Defective painting of kitchen panelling and claims handling delay
Summary
The applicant claimed $3,300 to repaint kitchen panelling damaged during repairs and for delays in the claim. AFCA found the scratches were wear and tear, but ordered $500 for defective varnish and $1,000 compensation for delay and inconvenience.
The insurer is only obliged to restore the home to its pre-loss condition, and the claimed scratches were not shown to be caused by its builder.
Issues
- Repairs or contractors primary · not upheld“the FSP is not liable to rectify the scratches and scuffs on the kitchen wood panelling or undertake any substantive rectification”
- Poor claim handling secondary · upheld“the claims' file notes also show multiple attendances by the FSP's assessor and builder and unacceptable delay”
- Delay secondary · upheld“the FSP's claims management and conduct has caused delay and has interfered with the applicants' expectation of enjoyment”
Subjects and remedies
home or building damagepay compensationpay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 455075 Determination Page 1 of 8
Case number: 455075 8 February 2018
1 Overview
1.1 Dispute
The applicant holds a home insurance policy with the financial services provider
(FSP). The applicant lodged two claims for damage to his home after it was burgled
and after damage was caused by a leak.
Disputes arose in relation to the claims which have been largely resolved. There
remains the applicant’s claim the FSP caused further damage while carrying out
repairs to the kitchen wood panelling.
The applicant also seeks compensation because of the FSP’s claims handling.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was partly in favour of the applicant. As the
recommendation was not accepted by the applicant, the dispute has been referred to
me for determination.
1.2 Issues and key findings
Is the FSP required to carry out any further rectification work?
The FSP is not required to carry out any further rectification work as the available
information does not establish the claimed damage to the kitchen wood panelling
was caused by the FSP nor that the FSP accepted liability for the damage. As the
available information shows a small defect (bubbling) in the varnish applied by the
FSP’s contractor, it is fair in the circumstances the FSP pay to the applicant $500.
Is the applicant entitled to compensation?
The available information establishes there was an unusual amount of physical
inconvenience, time taken to resolve a situation, and interference with the a pplicant’s
expectation of enjoyment or peace of mind which warrants an award of
compensation of $1,000.
1.3 Determination
This determination is partly in favour of the applicant.
Should the applicant accept this determination, then within seven days of
acceptance, the FSP is to make the following payments to the applicant:
$500 in relation to the claim for the kitchen wood paneling.
$1,000 compensation.
Case No: 455075 Determination Page 2 of 8
Otherwise, the FSP is not required to take any further action in relation to the claim or
the dispute.
Case No: 455075 Determination Page 3 of 8
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
Applicant’s submissions after the recommendation
After the recommendation was rejected, the applicant made further submissions in
which his position was essentially reiterated. Where relevant, these submissions will
be referred to in this determination. No new material was provided by either party.
2.1 Is the FSP required to carry out any further rectification work?
Applicant says the FSP’s builder damaged the kitchen wood panelling
The applicant made a number of complaints about the repair work performed by the
FSP. The recommendation dealt with two rectification issues. After the
recommendation, the applicant confirmed the complaint about the pantry doors was
cash settled by the FSP.
The remaining issues in dispute relate to the claimed damage to the kitchen wood
panelling and compensation for the FSP’s claims handling.
The material provided shows the applicant made two claims on the FSP. The first
claim was for damage caused in a burglary and the second claim was for damage
caused by a leak.
The FSP accepted both claims and a builder was appointed to each claim. The
builder who dealt with the burglary claim (P) undertook some work including pulling
up the kitchen tiles. Not long after the second claim was made, the FSP decided to
allocate all of the repairs to the second builder (J).
J then continued with repairs in the kitchen.
The applicant says the oven wall end panel, two sides of a breakfast bench and all
kickers in the kitchen were repainted by J due to damage which was caused when
the old kitchen tiles were pulled up by P.
The applicant claims J’s painti ng was defective. The applicant relies on photographs.
He says the surfaces were not properly prepared for painting and the damage was
painted over which accentuated the prior damage. The applicant points out a section
where the paint is rough and bubbled. He says the FSP has a responsibility to carry
out works to an acceptable standard and, although the FSP provides a lifetime
warranty on building repairs, the FSP used incompetent builders.
The applicant says two independent cabinetmakers told him the only way to fix the
damage is by properly preparing, sanding and repainting all timber surfaces in the
kitchen to create a uniform and acceptable finish.
