Defective painting of kitchen panelling and claims handling delay

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$500
Non-financial loss$1,000
Amount claimed$3,300
SourceAFCA PDF

Summary

The applicant claimed $3,300 to repaint kitchen panelling damaged during repairs and for delays in the claim. AFCA found the scratches were wear and tear, but ordered $500 for defective varnish and $1,000 compensation for delay and inconvenience.

The insurer is only obliged to restore the home to its pre-loss condition, and the claimed scratches were not shown to be caused by its builder.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 455075 Determination Page 1 of 8 Case number: 455075 8 February 2018 1 Overview 1.1 Dispute The applicant holds a home insurance policy with the financial services provider (FSP). The applicant lodged two claims for damage to his home after it was burgled and after damage was caused by a leak. Disputes arose in relation to the claims which have been largely resolved. There remains the applicant’s claim the FSP caused further damage while carrying out repairs to the kitchen wood panelling. The applicant also seeks compensation because of the FSP’s claims handling. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was partly in favour of the applicant. As the recommendation was not accepted by the applicant, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP required to carry out any further rectification work? The FSP is not required to carry out any further rectification work as the available information does not establish the claimed damage to the kitchen wood panelling was caused by the FSP nor that the FSP accepted liability for the damage. As the available information shows a small defect (bubbling) in the varnish applied by the FSP’s contractor, it is fair in the circumstances the FSP pay to the applicant $500. Is the applicant entitled to compensation? The available information establishes there was an unusual amount of physical inconvenience, time taken to resolve a situation, and interference with the a pplicant’s expectation of enjoyment or peace of mind which warrants an award of compensation of $1,000. 1.3 Determination This determination is partly in favour of the applicant. Should the applicant accept this determination, then within seven days of acceptance, the FSP is to make the following payments to the applicant:  $500 in relation to the claim for the kitchen wood paneling.  $1,000 compensation. Case No: 455075 Determination Page 2 of 8 Otherwise, the FSP is not required to take any further action in relation to the claim or the dispute. Case No: 455075 Determination Page 3 of 8 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. Applicant’s submissions after the recommendation After the recommendation was rejected, the applicant made further submissions in which his position was essentially reiterated. Where relevant, these submissions will be referred to in this determination. No new material was provided by either party. 2.1 Is the FSP required to carry out any further rectification work? Applicant says the FSP’s builder damaged the kitchen wood panelling The applicant made a number of complaints about the repair work performed by the FSP. The recommendation dealt with two rectification issues. After the recommendation, the applicant confirmed the complaint about the pantry doors was cash settled by the FSP. The remaining issues in dispute relate to the claimed damage to the kitchen wood panelling and compensation for the FSP’s claims handling. The material provided shows the applicant made two claims on the FSP. The first claim was for damage caused in a burglary and the second claim was for damage caused by a leak. The FSP accepted both claims and a builder was appointed to each claim. The builder who dealt with the burglary claim (P) undertook some work including pulling up the kitchen tiles. Not long after the second claim was made, the FSP decided to allocate all of the repairs to the second builder (J). J then continued with repairs in the kitchen. The applicant says the oven wall end panel, two sides of a breakfast bench and all kickers in the kitchen were repainted by J due to damage which was caused when the old kitchen tiles were pulled up by P. The applicant claims J’s painti ng was defective. The applicant relies on photographs. He says the surfaces were not properly prepared for painting and the damage was painted over which accentuated the prior damage. The applicant points out a section where the paint is rough and bubbled. He says the FSP has a responsibility to carry out works to an acceptable standard and, although the FSP provides a lifetime warranty on building repairs, the FSP used incompetent builders. The applicant says two independent cabinetmakers told him the only way to fix the damage is by properly preparing, sanding and repainting all timber surfaces in the kitchen to create a uniform and acceptable finish. Case No: 455075 Determination Page 4 of 8 The applicant submits the FSP accepted liability for the damage caused by P by engaging J. The applicant complains the rectification work carried out by J is poor and has added to the damage caused by P. After the recommendation, the applicant relied on the Victorian