Storm and burst-pipe home claims settlement amounts disputed and delayed; alleged non-cooperation
Text of the determination
Determination
Case No: 454413 Determination Page 1 of 14
Case number: 454413 13 April 2017
1 Overview
1.1 Dispute
The applicants held a Home Insurance Policy with the financial services provider
(FSP). The applicants have lodged two claims with the FSP for damage to their
property. The FSP has accepted the claims and made some payments to the
applicants in partial settlement of the claims.
The applicants say that the FSP is unreasonably delaying settlement of the claims by
requesting irrelevant documents. The applicants say that they have provided the FSP
with copies of all of the documents it has requested.
The FSP says that it has not been able to fully settle the claims because the
applicants have not cooperated with its investigations.
1.2 Issues and key findings
Have the applicants established an entitlement to cover?
The applicants have established an entitlement to cover.
Is the FSP entitled to deny the claim due to non-cooperation?
The FSP has not provided any evidence that the applicants have not cooperated with
its investigations into the claims.
The FSP has not established any entitlement to deny the claims, or to reduce its
liability for the claims, on the basis of non-cooperation by the applicants.
Is the FSP required to make any further payments?
The FSP is required to make further payments to the applicants in settlement of the
claims.
Are the applicants entitled to consequential loss or legal costs?
I am not satisfied the applicants‟ consequential loss or legal costs arose from the
FSP‟s poor management of the claim. The FSP is not liable to pay consequential loss
or legal costs.
Case No: 454413 Determination Page 2 of 14
Are the applicants entitled to compensation for non-financial loss?
T he FSP‟s poor management of the claim has caused an unusual amount of delay in
resolving the claim and interference with the applicants‟ peace of mind. The FSP
must pay the applicants compensation for non-financial loss in the sum of $3,000 for
each claim.
1.3 Determination
This determination is substantially in favour of the applicants.
The FSP is required to settle the applicants‟ claims by paying $214,164.90, plus
interest at the rate determined under Section 57 of the Insurance Contracts Act 1984
(the Act) from 1 July 2016 until the payment date.
The FSP is required to pay the applicants a further $495 upon provision by the
applicants of a structural engineer‟s invoice in that amount.
The FSP is required to pay the applicants a further $6,000 compensation for non-
financial loss.
The FSP is entitled to reduce the amount it pays to the applicants to the extent that
previous payments made by the FSP to the applicants relate to the work described in
the quotes and invoices described in section 2.3 of this determi nation.
Case No: 454413 Determination Page 3 of 14
2 Reasons for determination
2.1 Have the applicants established an entitlement to cover?
Onus is on the applicants to establish entitlement to cover
The applicants have the onus of establishing that they have suffered a loss caused
by an event for which their insurance policy provides cover (see section 3.2 of this
determination).
Once established the onus shifts to the FSP to establish the application of any
condition or exclusion.
Applicants have established an entitlement to cover
The applicants have lodged two claims for damage to their property. The first claim,
lodged in August 2014, was for storm damage. The second claim, lodged in
December 2015, was for damage caused by a burst pipe.
The applicants have provided a copy of the product disclosure statement (PDS).
Page 18 of the PDS says that the policy covers damage caused by a storm. Page 22
of the PDS says that the policy covers damage caused by liquid bursting from a pipe.
The applicants have provided photographs, invoices, and expert reports to
substantiate their claims. The FSP has not made any submission disputing that the
applicants‟ property was damaged by insured events during the period of insurance.
The applicants have provided copies of correspondence from the FSP (an email
dated 1 December 2015 and a letter dated 18 July 2016) confirming that the FSP
accepted the claims.
Having considered the above information, I am satisfied that the applicants have
established an entitlement to cover.
2.2 Is the FSP entitled to deny the claim?
FSP has not responded to FOS ’ requests for information
On 23 November 2016, a FOS case worker called the FSP and discussed the matter
with an employee of the FSP.
