Home / Financial Firm (Unknown - Insurer) / Determination 454641

Determination 454641

Escape of liquid claim for rental property damage declined; legal fees contribution ordered

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-21
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$1,500
Non-financial loss—
Amount claimed$153,450
SourceAFCA PDF

Summary

The applicant claimed $153,450 for water damage to her rental property, which the FSP declined as not caused by an insured leak. AFCA upheld the decline but ordered the FSP to contribute $1,500 towards her legal fees given her medical condition and the complexity of the dispute.

The applicant failed to show on the balance of probabilities that an escape of liquid from a pipe caused the damage, which the experts attributed mainly to long-term groundwater and inadequate subfloor ventilation.

Issues

Subjects and remedies

health or medicalpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 454641 Determination Page 1 of 12 Case number: 454641 7 December 2017 1 Overview 1.1 Dispute The applicant says her rental property was damaged by a leaking pipe. She lodged a claim with the financial services provider (FSP) and submitted a repair quotation in the amount of $153,450 for payment. The FSP declined the claim. It says the damage was not caused by a leaking pipe. Rather, it was due to condensation and groundwater moisture caused by the design and ventilation issues at the property. 1.2 Issues and key findings Is the FSP entitled to decline the claim? On the information provided, the applicant has not established a prima facie claim. She has not established the claimed leaks caused the claimed damage. While the parties’ experts agree the damage occurred over a long period of time, no leaks were found at the time the claim was first made in April 2015. The leak detected in February 2016 could not have caused the damage seen at the time the claim was assessed and the leak detection test was undertaken in May 2015. Is the applicant entitled to compensation? The applicant is not entitled to non-financial compensation because the material provided does not establish the FSP’s claims handling caused the applicant to experience an unusual degree or extent of inconvenience. The applicant is not entitled to professional costs because her engineer’s report did not assist the applicant in establishing the damage was caused by an insured event. The applicant is entitled to $1,500 as reimbursement of legal fees, given the applicant’s medical condition and complexity of the claim and dispute. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is entitled to decline the claim and need take no further action in relation to the claim or the dispute. Should the applicant accept the determination, within seven days of acceptance, the FSP is to pay to the applicant $1,500 towards her legal fees. Case No: 454641 Determination Page 2 of 12 2 Reasons for determination 2.1 Is the FSP entitled to decline the claim? Applicant must establish an insured event caused the loss The applicant must establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In the specific circumstances of this dispute, the applicant must establish the claimed damage was caused by escape of liquid. Once established, the onus shifts to the FSP to establish it is entitled to deny or limit the claim because the claimed damage was caused by an excluded cause. The applicant’s engineer asserts several leaks have caused damage. The first leak was in 2014 at the south east corner of the driveway. The second leak was in April 2015 when the tenants said the toilet cistern was leaking. The third leak was in February 2016 when a leak at the stop tap on the south side of the building was identified. The applicant’s engineer says the damage claimed is essentially limited to the bathroom and toilet, the north-west corner of the living room and a small section of floor between bedroom two and three. The engineer says all of these areas are either wet areas or in locations where water has leaked. Applicant identifies a number of water leaks The applicant’s property was constructed in about 2006, and was occupied by the applicant until 2013. The applicant states there were no leaks during this time. Photographs taken in August 2013 show some minor cracking damage to the outside of the house which the applicant attributed to various construction works adjacent to her property. In July 2014, the applicant says the tenant observed water flowing up through the joints in the front driveway. She said a plumber found water leaked from the water main at the south east corner of the garage and the leak was repaired. The applicant’s engineer supplied photographs showing water emanat ing from the joint in the driveway flowing to the roadside. The engineer reported, following repairs, no further water was seen coming from the driveway joints. The material provided shows no claim was lodged on the FSP. In April 2015, the applicant’s tena nts told the applicant they could no longer use the main toilet in the house. They said the toilet cistern was leaking, water fell on the floor when the toilet was flushed, and the floor was spongy. They said they turned the water stop tap off at the wall and locked the door