Text of the determination
Determination
Case No: 454070 Determination Page 1 of 5
Case number: 454070 17 January 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his landlord insurance with the financial services
provider (FSP) for storm damage to his property in November 2014.
The FSP accepted the applicant’s claim for hail damage to the polycarbonate roof at
the rear of the property and internal damage caused by water entry. However, the
FSP denied cover for the cost of repairing the roof.
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the FSP liable for the costs of replacing the asbestos roof?
The FSP is not liable for the cost of replacing the roof because the damage was not
caused by the storm (or any other insured event under the policy).
Is the FSP required to increase the amount paid for loss of rent?
The FSP is required to contribute an additional $1,000 for loss of rent because its
builder reiterated the incorrect findings of the applicant’s roofer that the walls and
ceilings contained asbestos.
1.3 Determination
This determination is substantially in favour of the FSP.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome.
The FSP is not liable for the costs of replacing the asbestos roof. The FSP is
required to pay the applicant an amount of $1,000 for loss of rent for the period from
9 July 2016 to 23 August 2016.
Case No: 454070 Determination Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this dispute based on what is fair in all the circumstances. I have had
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions.
In reaching my decision, I have taken into account all the material submitted by the
parties, both before and after the recommendation. I am satisfied that the
documentation I have relied on has been provided to both parties.
I am satisfied that the case manager ’s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Is the FSP liable for the costs of replacing the asbestos roof ?
Available information does not establish roof was damaged by storm
The applicant’s policy provides cover for loss or damage caused by the insured
events listed in the policy (including storm). In order to establish a claim, the
applicant is required to show that, on the balance of probabilities, his roof was
damaged by an insured event.
The FSP accepted liability for minor holes in the polycarbonate roof at the rear of the
property, on the basis this damage was consistent with the impact of hail stones. The
FSP also accepted liability for internal damage caused by water entering through the
asbestos roof sheets over the main part of the property.
However, the FSP denied liability for damage to the asbestos roof itself on the basis
this damage was not caused by the storm but by factors which are excluded from
cover under the policy (such as wear, tear and gradual deterioration).
The FSP’s builder (PI) who assessed the damage to th e property following the storm
confirmed that water had entered through the asbestos roof.
However, PI advised that the issues with the roof which had led to water entry were
not caused by hail damage. PI advised that water had entered through pre-existing
cracks in the asbestos roof sheets, as well as the build-up of leaves and other debris
in the roof valleys and gutters.
Having carefully reviewed PI’s report, I consider it provides a logical explanation of
how the damage occurred which is consistent with the observed facts. In particular,
PI’s report includes several close up, colour photographs which show cracks in the
asbestos roof sheets.
The applicant disputes the PI’s findings and says the asbestos roof was damaged by
hail. He has provided copies of media reports confirming the severity of the storm,
together with reports from his roofing contractor (RR) which refer to hail damage.
Case No: 454070 Determination Page 3 of 5
The fact that the storm caused widespread damage does not of itself confirm that the
asbestos roof at the applicant’s property suffered hail damage during the storm. The
cause of damage to the applicant’s roof is to be determined based on the specific
facts and circumstances.
The initial quotation provided by the applicant’s roofer (RRS) in April 2015 refers to
‘obvious scuffing damage to the surface’ of the asbestos roof sheets which was ‘likely
to be attributable to hail’. The report also notes that the surface of the roof sheets is
broken and unstable in many places.
However, RRS’s report does not include any photographs showing the ‘scuffing
damage’ claimed. I am satisfied that no such dama ge is apparent in the photographs
taken by the FSP’s builder (PI).
Likewise, RRS’s report does not include photographs of the cracking damage said to
have been caused by the storm i n November 2014. The photographs in PI’s report
indicate the cracks had been painted over, which establishes they were present prior
to the storm.
The applicant provided a short email from RRS in June 2017 which states that the
storm caused damage to the roof resulting in water entry. However, this email was
provided over two years after RRS’s inspection and does not provide any additional
explanation as to the nature of the damage observed at that time.
The fact that the applicants’ tenants did not advise him of any leaks prior to February
2015 does not of itself establish that the roof was damaged by the hail storm in
November 2014. It is clear from the information provided that the condition of the roof
had gradually deteriorated over time.
Having carefully reviewed the available information (including the photographs
provided), I am not satisfied that the hail storm in November 2014 caused any
damage to the asbestos roof sheeting.
Available information establishes that roof required replacement
The applicant replaced the asbestos roof sheeting after the FSP advised it would not
carry out the internal repairs until these works had been completed.
The applicant has subsequently cast doubt on the accuracy of the various reports
provided by the FSP’s builde r (PI).
However, I am satisfied that the report provided by PI clearly identified pre-existing
issues with the asbestos roof sheets which necessitated the requirements of the roof.
