Escape of liquid claim for rental property damage declined; legal fees contribution ordered
Text of the determination
Determination
Case No: 454641 Determination Page 1 of 12
Case number: 454641 7 December 2017
1 Overview
1.1 Dispute
The applicant says her rental property was damaged by a leaking pipe. She lodged a
claim with the financial services provider (FSP) and submitted a repair quotation in
the amount of $153,450 for payment.
The FSP declined the claim. It says the damage was not caused by a leaking pipe.
Rather, it was due to condensation and groundwater moisture caused by the design
and ventilation issues at the property.
1.2 Issues and key findings
Is the FSP entitled to decline the claim?
On the information provided, the applicant has not established a prima facie claim.
She has not established the claimed leaks caused the claimed damage. While the
parties’ experts agree the damage occurred over a long period of time, no leaks were
found at the time the claim was first made in April 2015. The leak detected in
February 2016 could not have caused the damage seen at the time the claim was
assessed and the leak detection test was undertaken in May 2015.
Is the applicant entitled to compensation?
The applicant is not entitled to non-financial compensation because the material
provided does not establish the FSP’s claims handling caused the applicant to
experience an unusual degree or extent of inconvenience.
The applicant is not entitled to professional costs because her engineer’s report did
not assist the applicant in establishing the damage was caused by an insured event.
The applicant is entitled to $1,500 as reimbursement of legal fees, given the
applicant’s medical condition and complexity of the claim and dispute.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is entitled to decline the claim and need take no further action in relation to
the claim or the dispute.
Should the applicant accept the determination, within seven days of acceptance, the
FSP is to pay to the applicant $1,500 towards her legal fees.
Case No: 454641 Determination Page 2 of 12
2 Reasons for determination
2.1 Is the FSP entitled to decline the claim?
Applicant must establish an insured event caused the loss
The applicant must establish on the balance of probabilities she has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim. In the specific circumstances of this dispute, the applicant must establish the
claimed damage was caused by escape of liquid.
Once established, the onus shifts to the FSP to establish it is entitled to deny or limit
the claim because the claimed damage was caused by an excluded cause.
The applicant’s engineer asserts several leaks have caused damage. The first leak
was in 2014 at the south east corner of the driveway. The second leak was in April
2015 when the tenants said the toilet cistern was leaking. The third leak was in
February 2016 when a leak at the stop tap on the south side of the building was
identified.
The applicant’s engineer says the damage claimed is essentially limited to the
bathroom and toilet, the north-west corner of the living room and a small section of
floor between bedroom two and three. The engineer says all of these areas are either
wet areas or in locations where water has leaked.
Applicant identifies a number of water leaks
The applicant’s property was constructed in about 2006, and was occupied by the
applicant until 2013. The applicant states there were no leaks during this time.
Photographs taken in August 2013 show some minor cracking damage to the outside
of the house which the applicant attributed to various construction works adjacent to
her property.
In July 2014, the applicant says the tenant observed water flowing up through the
joints in the front driveway. She said a plumber found water leaked from the water
main at the south east corner of the garage and the leak was repaired.
The applicant’s engineer supplied photographs showing water emanat ing from the
joint in the driveway flowing to the roadside. The engineer reported, following repairs,
no further water was seen coming from the driveway joints. The material provided
shows no claim was lodged on the FSP.
In April 2015, the applicant’s tena nts told the applicant they could no longer use the
main toilet in the house. They said the toilet cistern was leaking, water fell on the
floor when the toilet was flushed, and the floor was spongy. They said they turned the
water stop tap off at the wall and locked the door so the toilet could not be used.
The applicant lodged a claim with the FSP in April 2015 after the tenant’s notification
and was told by the FSP to repair the leak. From the material provided, it is not
known if and when the leak was re paired. The panel notes the applicant’s engineer
Case No: 454641 Determination Page 3 of 12
says the leak in the toilet was repaired prior to his involvement. The engineer
inspected the property on 1 December 2016.