so the toilet could not be used. The applicant lodged a claim with the FSP in April 2015 after the tenant’s notification and was told by the FSP to repair the leak. From the material provided, it is not known if and when the leak was re paired. The panel notes the applicant’s engineer Case No: 454641 Determination Page 3 of 12 says the leak in the toilet was repaired prior to his involvement. The engineer inspected the property on 1 December 2016. Experts assessed the damage and provided reports The FSP’s assessor (C) inspected the property with the applicant’s builder (F) on 6 May 2015. C reported the builder inspected a meter box at the front of the property along the driveway which showed water pooling under the box. Although water was bailed out, gravel continued to fall into the box from the sides with water continually filling the cavity. C also noted the ground was damp under the house and mould was present on beams. The builder said the damage to the floor might be because of changes in the groundwater flow off. Because there was damage in the dining area also, the builder thought the damage was not because of a leaking pipe. There was no evidence of water pooling in the toilet when they inspected it. C noted the damage in the toilet and also noted the dining room floor had dropped slightly along the back wall. C noted minor watermarks at the back door entry and thought this might be because of rain coming through the open door. The applicant’s builder asked for a water pressure test be undertaken to see if pipes were leaking. In May 2015, the applicant’s plumber (CJ) detected no leaks when he completed a water pressure test on the water supply. Because of the musty odour under the timber floor, CJ went under the floor. He said he found the whole of the underfloor along the southern side of the house was “dripping wet.” Two floor joists in the toilet had completely rotted (thus causing the floor to be spongy). He said the same problem was happening around the bath. CJ did not make a finding about the source of moisture, but he said the vents in the walls on the southern and western sides were not clear and so there was no air flow at all under the floor. He also noted the underfloor area was well below the path level outside the south side and also well below the concrete garage slab. After further investigation by an engineer and geotechnical expert, the FSP declined the applicant’s claim. The FSP said the damage was not caused by leaking pipes. Rather, the FSP contended the damage was because of condensation of groundwater within the subfloor space caused by inadequate subfloor ventilation which had been ongoing over the life of the building. The FSP’s engineer inspected the property in September 2015. He observed the timber floor in the bathroom was decayed and the floors in the toilet and the north- west corner of the living room floor were spongy. Even though the leaks identified in 2014 and 2015 had apparently been repaired, nonetheless, he said the underside of the flooring and floor framing was saturated and covered with mould. The FSP’s engineer also engaged a geotechnical expert who concluded the groundwater levels had been observed at about 0.8m to 1m below ground level and Case No: 454641 Determination Page 4 of 12 higher ground water levels are possible especially after high rainfall events. The engineer did not have proof of the high water levels but said the sands at the site had high permeability and would allow groundwater level to rise quickly if sufficient rain fell on slopes uphill of the house. The FSP’s engineer described the relevance of these observations. He said if the ground level rose then the water table in the backyard would be higher than the ground surface level of the sub floor as the subfloor space is 300mm lower than the ground surface in the backyard. As a result, this groundwater, without any effective subfloor ventilation causes condensation within the subfloor space leading to disintegration of the flooring and framing. He said the extent of the timber decay was such that it had been ongoing for a long period. In February 2016, the FSP arranged for a plumbing camera operator (N) to attend the site to undertake investigative works. There was a pipe camera inspection of all drains and stormwater pipes. No blockages, breaks or escape of liquid was detected except for a minor leak at the stop tap close to the bathroom. The leak was described as “very very minor just a dribble.” N also inspected under the house to find it was very damp with mould build up in areas away from any water points. He concluded the groundwater and the inabili ty for this to dry is a major problem. In December 2016, the applicant’s engineer inspected the property. In addition to the deterioration of the timber floor in the main bathroom and toilet, he identified significant settlement of the timber floor in the north-west corner of the living room and sponginess in another section of floor along the south wall between bedroom two and three. He says the “more recently discovered water leak” outside the south wall of bedroom two is discharging water into the subfloor. He measured the water flow and determined it was flowing at 16 litres per hour. This stands in contrast to