Case No: 455075 Determination Page 4 of 8
The applicant submits the FSP accepted liability for the damage caused by P by
engaging J. The applicant complains the rectification work carried out by J is poor
and has added to the damage caused by P.
After the recommendation, the applicant relied on the Victorian Building Authority’s
standards in relation to painting. He also says, in response to his quotation to repair
the claimed damage in the sum of $3,300, the FSP only offered $500.
The applicant relies on the scope of works dated 12 October 2016 which shows J
agreed to undertake work in the kitchen as evidenced by items 31, 32 and 33 in the
scope of works.
He submits J’s painting work on the balustrade had to be rectified yet the complaints
about J’s painting work in the kitc hen were not addressed.
He says photographs taken by the FSP’s assessor before J’s painting will clearly
show scratches in the kitchen were white in colour, not black as they now are after
J’s painting. He complains the FSP has not provided these photograp hs. He also
complains relevant information is missing from the FSP’s material.
The FSP says the scratches and scuffs are normal wear and tear
The FSP says it is not required to complete rectification works to the paintwork of the
kitchen wood panelling a s the scratches or scuffs were not caused by the FSP’s
builders. The FSP says the scratches are normal wear and tear for which it is not
liable.
The FSP did not specifically address the contentions made by the applicant about J’s
painting of the kitchen wood panelling.
Available material shows scratches and scuffs not caused by FSP’s builder
I have carefully considered the material provided by the parties including the FSP’s
file notes. While the applicant contends specific details and notes of multiple
telephone conversations are missing, this is not established by the file notes which
appear to be comprehensive.
I do not accept the FSP is liable to undertake all of the claimed rectification work in
relation to the kitchen wood panelling.
This is because the available material does not establish damage was caused to the
kitchen panelling by P when pulling up the old kitchen tiles. Rather, I am satisfied the
available material shows the scratches and scuffs on the wood panelling are
consistent with wear and tear. Both the assessor and the builder J said the scratches
and scuffs are related to general use and not related to repairs. Further, I am
satisfied the photographs provided support this contention.
The policy terms are clear. The FSP is only obliged to repair to a similar condition to
what the home was in before the loss or damage occurred. In the circumstances, on
the available information, the FSP is not liable to repair the scratches and scuffs on
the kitchen wood panelling.
Case No: 455075 Determination Page 5 of 8
The FSP did not accept liability for the claimed damage
Secondly, the available material does not establish the FSP accepted liability for the
damage caused by P by engaging J. Rather, the material indicates J was chosen to
complete all the works necessitated by both claims because this was the most
efficient way of dealing with the repairs.
Thirdly, the available material does not establish the FSP accepted liability for the
claimed damage to the kitchen wood panelling. Rather, the FSP’s claim file notes
show, while the FSP accepted liability to rectify some work, on a number of
occasions, the FSP advised the applicant it did not accept it was liable for the
claimed damage to the kitchen wood panelling.
Accordingly, while more comprehensive painting rectification may have bee n
required had the FSP accepted it was liable for the scratches and scuffs on the
kitchen wood panelling, the FSP was not obliged to undertake the comprehensive
painting work claimed by the applicant when the FSP did not accept liability for the
claimed damage to the kitchen wood panelling.
The applicant also relies on the scope of works dated 12 October 2016. While the
scope included work in the kitchen, the only painting work was varnishing. Further,
the FSP’s file notes show J agreed to this work as a co urtesy only.
Fair in the circumstances the FSP pay to the applicant $500
The applicant contends the work done by J has worsened the scratching and scuff
marks on the kitchen wood panelling. Although the applicant obtained a quote for the
cost of repairs, and refers to consultation with two cabinetmakers, he has not
provided a copy of the quote or any compelling independent evidence in support of
his contention. While he criticises the lack of provision of “before” photographs by the
FSP, the onus is on the applicant to establish the loss claimed.
One of the photographs of J’s painting work provided by the applicant shows surface
bubbling. I accept this bubbling means some of J’s varnish application was not free of
defects.
Taking all matters into account, I am satisfied the offer of $500 made by the FSP was
reasonable. On the information provided and for the reasons stated, I am satisfied
the FSP is not liable to rectify the scratches and scuffs on the kitchen wood panelling
or undertake any substantive r ectification to J’s application of varnish in the kitchen.
I am satisfied it is fair in the circumstances the FSP pay to the applicant $500 in
relation to this part of the claim and the dispute.