Experts assessed the damage and provided reports
The FSP’s assessor (C) inspected the property with the applicant’s builder (F) on 6
May 2015. C reported the builder inspected a meter box at the front of the property
along the driveway which showed water pooling under the box. Although water was
bailed out, gravel continued to fall into the box from the sides with water continually
filling the cavity.
C also noted the ground was damp under the house and mould was present on
beams. The builder said the damage to the floor might be because of changes in the
groundwater flow off. Because there was damage in the dining area also, the builder
thought the damage was not because of a leaking pipe. There was no evidence of
water pooling in the toilet when they inspected it.
C noted the damage in the toilet and also noted the dining room floor had dropped
slightly along the back wall. C noted minor watermarks at the back door entry and
thought this might be because of rain coming through the open door.
The applicant’s builder asked for a water pressure test be undertaken to see if pipes
were leaking.
In May 2015, the applicant’s plumber (CJ) detected no leaks when he completed a
water pressure test on the water supply.
Because of the musty odour under the timber floor, CJ went under the floor. He said
he found the whole of the underfloor along the southern side of the house was
“dripping wet.” Two floor joists in the toilet had completely rotted (thus causing the
floor to be spongy). He said the same problem was happening around the bath.
CJ did not make a finding about the source of moisture, but he said the vents in the
walls on the southern and western sides were not clear and so there was no air flow
at all under the floor. He also noted the underfloor area was well below the path level
outside the south side and also well below the concrete garage slab.
After further investigation by an engineer and geotechnical expert, the FSP declined
the applicant’s claim. The FSP said the damage was not caused by leaking pipes.
Rather, the FSP contended the damage was because of condensation of
groundwater within the subfloor space caused by inadequate subfloor ventilation
which had been ongoing over the life of the building.
The FSP’s engineer inspected the property in September 2015. He observed the
timber floor in the bathroom was decayed and the floors in the toilet and the north-
west corner of the living room floor were spongy.
Even though the leaks identified in 2014 and 2015 had apparently been repaired,
nonetheless, he said the underside of the flooring and floor framing was saturated
and covered with mould.
The FSP’s engineer also engaged a geotechnical expert who concluded the
groundwater levels had been observed at about 0.8m to 1m below ground level and
Case No: 454641 Determination Page 4 of 12
higher ground water levels are possible especially after high rainfall events. The
engineer did not have proof of the high water levels but said the sands at the site had
high permeability and would allow groundwater level to rise quickly if sufficient rain
fell on slopes uphill of the house.
The FSP’s engineer described the relevance of these observations. He said if the
ground level rose then the water table in the backyard would be higher than the
ground surface level of the sub floor as the subfloor space is 300mm lower than the
ground surface in the backyard. As a result, this groundwater, without any effective
subfloor ventilation causes condensation within the subfloor space leading to
disintegration of the flooring and framing. He said the extent of the timber decay was
such that it had been ongoing for a long period.
In February 2016, the FSP arranged for a plumbing camera operator (N) to attend
the site to undertake investigative works. There was a pipe camera inspection of all
drains and stormwater pipes. No blockages, breaks or escape of liquid was detected
except for a minor leak at the stop tap close to the bathroom. The leak was described
as “very very minor just a dribble.”
N also inspected under the house to find it was very damp with mould build up in
areas away from any water points. He concluded the groundwater and the inabili ty
for this to dry is a major problem.
In December 2016, the applicant’s engineer inspected the property. In addition to the
deterioration of the timber floor in the main bathroom and toilet, he identified
significant settlement of the timber floor in the north-west corner of the living room
and sponginess in another section of floor along the south wall between bedroom two
and three.
He says the “more recently discovered water leak” outside the south wall of bedroom
two is discharging water into the subfloor. He measured the water flow and
determined it was flowing at 16 litres per hour. This stands in contrast to what N
describes as “a dribble.” The applicant’s engineer could make no observations about
the flow of and duration of the two earlier leaks.
The panel has no information about repairs to the leak identified in February 2016.