Building Authority’s standards in relation to painting. He also says, in response to his quotation to repair the claimed damage in the sum of $3,300, the FSP only offered $500. The applicant relies on the scope of works dated 12 October 2016 which shows J agreed to undertake work in the kitchen as evidenced by items 31, 32 and 33 in the scope of works. He submits J’s painting work on the balustrade had to be rectified yet the complaints about J’s painting work in the kitc hen were not addressed. He says photographs taken by the FSP’s assessor before J’s painting will clearly show scratches in the kitchen were white in colour, not black as they now are after J’s painting. He complains the FSP has not provided these photograp hs. He also complains relevant information is missing from the FSP’s material. The FSP says the scratches and scuffs are normal wear and tear The FSP says it is not required to complete rectification works to the paintwork of the kitchen wood panelling a s the scratches or scuffs were not caused by the FSP’s builders. The FSP says the scratches are normal wear and tear for which it is not liable. The FSP did not specifically address the contentions made by the applicant about J’s painting of the kitchen wood panelling. Available material shows scratches and scuffs not caused by FSP’s builder I have carefully considered the material provided by the parties including the FSP’s file notes. While the applicant contends specific details and notes of multiple telephone conversations are missing, this is not established by the file notes which appear to be comprehensive. I do not accept the FSP is liable to undertake all of the claimed rectification work in relation to the kitchen wood panelling. This is because the available material does not establish damage was caused to the kitchen panelling by P when pulling up the old kitchen tiles. Rather, I am satisfied the available material shows the scratches and scuffs on the wood panelling are consistent with wear and tear. Both the assessor and the builder J said the scratches and scuffs are related to general use and not related to repairs. Further, I am satisfied the photographs provided support this contention. The policy terms are clear. The FSP is only obliged to repair to a similar condition to what the home was in before the loss or damage occurred. In the circumstances, on the available information, the FSP is not liable to repair the scratches and scuffs on the kitchen wood panelling. Case No: 455075 Determination Page 5 of 8 The FSP did not accept liability for the claimed damage Secondly, the available material does not establish the FSP accepted liability for the damage caused by P by engaging J. Rather, the material indicates J was chosen to complete all the works necessitated by both claims because this was the most efficient way of dealing with the repairs. Thirdly, the available material does not establish the FSP accepted liability for the claimed damage to the kitchen wood panelling. Rather, the FSP’s claim file notes show, while the FSP accepted liability to rectify some work, on a number of occasions, the FSP advised the applicant it did not accept it was liable for the claimed damage to the kitchen wood panelling. Accordingly, while more comprehensive painting rectification may have bee n required had the FSP accepted it was liable for the scratches and scuffs on the kitchen wood panelling, the FSP was not obliged to undertake the comprehensive painting work claimed by the applicant when the FSP did not accept liability for the claimed damage to the kitchen wood panelling. The applicant also relies on the scope of works dated 12 October 2016. While the scope included work in the kitchen, the only painting work was varnishing. Further, the FSP’s file notes show J agreed to this work as a co urtesy only. Fair in the circumstances the FSP pay to the applicant $500 The applicant contends the work done by J has worsened the scratching and scuff marks on the kitchen wood panelling. Although the applicant obtained a quote for the cost of repairs, and refers to consultation with two cabinetmakers, he has not provided a copy of the quote or any compelling independent evidence in support of his contention. While he criticises the lack of provision of “before” photographs by the FSP, the onus is on the applicant to establish the loss claimed. One of the photographs of J’s painting work provided by the applicant shows surface bubbling. I accept this bubbling means some of J’s varnish application was not free of defects. Taking all matters into account, I am satisfied the offer of $500 made by the FSP was reasonable. On the information provided and for the reasons stated, I am satisfied the FSP is not liable to rectify the scratches and scuffs on the kitchen wood panelling or undertake any substantive r ectification to J’s application of varnish in the kitchen. I am satisfied it is fair in the circumstances the FSP pay to the applicant $500 in relation to this part of the claim and the dispute. 