Storm water damage and mould contents claims denied on structural defect and mould exclusions; cash settlement disputed
Text of the determination
Determination
Case No: 454602 Determination Page 1 of 12
Case number: 454602 29 June 2018
1 Overview
1.1 Dispute
The applicants held a rural insurance policy with the financial services provider (FSP)
which provided cover for two buildings at their property (the main residence and the
cottage) for the period from 25 August 2009 to 25 August 2014.
In May 2015, the applicants lodged a claim under policy, after they noticed water
damage to the kitchen in the main residence. The applicants considered the water
damage had been caused by a storm some time earlier.
After assessing the damage to the property, the FSP initially declined the applicants’
claim. However, the FSP later reversed its decision and cash settled the applicants
for the estimated cost of repairing internal water damage to the property.
In October 2015, the applicants advised the FSP they discovered mould damage to
contents items at the property and sought to have these items added to the claim.
However, in August 2016, the FSP denied cover on the basis that the damage was
not caused by an insured event (namely, a storm on 1 June 2013) but by factors
which are excluded under the policy, such as structural defects.
The FSP says the property is affected by ongoing moisture issues and its earlier
decision to settle the applicants for the cost of repairs was incorrect.
The applicants dispute the FSP’s decision. They seek cover for their damaged
contents items, as well additional damage to the building which was not taken into
account in the cash settlement paid. The applicants also seek compensation for non-
financial loss due to the manner in which the FSP handled their claim.
1.2 Issues and key findings
Is the FSP liable for the applicants’ claim ?
The applicants have established a prima facie claim for storm damage. The assumed
date of loss relied on by the FSP to deny the claim was not provided by the
applicants but was suggested by the FSP’s consultant.
The FSP is not entitled to deny the claim based on policy exclusions related to the
design and construction of the building. The available information indicates that the
applicants told the FSP’s agent prior to the inception of the policy that the building did
not have a permit for residential use.
Case No: 454602 Determination Page 2 of 12
Accordingly, the FSP is liable for the internal water damage to the kitchen area. The
FSP is also liable for the mould growth to the applicants’ contents items which
occurred as a result.
How should this dispute be resolved?
The cash settlement amount for building repairs should be increased to $22,500 to
more accurately reflect the cost of repairing the damage to the kitchen area.
The FSP should pay the applicant a total of $43,528.26 for mould damage to their
contents.
Are the applicants entitled to compensation?
The applicants are entitled to compensation in the amount of $3,000 for non-financial
loss suffered due to the manner in which the FSP handled their claim.
1.3 Determination
This determination is substantially in favour of the applicants.
The FSP is required to pay the applicant an additional amount of $54,534.01 in full
and final settlement of their claim, plus interest on this amount at the rate calculated
under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 17 August
2016 until the payment date .
The FSP is required to pay the applicants an additional amount of $3,000 as
compensation for non-financial loss.
Case No: 454602 Determination Page 3 of 12
2 Reasons for determination
2.1 Is the FSP liable for the applicants’ claim ?
Main residence was insured under standard home cover
The appl icants’ main residence was originally constructed in or around 2005 as a
Colourbond shed, with the south side of the building used as a residence and the
north side used for business purposes. In 2014, the applicants converted the north
side to residential use.
From 2009 to 2014, the applicants insured the main residence under their rural
insurance policy, which also provided cover for another building at the property.
During the course of the claim, there was some confusion regarding which cover
applied.
However, the FSP has confirmed that the main residence was insured under the
standard home cover. It was identified as risk 001/007 on the certificate of insurance
with a building sum insured of $138,952 and a contents sum insured of $168,826.
Policy provides cover for insured events subject to exclusions
The applicants’ policy provides cover for damage for loss or damage directly caused
by the events listed in the policy (including ‘storm’) , subject to the conditions and
exclusions set out in the policy.
However, the insured event of storm contains a specific exclusion for loss or damage
directly or indirectly caused or arising out of a structural fault, faulty design or faulty
workmanship.
