Home / Financial Firm (Unknown - Insurer) / Determination 454413

Determination 454413

Storm and burst-pipe home claims settlement amounts disputed and delayed; alleged non-cooperation

FirmFinancial Firm (Unknown - Insurer)
Decided2017-04-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$214,660
Non-financial loss$6,000
Amount claimed$292,922
SourceAFCA PDF

Summary

The applicants claimed for storm and burst-pipe damage to their home and the FSP delayed settlement, alleging non-cooperation. AFCA ordered settlement of $214,164.90 plus a further $495, interest, and $6,000 non-financial loss, but refused consequential loss and legal costs.

The applicants established cover, the FSP produced no evidence of non-cooperation or any ground to deny or reduce the claims, and the PDS excludes consequential loss and the cost of the applicants' own time.

Issues

Subjects and remedies

natural disasterpay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 454413 Determination Page 1 of 14 Case number: 454413 13 April 2017 1 Overview 1.1 Dispute The applicants held a Home Insurance Policy with the financial services provider (FSP). The applicants have lodged two claims with the FSP for damage to their property. The FSP has accepted the claims and made some payments to the applicants in partial settlement of the claims. The applicants say that the FSP is unreasonably delaying settlement of the claims by requesting irrelevant documents. The applicants say that they have provided the FSP with copies of all of the documents it has requested. The FSP says that it has not been able to fully settle the claims because the applicants have not cooperated with its investigations. 1.2 Issues and key findings Have the applicants established an entitlement to cover? The applicants have established an entitlement to cover. Is the FSP entitled to deny the claim due to non-cooperation? The FSP has not provided any evidence that the applicants have not cooperated with its investigations into the claims. The FSP has not established any entitlement to deny the claims, or to reduce its liability for the claims, on the basis of non-cooperation by the applicants. Is the FSP required to make any further payments? The FSP is required to make further payments to the applicants in settlement of the claims. Are the applicants entitled to consequential loss or legal costs? I am not satisfied the applicants‟ consequential loss or legal costs arose from the FSP‟s poor management of the claim. The FSP is not liable to pay consequential loss or legal costs. Case No: 454413 Determination Page 2 of 14 Are the applicants entitled to compensation for non-financial loss? T he FSP‟s poor management of the claim has caused an unusual amount of delay in resolving the claim and interference with the applicants‟ peace of mind. The FSP must pay the applicants compensation for non-financial loss in the sum of $3,000 for each claim. 1.3 Determination This determination is substantially in favour of the applicants. The FSP is required to settle the applicants‟ claims by paying $214,164.90, plus interest at the rate determined under Section 57 of the Insurance Contracts Act 1984 (the Act) from 1 July 2016 until the payment date. The FSP is required to pay the applicants a further $495 upon provision by the applicants of a structural engineer‟s invoice in that amount. The FSP is required to pay the applicants a further $6,000 compensation for non- financial loss. The FSP is entitled to reduce the amount it pays to the applicants to the extent that previous payments made by the FSP to the applicants relate to the work described in the quotes and invoices described in section 2.3 of this determi nation. Case No: 454413 Determination Page 3 of 14 2 Reasons for determination 2.1 Have the applicants established an entitlement to cover? Onus is on the applicants to establish entitlement to cover The applicants have the onus of establishing that they have suffered a loss caused by an event for which their insurance policy provides cover (see section 3.2 of this determination). Once established the onus shifts to the FSP to establish the application of any condition or exclusion. Applicants have established an entitlement to cover The applicants have lodged two claims for damage to their property. The first claim, lodged in August 2014, was for storm damage. The second claim, lodged in December 2015, was for damage caused by a burst pipe. The applicants have provided a copy of the product disclosure statement (PDS). Page 18 of the PDS says that the policy covers damage caused by a storm. Page 22 of the PDS says that the policy covers damage caused by liquid bursting from a pipe. The applicants have provided photographs, invoices, and expert reports to substantiate their claims. The FSP has not made any submission disputing that the applicants‟ property was damaged by insured events during the period of insurance. The applicants have provided copies of correspondence from the FSP (an email dated 1 December 2015 and a letter dated 18 July 2016) confirming that the FSP accepted the claims. Having considered the above information, I am satisfied that the applicants have established an entitlement to cover. 