On 15 December 2016, FOS sent a letter to the FSP asking the FSP to provide
written reasons for its position and copies of any supporting documents by 5 January
2017.
On 6 January 2017, FOS sent a letter to the FSP requesting a response to the letter
of 15 December 2016. The letter said that if the FSP did not respond within seven
days, FOS may:
make a decision based on the information we have; and
conclude, in line with paragraph 7.6 of the FOS Terms of Reference, that the
FSP was choosing not to provide information because the information does no t
support the FSP‟s position.
Case No: 454413 Determination Page 4 of 14
On 31 January 2017, a FOS case worker called the FSP and left a message asking
the FSP to call FOS to discuss this dispute.
On 7 February 2017, FOS sent a letter to the FSP, again requesting that the FSP
provide information within seven days. The letter said that if the FSP did not respond,
FOS may infer that the FSP was choosing not to provide information because the
information does not support the FSP‟s position.
In addition to the above correspondence, FOS has regularly written to the FSP
providing documents and progress updates from 22 September 2016 to the date of
this determination. The latest information and documentation was provided to the
FSP by the Service on 23 February 2016. No response has been provided.
Despite the requests from the service and documentation exchanged with the FSP, it
has provided no information in relation to this dispute since 23 November 2016.
Policy requires applicants to cooperate with FSP investigation
Page 39 of the PDS says that the FSP may require the applicants to provide
evidence to prove the extent of their loss. It states: “If we decide that you are unable
to reasonably substantiate your claim, we might reduce or refuse your claim.”
Applicants have cooperated with FSP investigation
The applicants have provided extensive documentation in support of their claims.
The documents provided by the applicants to FOS (all of which have also been
provided to the FSP) are listed in section 3.5 of this determination. The list contains
76 documents, including quotes, invoices, expert reports, and photographs.
Copies of emails provided by applicants indicate that the bulk of the listed documents
were sent to the FSP by the applicants in or before November 2016. The documents
available to the FSP in or before November 2016 include repair quotes, engineers‟
reports, and code compliance certifications, and clearly provided enough information
for the FSP to investigate and respond to the claims. Copies of all of the listed
documents were provided by FOS to the FSP by no later than 22 February 2017.
In addition to providing documentation, the applicants say that they have allowed the
FSP to inspect their home many times. The FSP has not refuted this claim.
Furthermore, some of the expert reports provided by the applicants were written by
experts appointed by the FSP, and state that they were written following an
inspection of the applicants‟ home.
No evidence of non-cooperation by applicants
During a phone call with a FOS case worker on 23 November 2016, an employee of
the FSP stated that settlement of the claims was being delayed due to non-
cooperation by the applicants. The FSP has not provided any evidence that the
applicants have failed to cooperate with the FSP‟s investigation of the claims. The
FSP has not made any submission stating what further information it requires to
assess the applicants‟ claims.
Case No: 454413 Determination Page 5 of 14
During a phone call with a FOS case worker on 23 November 2016, an employee of
the FSP stated that the building company that quoted for repairs to the applicants‟
property was owned and operated by the applicants. The FSP has not made any
submission alleging that the applicants attempted to conceal the relationship
between themselves and the building company (and any such allegation would be
undermined by the fact that the email address used by the applicants to
communicate with the FSP is “[ building company name]@gmail.com” ).
The FSP has had ample time to review the documents provided by the applicants‟
building company, and to have the documents reviewed by its experts. The FSP has
not made any submission alleging that the documents were inaccurate, or included
quotes for non-existent or non-claim-related repairs.
Having considered the above information, I am not satisfied that the FSP has
established any entitlement to deny the claims, or to reduce its liability for the claims,
on the basis of non-cooperation by the applicants.
2.3 Is the FSP required to make any further payments?
FSP required to settle claims
As stated in section 2.1 of this determination, the applicants have established an
entitlement to cover. As stated in section 2.2 of this determination, the FSP has not
established any reason why it should be entitled to deny the claims, or to reduce its
liability for the claims. Therefor e, the FSP is required to settle the applicants‟ claims.