These issues are reflected in the photographs included in PI’s reports.
On this basis, I consider it was reasonable for the FSP to delay completion of the
internal repairs until after the main roof had been replaced. In the absence of these
works, the FSP would have been unable to guarantee the internal repairs.
Case No: 454070 Determination Page 4 of 5
FSP is not liable for costs of replacing roof
For the reasons outlined above, the applicant has not established that the asbestos
roof required replacement due to damage caused by the storm (or any other insured
event).
Accordingly, the FSP is not liable for the costs of replacing the roof.
The applicant says the FSP should indemnify him for the costs of replacing the roof,
given his status as an employee and in light of his very serious health condition.
It is open to the FSP to take such matters into account for the purpose of considering
whether to provide an ex gratia settlement. However, FOS will not compel an insurer
to provide an ex gratia settlement.
2.3 Is the FSP required to increase the amount paid for loss of rent?
FSP should pay applicant $1,000 for loss of rent
The internal repairs were delayed until the tenants’ existing lease expired and were
carried out while the property was vacant.
The FSP cash settled the applicant for loss of rent during the 10 day period while the
internal repairs were carried out.
However, the applicant says the FSP should compensate him for loss of rent during
the entire period the property was vacant because the FSP’s builder incorrectly
advised that:
the ceilings and walls contained asbestos
accordingly, the repairs should be carried out while the property was vacant.
The information that the ceilings contained asbestos was included in the initial
quotation provided by the applicant’s roofer (RRS) when the claim was lodged in
September 2015. This information was subsequently reflected in the report prepared
by the FSP’s builder (PI).
There is no information which conclusively establishes who advised the applicant (or
his property manager) that the repairs should be vacant in order to allow the repairs
to be carried out.
In an email sent on 11 February 2016, the applicant advised this advice was provided
by ‘the roof contractor’. The broader context in which that phrase is used suggests it
was more likely to refer to his roofer (RRS) than the FSP’s contractors .
However, t he applicant’ s property manager also stated that the FSP’s assessor
and/or builder advised her that the walls and ceilings were ‘possibly’ asbestos.
Based on the available information, I am satisfied that the FSP was not primarily
responsible for the appli cant’s understanding that the walls and ceilings contained
asbestos. The FSP is not responsible for incorrect information provided by the
applicant’s roofer.
Case No: 454070 Determination Page 5 of 5
However, the inclusion of this information in PI’s report (and in discussions with the
property manager) contributed to the applicant arranging for the repairs to be carried
out after the tenants had vacated.
On this basis, I consider it is fair and reasonable that the FSP pay the applicant an
amount of $1,000 for loss of rent for the period from 9 July 2016 to 23 August 2016
(when a new lease commenced).
FSP is not liable for any other amounts
During the course of this dispute, the applicant raised concerns about further internal
water damage which occurred in or around December 2016.
The applicant suggested this damage had occurred because the FSP’s builder (PI)
painted the water damaged ceiling, rather than replacing it. He considered this
resulted in moisture and mould reappearing at a later date.
The costs of repairing the additional water damage were subsequently covered by
the insurer of the property at the relevant time (the applicant having changed insurers
in the meantime).
Based on the available information, I do not consider that the internal repairs carried
out by the FSP were inadequate. The reports obtained from the various contractors
confirm the water damage in 2016 was new, rather than being related to the previous
repairs.
The applicant also raised conc erns about reports provided by the FSP’s contractors
which advised that the additional damage had occurred due to defects with the
roofing repairs carried out by the applicant’s roofers. However, a report obtained by
the applicant in April 2017 also identified similar issues.
For the reasons outlined above, the applicant is not entitled to any further payments.
Recommendation
Case No: 454070 Recommendation Page 1 of 8
Case number: 454070 30 June 2017
3 Overview
3.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) in September
2015 after discovering the exterior roofing and internal areas of his rental property
had sustained damage from a storm event on 27 November 2014.
The FSP denied the claim for the main exterior roof on the basis it had not been
damaged by the storm. The FSP repaired the applicant’s polycarbonate roof and also
agreed to cover the resultant internal damage once the applicant had rectified the
main roof. The applicant paid to replace the roof, but maintains that the FSP is liable
for these costs and seeks reimbursement.
Further, the applicant also claims for loss of rent as he believes the FSP’s agents
incorrectly reported there was asbestos in the ceilings, and told his real estate agent
that repairs could not be safely undertaken until his tenants moved out.
3.2 Issues and key findings
Is the FSP liable for the cost of the roof repairs?
The FSP is not liable for the repairs to the asbestos roof, as the weight of the
evidence suggests the problems are either maintenance related, or due to previous
issues with workmanship. The FSP has already effected repairs to the storm-
damaged polycarbonate roof, and has therefore met its liability.
Did the FSP cause the applicant financial loss in relation to his rent?