2.2 Is the FSP entitled to deny the claim? FSP has not responded to FOS ’ requests for information On 23 November 2016, a FOS case worker called the FSP and discussed the matter with an employee of the FSP. On 15 December 2016, FOS sent a letter to the FSP asking the FSP to provide written reasons for its position and copies of any supporting documents by 5 January 2017. On 6 January 2017, FOS sent a letter to the FSP requesting a response to the letter of 15 December 2016. The letter said that if the FSP did not respond within seven days, FOS may:  make a decision based on the information we have; and  conclude, in line with paragraph 7.6 of the FOS Terms of Reference, that the FSP was choosing not to provide information because the information does no t support the FSP‟s position. Case No: 454413 Determination Page 4 of 14 On 31 January 2017, a FOS case worker called the FSP and left a message asking the FSP to call FOS to discuss this dispute. On 7 February 2017, FOS sent a letter to the FSP, again requesting that the FSP provide information within seven days. The letter said that if the FSP did not respond, FOS may infer that the FSP was choosing not to provide information because the information does not support the FSP‟s position. In addition to the above correspondence, FOS has regularly written to the FSP providing documents and progress updates from 22 September 2016 to the date of this determination. The latest information and documentation was provided to the FSP by the Service on 23 February 2016. No response has been provided. Despite the requests from the service and documentation exchanged with the FSP, it has provided no information in relation to this dispute since 23 November 2016. Policy requires applicants to cooperate with FSP investigation Page 39 of the PDS says that the FSP may require the applicants to provide evidence to prove the extent of their loss. It states: “If we decide that you are unable to reasonably substantiate your claim, we might reduce or refuse your claim.” Applicants have cooperated with FSP investigation The applicants have provided extensive documentation in support of their claims. The documents provided by the applicants to FOS (all of which have also been provided to the FSP) are listed in section 3.5 of this determination. The list contains 76 documents, including quotes, invoices, expert reports, and photographs. Copies of emails provided by applicants indicate that the bulk of the listed documents were sent to the FSP by the applicants in or before November 2016. The documents available to the FSP in or before November 2016 include repair quotes, engineers‟ reports, and code compliance certifications, and clearly provided enough information for the FSP to investigate and respond to the claims. Copies of all of the listed documents were provided by FOS to the FSP by no later than 22 February 2017. In addition to providing documentation, the applicants say that they have allowed the FSP to inspect their home many times. The FSP has not refuted this claim. Furthermore, some of the expert reports provided by the applicants were written by experts appointed by the FSP, and state that they were written following an inspection of the applicants‟ home. No evidence of non-cooperation by applicants During a phone call with a FOS case worker on 23 November 2016, an employee of the FSP stated that settlement of the claims was being delayed due to non- cooperation by the applicants. The FSP has not provided any evidence that the applicants have failed to cooperate with the FSP‟s investigation of the claims. The FSP has not made any submission stating what further information it requires to assess the applicants‟ claims. Case No: 454413 Determination Page 5 of 14 During a phone call with a FOS case worker on 23 November 2016, an employee of the FSP stated that the building company that quoted for repairs to the applicants‟ property was owned and operated by the applicants. The FSP has not made any submission alleging