Page 41 of the PDS says that the FSP may settle building claims by paying “ what it
would cost us to repair or rebuild the building ”. The FSP has indicated (in an email to
the applicants dated 1 December 2015 and during the conversation with a FOS case
worker on 23 November 2016) that it intends to cash-settle the claim. The applicants
do not dispute the FSP‟s decision to cash -settle the claim.
The FSP has made some payments to the applicants in partial settlement of the
claims. The FSP is entitled to reduce the amount it pays to the applicants to the
extent that those previous payments relate to the work described in the quotes and
invoices described in this section (2.3) of this determination.
Settlement of storm damage claim
The applicants say that the following additional payments are required to settle the
storm damage claim:
Storm damage claim
Quote for r epair work to rectify storm damage $58,879.70
Variation for additional work needed to rectify
storm damage
$4,022.70
„JM‟, structural engineer, report preparing fee $495
TOTAL $63,397.40
Case No: 454413 Determination Page 6 of 14
The applicants have provided quotes from the applicants‟ building company for the
storm damage repairs. The applicants have not provided an invoice from JM for the
report preparing fee. The FSP has not provided any information to dispute the
applicants‟ quote.
The FSP is required to settle the storm damage claim by paying the applicants
$62,902.40.
The FSP is required to pay the applicants a further $495 upon provision of an invoice
from JM.
Settlement of escape of liquid claim
The applicants say that the following additional payments are required to settle the
escape of liquid claim:
Escape of liquid claim
Quote for r epair work to rectify damage caused
by escape of liquid
$ 151,112.50
Temporary accommodation for four months at
$15,167 per month (as approved by FSP for
storm damage claim)
$ 60,748
Reloc ation to and from rental accommodation
(as approved by FSP for storm damage claim)
$ 48,114
„QS Plumbing‟ report writing fee $150
TOTAL $ 212,010.50
The applicants have provided a quote for the water damage repairs and an invoice
for the report writing fee. The FSP has not provided any information to dispute the
quote.
During a phone call with a FOS case worker on 14 December 2016, the applicants
advised that the FSP had paid a cash settlement for temporary accommodation, but
the applicants had not yet been paid for temporary accommodation and were still
living in the home. The applicants said that temporary accommodation would be
required during repair work that had not yet commenced because the claim was not
yet settled.
The applicants have provided a scope of works stating that the water damage repairs
will take 120 days (approximately four months). However, it is possible that some or
all of this work could be performed at the same time as the storm damage repairs, so
the applicants will not need to incur any further costs for accommodation. Even if the
work takes longer than four months, the applicants will not need to incur a second set
of relocation expenses. I am not satisfied that the applicants have established an
entitlement to further payments for temporary accommodation.
Case No: 454413 Determination Page 7 of 14
The FSP is required to settle the escape of liquid claim by paying the applicants
$151,262.50. If the applicants provide evidence that the FSP‟s previous payment for
temporary accommodation is insufficient to pro vide accommodation for the duration
of repairs, the FSP is required to assess whether any additional payments for
temporary accommodation are payable under the policy.
FSP must pay interest
Section 57 of the Act provides that the FSP must pay interest from the time when it
was unreasonable for the FSP to have withheld payment. In the circumstances, I
consider this date to be 1 July 2016, six months after the lodgement of the second
claim.
2.4 Are the applicants entitled to compensation for consequential loss
or legal costs?
The applicants say that they are entitled to the following:
Additional compensation sought
Time spent preparing documents,
corresponding with FSP, and participating in
interviews: 136 hours at $110 per hour plus
GST
$ 16,456
Cost of seeking legal advice in relation to claims $ 1,012
Cost of getting National Police Check report $ 46
TOTAL $ 17,514
Page 33 of the PDS states that the policy excludes cover for consequential loss,
including:
loss of income or wages;
the costs , “ including the cost of your time ”, of proving loss or helping the FSP
assess a claim; and
legal costs, unless they are incurred with the FSP‟s written authority.