what N describes as “a dribble.” The applicant’s engineer could make no observations about the flow of and duration of the two earlier leaks. The panel has no information about repairs to the leak identified in February 2016. Given the applicant’s plumber (CJ) confirmed in M ay 2015 there was no leak in the water supply, on balance, the panel accepts it is likely the leak detected by N developed after May 2015. The applicant’s engineer (TC) acknowledged this as a possibility. Whilst this leak may have been an initial minor dribble, the panel accepts the leak probably worsened. In January 2017, the applicant’s engineer cut a series of holes in the flooring at various locations and confirmed the flooring, joists and bearers in the bathroom and toilet were severely degraded due to timber rot. He described damage to the flooring of the living room isolated in the north-west corner. He also said the damage to the floor in bedrooms two and three along the south wall was isolated in the vicinity of the leaking water main along the south wall. He observed the flooring and framing and said other areas of the living room, dining room and kitchen area do not have significant damage. He also said areas of the Case No: 454641 Determination Page 5 of 12 room further north of the leaking pipe on the south wall are not affected and areas further west and east along the south wall are also not as badly affected. The applicant’s engineer argues the high water table measured by the FSP’s engineers has only been inferred. Given the location of the water damage he argues it is likely the water damage was caused by the three identified water leaks. He says if groundwater was the major water source causing damage then more widespread damage would be expected. He also contends, while the pressure test in May 2015 did not identify any leaks, the toilet cistern and water main had already been repaired. The experts do not agree on the source of the water The parties have both provided engineer’s reports. On the information exchanged, the panel accepts there is damage and advanced timber rot to the property as identified by the engineers and the damage is caused by water. The issue in dispute is the source of the water. Both engineers identify non-compliance with building codes including that the ground level in the subfloor space is lower than the ground or paving about the perimeters and the inadequacy of the subfloor ventilation. Both plumbers make these observations too. While the applicant’s engineer accepts the inadequate subfloor ventilation is a major contributing factor to the damage, the disagreement in opinion lies in the source of water. The applicant’s engineer says the geotechnical results with respect to groundwater is insufficient evidence to conclude the deterioration is because of the high water table. While the engineer accepts the groundwater is a likely contributing source, he says the water from wet areas including leaking pipes is also a major factor. In 2014 the water flowed away from the property The applicant must establish escape of liquid caused the damage. She identifies three leaking pipe events. She must show the proximate cause of the loss (or the effective, dominant or operative cause) is caused by one of these events. Having considered the photographs provided, the panel accepts in 2014 water flowed up through the joints in the driveway. Apparently, the applicant’s plumber identified a leak in the water main at the south-east corner of the garage which was repaired. The applicant’s engineer reports no further water was observed emanating from the driveway joints after repair. He also makes the point the main could have been leaking for a considerable period of time causing water to flow under both the garage and driveway slab saturating the soil before the leaking was seen. As the FSP’s engineer was not previously made aware of the tenant’s observation in July 2014, he made no substantive specific comment except to say no leaks were identified when tested in May 2015. The panel is not persuaded on the balance of probabilities the leaking pipe in 2014 cause the claimed water damage. The photographs show the water moving down the Case No: 454641 Determination Page 6 of 12 driveway away from the house into the street. In addition, although the applicant’s engineer speculates the main could have been leaking for some time, saturating the soil, without further information, this speculation is insufficiently persuasive. No material is provided contemporaneous with the event. There is no statement from the tenants about the extent of damage from this event and no material from the plumber who repaired the leak in 2014. Furthermore, no leak was detected by the applicant’s plumber in May 2015. The panel considers the applicant has not established a prima facie claim and has not established the proximate cause of the claimed damage was the leaking pipe in 2014. No leak detected in the cistern by the applicant’s plumber in May 2015 The panel is also not persuaded on the balance of probabilities the claimed leaking toilet cistern caused damage. This is because no leak was detected by the applicant’s plumber in May 2 015. Although it is said the leak was repaired, no material is provided by the