The FSP conducted a full assessment of the property when assessing its liability. It
therefore had the opportunity to confirm the presence of asbestos, rather than relying
on a prev ious report from the applicant’s builder, which turned out to be incorrect.
While the FSP is not fully liable, it should contribute $1,000 towards the applicant’s
loss of rent on the basis it has contributed to the situation.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
Subject to the parties accepting this recommendation:
the FSP is not required to take any further action in relation to the roof
Case No: 454070 Recommendation Page 2 of 8
the FSP is required to contribute $1,000 towards loss of rent for the period 9
July 2016 to 23 August 2016.
4 Reasons for recommendation
4.1 Is the FSP liable for the cost of the roof repairs?
The applicant is required to establish a claimable loss
The applicant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as establishing a
prima facie claim.
The applicant held a Landlord Insurance policy with the FSP. The accidental damage
option was not selected. The applicant says that in November 2014 the roof of his
rental property was damaged by a severe storm event, and that the subsequent
water ingress caused damage to the inside of the property. The applicant lodged his
claim with the FSP in September 2015.
On inspection, the FSP noted there were several different types of roofing in place at
the property. The FSP accepted there was hail damage to the polycarbonate roof,
which was subsequently repaired.
However, its expert reports indicated that the main roof, which was asbestos, was not
storm damaged. Rather, the FSP said the roof needed maintenance to address the
issues which allowed water to enter the home. It said it would undertake internal
repairs once the outstanding maintenance issues with the roof were addressed by
the applicant.
The applicant attended to the roof repairs, and the FSP fixed the resultant internal
damage. However, the applicant was not satisfied and continued to pursue the FSP
for the cost of the replacement of the main (asbestos) roof.
FSP’s evidence indica tes damage to the asbestos roof was not due to an
insured event
The FSP relies on its expert reports and photographs which indicate that the majority
of the roofing at the applicant’s rental property was not damaged by the storm. The
FSP’s expert says that the water ingress via the main asbestos roof was due to a
number of issues set out in the report including:
cracking in the roof sheets
valleys and gutters full of leaves and debris
The main (asbestos) roof was not damaged in the storm
The applicant initially provided a copy of the quote from the roofer he engaged to
repair the damaged asbestos roof. The report indicates that there is scuffing to the
roof, likely attributable to hail, however it does not go into any significant detail. The
report also mentions that the surface of the roof is unstable and broken in many
places, however this particular aspect is further quantified in the FSP’s report,
Case No: 454070 Recommendation Page 3 of 8
wherein the expert notes there are cracks evident to the roof, but they are old and
have been previously repaired and painted over.
The applicant also provided some information from the tradesperson (DSR) who had
originally repaired his roof in 2012 (prior to the storm event). The applicant had DSR
revisit on the basis that the FSP had suggested there were previo us issues with the
workmanship. DSR did not agree with the FSP’s findings and concluded that the roof
had defects due to foot traffic, and in particular noted that they had seen a
photograph of a tradesperson on the roof. DSR also advised the applicant it was
voiding his warranty, and would not engage in any further repairs or correspondence
with him.
The applicant’s real estate agent also sent a tradesperson to the property to examine
the roof. A very brief email was provided from (GC), which surmised that the damage
was due to various maintenance issues.
The applicant feels that as the information from his independent builder could not
establishes the responsible party, the FSP should bear the costs.
On the information provided, I am not satisfied the applicant has established the
claimed damage to the asbestos roof was caused in a storm event. Rather, I accept
the material provided by the FSP establishes there is no storm damage to t his
particular section of the roof. Further, I am not persuaded the applicant has
established that the FSP is liable repairs to the roof that was worked on by either of
the contractors he hired (DSR and RRS).
I note that the applicant has said that he feels the FSP should be willing to settle his
claim, regardless of its findings. He says that consideration should be given to his
employment status with the FSP, and also because he is unwell.
In making a decision, I am to consider the available material including the terms of
the policy, having regards to relevant law, good industry practice, codes of practice
and previous FOS decisions.
On the information provided, I am satisfied the FSP’s position is fair. On the available
material, the applicant has not established the damage to the asbestos roof was
caused by a storm.
The FSP accepted the resultant damage to the inside of the home. It also agreed that
it would cover internal repairs after the applicant addressed the maintenance issues
outlined. The FSP met this obligation in June 2016, after the tenants had moved out.
In the circumstances, the FSP is not obliged to pay for the replacement roof as the
damage was not caused by an insured event.
Applicant’s claim with new insurer does not affect FSP’s liability
During the course of the dispute, a further water ingress event occur red and the
internal ceilings were damaged again. The applicant advised the FSP he believed he
should be covered for this under the lifetime guarantee for repairs.