Given the applicant’s plumber (CJ) confirmed in M ay 2015 there was no leak in the
water supply, on balance, the panel accepts it is likely the leak detected by N
developed after May 2015. The applicant’s engineer (TC) acknowledged this as a
possibility. Whilst this leak may have been an initial minor dribble, the panel accepts
the leak probably worsened.
In January 2017, the applicant’s engineer cut a series of holes in the flooring at
various locations and confirmed the flooring, joists and bearers in the bathroom and
toilet were severely degraded due to timber rot. He described damage to the flooring
of the living room isolated in the north-west corner.
He also said the damage to the floor in bedrooms two and three along the south wall
was isolated in the vicinity of the leaking water main along the south wall.
He observed the flooring and framing and said other areas of the living room, dining
room and kitchen area do not have significant damage. He also said areas of the
Case No: 454641 Determination Page 5 of 12
room further north of the leaking pipe on the south wall are not affected and areas
further west and east along the south wall are also not as badly affected.
The applicant’s engineer argues the high water table measured by the FSP’s
engineers has only been inferred. Given the location of the water damage he argues
it is likely the water damage was caused by the three identified water leaks. He says
if groundwater was the major water source causing damage then more widespread
damage would be expected. He also contends, while the pressure test in May 2015
did not identify any leaks, the toilet cistern and water main had already been
repaired.
The experts do not agree on the source of the water
The parties have both provided engineer’s reports.
On the information exchanged, the panel accepts there is damage and advanced
timber rot to the property as identified by the engineers and the damage is caused by
water. The issue in dispute is the source of the water.
Both engineers identify non-compliance with building codes including that the ground
level in the subfloor space is lower than the ground or paving about the perimeters
and the inadequacy of the subfloor ventilation. Both plumbers make these
observations too.
While the applicant’s engineer accepts the inadequate subfloor ventilation is a major
contributing factor to the damage, the disagreement in opinion lies in the source of
water. The applicant’s engineer says the geotechnical results with respect to
groundwater is insufficient evidence to conclude the deterioration is because of the
high water table. While the engineer accepts the groundwater is a likely contributing
source, he says the water from wet areas including leaking pipes is also a major
factor.
In 2014 the water flowed away from the property
The applicant must establish escape of liquid caused the damage. She identifies
three leaking pipe events. She must show the proximate cause of the loss (or the
effective, dominant or operative cause) is caused by one of these events.
Having considered the photographs provided, the panel accepts in 2014 water flowed
up through the joints in the driveway. Apparently, the applicant’s plumber identified a
leak in the water main at the south-east corner of the garage which was repaired.
The applicant’s engineer reports no further water was observed emanating from the
driveway joints after repair. He also makes the point the main could have been
leaking for a considerable period of time causing water to flow under both the garage
and driveway slab saturating the soil before the leaking was seen.
As the FSP’s engineer was not previously made aware of the tenant’s observation in
July 2014, he made no substantive specific comment except to say no leaks were
identified when tested in May 2015.
The panel is not persuaded on the balance of probabilities the leaking pipe in 2014
cause the claimed water damage. The photographs show the water moving down the
Case No: 454641 Determination Page 6 of 12
driveway away from the house into the street. In addition, although the applicant’s
engineer speculates the main could have been leaking for some time, saturating the
soil, without further information, this speculation is insufficiently persuasive. No
material is provided contemporaneous with the event. There is no statement from the
tenants about the extent of damage from this event and no material from the plumber
who repaired the leak in 2014.
Furthermore, no leak was detected by the applicant’s plumber in May 2015.
The panel considers the applicant has not established a prima facie claim and has
not established the proximate cause of the claimed damage was the leaking pipe in
2014.
No leak detected in the cistern by the applicant’s plumber in May 2015
The panel is also not persuaded on the balance of probabilities the claimed leaking
toilet cistern caused damage. This is because no leak was detected by the
applicant’s plumber in May 2 015. Although it is said the leak was repaired, no
material is provided by the applicant’s plumber about the extent or cause of the leak.
Further, even though the tenants turned off the tap in April 2015, and the cistern was
apparently repaired, nonethele ss, when the FSP’s engineer inspected the damage in
September 2015 he observed the underside of the flooring and floor framing was
saturated and covered with mould.