that the applicants attempted to conceal the relationship between themselves and the building company (and any such allegation would be undermined by the fact that the email address used by the applicants to communicate with the FSP is “[ building company name]@gmail.com” ). The FSP has had ample time to review the documents provided by the applicants‟ building company, and to have the documents reviewed by its experts. The FSP has not made any submission alleging that the documents were inaccurate, or included quotes for non-existent or non-claim-related repairs. Having considered the above information, I am not satisfied that the FSP has established any entitlement to deny the claims, or to reduce its liability for the claims, on the basis of non-cooperation by the applicants. 2.3 Is the FSP required to make any further payments? FSP required to settle claims As stated in section 2.1 of this determination, the applicants have established an entitlement to cover. As stated in section 2.2 of this determination, the FSP has not established any reason why it should be entitled to deny the claims, or to reduce its liability for the claims. Therefor e, the FSP is required to settle the applicants‟ claims. Page 41 of the PDS says that the FSP may settle building claims by paying “ what it would cost us to repair or rebuild the building ”. The FSP has indicated (in an email to the applicants dated 1 December 2015 and during the conversation with a FOS case worker on 23 November 2016) that it intends to cash-settle the claim. The applicants do not dispute the FSP‟s decision to cash -settle the claim. The FSP has made some payments to the applicants in partial settlement of the claims. The FSP is entitled to reduce the amount it pays to the applicants to the extent that those previous payments relate to the work described in the quotes and invoices described in this section (2.3) of this determination. Settlement of storm damage claim The applicants say that the following additional payments are required to settle the storm damage claim: Storm damage claim Quote for r epair work to rectify storm damage $58,879.70 Variation for additional work needed to rectify storm damage $4,022.70 „JM‟, structural engineer, report preparing fee $495 TOTAL $63,397.40 Case No: 454413 Determination Page 6 of 14 The applicants have provided quotes from the applicants‟ building company for the storm damage repairs. The applicants have not provided an invoice from JM for the report preparing fee. The FSP has not provided any information to dispute the applicants‟ quote. The FSP is required to settle the storm damage claim by paying the applicants $62,902.40. The FSP is required to pay the applicants a further $495 upon provision of an invoice from JM. Settlement of escape of liquid claim The applicants say that the following additional payments are required to settle the escape of liquid claim: Escape of liquid claim Quote for r epair work to rectify damage caused by escape of liquid $ 151,112.50 Temporary accommodation for four months at $15,167 per month (as approved by FSP for storm damage claim) $ 60,748 Reloc ation to and from rental accommodation (as approved by FSP for storm damage claim) $ 48,114 „QS Plumbing‟ report writing fee $150 TOTAL $ 212,010.50 The applicants have provided a quote for the water damage repairs and an invoice for the report writing fee. The FSP has not provided any information to dispute the quote. During a phone call with a FOS case worker on 14 December 2016, the applicants advised that the FSP had paid a cash settlement for temporary accommodation, but the applicants had not yet been paid for temporary accommodation and were still living in the home. The applicants said that temporary accommodation would be required during repair work that had not yet commenced because the claim was not yet settled. The applicants have provided a scope of works stating that the water damage repairs will take 120 days (approximately four months). However, it is possible that some or all of this work could be performed at the same time as the storm damage repairs, so the applicants will not need to incur any further costs for accommodation. Even if the work takes longer than four months, the applicants will not need to incur a second set of relocation expenses. I am not satisfied that the applicants have established an entitlement to further payments for temporary accommodation. Case No: 454413 Determination Page 7 of 14 The FSP is required to settle the escape of liquid claim by paying the applicants $151,262.50. If the applicants provide evidence that the FSP‟s previous payment for temporary accommodation is insufficient to pro vide accommodation for the duration of repairs, the FSP is required to assess whether any additional payments for temporary accommodation are payable under the policy. FSP must pay interest Section 57 of the Act provides that the FSP must pay interest from the time when it was unreasonable for the FSP to have withheld payment. In the circumstances, I consider this date to be 1 July 2016, six months after the lodgement of the second claim. 