2.2 Is the applicant entitled to compensation? FOS may award compensation in some circumstances The applicant complains about the FSP’s claims handling. The applicant says it has been extremely inconvenient, stressful and difficult dealing with the FSP and its contractors. Case No: 455075 Determination Page 6 of 8 The applicant says the work should have been completed in weeks but the work took months. He also says the rectification work in relation to pantry doors was not completed but was only cash settled after considerable delay. After the recommendation, the applicant also contended the FSP was dishonest and deceptive in relation to provision of material to FOS. The applicant also amplified and described some of the inconvenience caused by the FSP’s poor claims handling and poor workmanship by the FSP’s builders. The applicant describes why the home was uncomfortable and unsafe. The applicant claims financial compensation for the stress and the unnecessary delay in completion of repairs. He also claims for unpaid time taken off work while dealing with the claim and the FSP’s contractors. The FSP says in the circumstances of two claims, it proactively managed the claims and assisted the applicant. It says the second claim caused unavoidable delays. The FSP submits an award of compensation is not warranted given these circumstances and in light of FOS’ s conservative approach to compensation FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the a pplicant’s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. FOS considers compensation should not be provided where an applicant merely suffers inconvenience which is a normal part of doing business. FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem arises. Fair in the circumstances the FSP pay the applicant $1,000 compensation The material provided shows the burglary claim was made in December 2015. While the claim for damage to the balustrade and kitchen tiles was initially rejected, once it was accepted, the builder P was instructed to commence repairs in February 2016. While undertaking repairs, P discovered a leak in early April 2016. J was appointed to do the building work in relation to the leaking water claim on 11 April 2016. The FSP recognised complications arose because two builders were dealing with the repairs. Consequently, on 2 May 2016, the assessor re-attended to prepare a scope of works so J could complete all works related to both claims. A number of issues arose. The FSP accepted liability for some of the issues and cash settled others. By October 2016, the remaining issues were the issue which is the subject of this determination and the repairs required to the pantry doors. The available information shows difficulties arose with rectifying the pantry doors. Ultimately, the pantry doors were not rectified by J . Rather the applicant says “after eight months of arguing with the FSP and countless visits from different cabinetmakers to fix the doors”, the FSP cash settled the applicant for the rectification repairs required to the pantry doors. Case No: 455075 Determination Page 7 of 8 In the circumstances of this dispute, I consider the FSP’s claims management and conduct has caused delay and has interfered with the a pplicants’ expectation of enjoyment or peace of mind. The available material does not establish the FSP has been deceptive. In circumstances where the applicant sought assistance, FOS does not award compensation for losses incurred by the applicant’s representative because of time off work. Further, no material substantiating the loss has been provided. I accept the discovery of leaking water and the ensuing claim delayed the repairs necessitated by the damage caused in the burglary. However, I am also satisfied the available information establishes delays were also caused because rectification repairs were required. While I accept the FSP w as reasonably responsive to the applicant’s issues, the claims’ file notes also show multiple attendances by the FSP’s assessor and builder and unacceptable delay particularly in relation to the settlement of the issue with the pantry doors. While FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem arises, I am satisfied the available material shows more than a normal degree of inconvenience was suffered by the applicant. The FSP expressed regret on a number of occasions for delay and inconvenience. The FSP waived the policy excess of $500 in relation to the leak claim. Taking all matters into account, I am satisfied it is fair in all the circumstances the FSP pay to the applicant $1,000 compensation. Case No: 455075 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach There has been a full exchange of all material and information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice, and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The applicant is represented. For the purposes of this determination, submissions made by the applicant’s representative have been treated as if they had been made by the applicant and all references to the applicant include references to the applicant’s representative . It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 3 February 2017. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties’ submissions, emails , scopes of works, assessment and reinspection reports, photographs , the FSP’s claim notes in relation to two claims and all attachments to all submissions both before and after the recommendation.  Correspondence between the parties.