Also of particular note, the applicant’s engineer stated in his report that the timber
decay had occurred over a long period of time, and not just since the first issues
were observed in 2013. In the circumstances, the panel is not persuaded the
proximate cause of the loss is the leaking cistern, as the panel does not accept the
flooring would be saturated some several months after the leaking was observed and
repaired. Further, the experts agree that the timber rot was likely occurring over an
extended period of time, likely for years prior to the reported leaking cistern.
Leak near bedroom two and three did not cause damage to bathroom and toilet
The panel is also not persuaded on the balance of probabilities the leak outside
bedroom two and three caused the claimed damage in the bathroom and toilet.
This is because this leak was not identifi ed in May 2015. When the applicant’s
engineer provided his report in January 2017, he agreed this leak may have only
been occurring for 12 months.
The leak was identified in February 2016. The applicant’s engineer attributes the
damage in bedroom two and three to this leak saying the location corresponds with
the south side water pipe leak.
In February 2016, the leak was described by the FSP’s plumber as very, very minor.
On the other hand, the applicant’s engineer says a new electronic flow meter was
installed in the property in November 2015 and when he measured the flowrate in
December 2016 the flowrate from the leak was determined to be 16 L per hour.
Case No: 454641 Determination Page 7 of 12
The applicant’s e ngineer goes on to say the camera survey of the sewer and
stormwater pipes most likely only covered the main lines and not all branches due to
the limited access for the camera and may not necessarily identify a leaking joint.
However, the material provided indicates the leak was identified but was considered
to be minor.
The leak was not repaired at the time of the applicant’s engineer’s reports.
The panel considers the material provided establishes the leak identified in February
2016 probably developed sometime between May 2015 and February 2016. As such
the panel is satisfied this leak did not contribute to the claimed damage under the
bathroom and toilet identified in April 2015.
Substantial water damage identified at the property in May 2015
As for the cause of the damage to bedroom two and three, the panel accepts on the
information provided this leak may have caused some damage to areas proximate to
the leak. The applicant’s engineer identifies this as a small section of floor between
bedroom two and three.
When the leak was identified, it was identified as being very very minor.
While the panel accepts the minor leak may have caused damage to bedroom one
and two, once the leak was identified, it should have been repaired. The applicant
has an obligation to mitigate damage.
Further, the panel considers other factors must be taken into consideration. The
applicant’s engineer agrees with the FSP’s engineer that the excavated ground level
beneath the timber floor does not comply with building code requirements. Therefore
water ponded beneath the building because of the lower level compared to the
external surface.
Also, the applicant’s engineer agrees the subfloor ventilation is a “major contributing
factor” to the water damage. He says the area ve ntilation is “completely inadequate”
being only around 12% of what is recommended in the building code.
He agrees the property could be classified as having a relatively high water table and
poor drainage yet says not only is there an inadequate ventilation system but there is
no recommended membrane over the ground surface or treated timber. He also says
the choice of a timber floor was inappropriate and should have been slab on ground
construction with a floating timber overlay.
He argues these issues are ameliorated by the concrete paving surrounding all sides
of the property as the paving would help stabilise the water table level by limiting
water ingress during periods of high rainfall.
He also argues there would be more widespread deterioration if the groundwater was
the main water source. He cut holes in the flooring in January 2017 and said he did
not see widespread deterioration. While he agrees with the FSP’s engineer that
groundwater is a contributing factor, he argues the water leaks are a more significant
cause of the damage.
Case No: 454641 Determination Page 8 of 12
He asserts even with improved subfloor ventilation, the quantities of water from
leaking pipes would be sufficient over time to cause the observed damage. He says
the timber decay occurred over a long period of time.
Having considered all the material provided, the panel is not satisfied the proximate
cause of the damage to bedroom two and three is from the leaks identified in May
2015 or February 2016. This is because if the damage in this area was as a result of
the leaking pipe identified in February 2016, then it could not have contributed to the
damp environment which caused the rotted timber seen in May 2015.
