conditions affected the local area, including
the region where the applicant’ s property is located.
The report from the FSP’s hydro logist confirms that there was significant rainfall in
this local area, over the period from 5 - 7 June 2016.
BW further notes that this weather system and the resulting rainfall ultimately led to
the water inundation of the applicant’s property
Policy provides cover for storm, tempest, rainwater and hail
The policy provides cover for storm, tempest, rainfall and hail and the panel accepts
that the applicant has established that the storm and rainwater contributed to the loss
and damage at the applicant’s p roperty.
2.2 Can the FSP deny liability for the applicant’s loss ?
Damage caused by water from the E River
There is no dispute that water inundated the applicant’s property and caused
damage to his business premises.
Case No: 455156 Determination Page 4 of 6
The FSP contends that the water which was responsible for the inundation came
from the E River, which runs adjacent to the applicant’s property. The FSP has
provided a report from the hydrologist (BW), in support of its position.
The applicant has provided information which shows BW’s observation that the
applicant’s property is on a low point along R Road was incorrect. The applicant says
that his property is higher, and further from the river than a nearby property which
was not inundated. The applicant says this is because the nearby property was on
the northern side of the railway bridge, whereas his property is on the south side.
In its response, BW has indicated that the applicant is correct; the site itself is higher
than R Road and that the road itself has a low point near the site. However, BW says
that this does not change the findings of its report.
The applicant also disagrees with BW’s use of information with respect to the C River
(a neighbouring watercourse) to establish the behaviour of the water levels in the E
River. The applicant also notes that the C River did not flood.
BW responded that:
the catchments for the E River and C River area are of similar size, and there is
a rain gauge roughly located on the catchment boundary between the two
this rain gauge recorded the largest rainfall of any of the surrounding gauges
and it is considered reasonable to assume that both the neighbouring
catchments would receive similar rainfall depths
it used the stream gauge information from C River to estimate whether rainfall
would have resulted in a stream level rise and the approximate timing of the
river response from the rainfall
even setting aside the C River data, it would not change the findings of the
report based on eyewitness accounts and site observations.
The applicant has also argued that BW has shown bias by not disclosing the full
impact and dominant cause (of the inundation of his property) being the third party
infrastructure blocking the river. The applicant says BW has focussed instead on the
rainfall data to avoid concluding the proximate cause being the third party
infrastructure and not flood.
Based on the information provided by the applicant, the panel accepts that debris
accumulated under the railway bridge on the E River, partially preventing the water in
the river from continuing its normal course. It is accepted that as a result of the
blockages, the water from the E River found an alternative route(s), which was
thr ough several properties, including the applicant’s property.
However, the panel also notes that there is no dispute that the water which caused
the inundation of the property was from the E River.
The panel has considered whether the water which was responsible for the
inundation was properly characterised as flood water or stormwater.
BW states in its report that the timing of the inundation of properties along R Road
(including the applicant’s property) occurred approximately 24 hours after rain began
to fall in the region and more than 10 hours after the commencement of the most
Case No: 455156 Determination Page 5 of 6
intense period of rainfall. BW concludes that local stormwater runoff would not have
been sufficient to inundate the site, such as to cause the damage.
After considering the evidence provided by both parties, the panel is of the view that
the proximate cause (that is, the dominant or effective cause) of the damage, was the
water which had escaped from the E River.
Water causing damage is Flood, as defined in the policy
The policy defines ‘ Flood ’ as water from a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original state or have
been modified), that overflows onto normally dry land.
The panel notes the applicant’s position that the blockage o f the third party
infrastructure (the railway bridge), was the dominant cause of the damage.
It is accepted that had the blockages not been present under the railway bridge at the
time, the water in the river may not have sought an alternative route through the
applicant’s property (among others).
However, the policy definition of flood does not provide any conditional relief with
respect to circumstances where obstacles or blockages are present in the
watercourse. The exclusion merely requires that the wa ter which caused the damage
was water which had escaped from a watercourse, irrespective of the mechanism of
the escape.
After considering the evidence provided, the panel is satisfied that the water which
caused the damage to the applicant’s property cons titutes ‘ Flood ’ as defined by the
policy and is in line with established Australian case law.
Accordingly, the FSP is entitled to deny liability for the applicant’s loss.
2.3 Was FSP required to clearly inform the applicant of the flood
exclusion?
Policy was arranged by a broker, which acted as agent for the applicant
The applicant held a Motor Trades Policy with the FSP. The contract of insurance
between the parties is not regarded as a ‘ prescribed contract ’ for the purposes of the
Insurance Contracts Act 1984 (the Act).
Section 37 of the Act, provides that the FSP may not rely on a provision included in a
contract of insurance , which seeks to limit the FSP’s obligations under a
non-prescribed contract, unless before the contract was entered into, the FSP clear ly
informed the applicant in writing of the effect of the provision.
In order to clearly inform the applicant, the FSP would normally provide him with the
policy wording which contains relevant provisions including the exclusion for flood.
It is clear that:
the applicant arranged the policy through a broker
the broker acted as agent for the applicant and not as agent for the FSP.
Case No: 455156 Determination Page 6 of 6
Section 71(1) of the Act provides that any requirement for the FSP to provide a
document or information to the applicant before a contract of insurance is entered
into, does not apply where the contract was arranged by an insurance broker, as
agent of the applicant.
In this instance, any requirement to clearly inform the applicant of this exclusion falls
to the applicant’s broker, not the FSP.