Home / Financial Firm (Unknown - Insurer) / Determination 454726

Determination 454726

Flood exclusion used to deny storm and water damage claim to business premises

FirmFinancial Firm (Unknown - Insurer)
Decided2017-08-09
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's business premises were damaged by June 2016 weather events and the FSP denied the claim under the flood exclusion. AFCA found most damage was flood but ordered the FSP to meet stormwater damage up to 50mm above slab level, with interest if cash settled.

Water that escapes a river or surcharges drains is flood under the policy, but stormwater runoff that entered first is covered and the FSP bears the onus on the exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 454726 Determination Page 1 of 7 Case number: 454726 10 July 2017 1 Overview 1.1 Dispute This matter involves a claim by the applicant under a Business Insurance Policy, held with the financial service provider (FSP), following damage at the business premises as a result of weather events in June 2016. The FSP has denied the applicant’s claim on the basis of the policy exclusion for loss or damage caused by flood. 1.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim under the terms and conditions of the policy? The FSP is required to meet the applicant’s claim for loss and damage as a result of stormwater inundation through the property, to the level of 50 millimetres above ground level. 1.3 Determination This determination is partially in favour of the applicant. The FSP is required to meet the applicant’s claim in accordance with this determination and under the terms of the policy for loss or da mage at the applicant’s property caused by stormwater inundation to the level of 50 millimetres above ground level. For the sake of clarity, for the purposes of this dispute, ground level is considered to be the level of the slab. The parties are required to work together to reach a satisfactory resolution of the claim in accordance with the determination and the provisions of the policy. Should the parties be unable to reach a satisfactory conclusion then either party may make further application to the service. Should the FSP seek to cash settle any aspect of the applicant’s claim, the FSP is required to pay interest, in accordance with the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim, to the date of the cash settlement. Case No: 454726 Determination Page 2 of 7 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination follows consideration of all of the informa tion exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. The decision is made by a panel consisting of a Panel Chair Ombudsman and two representatives with extensive experience in the insurance industry and consumer claims. On 23 June 2017, the Panel Chair Ombudsman met onsite with the applicant. The FSP declined the invitation to attend the meeting. The information obtained during the course of the onsite meeting has been used, together with all information exchanged, in the formulation of this determination. 2.1 Is the FSP entitled to deny the applicant’s claim on the basis of the terms of the policy? Coverage of the policy The coverage provided by the applicant’s Business Insurance Policy is in respect to loss and damage caused by an insured event listed within the policy. This means that not all loss and damage is automatically covered, but rather only loss and damage caused by a listed event detailed within the policy. The details of the policy are contained within the Product Disclosure Statement (PDS). The PDS details: Fire and other insured events Cover We will indemnify You up to the limit shown in Your Policy Schedule in respect of physical loss of or damage to: 1. Buildings; 2. Contents; 3. other interests as shown in Your Policy Schedule; directly caused by an insured event. …. Insured events …. 3. Wind and water Wind and water including water and any other liquid discharged, overflowing, leaking or bursting from mains, fixed pipes, gutters, drains, fixed tanks or fixed apparatus used to hold or carry liquids, but not loss or damage: a. by sea, tidal wave, tsunami, high water, Flood, erosion, subsidence, landslide, mudslide or settling; Case No: 454726 Determination Page 3 of 7 …. 11. Accidental damage a. Loss of or damage to Buildings or Contents caused by any accident except loss or damage caused by: i. Insured events 1. to 10. or by any event or circumstance excluded therein ; …. The exchanged material confirms that the applicant was provided with a Supplementary Product Disclosure Statement (SPDS). The SPDS details: New definition of ‘flood’ In all instances in the PDS where the meaning of flood appears, the definition is deleted and replaced with the following definition for flood; ‘Flood’ means the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: a) a lake (whether or not it has been altered or modified); b) a river (whether or not it has been altered or modified); c) a creek (whether or not it has been altered or modified); d) another natural watercourse (whether or not it has been altered or modified); e) a reservoir; f) a canal; g) a dam. About ‘flood’ cover In most cases, (FSP) does not cover flood under the Business Commercial / Retail / Industrial Insurance Policy. This SPDS only changes the definition of flood and does not otherwise change the cover provided. Flood damage is excluded by the standard policy and unless your Policy Schedule specifically states otherwise, there is no cover provided for flood. You should review your PDS and Policy Schedule, as well as any other information given to you by your financial