applicant’s plumber about the extent or cause of the leak. Further, even though the tenants turned off the tap in April 2015, and the cistern was apparently repaired, nonethele ss, when the FSP’s engineer inspected the damage in September 2015 he observed the underside of the flooring and floor framing was saturated and covered with mould. Also of particular note, the applicant’s engineer stated in his report that the timber decay had occurred over a long period of time, and not just since the first issues were observed in 2013. In the circumstances, the panel is not persuaded the proximate cause of the loss is the leaking cistern, as the panel does not accept the flooring would be saturated some several months after the leaking was observed and repaired. Further, the experts agree that the timber rot was likely occurring over an extended period of time, likely for years prior to the reported leaking cistern. Leak near bedroom two and three did not cause damage to bathroom and toilet The panel is also not persuaded on the balance of probabilities the leak outside bedroom two and three caused the claimed damage in the bathroom and toilet. This is because this leak was not identifi ed in May 2015. When the applicant’s engineer provided his report in January 2017, he agreed this leak may have only been occurring for 12 months. The leak was identified in February 2016. The applicant’s engineer attributes the damage in bedroom two and three to this leak saying the location corresponds with the south side water pipe leak. In February 2016, the leak was described by the FSP’s plumber as very, very minor. On the other hand, the applicant’s engineer says a new electronic flow meter was installed in the property in November 2015 and when he measured the flowrate in December 2016 the flowrate from the leak was determined to be 16 L per hour. Case No: 454641 Determination Page 7 of 12 The applicant’s e ngineer goes on to say the camera survey of the sewer and stormwater pipes most likely only covered the main lines and not all branches due to the limited access for the camera and may not necessarily identify a leaking joint. However, the material provided indicates the leak was identified but was considered to be minor. The leak was not repaired at the time of the applicant’s engineer’s reports. The panel considers the material provided establishes the leak identified in February 2016 probably developed sometime between May 2015 and February 2016. As such the panel is satisfied this leak did not contribute to the claimed damage under the bathroom and toilet identified in April 2015. Substantial water damage identified at the property in May 2015 As for the cause of the damage to bedroom two and three, the panel accepts on the information provided this leak may have caused some damage to areas proximate to the leak. The applicant’s engineer identifies this as a small section of floor between bedroom two and three. When the leak was identified, it was identified as being very very minor. While the panel accepts the minor leak may have caused damage to bedroom one and two, once the leak was identified, it should have been repaired. The applicant has an obligation to mitigate damage. Further, the panel considers other factors must be taken into consideration. The applicant’s engineer agrees with the FSP’s engineer that the excavated ground level beneath the timber floor does not comply with building code requirements. Therefore water ponded beneath the building because of the lower level compared to the external surface. Also, the applicant’s engineer agrees the subfloor ventilation is a “major contributing factor” to the water damage. He says the area ve ntilation is “completely inadequate” being only around 12% of what is recommended in the building code. He agrees the property could be classified as having a relatively high water table and poor drainage yet says not only is there an inadequate ventilation system but there is no recommended membrane over the ground surface or treated timber. He also says the choice of a timber floor was inappropriate and should have been slab on ground construction with a floating timber overlay. He argues these issues are ameliorated by the concrete paving surrounding all sides of the property as the paving would help stabilise the water table level by limiting water ingress during periods of high rainfall. He also argues there would be more widespread deterioration if the groundwater was the main water source. He cut holes in the flooring in January 2017 and said he did not see widespread deterioration. While he agrees with the FSP’s engineer that groundwater is a contributing factor, he argues the water leaks are a more significant cause of the damage. Case No: 454641 Determination Page 8 of 12 He asserts even with improved subfloor ventilation, the quantities of water from leaking pipes would be sufficient over time to cause the observed damage. He says the timber decay occurred over a long period of time. Having considered all the material provided, the panel is not satisfied the proximate cause of the damage to bedroom two and three is from the leaks identified in May 2015 or February 2016. This is because if the damage in this area was as a result of the leaking