Therefore, under the terms of the policy, the applicants are not entitled to recover
these costs.
FOS cannot award compensation for non-financial loss in a dispute arising from a
claim on a general insurance policy that excludes such liability. It can, however,
compensate an applicant for non- financial loss arising from the FSP‟s poor
management of the claim.
The applicants have provided an invoice from their lawyers for $968. The invoice is
dated 4 July 2016, and states that it is for “attending to client in initial conference,
receiving instructions and advising”.
Given the complexity of the dispute , even if the FSP managed the claims diligently,
the applicants would be required to spend considerable time attending to the matter
Case No: 454413 Determination Page 8 of 14
and provide extensive documentation to support their claim. The applicants might
reasonably consult lawyers to assist them in doing so.
Based on the available information, I am not satisfied that the applicants‟ legal costs
were incurred due to the FSP‟s poor management of the claim s nor has there been
any information from the lawyers that has been relied on in reaching this
determination.
2.5 Are the applicants entitled to compensation for non-financial loss?
FOS may award compensation for non-financial loss
FOS may award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or
interference with an a pplicant‟s expectation of enjoyment or peace of mind.
FOS expects an applicant to be moderately robust and tolerate a normal degree of
inconvenience when making a claim. FOS takes a conservative approach to
assessing compensation for non-financial loss. The maximum amount FOS can
award for non-financial loss is $3,000 per claim.
Applicants entitled to $3,000 compensation for non-financial loss
The claims were lodged in August 2014 and December 2015. The applicants say that
the claims have taken an unreasonably long time to resolve because the FSP has
requested irrelevant documents and conducted unreasonably slow and lengthy
investigations into the claims. The male applicant says that the FSP is harassing
them by needlessly prolonging the investigations, and he is suffering anxiety and
depression as a result.
This is a complex dispute, involving two separate insured events causing hundreds of
thousands of dollars‟ worth of damage to the applicants‟ home. However, even when
the complexity of the matter is taken into account, the FSP‟s handling of the cl aim
has been unreasonably slow.
The applicants have cooperated with the FSP‟s investigations by making their home
available for inspection and providing extensive documentation in support of their
claims. The FSP says that the applicants have not cooperated with its investigations,
but has not explained what more the applicants must do in order to resolve the
dispute. The FSP has not explained why the available information is insufficient to
assess the claims, or what further information it requires to settle the claims. The
FSP has ignored FOS‟ requests for the FSP to explain its position.
It has been more than a year since the second claim was lodged, and the FSP has
given no indication of when it expects to be able to settle the claim.
I consider that the FSP‟s poor management of the claim has caused an unusual
amount of delay in resolving the claim and interference with the applicants ‟ peace of
mind. I consider it fair in all the circumstances that the FSP pay the applicants
compensation for non-financial loss in the sum of $3,000 for each claim.
Case No: 454413 Determination Page 9 of 14
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the parties and
each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions. For the purpose of this determination,
commentary is restricted to only those issues considered relevant.
3.2 Relevant law
Prima facie claim
There is an onus on an insured to establish a prima facie claim. This means that the
insured must establish, on the balance of probabilities, that they have suffered a loss
caused by an event for which their insurance policy provides cover.
Should this onus be discharged, the insurer then has the onus of establishing, on the
balance of probabilities, the application of any exclusion on which it relies to deny the
claim.
3.3 Submissions made by one applicant on behalf of both applicants
At times during the course of this dispute, one applicant has made submissions on
behalf of both applicants. For the purposes of this determination, submissions made
by one applicant have been treated as if they had been made by both applicants.
3.4 Relevant policy terms
What you are covered for – Insured Events page s 16 – 25
Storm
(page 18)
We cover
Loss or damage to the building caused by a storm.