2.4 Are the applicants entitled to compensation for consequential loss or legal costs? The applicants say that they are entitled to the following: Additional compensation sought Time spent preparing documents, corresponding with FSP, and participating in interviews: 136 hours at $110 per hour plus GST $ 16,456 Cost of seeking legal advice in relation to claims $ 1,012 Cost of getting National Police Check report $ 46 TOTAL $ 17,514 Page 33 of the PDS states that the policy excludes cover for consequential loss, including:  loss of income or wages;  the costs , “ including the cost of your time ”, of proving loss or helping the FSP assess a claim; and  legal costs, unless they are incurred with the FSP‟s written authority. Therefore, under the terms of the policy, the applicants are not entitled to recover these costs. FOS cannot award compensation for non-financial loss in a dispute arising from a claim on a general insurance policy that excludes such liability. It can, however, compensate an applicant for non- financial loss arising from the FSP‟s poor management of the claim. The applicants have provided an invoice from their lawyers for $968. The invoice is dated 4 July 2016, and states that it is for “attending to client in initial conference, receiving instructions and advising”. Given the complexity of the dispute , even if the FSP managed the claims diligently, the applicants would be required to spend considerable time attending to the matter Case No: 454413 Determination Page 8 of 14 and provide extensive documentation to support their claim. The applicants might reasonably consult lawyers to assist them in doing so. Based on the available information, I am not satisfied that the applicants‟ legal costs were incurred due to the FSP‟s poor management of the claim s nor has there been any information from the lawyers that has been relied on in reaching this determination. 2.5 Are the applicants entitled to compensation for non-financial loss? FOS may award compensation for non-financial loss FOS may award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with an a pplicant‟s expectation of enjoyment or peace of mind. FOS expects an applicant to be moderately robust and tolerate a normal degree of inconvenience when making a claim. FOS takes a conservative approach to assessing compensation for non-financial loss. The maximum amount FOS can award for non-financial loss is $3,000 per claim. Applicants entitled to $3,000 compensation for non-financial loss The claims were lodged in August 2014 and December 2015. The applicants say that the claims have taken an unreasonably long time to resolve because the FSP has requested irrelevant documents and conducted unreasonably slow and lengthy investigations into the claims. The male applicant says that the FSP is harassing them by needlessly prolonging the investigations, and he is suffering anxiety and depression as a result. This is a complex dispute, involving two separate insured events causing hundreds of thousands of dollars‟ worth of damage to the applicants‟ home. However, even when the complexity of the matter is taken into account, the FSP‟s handling of the cl aim has been unreasonably slow. The applicants have cooperated with the FSP‟s investigations by making their home available for inspection and providing extensive documentation in support of their claims. The FSP says that the applicants have not cooperated with its investigations, but has not explained what more the applicants must do in order to resolve the dispute. The FSP has not explained why the available information is insufficient to assess the claims, or what further information it requires to settle the claims. The FSP has ignored FOS‟ requests for the FSP to explain its position. It has been more than a year since the second claim was lodged, and the FSP has given no indication of when it expects to be able to settle the claim. I consider that the FSP‟s poor management of the claim has caused an unusual amount of delay in resolving the claim and interference with the applicants ‟ peace of mind. I consider it fair in all the circumstances that the FSP pay the applicants compensation for non-financial loss in the sum of $3,000 for each claim. Case No: 454413 Determination Page 9 of 14 3 Supporting information 3.1 FOS approach to this dispute A full exchange of the relevant information has taken place between the parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions. For the purpose of this determination, commentary is restricted to only those issues considered relevant. 