The policy also contains a general condition requiring the policyholder to comply with
the requirements of government and statutory authorities and Australian Standards.
There is also a general exclusion for ‘damage that is mould’.
FSP has altered position multiple times during claim process
In its submissions to FOS, the FSP says it is not liable for any of the claimed damage
to the applicants’ home or contents. However, the FSP has altered its position
several times during the lengthy claims process.
As outlined above, the applicants initially lodged their claim in May 2015 (although
they were no longer insured with the FSP at this time, as they had transferred cover
to another insurer in August 2014).
The applicants had previously lodged a claim with their new insurer (X). After
assessing the damage, X denied cover on the basis the damage had been caused by
faulty workmanship and had occurred prior to the commencement of cover.
When the applicants lodged their claim with the FSP, they advised of water damage
to the walls, floors and kickboards in the kitchen. The applicants were unable to
confirm exactly when the damage occurred but advised that they first noticed it in
mid-2013. They noted there had been a lot of rain around this time.
Case No: 454602 Determination Page 4 of 12
The building consultant (CR) appointed by the FSP reported that the damage had
been occurring for an extended period of time because the building had not been
adequately constructed to prevent water entering through the walls. He advised that
the building had been constructed as a shed (a Class 10a structure) and was non-
compliant with a number of the requirements for a residential building (a Class 1
structure).
In August 2015, the FSP denied the applicants’ claim based on the findings in CR’s
report. However, after the applicants disputed this decision, the FSP called them in
September 2015 to advise that it was accepting liability for the internal damage to the
kitchen, as it accepted this could have been caused by a single storm event.
The FSP offered to cash settle the applicants for the estimated cost of the kitchen
repairs. However, the applicants disputed the settlement amount which they
considered did not cover all of the damage to the kitchen (including mould growth).
In October 2015, the applicants advised of additional mould damage to household
linens, fabrics and artworks stored in the linen cupboard adjacent to the kitchen.
During the following months, the FSP engaged specialist contractors (including an art
restorer) to assess the extent of the damage and advise whether the items could be
restored.
In February 2016, the FSP’s contractors advised of high moisture readings in the
kitchen, which indicated that the property was subject to ongoing water entry issues.
In April 2016, the FSP wrote to the applicants advising that it was not liable for their
claim because the damage had occurred as a result of structural faults.
However, the FSP acknowledged that, as part of its claim process, it had failed to
advise the applicants that the building did not comply with the building code and
therefore, it remained willing to accept liability for the resulting damage to the
building.
In its letter of April 2016, the FSP declined the applicant’s claim for mould damage to
contents items based on the general policy exclusion for mould.
After the applicants disputed the FSP’s decision on their contents claim, the matter
was escalated to the FSP’s internal dispute resolution (IDR) department.
In August 2016, the IDR department advised that the FSP was not liable for any
aspect of the building or contents claim because the damage had been caused by
structural defects or faulty workmanship.
The FSP also stated that the applicants had failed to establish that the damage had
been caused by the insured event of storm because meteorological records showed
there had been no rain on 1 June 2013 (which was recorded as the date of loss for
claim purposes). This was the first time this issue had been raised by the FSP.
Applicants have established prima facie claim for storm damage
The applicants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
Case No: 454602 Determination Page 5 of 12
If the applicants are able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
As outlined above, the FSP says meteorological records do not support the
app licants’ position that the water damage to the kitchen was caused by a storm in
June 2013.
However, the FSP’s conclusion is based on the mistaken assumption that the
applicants advised the FSP’s consultant that the damage was caused by a storm on
1 June 2013.
However, the FSP’s assumption is incorrect. The recording of the claim lodgement
call confirms that the date of 1 June 2013 was suggested by the FSP’s consultant
when the applicants advised that they had first noticed the damage in June or July
2013.
During the call, the applicants clearly advised that they were unsure when the
damage occurred, other than noting extensive rainfall around the relevant time. The
applicants later consulted a notebook they keep to record daily events at the
property, which confirms several severe storms occurred in March 2013.