pipe identified in February 2016, then it could not have contributed to the damp environment which caused the rotted timber seen in May 2015. Although the applicant’s engineer says the areas of damage are not widespread, he bases this on what he saw when he cut holes in the floor in January 2017. This does not take into account observations made by the various experts who inspected the property earlier. Specifically, in May 2015, the applicant’s plumber reported: “I proceeded under floor and found tha t the whole of under floor along southern side of hous e was dripping wet. It had beads of water dripping of water bottom of under flooring and off floor joists and bearers. This stretched out about 2 metres off southern wall……” Taking all matters into account, and particularly the extensive damage identified in May 2015, the panel is not satisfied on the balance of probabilities the proximate cause of the damage to bedroom two and bedroom three is the leaking pipe identified in February 2016. Rather, havin g considered both parties’ engineers’ opinions, the panel accepts the timber damage had occurred over a long period of time. The panel is satisfied on the balance of probabilities the proximate cause of the claimed damage is non- compliance with a number of building code requirements. Living room damage not caused by leaking pipes Both engineers identified damage in the north-west corner of the living room. The FSP’s engineer agrees there is spongy flooring in this area where it has substantially lost support typical of timber framing decay. The applicant does not contend the three leaks caused this damage. After the applicant’s engineer cut a series of holes in the flooring, he identified the damage to the flooring and framing in the living room was isolated. He said it appeared to be related to water leaks through the sliding door in the west wall. The engineer conducted a spray test on the door. It leaked. The engineer observed there were no drainage holes in the track and it discharges water each end of the track. He contended the inadequate subfloor ventilation did not affect this failure as water ingress was at flooring level. The FSP’s engineer agrees this appears to be water leaking in through the door framing rather than subfloor moisture. In order for the FSP’s policy to respond, the applicant must establish this damage was caused by an insured event such as water leaking through the door in a storm. On the material provided, the panel is not satisfied the damage was caused by any specific event; there is no report of any such storm, but rather water entry appears to have occurred over time. Case No: 454641 Determination Page 9 of 12 In any event, the panel accepts the material provided from the applicant’s engineer establishes the sliding door leaked. The FSP’s policy does not resp ond to damage caused by a defect which an insured knew about or should reasonably have known about but did not fix. Cover is not provided for damage which occurs in this manner. External cracking damage not caused by an insured event The applicant submitted a letter dated 16 September 2016 from her builder relating to proposed remedial works. Those works included the repair of cracking to the external block work of the house. The FSP’s engineer compared photographs taken in 2013 and 2015. It said the external damage had not increased and so considered the external damage was caused on or before 2013. The tenant apparently said the cracking in the walls first appeared following the 2013 winter. The applicant referred to construction which took place adjace nt to her property at or about this time. Having undertaken a series of tests, the FSP’s geotechnical expert said the exterior damage to the house is related to the settlement of the footings which was considered to be due to loss of bearing capacity of sandy soils due to saturation and/or further loss of bearing capacity due to partial liquid application of saturated sand induced by vibrating earthmoving equipment. The FSP’s engineer said, in addition, the masonry veneer and its rendered surfaces became saturated with groundwater over time weakening the bonds at the interface of the blockwork masonry and either concrete and render. The applicant’s engineer noted the cracking of the external masonry walls was first identified during the winter of 2013 and coincided with construction adjoining the property. The applicant’s engineer agrees minor footing movement in saturated soils is likely to have caused the issue. He says the lack of movement joints in the masonry reduces the ability of the wall to accommodate this movement and hence increases cracking. He says the cracking is not structurally significant and is more prevalent at the east end of the house. The FSP’s policy is an insured event policy. The uncontested information is the damage was caused by footing movement or lack of movement joints in the masonry. There is no information that this claimed damage or footing movement was caused by an insured event such as flood or storm or earthquake or escape of liquid. The applicant’s engineer says the dam age is mainly to the east or front of the property. The material provided does not establish one of the three leaking pipes caused the damage. Even though a pipe leaked at the front of the house in 2014, the panel accepts the uncontested evidence the damage occurred sometime in 2013. In the circumstances, on the information provided, the panel is satisfied the FSP is entitled to deny liability for the claim to cracking damage. Case No: 454641 Determination Page 10 of 12 The FSP is entitled to decline the claim as the applicant has not established a prima facie claim. 