Water damage claim to bathroom and laundry partly denied

FirmFinancial Firm (Unknown - Insurer)
Decided2017-10-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed water damage to tiles and doors from a burst pipe under the house and the insurer denied the claim. AFCA denied the ensuite damage as wear and tear but found the bathroom and laundry damage covered, directing a cash settlement of 50% of repair costs and payment of the engineer's report up to $3,000 with statutory interest.

The applicant established a prima facie claim for accidental escape of liquid and the insurer did not prove an exclusion applied to the bathroom and laundry, but pre-existing and unrelated tile damage justified limiting the payment to 50%.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 454518 Determination Page 1 of 13 Case number: 454518 4 October 2017 1 Overview 1.1 Dispute The applicant holds a home and contents insurance policy with the FSP. The policy covers damage “caused by accidental escape of liquid from [a] fixed pipe”. The applicant says that a water pipe or pipes under his home have burst or leaked, resulting in damage. The applicant says that the damage is confined to three rooms (main bathroom, ensuite, and linen room/laundry), and each room has damage to the tiles and water damage to the bottoms of the doors. The FSP says that there have been three “escape of liquid” events (burst/leaking pipes) at the home, but none of the escaping liquid has caused any damage. The FSP says that the damage to the tiles and doors is not caused by the leak events. 1.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim for water damage? The information provided establishes on the balance of probabilities the damage to the ensuite is not water damage but wear and tear damage. As this is excluded from cover, the FSP is entitled to deny the claim for damage to the ensuite. The information provided establishes on the balance of probabilities a prima facie claim for damage in the main bathroom and laundry (including the doors to these rooms) caused by the accidental escape of liquid from the fixed pipe next to the hot water service at the back of the house. This is because of the applicant’s description of the water in the main bathroom upon return from holidays and that both the engineers agree water penetrated the main bathroom area via the subfloor pipe trenches. The information provided does not establish on the balance of probabilities the claimed damage in the main bathroom and laundry was caused by policy exclusions such as wear and tear or gradual deterioration. Further, the preponderance of expert opinion is that ground movement is not a cause of the claimed damage. Taking into account all information provided including photographs of the damage, evidence of pre-existing damage, and problems with tiles in other areas of the house not affected by water leaks, the FSP is not obliged to pay all of the cost of repairs in the main bathroom and laundry. It is fair in all the circumstances the FSP pay 50% of the cost of repairs in the main bathroom and laundry, including the doors. Case No: 454518 Determination Page 2 of 13 As the FSP is not liable to pay for the cost to repair the ensuite bathroom, the house will not be unliveable due to repairs for which the FSP is liable, and the FSP is not liable to pay for temporary accommodation costs. Is the applicant entitled to compensation? The applicant is not entitled to compensation for stress and inconvenience as there has not been an unusual amount of inconvenience, time taken to resolve the situation or interference with the applicant’s expectation of enjoyment or peace of mind caused by the FSP’s conduct. It is fair in all the circumstances the FSP pay for the cost of the applicant’s engineer’s report because of the complexity of the dispute and because the applicant genuinely required expert assistance in view of the expert reports obtained by the FSP. 1.3 Determination This determination is substantially in favour of the applicant. The extent of the FSP’s liability and the mechanism for settlement are set out in full in the paragraph in this determination headed: “FSP to cash settle based on an augmented scope of works to include the doors.” Should the applicant accept this claim, then within 14 days of acceptance:  the FSP is to arrange for its builder to augment its scope of works with the cost to repair or replace the bathroom and laundry doors  within a further seven days, the FSP is then to arrange to cost the repairs in the augmented scope of works so as to cash settle the applicant’s claim in respect of 50% of the cost of the repairs in the augmented scope of works  within 14 days of the parties agreeing the scope of works and the costing of the scope of works, the FSP is to cash settle the applicant the agreed sum taking into account the FSP’s policy terms and conditions and any excess payable  within seven days of acceptance of the determination, the applicant is to provide to the FSP an invoice from his engineer for the cost of the engineer’s report  within seven days of receipt of the invoice, the FSP is to pay the cost of the applicant’s engineer’s