The panel notes that, in September 2015, the FSP accepted that the damage could
have been caused by a single storm event (even after having received CR’s report).
In these circumstances, the panel is satisfied that the applicants have established a
prima facie claim for storm damage.
FSP seeks to rely on exclusions for structural defects etc
As outlined above, the FSP also seeks to deny the applicants’ claim on the basis that
the damage was caused by structural defects or a failure to comply with relevant
building standards.
Generally, the FSP will be entitled to rely on a policy exclusion if it can show that the
excluded factors are the proximate cause of the loss (that, is the dominant, effective
or operative cause).
As outlined above, the FSP’s building consultant (CR) identified a number of aspects
in which the applicant’s property failed to comply with relevant building standards, for
a residential building, which are aimed at preventing water entry. CR explained how
these defects had enabled water to enter the building.
The information provided by the applicants confirms that, when the b uilding was
initially constructed, development approval was obtained for a farm shed (a Class
10a building) only. The certificate of occupation granted in December 2005 was
issued on that basis.
The applicants have confirmed that they never obtained council approval to use any
part of the shed for residential purposes.
Case No: 454602 Determination Page 6 of 12
FSP is unable to rely on exclusions relating to construction defects
The applicants say the FSP should not be able to rely on the relevant exclusions
because it was aware of issues regarding the construction of their home before cover
was taken out in August 2009.
The applicants says that the FSP’s agent (PG) attended the property on 13 August
2009 to arrange the policy. They say that PG spent several hours at the property,
during which he inspected the buildings (inside and out), made notes and took
photographs.
The applicants say that, during PG’s inspection, they advised him that they had
obtained approval for the construction of a farm shed but had not obtained a permit
to use the building for residential purposes.
The FSP has confirmed its standard practice is to arrange for an agent to attend the
property before agreeing to provide cover.
However, it says PG is not an assessor, builder or engineer and therefore was not
qualified to examine the building in detail (and was not licensed to provide personal
advice to the applicants). PG also denies the applicants ever advised him that the
building had not been approved for residential use.
Under the terms of the policy, customers are required to complete a proposal form
before cover is provided. It appears likely that the proposal form was part of the
paperwork completed during PG’s visit in August 2013.
However, the FSP has been unable to produce a copy of the completed proposal
form. The FSP has also been unable to provide a copy of the notes and photographs
taken by PG during his time at the property. These documents would have been
helpful in confirming what was discussed.
The panel acknowledges that the fact that an insurer’s agent inspected the property
prior to policy inception will not generally be taken as confirmation that the property is
free from all defects (and therefore will not prevent the insurer from subsequently
relying on exclusions which are contained in the policy documents).
However, in the present case, the issue which the applicants say they raised (that the
property did not have approval for residential use) is fundamental to the nature of the
insurance cover being offered. The absence of such approval is inconsistent with the
offer of cover under the FSP’s standard home policy.
The claim records reflect that the applicants advised various FSP contractors that the
building had been constructed as a shed and did not have a permit for residential
use. On this basis, the panel considers it is likely the applicants also advised PG.
As outlined above, the FSP has been unable to provide copies of the relevant
documents (the proposal form and PG’s records) . In the circumstances, the panel
considers it would be unfair to allow the FSP to rely on the relevant policy exclusions.
Case No: 454602 Determination Page 7 of 12
FSP is liable for internal water damage
For the reasons outlined above, the FSP is not entitled to rely on exclusions under
the policy to deny the applicants’ claim for water damage ca used by a storm in March
2013. Accordingly, the FSP is liable for this damage.
FSP is liable for mould damage to contents items
T he FSP denied liability for damage to the applicants’ contents items based on the
general exclusion for mould. The FSP also says the mould damage occurred after
the period of cover expired.
The FSP says the general exclusion for mould applies regardless of the underlying
cause of the mould.
The panel acknowledges that the exclusion for mould damage is broadly drafted.
However, in the panel’s view, the exclusion does not exclude cover where the
proximate cause of the damage is an event which is otherwise covered under the
policy.