2.2 Is the applicant entitled to compensation?
FOS may award compensation in some circumstances
The applicant complains about the FSP’s claims handling. The applicant says it has
been extremely inconvenient, stressful and difficult dealing with the FSP and its
contractors.
Case No: 455075 Determination Page 6 of 8
The applicant says the work should have been completed in weeks but the work took
months. He also says the rectification work in relation to pantry doors was not
completed but was only cash settled after considerable delay.
After the recommendation, the applicant also contended the FSP was dishonest and
deceptive in relation to provision of material to FOS. The applicant also amplified and
described some of the inconvenience caused by the FSP’s poor claims handling and
poor workmanship by the FSP’s builders. The applicant describes why the home was
uncomfortable and unsafe.
The applicant claims financial compensation for the stress and the unnecessary
delay in completion of repairs. He also claims for unpaid time taken off work while
dealing with the claim and the FSP’s contractors.
The FSP says in the circumstances of two claims, it proactively managed the claims
and assisted the applicant. It says the second claim caused unavoidable delays. The
FSP submits an award of compensation is not warranted given these circumstances
and in light of FOS’ s conservative approach to compensation
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the a pplicant’s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss. FOS
considers compensation should not be provided where an applicant merely suffers
inconvenience which is a normal part of doing business. FOS expects an applicant to
be moderately robust and bear the normal degree of inconvenience experienced
when a problem arises.
Fair in the circumstances the FSP pay the applicant $1,000 compensation
The material provided shows the burglary claim was made in December 2015. While
the claim for damage to the balustrade and kitchen tiles was initially rejected, once it
was accepted, the builder P was instructed to commence repairs in February 2016.
While undertaking repairs, P discovered a leak in early April 2016. J was appointed
to do the building work in relation to the leaking water claim on 11 April 2016.
The FSP recognised complications arose because two builders were dealing with the
repairs. Consequently, on 2 May 2016, the assessor re-attended to prepare a scope
of works so J could complete all works related to both claims.
A number of issues arose. The FSP accepted liability for some of the issues and
cash settled others. By October 2016, the remaining issues were the issue which is
the subject of this determination and the repairs required to the pantry doors.
The available information shows difficulties arose with rectifying the pantry doors.
Ultimately, the pantry doors were not rectified by J . Rather the applicant says “after
eight months of arguing with the FSP and countless visits from different
cabinetmakers to fix the doors”, the FSP cash settled the applicant for the
rectification repairs required to the pantry doors.
Case No: 455075 Determination Page 7 of 8
In the circumstances of this dispute, I consider the FSP’s claims management and
conduct has caused delay and has interfered with the a pplicants’ expectation of
enjoyment or peace of mind.
The available material does not establish the FSP has been deceptive. In
circumstances where the applicant sought assistance, FOS does not award
compensation for losses incurred by the applicant’s representative because of time
off work. Further, no material substantiating the loss has been provided.
I accept the discovery of leaking water and the ensuing claim delayed the repairs
necessitated by the damage caused in the burglary. However, I am also satisfied the
available information establishes delays were also caused because rectification
repairs were required.
While I accept the FSP w as reasonably responsive to the applicant’s issues, the
claims’ file notes also show multiple attendances by the FSP’s assessor and builder
and unacceptable delay particularly in relation to the settlement of the issue with the
pantry doors.
While FOS expects an applicant to be moderately robust and bear the normal degree
of inconvenience experienced when a problem arises, I am satisfied the available
material shows more than a normal degree of inconvenience was suffered by the
applicant.
The FSP expressed regret on a number of occasions for delay and inconvenience.
The FSP waived the policy excess of $500 in relation to the leak claim.
Taking all matters into account, I am satisfied it is fair in all the circumstances the
FSP pay to the applicant $1,000 compensation.
Case No: 455075 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach
There has been a full exchange of all material and information relied on for the
purposes of this determination and each party has had the opportunity to address
any issues raised by the other. All of the material provided by the parties has been
reviewed and considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice, and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is represented. For the purposes of this determination, submissions
made by the applicant’s representative have been treated as if they had been made
by the applicant and all references to the applicant include references to the
applicant’s representative .
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 3
February 2017. Both the policy document and the Notice have been exchanged with
the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions, emails , scopes of works, assessment and reinspection
reports, photographs , the FSP’s claim notes in relation to two claims and all
attachments to all submissions both before and after the recommendation.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.