3.2 Relevant law Prima facie claim There is an onus on an insured to establish a prima facie claim. This means that the insured must establish, on the balance of probabilities, that they have suffered a loss caused by an event for which their insurance policy provides cover. Should this onus be discharged, the insurer then has the onus of establishing, on the balance of probabilities, the application of any exclusion on which it relies to deny the claim. 3.3 Submissions made by one applicant on behalf of both applicants At times during the course of this dispute, one applicant has made submissions on behalf of both applicants. For the purposes of this determination, submissions made by one applicant have been treated as if they had been made by both applicants. 3.4 Relevant policy terms What you are covered for – Insured Events page s 16 – 25 Storm (page 18) We cover Loss or damage to the building caused by a storm. Escape of liquid (page 22) We cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following:  refrigerators, freezers, dishwas hers and washing machines;  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  fixed tanks;  swimming pools or spas;  waterbeds;  baths, sinks, toilets and basins;  fixed heating or cooling system;  water main, fire hydrant or water supply pipe;  an aquarium. Case No: 454413 Determination Page 10 of 14 What we do not cover – general exclusions page s 32 – 36 Consequential losse s or extra costs following an incident covered by your policy (page 33) You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … consequential loss (financial and non - financial loss) or extra costs following an incident covered by your policy including:  loss of income or wages;  costs, including the cost of your time, to prove your loss or to hel p us with your claim;  cost of hiring appliances after yours suffer loss or damage;  professional, expert, legal, consulting or valuation costs unless you obtained our prior written authority to incur these costs;  cost of replacing or reapplying pest control chemicals and baits in or around the insured address;  travel costs;  cleaning costs;  any costs not covered by your policy. How to establi sh your loss page 39 Establish an incident took place When making a claim you must be able to prove that an incident covered by your policy actually took place. If you do not do this, we will not be able to pay your claim. Proof of Loss Allowing us, a repairer or an expert appointed by us, to look at what is damaged is usually all that is needed to prove your l oss. Sometimes though we might ask you to produce a copy of the most recent plans and drawings for the building, photographs of the building or other evidence that supports the extent of the loss you have suffered. If we decide that you are unable to reaso nably substantiat e your claim, we might reduce or refuse your claim. How we settle building claims page 41 – 47 If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:  repair damage to the building;  rebuild the building;  pay you what it would cost us to repair or rebuild the building. Case No: 454413 Determination Page 11 of 14 3.5 Documents provided by the applicants The applicants have provided the following documents in support of the claim and in response to requests by the FSP. Copies of all of these documents have been provided to the FSP. Document Author Date Compliance certificate Plumbing Industry Commission 29 August 2011 Occupancy permit „NS‟, building surveyor 28 June 2012 Certificate of compliance „NS‟, building surveyor 15 April 2010 Roof structure design certificat e „BBTT‟, roof truss manufacturer 27 January 2011 Water Proofing Certificate for Balconie s Applicants‟ building company Undated Water Proofing Certificate for En Suite Applicants‟ building company Undated Letter “ Re: Ceiling and wall cracking and render rippling ” „JM‟, structural engineer 20 March 2016 Letter “ Re: Additional water damage to structure ” „JM‟, structural engineer 20 March 2016 Tax invoice: “ Deposit for Sourcing and supply of Timber Flooring ” Applicants‟ building company 25 June 2016 Tax invoice: moving of furniture