For the reasons outlined above, the panel considers the FSP is liable for the water
damage to the kitche n. The photographs taken by the FSP’s assessor (CC) following
his initial attendance confirm mould was already present in this area.
The contents items were stored in the linen cupboard which is directly adjacent to the
kitchen. The applicants have advised they noticed mould damage after not having
accessed the items for some time.
Based on the timing and location of the mould growth affecting the applicants’
contents, the panel is satisfied that it developed over time as a result of the water
entry which caused by damage to the kitchen.
The FSP’s position that the mould growth occurred after the expiry of the policy is
based on a report provided by its art restorer (RM) in December 2015, which advised
that the bulk of the mould affecting the artworks had developed during the previous
twelve months or so.
However, there has been significant confusion on the part of the FSP during this
claim as to whether the applicants’ policy expired in August 2013 or August 2014. In
its notice of response, the FSP confirmed the date of expiry as 25 August 2014.
The panel does not accept that it is possible to accurately determine (to a period of
months) when mould growth developed. On this basis, the mould growth may well
have developed within the period of cover. In any event, it was caused by an event
within the period of cover.
The panel acknowledges that there was a delay in the applicants lodging their claim
after they first noticed water damage to the property, which may have contributed to
the mould growth.
However, the panel also considers that the time taken by the FSP to resolve the
applicants’ claim (and its multiple changes of position) has contributed to a further
worsening of the damage.
Case No: 454602 Determination Page 8 of 12
2.2 How should this dispute be resolved?
Cash settlement for building damage should be increased to $22,500
The FSP paid the applicants an amount of $11,494.25 in May 2016, being the
estimated cost of repairing the water damage to their kitchen. This amount was
based on a quotation for the repairs prepared by the FSP’s builder ( BC).
At the time the cash settlement was paid, the applicants expressed concern that it
was not sufficient to repair all of the resulting damage to the kitchen (for which the
FSP had accepted liability).
The applicants were concerned that further water damage and mould growth might
be discovered once the kitchen cupboards were removed, resulting in the need for
further remediation.
During the early months of 2016, the applicants had repeatedly raised concerns
about the extent of the mould at the property, which they believed was affecting their
health.
At this stage, the FSP had accepted liability for resulting damage to the building but
was continuing to assess its liability for contents damage. However, the FSP did not
take any steps to address the applicants’ concerns (for example, by offering them
temporary accommodation).
The applicants have provided photographs which confirm that extensive mould was
discovered during the course of the kitchen repairs.
In these circumstances, the panel considers the FSP should be required to increase
the cash settlement amount paid for building repairs. The panel considers it is
reasonable that the total cash settlement be increased to a total of $22,500, being
the amount of the quotation obtained by the applicants in January 2017.
Accordingly, the FSP is required to pay the applicants an additional amount of
$11,005.75, plus interest on this amount at the rate calculated under section 57 of
the Act from 17 August 2016 until the payment date.
FSP is required to cash settle contents claim for $43,528.26
As outlined above, the applicants’ contents claim relates to hou sehold linens, fabrics
and artworks which were stored in the linen cupboard adjacent to the kitchen.
The applicants have advised that they had a large store of fabrics, having previously
carried on an interior design business.
During the claim process, the FSP asked the applicant to obtain quotations for the
household linens and other fabrics which suffered mould damage.
The applicants obtained quotations totalling $32,329.26 for the replacement of most
of these items. They were unable to obtain a quote for a length of expensive French
fabric which they advised they had purchased overseas for approximately $2,450.
Case No: 454602 Determination Page 9 of 12
In the absence of any information to the contrary, the panel considers the FSP
should be required to cash settle the applicants’ claim for the d amaged linens and
fabrics for a total of $34,779.26.
The FSP’s art restorer (RM) inspected 24 mould damaged artworks, including
approximately 20 Japanese woodblock prints. RM advised that the artworks were
restorable at a total cost of $22,495.
The policy limits the cover provided for works of art and collections to a maximum of
$5,000 for any item, set or collection.