report or $3,000, whichever is less  at the same time, the FSP is to pay statutory interest on the cost of the report (or $3,000) from the date the applicant paid the engineer for the report until the date of settlement. Case No: 454518 Determination Page 3 of 13 2 Reasons for determination 2.1 Is the FSP entitled to deny the applicant’s claim for water damage? The applicant must establish a prima facie claim The applicant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP’s policy provides cover for loss and damage caused by accidental escape of liquid from any fixed pipe. The applicant says over the course of two years, three separate poly pipe fittings cracked and flooded areas of his house. On 11 June 2016, he says he noticed water seeping through tiles in the main bathroom. Thereafter, he claims a large crack appeared. The applicant asked a plumber to investigate the leak. The plumber found a poly pipe fitting had broken under the pavers outside next to the mai n bathroom. Due to the slope of land, the applicant believes water leaked into the slab, caused pressure and damaged tiles and doors in the main bathroom. He says the room next to the bathroom (described both as the linen room and laundry but referred to in this determination as the laundry) was also affected by the escape of liquid event. He describes a line of calcium/watermarks in the lining of the grout surrounding tiles which he said lifted due to water ingress. He says the doors to both rooms are also water damaged. The FSP’s plumber provided a report in July 2016. He confirms he repaired three broken mains water fittings underneath stabilised pavers over the past two years. The first fitting was in the middle of the back courtyard, the second fitti ng was at the front left-hand side of the house and the third fitting was next to the hot water service at the back of the house. The second fitting is adjacent to the ensuite bathroom. The third fitting is adjacent to the main bathroom and laundry. The applicant engaged an engineer who inspected and photographed the damage in the main bathroom and laundry. He provided a report in November 2016. The report only deals with the damage caused by the leak adjacent to the rear wall of the main bathroom and laundry. The engineer describes the damage including drummy tiles, cracks to grout lines, cracked tiles, efflorescence in the grout lines of the laundry tiles, and swelling to the bottom of the doors to the bathroom and laundry. The applicant’s engineer says some of the cracking damage was pre-existing. But he also says: Case No: 454518 Determination Page 4 of 13 … there is evidence of new cracking in the grout lines and the presence of efflorescence. There is no doubt that the burst water main has caused significant and a detrimental water penetration to this area via the subfloor plumbing trenches. He says the cause of drummy tiles is significant moisture exposure such as a burst pipe causing flooding and excessive exposure to moisture which can result in the breakdown of the tile adhesive causing drummy sounding tiles and contributes to efflorescence. He also says water penetration as a result of the burst water main contributed to the deterioration of the bottom of the doors. The main bathroom and laundry damaged by escape of liquid On this basis, the panel is satisfied the applicant has established on the balance of probabilities a prima facie claim for damage in the main bathroom and laundry caused by the accidental escape of liquid from the fixed pipe next to the hot water service at the back of the house. The FSP must prove an exclusion applies if it seeks to deny the claim Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. The FSP says it is entitled to rely on policy exclusions to deny the claim. It says the policy does not cover damage that is caused by or arises from poor maintenance, defects in workmanship or construction, wear and tear and subsidence or settling. The parties rely on expert reports The FSP relies on a number of expert reports. The FSP’s assessor attended and photographed the property on 27 June 2016. The applicant described the three water leaks at the property. The applicant told the assessor tiles in the living space were also drummy at random intervals. The applicant said he had re-glued these tiles. The assessor described the property as about 25 years old, free standing, on sloping ground with a concrete slab foundation. The assessor photographed and described the damage. She said there were cracked marble tiles in the main bathroom, drummy tiles in the linen room (laundry), damage to the bathroom door and linen room door, cracked marble tiles in the ensuite bathroom, and drummy tiles on the rear patio. The assessor described the cause of damage as a possible external pipe leak but she required further expert opinion. She engaged a building consultant and an engineer. The building consultant was also asked to prepare a scope of works for the repair of the damage. The FSP’s building consultant inspected and photographed the property on 4 July 2016. The building consultant considered photographs of the ruptured pipe recorded on the applicant’s mobile