Although the applicant’s engineer says the areas of damage are not widespread, he
bases this on what he saw when he cut holes in the floor in January 2017. This does
not take into account observations made by the various experts who inspected the
property earlier. Specifically, in May 2015, the applicant’s plumber reported:
“I proceeded under floor and found tha t the whole of under floor along southern side of hous e
was dripping wet. It had beads of water dripping of water bottom of under flooring and off floor
joists and bearers. This stretched out about 2 metres off southern wall……”
Taking all matters into account, and particularly the extensive damage identified in
May 2015, the panel is not satisfied on the balance of probabilities the proximate
cause of the damage to bedroom two and bedroom three is the leaking pipe
identified in February 2016.
Rather, havin g considered both parties’ engineers’ opinions, the panel accepts the
timber damage had occurred over a long period of time. The panel is satisfied on the
balance of probabilities the proximate cause of the claimed damage is non-
compliance with a number of building code requirements.
Living room damage not caused by leaking pipes
Both engineers identified damage in the north-west corner of the living room. The
FSP’s engineer agrees there is spongy flooring in this area where it has substantially
lost support typical of timber framing decay.
The applicant does not contend the three leaks caused this damage.
After the applicant’s engineer cut a series of holes in the flooring, he identified the
damage to the flooring and framing in the living room was isolated. He said it
appeared to be related to water leaks through the sliding door in the west wall. The
engineer conducted a spray test on the door. It leaked. The engineer observed there
were no drainage holes in the track and it discharges water each end of the track.
He contended the inadequate subfloor ventilation did not affect this failure as water
ingress was at flooring level.
The FSP’s engineer agrees this appears to be water leaking in through the door
framing rather than subfloor moisture.
In order for the FSP’s policy to respond, the applicant must establish this damage
was caused by an insured event such as water leaking through the door in a storm.
On the material provided, the panel is not satisfied the damage was caused by any
specific event; there is no report of any such storm, but rather water entry appears to
have occurred over time.
Case No: 454641 Determination Page 9 of 12
In any event, the panel accepts the material provided from the applicant’s engineer
establishes the sliding door leaked. The FSP’s policy does not resp ond to damage
caused by a defect which an insured knew about or should reasonably have known
about but did not fix. Cover is not provided for damage which occurs in this manner.
External cracking damage not caused by an insured event
The applicant submitted a letter dated 16 September 2016 from her builder relating to
proposed remedial works. Those works included the repair of cracking to the external
block work of the house.
The FSP’s engineer compared photographs taken in 2013 and 2015. It said the
external damage had not increased and so considered the external damage was
caused on or before 2013.
The tenant apparently said the cracking in the walls first appeared following the 2013
winter. The applicant referred to construction which took place adjace nt to her
property at or about this time.
Having undertaken a series of tests, the FSP’s geotechnical expert said the exterior
damage to the house is related to the settlement of the footings which was
considered to be due to loss of bearing capacity of sandy soils due to saturation
and/or further loss of bearing capacity due to partial liquid application of saturated
sand induced by vibrating earthmoving equipment.
The FSP’s engineer said, in addition, the masonry veneer and its rendered surfaces
became saturated with groundwater over time weakening the bonds at the interface
of the blockwork masonry and either concrete and render.
The applicant’s engineer noted the cracking of the external masonry walls was first
identified during the winter of 2013 and coincided with construction adjoining the
property.
The applicant’s engineer agrees minor footing movement in saturated soils is likely to
have caused the issue. He says the lack of movement joints in the masonry reduces
the ability of the wall to accommodate this movement and hence increases cracking.
He says the cracking is not structurally significant and is more prevalent at the east
end of the house.
The FSP’s policy is an insured event policy. The uncontested information is the
damage was caused by footing movement or lack of movement joints in the masonry.
There is no information that this claimed damage or footing movement was caused
by an insured event such as flood or storm or earthquake or escape of liquid.
The applicant’s engineer says the dam age is mainly to the east or front of the
property. The material provided does not establish one of the three leaking pipes
caused the damage. Even though a pipe leaked at the front of the house in 2014, the
panel accepts the uncontested evidence the damage occurred sometime in 2013.