services provider. It is accepted insurance law that the applicant carries the initial onus to show that the loss is covered by the terms and conditions of the policy. Once the applicant has established that coverage is provided for an event, the FSP ’s obligation is to show the application of an exclusion upon which it seeks to deny the claim. The exchanged material confirms that there was a significant weather event in the local area on 5, 6 and 7 June 2016. Further, there is no dispute that the appl icant’s property suffered significant damage as a result of water inundation. As detailed above, the policy provides coverage in the event of loss and damage caused by Wind and water. At claim lodgement, the representatives of the FSP recorded the applicant advising of drain overflow and drain covers lifting off. The panel is satisfied that the applicant has established a claim for loss and damage caused by the insured event of Wind and water. Case No: 454726 Determination Page 4 of 7 Alternatively, the policy provides coverage in the event of Accidental damage. Noting that the damage at the applicant’s property was unforeseen and unintended, the panel is satisfied that in the event the damage was not considered to be caused by Wind and water (which the panel considers was the case) the damage would certainly be regarded as accidental. That said, the policy documentation is clear in that both the insured event of Wind and water and Accidental damage are subject to the exclusion for loss or damage caused by flood. The FSP maintains that it is entitle d to deny the applicant’s claim on the basis that the damage at the premises was caused by flood. The FSP carries the onus to establish this exclusion. Circumstances of the loss The exchanged material confirms that the applicant was at the premises on 5 June 2016, but that there was no inundation at the premises on that date. The applicant says that he received a telephone call from a friend, who was a member of the fire department, at about 3.30am on 6 June 2016. The applicant arrived at the premises at about 4.00am on 6 June 2016. At that time, the water at the premises was about waist height and it had pushed in the roller door to the workshop. In addition to drains overflowing and drain covers lifting, the applicant says that upgrades to the FGR Bridge, allowed more debris to pass down the E River and accumulate at the rail bridge. As a result, water which would normally have proceeded down the river, was blocked and came onto the local land area, including the applicant’s property. Expert evidence In sup port of its denial of the applicant’s claim, the FSP relies upon reports from the hydrologist WRM following a site inspection on 20 June 2016. On the basis of data collected, WRM advised that rainfall intensities were significant, with the one hour storm duration having an annual recurrence interval (ARI) of nine years. Longer duration rainfall intensities were severe, with storm durations between 12 and 48 hours having ARI’s greater than 100 years. WRM concluded that direct rainfall and stormwater runoff from the external catchments would have caused some stormwater runoff to flow in a westerly direction across the property, prior to the arrival of water overflown from the E River. WRM said that this stormwater runoff would have been very shallow in depth. Further, WRM was of the view that it is possible that local stormwater runoff would have reached sufficient depth to enter the large shed or the smaller storage shed and if it were to have entered the sheds, the exact depth is unknown. However, WRM Case No: 454726 Determination Page 5 of 7 was of the view stormwater runoff was likely to have been sufficient to wet the floors only. In addition, WRM was of the view that the local stormwater runoff alone would not reach sufficient depth or flowed with sufficient force to cause damage to roller doors, paving and concrete slabs. Noting that the stormwater manholes are situated along the western boundary of the property, WRM was of the view that water surcharging from the stormwater pipe network would flow in a westerly direction away from the sheds unless it combined with water overflowing from the E River. The surcharging of the stormwater pipes was likely to be due to high tail water levels in the E River. The maximum inundation of the subject property to a depth of about 0.5 metres above floor level i n the large shed, was caused by water overflowing from the E River. WRM agreed with the applicant to the extent that significant blockage of the E River channel by debris caught at the rail bridge, north of the subject property, caused the E River levels upstream of the rail bridge to rise, flowing overland along R road to bypass the debris obstruction at the rail bridge. Based on an assessment of the available data, WRM concluded that the initial inundation of the sheds may have been caused by local stormwater runoff but the exact depth of this initial inundation, if it happened, is unknown but likely to have been sufficient to wet the floors only. Finally, WRM concluded that the maximum inundation of the property to a depth of about 0.5 metres above floor level in the large shed, was caused by water overflowing from the river. Unfortunately with an email of 13 October 2016, WRM appears to have revised its original opinion to the effect that it was of the view that local stormwater runoff would not have inundated the subject property prior to the arrival of water overflowing from the E River. The panel is concerned about this refinement, particularly with regard to the question of stormwater runoff through the