phone. The photographs were taken at the time the appl icant’s plumber carried out repairs. The builder said the photographs indicated the water pipes were about 300mm below ground level. Case No: 454518 Determination Page 5 of 13 The builder also said the top surface of the walkway is about 100mm below the top of the internal floor surface of the house. The applicant told him the cracked tiles in the main bathroom appeared after the water pipe leaks were detected and repaired. The builder said the leaking water pipe did not contribute to the cracked tiles in the bathroom and ensuite. He said the water from the pipes would have distributed over the top surface of the brick paver walkway and discharged in a similar way to surface rainwater. As for the crack in the main bathroom, he noted residual matter deposited in the cracked surface was aged in appearance. He concluded the cracking had occurred over an extended period of time. He said the tiles in the main bathroom and ensuite were not drummy. He noted the cracked tiles in these rooms and the flexible sealant installed to the tiled perimeter floor and wall junction in the ensuite. He concluded: … the combination of differential substrate movement combined with the breakdown of tile adhesion has contributed to the cracking of the floor tile located at the doorway entrance of the ensuite. I consider this to be a maintenance related issue Likewise, he considered the differential substrate movement had caused the cracking in the floor tile in the main bathroom. As for tiles in other rooms in the house, he said they were in good condition. He saw no loose or cracked tiles elsewhere. The FSP’s engineer inspected and photographed the property on 9 September 2016. He was told the burst pipe near the ensuite occurred in about April 2016 He observed cracks in the marble tiles in the ensuite. He said the tiles had an aged appearance but were not drummy. He noted no cracking in the interior or exterior walls and ceilings to suggest any ground movement had occurred. He saw no water damage to the skirtings or fixtures. He noted damage to the lower edge of the door which he attributed to normal wear and tear. He said the external paving level was about 200mm lower than the ensuite floor. He concluded: ….the cracks in the tiles are not a result of a burst water pipe, but due to substandard installation and normal wear and tear and that they predated the burst water pipe event. As for the claimed damage to the main bathroom and laundry, he was told the cracking in the tiles occurred after a water pipe under an adjacent external paved area burst while the insured was on holidays. Upon return, the engineer was told there was water on the bathroom and laundry floors, which had seeped through the tiles, and damaged the lower edges of the bathroom and laundry doors. He was told the water did not extend to the carpet in the adjacent bedroom. Case No: 454518 Determination Page 6 of 13 The engineer observed the diagonal crack in the marble tiles, minor damage to the lower edges of the bathroom and laundry doors, localised discolouration of the grout in the laundry tiles and that the external paved area was about 100mm lower than the bathroom and laundry floors. He said the crack had an aged appearance, there was a 20mm gap under both doors and no cracking in the walls and ceilings to suggest ground movement. He agreed water may have been seen and said this may be because water from the burst water pipe followed a pipe trench. However, he said the water from the burst pipe did not cause the observed damage. Rather, he said the claimed damage in the bathroom was: ….consistent with normal shrinkage cracking occurring in the underlying concrete slab that has reflected through to the overlying tiles. The shrinkage would have commenced at completion of construction. The aged appearance of the crack across the tiles suggests that it predated the claimed event. Because of the height of the doors, the lack of damage to the adjoining floor coverings, the similar observed damage in the ensuite door, and the presence of an adjacent floor drain, he said the damage to the doors was not due to a burst water pipe but due to normal wear and tear The FSP’s engineer concluded: ….there is no observable damage sustained to the floor tiles in general or other fittings that is attributable to the burst water pipe. The applicant’s engineer commented on the FSP’s expert opinions. He noted a concrete catch drain above the retaining wall at the rear of the property which intercepted stormwater flows off the slope behind the property. He said the drain was well maintained and serviceable. He said the soil at the back of the property is founded on highly weathered rock and reported: A thorough investigation of the residence did not reveal any settlement or movement in the foundations which is consistent with the observed highly weathered rock founding soils. He agrees a differential settlement of foundations/substrate can cause drummy tiles but in this case says there is no differential movement. He also agrees thermal effects and shrinking can contribute to drummy tiles. But he eliminates shrinkage as a