Escape of liquid
(page 22)
We cover
Loss or damage to the building caused by liquid leaking, overflowing or
bursting from any of the following:
refrigerators, freezers, dishwas hers and washing machines;
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes,
drainage and sewage systems;
fixed tanks;
swimming pools or spas;
waterbeds;
baths, sinks, toilets and basins;
fixed heating or cooling system;
water main, fire hydrant or water supply pipe;
an aquarium.
Case No: 454413 Determination Page 10 of 14
What we do not cover – general exclusions page s 32 – 36
Consequential
losse s or extra
costs following an
incident covered by
your policy
(page 33)
You are not covered under any section of your policy for damage, loss, cost
or legal liability that is caused by, arises from or involves:
…
consequential loss (financial and non - financial loss) or extra costs following
an incident covered by your policy including:
loss of income or wages;
costs, including the cost of your time, to prove your loss or to hel p us with
your claim;
cost of hiring appliances after yours suffer loss or damage;
professional, expert, legal, consulting or valuation costs unless you
obtained our prior written authority to incur these costs;
cost of replacing or reapplying pest control chemicals and baits in or
around the insured address;
travel costs;
cleaning costs;
any costs not covered by your policy.
How to establi sh your loss page 39
Establish an
incident took place
When making a claim you must be able to prove that an incident covered by
your policy actually took place. If you do not do this, we will not be able to
pay your claim.
Proof of Loss Allowing us, a repairer or an expert appointed by us, to look at what is
damaged is usually all that is needed to prove your l oss. Sometimes though
we might ask you to produce a copy of the most recent plans and drawings
for the building, photographs of the building or other evidence that supports
the extent of the loss you have suffered.
If we decide that you are unable to reaso nably substantiat e your claim, we
might reduce or refuse your claim.
How we settle building claims page 41 – 47
If we agree to pay a claim for loss, theft or damage to the building, we will
decide if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building.
Case No: 454413 Determination Page 11 of 14
3.5 Documents provided by the applicants
The applicants have provided the following documents in support of the claim and in
response to requests by the FSP. Copies of all of these documents have been
provided to the FSP.
Document Author Date
Compliance certificate Plumbing Industry Commission 29 August 2011
Occupancy permit „NS‟, building surveyor 28 June 2012
Certificate of compliance „NS‟, building surveyor 15 April 2010
Roof structure design certificat e „BBTT‟, roof truss manufacturer 27 January 2011
Water Proofing Certificate for
Balconie s
Applicants‟ building company Undated
Water Proofing Certificate for En
Suite
Applicants‟ building company Undated
Letter “ Re: Ceiling and wall
cracking and render rippling ”
„JM‟, structural engineer 20 March 2016
Letter “ Re: Additional water
damage to structure ”
„JM‟, structural engineer 20 March 2016
Tax invoice: “ Deposit for Sourcing
and supply of Timber Flooring ”
Applicants‟ building company 25 June 2016
Tax invoice: moving of furniture Applicants‟ building company 23 February 2016
Tax invoice: moving of furniture Applicants‟ building company 2 April 2016
Tax invoice: “ remediation
restoration work to upstairs in
second floor B.R. 3, WIR , Prayer
room ”
Applicants‟ building company 10 April 2016
Tax invoice: “remediation/
restoration work to Gym and
Bathroom mould affected area”
Applicants‟ building company 2 April 2016
Tax invoice: “remediation/
restoration work to Second floor
mould affected area in Rumpus /
Billiards room”
Applicants‟ building company 2 April 2016
Tax invoice: “Repair work to
Rumpus / Billiard room in the 2 nd
floor including Electrical,
plastering, carpentry and
Painting”