Having regard to the ordinary meaning of the work ‘collection’ and the context in
which it is used, the panel considers the FSP is entitled to limit the cover for the
Japanese woodblock prints to a total of $5,000.
Having regard to the nature of the other items damaged, the panel considers the FSP
should be required to cash settle the applicants for a total of $8,749 for the damage
to the artworks.
Accordingly, the FSP is required to pay the applicants a total amount of $43,528.26
in settlement of their contents claim, plus interest on this amount at the rate
calculated under section 57 of the Act from 17 August 2016 until the payment date.
Applicant is entitled to compensation of $3,000
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
As outlined above, the claim history indicates there were significant delays
experienced during the claim process. Further, the FSP altered its position in relation
to the claim on a number of occasions.
The panel considers that the FSP’s overall management of the claim was extremely
frustrating and upsetting for the applicants, who were attempting to work with the
FSP in good faith to have their claim resolved.
The panel is also concerned about the following specific conduct by the FSP:
the FSP’s denial of the claim based on an estimated date of loss which the
claim lodgment call recording clearly established was not provided by the
applicants
the nature of the instructions given by the FSP to its building consultant (CR)
during the early stages of the claim process, when CR was instructed to ‘verify’
the findings of the applicants’ current insurer (rather than undertaking an
independent assessment)
the FSP’s failure to co nsider what actions could be taken to address the
applicants’ ongoing concerns about mould at the property, in circumstances
where it had accepted liability for resulting water damage.
The panel is satisfied that the FSP’s conduct of the claim caused s ignificant
additional stress and inconvenience to the applicants over an extended period of
time.
Case No: 454602 Determination Page 10 of 12
In the circumstances, the panel considers the FSP should be required to pay the
applicants the amount of $3,000 as compensation for non-financial loss.
Case No: 454602 Determination Page 11 of 12
3 Supporting Information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Policy terms
Policy term Key points
Applying for insurance
Cover
Page 5
To apply for insurance cover you must complete Our Proposal. When
You do so, You must comply with your duty of disclosure which We
tell You about on page 6
When We receive Your completed Proposal, We will:
Inform You what policies We are able to offer You and the total
premium You need to pay for your policies…
Your duty of di sclosure
Page 6
Before considering whet her to iss ue a policy to You, We need Your
answers to the questions set out in Our Proposal.
We will use the ans wers in deciding whether to insure You and
anyone else to be insured under the policy, and if so on what terms
General Conditions
Page 8
What you must do when you have a policy
You must:
Comply with all legislation and the requirements of government and
statutory authorities
Comply with all relevant Australian Standards
What can affect Your entitlements
If You do not do what You are obliged to do under Your policy, We
may refuse to pay a claim for any or part of it
Case No: 454602 Determination Page 12 of 12
Policy term Key points
General definitions
Page 11
Proposal means the documents in which We ask ques tions relating
to Your application to Us for insurance cover in this Plan
Standard home policy
Pages 51 - 57
What You are insured against if Your Home is not a caravan
… if the loss or damage is directly caused by any of the following
events occurring during the Period of Insurance.
10. Storm
but not loss or damage directly or indirectly caused by or arising out
of:
- A structural fault, faulty design or faulty workmanship
- Lack of maintenance
What is not insured
This policy does not insure You against:
2. loss or damage directly or indirectly caused by or arising out of:
- mildew or mould or wet or dry rot
4. damage that is mildew or mould or wet or dry rot
Limits on what We pay
for certain items of
contents
Page 52 - 53
If an insured item consists of a pair or a set , We pay only up to the
value of the part or parts damaged or stolen. We do not give any
allowance for any special value the item may have as a pair or a set
or for any depreciation in the remaining part or parts.
The sum insured shown for an item of Contents shown on the
certificate of insurance is included in the total sum insured shown for
all contents
TYPE OF CONTENTS
10. Antiques, heirlooms, pictures, paintings, works of art, curios,
stamps, medals, trophies, coins and collections
AMOUNT OF COVER
Value of the item, set or collection at the time of the damage, burglary
or theft up to $5, 000 for any one item, set or collection.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.