In the circumstances, on the information provided, the panel is satisfied the FSP is
entitled to deny liability for the claim to cracking damage.
Case No: 454641 Determination Page 10 of 12
The FSP is entitled to decline the claim as the applicant has not established a prima
facie claim.
2.2 Is the applicant entitled to compensation?
Compensation only payable in certain circumstances
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant’s expectation of
enjoyment or peace of mind.
The decision to reject the claim was made by the FSP in September 2015. This was
some four months after the claim was lodged with the FSP. The panel notes there
was some delay in processing the claim. However, given the complexity of the claim,
it was not unreasonable for the FSP to engage further experts to investigate and
assess the claim and report it.
After the claim was declined, the applicant requested an internal review. The FSP
was proactive in investigating the applicant’s concerns by sending out further experts
to assess and report.
The panel accepts the applicant’s circumstances are very stressful. However, on the
information provided, the panel is not satisfied an award of compensation is
warranted. The is because the panel does not accept the FSP’s claims handling
caused the applicant to experience an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant’s expectation of
enjoyment or peace of mind.
Engineer’s advice did not assist in the resolution of the dispute
The applicant seeks reimbursement for professional costs incurred during the course
of this dispute. She paid a significant amount to the engineer she engaged who
inspected the property and provided a number of reports.
Under paragraph 9.4 of FOS’s Terms of Reference, FOS may require the FSP to
contribute to professional costs incurred by an applicant in the course of the dispute.
However, FOS will generally do so only where the advice provided has assisted in
the resolution of the dispute.
In the present case, the pane l is not satisfied the reports provided by the applicant’s
engineer have assisted in identifying the cause of the claimed damage to the
property beyond the issues already identified by the FSP’s engineer and by the
parties’ leak detection reports.
The inve stigations carried out by the applicant’s engineer did identify a worsening
water leak. However this in itself did not assist the applicant in establishing the
damage was caused by this leak or an insured event under the policy.
Taking all matters into account, the panel is not satisfied the FSP is required to
reimburse the applicant for the professional costs incurred in engaging an engineer.
Case No: 454641 Determination Page 11 of 12
Medical condition and dispute’s complexity warrant part payment of legal fees
Under paragraph 9.4 of FOS’s Terms of Reference, FOS may require the FSP to
contribute to legal costs incurred by an applicant in the course of the dispute.
Unless exceptional circumstances apply, FOS will not require the FSP to contribute
more than $3,000 to these costs.
The FOS process is designed to be accessible to applicants without legal
representation. Accordingly, FOS will not generally require the FSP to contribute to
an applicant’s legal costs, unless the dispute is particularly complex or raises specific
legal issues.
The applicant has provided tax invoices from her lawyer totalling $3,300.
Given the circumstances of the current claim and the complexity of the dispute, the
panel accepts it was reasonable for the applicant to seek legal advice.
The applicant states she suffers from a bipolar disorder and the additional stressors
escalate her symptoms of anxiety and depression. The applicant provided medical
certificates showing she was unable to work while the claim and dispute were
ongoing.
The issues in dispute were complex. The damage sustained is extensive. The parties
had to investigate the cause of the damage.
The submissions prepared by the applicant’s lawyer were of some assistance in
clarifying the applicant’s position.
However, the panel does not accept the issues in dispute were so complex as to
require the extensive involvement of a lawyer on an ongoing basis.
Taking all matters into account, the panel considers it is fair in the circumstances the
FSP make some contribution to the a pplicant’s legal costs. The panel is satisfied it is
fair the FSP contribute $1,500 to the applicant’s legal fees.
Case No: 454641 Determination Page 12 of 12
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination by a panel.
The panel consists of an ombudsman and two panel members with extensive
experience in insurance industry matters and consumer complaints.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is represented. References to the applicant in the determination
include references to her representative.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 29
November 2016. Both the policy document and the Notice have been exchanged
with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions, emails, photographs, leak reports, engineers’ reports and
all attachments to all submissions
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.