Applicants‟ building company 18 April 2016
Tax invoice: “Repair work to B.R.3 Applicants‟ building com pany 18 April 2016
Case No: 454413 Determination Page 12 of 14
and Prayer room in 2 nd Floor
including Electrical, plastering,
carpentry and Painting”
Tax invoice: restoration of items Applicants‟ building company 15 April 2016
Tax invoice: second remediation
upstairs
Applicants‟ building company 20 May 2016
Tax invoice: structural engineer
consultation fee
Applicants‟ building company 10 March 2016
Email request to building surveyor Applicants 28 June 2012
Roof repair certificate Applicants‟ building company Undated
Email scope of works FSP 20 May 2015
Expert review report „RL‟, FSP assessor 23 October 2014
Bracing calculations „JM‟, structural engineer 11 March 2010
Bracing plan „JM‟, structural engineer 11 March 2010
Engineering investigation report „FM‟, forensic engineer 6 August 2015
Scope of works „FM‟, forensic engineer 11 November 2014
Lease for resident of applicants‟
house
„MB‟, property investors 25 February 2016
Receipt for payment by applicants Applicants‟ building company 26 May 2016
Receipt for payment by applicants Applicants‟ building company 29 June 2016
Receipt: debit $18,000 ANZ Banking Grou p 19 July 2016
Receipt: credit $18,000 ANZ Banking Group 19 July 2016
Rent al appraisal „JC‟, property managers Undated
Medical certificate Dr „ZW‟, applicant‟s doctor 7 June 2016
Medical certificate Dr „FS‟, applicant‟s doctor 8 June 2016
Invoice 186: cleaning and
waterproofing
„AP Constructions‟ 30 June 2011
Invoice 188: cleaning and
waterproofing
„AP Constructions‟ 30 June 2011
Invoice „DNA‟, plumbers 7 August 2011
Certificate of compliance – design „JM‟, structural engineer 20 February 2016
Mould ins pection report „ML1‟, mycologist 2 May 2016
Application for occupancy permit Applicants 25 June 2012
Certificate of compliance „BT Windows‟ 13 June 2012
Case No: 454413 Determination Page 13 of 14
Compliance certificate Plumbing Industry Commission 31 January 2013
Compliance certificate „VW Windows‟ 15 June 2012
Structural certification: spiral
stairs
„MK‟, structural engineer Undated
Certification and complianc e
statement: “disabled persons lift”
„EL Home Elevators‟ 3 May 2012
Compliance certificate Plumbing Industry Commission 19 June 2013
Certificate of electrical safety Energy Safe Victoria 1 August 2011
Certificate of electrical safety Energy Safe Victoria 20 September 2011
Insulation certification Applicants‟ building company 20 June 2012
Certificate of compliance:
balustrades, shower glazing
„CC Glass‟ 21 June 2012
Mould ins pection report and
proposed scope of works
„EH‟, occupational hygienist 29 May 2016
Analytical report (attached to EH
mould ins pection report)
„ML2‟, mycologist 19 May 2016
“ Interim Progress Report including
Mould Remediation and Repair
Work ”
Applicants Undated
Analytical report „ML2‟, mycologist 2 June 2016
Report of burst water pipe „QS Plumbing‟ 29 Jan 2016
Mould report „ST‟, cleaning and restoration
service
Undated (property
inspected 7 March 2016)
Letter enclosing invoice Applicants‟ lawyers 5 July 2016
Tax invoice „QS Plumbing‟ 29 Jan 2016
Engineering investigation report „FM‟, forensic engineer 14 October 2014
Photographs of damage (6) Not stated Undated
Photographs of damage (3) Not stated 3 August 2016
Quote: variation Applicants‟ building company 12 April 2016
Report “ Re: Cracking” „JM‟, structural engineer 12 July 2016
Quote: Repair work to rectify the
damages internal ceiling corners
and external rendering walls
Applicants‟ building company 10 November 2016
Quote: damages Caused by
Water burst Pipe, in the en suit
Applicants‟ building company 7 November 2016
Case No: 454413 Determination Page 14 of 14
wall of The upstairs front bed
room.
Scope of work for Repair of
damages due to Water Burst
Pipe
Appli cants Undated
Scope of works for additional
Jobs due to Storm Damage
Applicants Undated
Scope of works for mould
remediation
Applicants Undated
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.