Applicants‟ building company 23 February 2016 Tax invoice: moving of furniture Applicants‟ building company 2 April 2016 Tax invoice: “ remediation restoration work to upstairs in second floor B.R. 3, WIR , Prayer room ” Applicants‟ building company 10 April 2016 Tax invoice: “remediation/ restoration work to Gym and Bathroom mould affected area” Applicants‟ building company 2 April 2016 Tax invoice: “remediation/ restoration work to Second floor mould affected area in Rumpus / Billiards room” Applicants‟ building company 2 April 2016 Tax invoice: “Repair work to Rumpus / Billiard room in the 2 nd floor including Electrical, plastering, carpentry and Painting” Applicants‟ building company 18 April 2016 Tax invoice: “Repair work to B.R.3 Applicants‟ building com pany 18 April 2016 Case No: 454413 Determination Page 12 of 14 and Prayer room in 2 nd Floor including Electrical, plastering, carpentry and Painting” Tax invoice: restoration of items Applicants‟ building company 15 April 2016 Tax invoice: second remediation upstairs Applicants‟ building company 20 May 2016 Tax invoice: structural engineer consultation fee Applicants‟ building company 10 March 2016 Email request to building surveyor Applicants 28 June 2012 Roof repair certificate Applicants‟ building company Undated Email scope of works FSP 20 May 2015 Expert review report „RL‟, FSP assessor 23 October 2014 Bracing calculations „JM‟, structural engineer 11 March 2010 Bracing plan „JM‟, structural engineer 11 March 2010 Engineering investigation report „FM‟, forensic engineer 6 August 2015 Scope of works „FM‟, forensic engineer 11 November 2014 Lease for resident of applicants‟ house „MB‟, property investors 25 February 2016 Receipt for payment by applicants Applicants‟ building company 26 May 2016 Receipt for payment by applicants Applicants‟ building company 29 June 2016 Receipt: debit $18,000 ANZ Banking Grou p 19 July 2016 Receipt: credit $18,000 ANZ Banking Group 19 July 2016 Rent al appraisal „JC‟, property managers Undated Medical certificate Dr „ZW‟, applicant‟s doctor 7 June 2016 Medical certificate Dr „FS‟, applicant‟s doctor 8 June 2016 Invoice 186: cleaning and waterproofing „AP Constructions‟ 30 June 2011 Invoice 188: cleaning and waterproofing „AP Constructions‟ 30 June 2011 Invoice „DNA‟, plumbers 7 August 2011 Certificate of compliance – design „JM‟, structural engineer 20 February 2016 Mould ins pection report „ML1‟, mycologist 2 May 2016 Application for occupancy permit Applicants 25 June 2012 Certificate of compliance „BT Windows‟ 13 June 2012 Case No: 454413 Determination Page 13 of 14 Compliance certificate Plumbing Industry Commission 31 January 2013 Compliance certificate „VW Windows‟ 15 June 2012 Structural certification: spiral stairs „MK‟, structural engineer Undated Certification and complianc e statement: “disabled persons lift” „EL Home Elevators‟ 3 May 2012 Compliance certificate Plumbing Industry Commission 19 June 2013 Certificate of electrical safety Energy Safe Victoria 1 August 2011 Certificate of electrical safety Energy Safe Victoria 20 September 2011 Insulation certification Applicants‟ building company 20 June 2012 Certificate of compliance: balustrades, shower glazing „CC Glass‟ 21 June 2012 Mould ins pection report and proposed scope of works „EH‟, occupational hygienist 29 May 2016 Analytical report (attached to EH mould ins pection report) „ML2‟, mycologist 19 May 2016 “ Interim Progress Report including Mould Remediation and Repair Work ” Applicants Undated Analytical report „ML2‟, mycologist 2 June 2016 Report of burst water pipe „QS Plumbing‟ 29 Jan 2016 Mould report „ST‟, cleaning and restoration service Undated (property inspected 7 March 2016) Letter enclosing invoice Applicants‟ lawyers 5 July 2016 Tax invoice „QS Plumbing‟ 29 Jan 2016 Engineering investigation report „FM‟, forensic engineer 14 October 2014 Photographs of damage (6) Not stated Undated Photographs of damage (3) Not stated 3 August 2016 Quote: variation Applicants‟ building company 12 April 2016 Report “ Re: Cracking” „JM‟, structural engineer 12 July 2016 Quote: Repair work to rectify the damages internal ceiling corners and external rendering walls Applicants‟ building company 10 November 2016 Quote: damages Caused by Water burst Pipe, in the en suit Applicants‟ building company 7 November 2016 Case No: 454413 Determination Page 14 of 14 wall of The upstairs front bed room. Scope of work for Repair of damages due to Water Burst Pipe Appli cants Undated Scope of works for additional Jobs due to Storm Damage Applicants Undated Scope of works for mould remediation Applicants Undated