cause of the damage because the house is over 20 years old, the area does not have any significant thermal exposure and there are no extremes in the slab temperature. The FSP’s builder and engineer did not comment further. The FSP referred the reports to a qualified plumber who agreed with the FSP’s experts that the claimed damage was age-related and not caused by leaking pipes. Case No: 454518 Determination Page 7 of 13 Taking into account the observations made, he said the leak adjacent to the main bathroom occurred about 400mm below the tiled floor in the house. He says water will initially move downwards with gravity and sideways as the soil becomes wet. If soil reaches saturation point, he says water moves to the top of the pavers and runs along the paving that falls away from the house into the small garden bed. He wrote: In my opinion for water leaks that are located 400mm below floor height and away from the house, to be able to firstly penetrate the rock foundations, the brickwork and then somehow penetrate upwards through a solid concrete slab floor which should have a membrane/moisture barrier located under it defies sound logic. Because of the height of the doors above the floor, he doubts water would have damaged the doors in the main bathroom and laundry because there was no water damage to the carpet in the adjoining bedroom. He criticises the applicant’s engineer’s conclusion about water damage to the tiles noting it is an assumption made without the production of any moisture meter readings or testing. He refers to problems with the tiles throughout the property which have been previously repaired but were not affected by leaking pipes. The parties provided no further reports. The panel does not accept the FSP’s claims handling is compromised The applicant cast doub t on the FSP’s position because it did not provide a report from the initial assessor T. The applicant also criticises the independence of the FSP’s experts in view of their relationship with the assessor. The FSP says T attended the applicant’s property to assess the damage but provided no report about the cause of damage. As the FSP decided not to pay the claim, the panel accepts, in these circumstances, the FSP would not have obtained a report from T as T was engaged to assess the extent of the damage rather than the cause of the damage. As for the suggestion the FSP’s bu ilding consultant and engineer are compromised in view of their alleged relationship with the assessor, the panel does not accept this submission. The FSP’s experts have provided their reports in their professional capacities as experts in their field. It was always open to the applicant to obtain further evidence if he sought to challenge their independence or their opinions. The damage in the ensuite bathroom caused by wear and tear The panel has considered the various reports and photographs provided. The panel accepts there are cracks in the floors and damage to the doors in the main bathroom and ensuite. The FSP’s engineer said the cracks in the ensuite were not caused by burst water pipes but due to normal wear and tear. The applicant’s engineer did n ot address the cause of damage in the ensuite. Case No: 454518 Determination Page 8 of 13 Having considered all the information provided and in the absence of any other expert evidence about the cause of damage in the ensuite, the panel is satisfied the damage in the ensuite bathroom was not caused by water leaking from a cracked pipe. The panel accepts the FSP is entitled to rely on the policy term which excludes damage caused by wear and tear to deny this aspect of the applicant’s claim. The claimed damage was not caused by ground movement As for the damage to the main bathroom and laundry, the FSP’s builder attributed the tile cracks to differential substrate movement. However, both the engineers say there is no evidence of ground movement. In the circumstances, the panel accepts the preponderance of expert opinion is that ground movement is not a cause of the claimed damage. The main bathroom and laundry damaged by escape of liquid The FSP’s engineer attributed the damage in the main bathroom to wear and tear and normal shrinkage. He also says the aged appearance of the crack suggests it predated the event. This view is rebutted by the applicant’s engineer. Upon his return from holidays, the applicant said there was water on the bathroom floor. The FSP’s engineer does not refute this but says this might be because water from a burst water pipe followed a pipe trench. However, the FSP’s engineer says the damage is not water damage. The panel notes the applicant’s engineer also identified water penetration to the area by the subfloor plumbi ng trenches. While he concedes pre-existing damage, he describes drummy tiles, evidence of new cracking in the grout lines and the presence of efflorescence. The FSP’s assessor also described drummy tiles. The panel accepts drummy tiles and efflorescence are evidence of moisture exposure. Having considered the material provided, the panel accepts the most probable explanation for the damage in the main bathroom and laundry is that water from the burst water pipe