property, prior to water arriving from the E River. During the course of the onsite visit, the Panel Chair Ombudsman observed that the property slopes downwards from an east to west position, towards the E River. To the south east of the property is R Hill and on the basis of the onsite inspection, the panel is satisfied that there would have been significant stormwater runoff from R Hill in the direction of the applicant’s property and the E River. Having reviewed all of the exchanged material, the panel is satisfied that the property was subject to stormwater runoff prior to inundation of water from E River. However, having experience with numerous disputes involving stormwater runoff and flood, the panel is satisfied that inundation to a level of 0.5 metres within the shed and inundation to waist height at the low point of the property, is likely the result of flood rather than stormwater runoff. Case No: 454726 Determination Page 6 of 7 The panel accepts that inundation to the levels detailed by the applicant occurred as a result of water overflowing the stormwater drains in the area and water overflowing the confines of the E River and travelling onto the applicant’s property. On the basis of the exchanged material, the panel is satisfied that the water overflowed the stormwater drains in the local area as a result of the rising E River and the inability of stormwater runoff to enter those drains. The effect of the rising river was to cause a surcharge of water back through the drains and as described by the applicant, the lifting of the drain lids as a consequence of the pressure of the surcharge. Under accepted insurance law, the surcharging of drains as a result of the river exceeding its capacity, is flood, as defined by the policy. Further, the panel accepts the applicant’s position that as a result of the debris blocking the base of the railway bridge, water left the confines of the E River and travelled across land, including the applicant’s property. Noting that the policy exclusion for flood relates to the covering of normally dry land by water that has escaped a river, then this situation described by the applicant is again flood under accepted insurance law. The fact that the blockage created by debris at the base of the rail bridge caused the water to escape the river, does not assist the applicant in the claim under this policy of insurance. Once water has escaped from a river and covers normally dry land, then that water is regarded as flood, regardless of what caused the water to escape from the river. Further, the exchanged material confirms that it was raining during the evening of 5 June 2016 and the morning of 6 June 2016 and that there was stormwater runoff during that period. Firstly, as stated, the panel accepts that the stormwater runoff likely impacted the property prior to the water from the E River. Secondly, the water that inundated the applicant’s property to the level of 0.5 metres within the shed and waist height at the low point of the property, was likely a mixture of both stormwater runoff and water from the E River which the panel accepts was flood water. It is accepted insurance law that a mixture of stormwater runoff or rainwater and flood water, is floodwater for the purposes of an insurance policy. The result is that whilst the FSP is entitled to deny that damage caused by flood, the FSP, in accordance with the terms of the policy, must accept the damage from the initial inundation to the property caused by stormwater runoff including within the shed. The panel is of the view that the damage caused by the initial stormwater runoff, is likely to be limited. Case No: 454726 Determination Page 7 of 7 In this regard the panel does not accept that the stormwater runoff would likely have caused damage to a number of areas; specifically:  the cracking in the shed slab  the damage to the doors of the shed  the lifting of the securing bolts or damage to the shed itself  the damage to the forklift  the damage to the steam cleaner  damage to bitumen in the area. The panel accepts that damage to these items was, on balance, more likely than not caused by flood and the FSP is entitled to deny those aspects of the applicant’s claim. However, the FSP is to meet the applicant’s claim in accordance with this determination and under the terms of the policy, for the loss and damage at the applicant’s property as a result of stormwater inundation through the property, to the level of 50 millimetres above ground level. The applicant is to provide evidence of the items damaged and the parties are requested to work together to reach a satisfactory conclusion in respect to this matter. Should the parties be unable to reach a satisfactory conclusion then either party may make further application to the Service. Other claims The applicant says that a claim by the owner of a nearby property who held insurance with the same FSP, has been accepted by the FSP. This has been confirmed by the FSP. However, the panel accepts that each claim must be considered on its own merits, having regard to the particular policy provisions relevant to the claim and the particular evidence concerning the claim. At the onsite visit the Panel Chair Ombudsman was shown the site of the unrelated claim referred to by the applicant. The panel is satisfied that the topography of that site is different. In any event, the panel is satisfied that the fact that the FSP has accepted one claim does not mean that the FSP is r equired to accept the applicant’s claim and as stated each claim must be assessed on its own merits.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.