2.2 Is the applicant entitled to compensation? Compensation only payable in certain circumstances FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant’s expectation of enjoyment or peace of mind. The decision to reject the claim was made by the FSP in September 2015. This was some four months after the claim was lodged with the FSP. The panel notes there was some delay in processing the claim. However, given the complexity of the claim, it was not unreasonable for the FSP to engage further experts to investigate and assess the claim and report it. After the claim was declined, the applicant requested an internal review. The FSP was proactive in investigating the applicant’s concerns by sending out further experts to assess and report. The panel accepts the applicant’s circumstances are very stressful. However, on the information provided, the panel is not satisfied an award of compensation is warranted. The is because the panel does not accept the FSP’s claims handling caused the applicant to experience an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant’s expectation of enjoyment or peace of mind. Engineer’s advice did not assist in the resolution of the dispute The applicant seeks reimbursement for professional costs incurred during the course of this dispute. She paid a significant amount to the engineer she engaged who inspected the property and provided a number of reports. Under paragraph 9.4 of FOS’s Terms of Reference, FOS may require the FSP to contribute to professional costs incurred by an applicant in the course of the dispute. However, FOS will generally do so only where the advice provided has assisted in the resolution of the dispute. In the present case, the pane l is not satisfied the reports provided by the applicant’s engineer have assisted in identifying the cause of the claimed damage to the property beyond the issues already identified by the FSP’s engineer and by the parties’ leak detection reports. The inve stigations carried out by the applicant’s engineer did identify a worsening water leak. However this in itself did not assist the applicant in establishing the damage was caused by this leak or an insured event under the policy. Taking all matters into account, the panel is not satisfied the FSP is required to reimburse the applicant for the professional costs incurred in engaging an engineer. Case No: 454641 Determination Page 11 of 12 Medical condition and dispute’s complexity warrant part payment of legal fees Under paragraph 9.4 of FOS’s Terms of Reference, FOS may require the FSP to contribute to legal costs incurred by an applicant in the course of the dispute. Unless exceptional circumstances apply, FOS will not require the FSP to contribute more than $3,000 to these costs. The FOS process is designed to be accessible to applicants without legal representation. Accordingly, FOS will not generally require the FSP to contribute to an applicant’s legal costs, unless the dispute is particularly complex or raises specific legal issues. The applicant has provided tax invoices from her lawyer totalling $3,300. Given the circumstances of the current claim and the complexity of the dispute, the panel accepts it was reasonable for the applicant to seek legal advice. The applicant states she suffers from a bipolar disorder and the additional stressors escalate her symptoms of anxiety and depression. The applicant provided medical certificates showing she was unable to work while the claim and dispute were ongoing. The issues in dispute were complex. The damage sustained is extensive. The parties had to investigate the cause of the damage. The submissions prepared by the applicant’s lawyer were of some assistance in clarifying the applicant’s position. However, the panel does not accept the issues in dispute were so complex as to require the extensive involvement of a lawyer on an ongoing basis. Taking all matters into account, the panel considers it is fair in the circumstances the FSP make some contribution to the a pplicant’s legal costs. The panel is satisfied it is fair the FSP contribute $1,500 to the applicant’s legal fees. Case No: 454641 Determination Page 12 of 12 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination by a panel. The panel consists of an ombudsman and two panel members with extensive experience in insurance industry matters and consumer complaints. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The applicant is represented. References to the applicant in the determination include references to her representative. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 29 November 2016. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties’ submissions, emails, photographs, leak reports, engineers’ reports and all attachments to all submissions  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.