adjacent to the main bathroom penetrated the main bathroom via the subfloor plumbing trenches and remained in the area causing damage as the applicant was away on holidays. The FSP’s builder described the differential heights between the outside and inside of the house and said the cracked pipes did not cause the claimed damage as water from the pipes would have distributed over the top surface of the brick paver walkway and discharged in a similar method to that of surface rainwater. This opinion is supported by the FSP’s plumber. However, in view of the applicant’s description of the water in the main bathroom upon the return from holidays, and as both the engineers agree water penetrated the main bathroom area via the subfloor pipe trenches, the panel accepts damage in the main bathroom and laundry was caused by the accidental escape of liquid from the pipe adjacent to the main bathroom and laundry. Case No: 454518 Determination Page 9 of 13 Having considered the material provided, for the reasons stated, the panel is not satisfied the FSP has established on the balance of probabilities the claimed damage was caused by policy exclusions such as wear and tear or gradual deterioration. In the circumstances, the panel is not satisfied the FSP is entitled to deny the claim relating to the main bathroom and laundry. The FSP to pay 50% of the cost of repairs in the main bathroom and laundry While the applicant’s engineer describes defects which he attributes to the burst underground water pipe near the main bathroom and laundry, he concedes some of the damage observed was pre-existing. The panel accepts some of the damage was pre-existing in view of photographs and comments made by the FSP’s experts about the aged appearance of the damage. Further, there were issues with tiles in other areas of the house. These tiles were not affected by water leaks. This indicates there were issues generally with the tiles in the house which were unrelated to the water leaks. While the FSP’s plumber doubts that the doors were damaged because of the height of the doors above the floor and lack of damage to the carpets in the adjoining room, the FSP’s plumber did not actually inspect the damage. Whereas, the applicant’s engineer inspected the damage and describes damage/swelling to the bottom of the doors to the bathroom and the laundry. The FSP’s assessor also accepted there was damage to the bathroom and laundry doors. On the information provided, the panel is satisfied on the balance of probabilities the bathroom and laundry doors were damaged by water which escaped from the burst pipe. The applicant has provided no material about the cost of repairs. While the applicant’s engineer says some of the cracking is pre -existing, the engineer does not describe with particularity the damage which is pre-existing and the damage which is caused by the burst pipe. While the panel accepts the burst pipe caused damage, the extent of damage is not described or particularised by the applicant’s expert. Taking into account all information provided including photographs of the damage, evidence of pre-existing damage, and problems with tiles in other areas of the house not affected by water leaks, the panel does not accept the FSP is obliged to pay all of the cost of repairs in the main bathroom and laundry. The panel is satisfied it is fair in all the circumstances the FSP pay 50% of the cost of repairs in the main bathroom and laundry. FSP to cash settle based on an augmented scope of works to include the doors The policy sets out how the FSP will settle a buildings claim. At its option, it can repair or pay the reasonable cost of repairs. The FSP’s assessor provided a reserve. The FSP says the reserve is not a definitive estimate of the cost of repairs. The FSP did not seek quotations from a builder because of its decision to deny the claim. Case No: 454518 Determination Page 10 of 13 However, the FSP did arrange for its builder to provide a scope of works to rectify damage in the main bathroom, ensuite and generally. The panel accepts the FSP is not responsible to rectify damage in the ensuite. If the applicant accepts this determination, then the FSP is to arrange for its builder to augment its scope of works with the cost to repair or replace the bathroom and laundry doors. The FSP is then to arrange to cost the repairs in the augmented scope of works (excluding the cost to repair the ensuite). Because the work that needs to be done includes work that is at the cost of the applicant, and because of the length of time the parties have been in dispute, the panel considers it is fair in all the circumstances to bring this dispute to finality and a cash settlement is the fairest way to achieve this outcome. The panel therefore directs the FSP to cash settle the applicant’s claim in respect of 50% of the cost to repair the water damage in the main bathroom and laundry including the cost to repair the doors. The necessary repairs are described in the FSP’s builder’s scope of works. The scope is to be augmented to include the cost to repair or replace the doors in the main bathroom and laundry but is to exclude the cost of repairs in the ensuite. If during the process of repair, additional damage is discovered not considered in the scope of works, the applicant can refer it back to the FSP and the FSP can cash settle the repair of any additional unknown damage. The panel is concerned to bring finality to this dispute. Therefore, the panel considers it fair the FSP will not be liable for the cost of any additional unknown damage unless the FSP is advised of that damage within six months of the date of payment of the cash settlement by the FSP, pursuant to this determination. The panel considers it is not appropriate to require the FSP to pay interest on the cash settlement amount, given that this amount will be determined based on costings prepared using current market rates. It remains necessary for the amount of the cash settlement to be agreed, based on the scope of works prepared and augmented by the FSP’s builder and based on the FSP’s policy terms and conditions. This includes the deduction of any excess payable relating to the claim for the damage to the main bathroom and laundry. The panel encourages the parties to this dispute to resolve any issues that might arise during that process. However, the parties can return to FOS if they are unable to resolve any issues arising from the scope of works and/or the costing of that work and the ensuing cash settlement. The FSP is not obliged to pay temporary accommodation costs The applicant advised the FSP’s assessor he will be claiming for temporary accommodation costs. As the assessor considered both bathrooms would require a complete strip out and replacement, the assessor said the house would be unliveable and raised a preliminary reserve a $3,000 for temporary accommodation. Case No: 454518 Determination Page 11 of 13 However, as the FSP is not liable to pay for the cost to repair the ens uite bathroom, the panel considers the house will not be unliveable due to repairs for which the FSP is liable. In all the circumstances, on the information provided, the panel is satisfied the FSP is not liable to pay for temporary accommodation costs. 2.2 Is the applicant entitled to compensation? Compensation awarded only in certain circumstances FOS’s Terms of Reference allows FOS to award compensation to an applicant for non-financial loss where there is an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the applicant’s expectation of enjoyment or peace of mind. The maximum amount of compensation for non-financial loss is $3,000. FOS takes a conservative approach to compensation for non-financial loss. FOS considers compensation should not be awarded when an applicant suffers inconvenience that is a normal part of doing business. FOS expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. The applicant says the entire process has been stressful, drawn out and frustrating. The panel notes the dispute was ongoing for many months and there was a number of attendances by assessors and experts. However, while the dispute has been ongoing, the applicant has been able to use the ensuite and the bathroom and laundry/linen room. Having considered the material provided, and the FSP’s submissions, the panel also accepts the FSP has acted in a timely manner. While the panel acknowledges disputes by their nature are stressful, in the circumstances of this dispute, the panel is not satisfied compensation is warranted. The FSP is to pay the cost of the applicant’s engineer’s re port FOS may require the FSP contribute to professional costs incurred by an applicant in the course of the dispute. Unless exceptional circumstances apply, FOS will not require the FSP to contribute more than $3,000 to these costs. The panel notes the complexity of the dispute. Further, as the FSP obtained expert reports, the panel considers the applicant genuinely required expert assistance. In the circumstances, the panel considers it is fair the FSP pay for the cost of the engineer’s report provided to the applicant. If the applicant accepts this determination, then within seven days of acceptance, the applicant is to provide to the FSP an invoice from the engineer for the cost of the engineer’s report. Case No: 454518 Determination Page 12 of 13 Providing the cost of the applicant’s enginee r’s report does not exceed $3,000, the FSP is liable to pay the cost of the applicant’s engineer’s report. If the cost of the report exceeds $3,000, the FSP is to contribute $3,000 to the cost of the report. The FSP is also to pay statutory interest on the payment from the date the applicant paid the engineer for the report until the date of settlement. Case No: 454518 Determination Page 13 of 13 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. The determination is made by a panel consisting of the ombudsman together with an industry representative who has extensive experience in consumer claims and an industry representative who has extensive experience in the insurance industry. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 13 October 2016. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parti es’ submissions, emails, reports, photographs and all attachments to all submissions  Correspondence between the parties