The FSP’s expert attended the property again, and noted that there were still issues
with the main roof despite it being replaced. In regards to its own repairs to the
Case No: 454070 Recommendation Page 4 of 8
property, the FSP concurred there were some drill holes present in the polycarbonate
roof which should not have been present, and rectified this issue. It also noted that
the awnings could have been damaged in the storm, and replaced those. However,
the FSP did not find any issues in regards to the internal repairs. Regardless of this
finding, the FSP reiterated it would rectify the internal damage once the maintenance
with the new roof had been addressed, and suggested the applicant contact the
tradespeople concerned.
The applicant disputed this several times, mainly because he believed it had been
the FSP’s responsibility to check everything before going ahead with the internal
repairs, and therefore the onus was on it to now repair everything – including any
new issues with the roof. The FSP did not agree, and advised it was the applicant’s
responsibility to ensure the repairs he authorised were adequate. This dispute
became fairly protracted, until it was noted that the applicant had changed insurers
prior to the new water damage occurring. The FSP then concluded that as there was
no evidence its internal repairs were faulty, it was not on risk for the new internal
damage.
The applicant then lodged a claim with his current insurer (FSP2). FSP2 accepted
the claim, and fixed the internal damage. FSP2 made no reference to any
maintenance issues with the roof.
The applicant took the position that the acceptance of the claim by FSP2 indicated
the roof replacement was adequate, and that the FSP should reimburse him for the
replacement cost. However, this outcome has no bearing on the fact that the original
roof needed to be replaced, and FSP2’s reports provide no commentary on the
conditio n of the original roof. FSP2’s acceptance of the claim only indicates that there
was a liability for the resultant damage. The FSP had always maintained it would
cover the resultant damage once the problems with the roof were rectified. The only
reason the FSP ultimately did not cover this damage, was because it was no longer
on risk when it occurred.
4.2 Is the FSP liable for loss of rent ?
No evidence that the FSP directly advised the tenants to move out
The applicant says that the FSP incorrectly advised that there was asbestos in the
building. The applicant also says that the FSP told his tenants that they had to move
out before repairs could be effected.
There is no dispute that there was asbestos in the external roof. However, it was
noted once the internal repairs took place, that the internal area did not contain any
asbestos.
The first reports on the condition of the building are provided to the FSP by the
applicant on lodgement of the claim. These are reports from the tradesperson he
engaged to replace the external roof, (RRS), prior to lodging a claim with the FSP.
RRS provided a report for the external roof replacement, and a separate report for
the internal repairs. Both reports clearly state that asbestos is present internally and
externally.
Case No: 454070 Recommendation Page 5 of 8
The FSP agrees that its expert report from (P) also mirrors the asbestos findings of
RRS, however the FSP maintains that this was based on the content of the RRS
reports, which it took on face value as correct, rather than its own investigation of the
property. The FSP agrees it should have been more thorough in this regard, however
it points out that the report itself is not an instruction to the tenants to vacate the
premises.
The applicant has not been able to provide any evidence that (P) instructed his real
estate agent or tenants directly, that they needed the premises to be vacant prior to
engaging in repairs. However, it is clear that the presence of internal asbestos would
have caused a safety concern in relation to internal repairs. A note on the FSP case
file indicates the applicant’s real estate agent called to advise the FSP that due to the
presence of asbestos, the repairs could not commence until the tenants moved out.
Whilst the original report of asbestos did come from the applicant’s own expert RR S,
the FSP’s report also contributed to the understanding that the tenants need to move
out for repairs due to asbestos. It is somewhat unfair for the FSP to argue it should
not be held responsible for this error because it accepted the findings of asbestos by
RRS on face value, when at the same time the FSP choose not to accept the report’s
findings of storm damage and conducted its own investigation.
P’s report incorrectly represented that asbestos was present in the internal areas of
the property. Had the FSP been diligent in its review, it should have noted that the
internal area did not have any asbestos present.
FSP’s misrepresentation has contributed the applicant’s loss
The policy allows for a benefit to be paid for loss of rent, during the period that the
property cannot be lived in whilst repairs are being effected. The evidence shows that
the internal repairs took 10 days, and the applicant was paid for this period.
However, I believe that the content of the FSP’s expert reports did contribute to t he
tenants vacating the property. The applicant says that had the report accurately
stated there was no internal asbestos, there would have been no reason for the
tenants to move out.
Further the applicant says the agent at the time contacted the FSP and was told the
tenants would need to move out. While it cannot be confirmed that the FSP told the
agent the tenants needed to move out, there is evidence from the FSP’s case notes
that the agent was under the belief the tenants needed to move out during repairs
due to asbestos.
Bearing in mind what is fair in all the circumstances, the FSP should pay $1,000
towards the applicant’s loss of rent between 9 July 2016 to 23 August 2016 on the
basis it has contributed to the belief the tenants needed to vacate the property.
Case No: 454070 Recommendation Page 6 of 8
5 Supporting information
5.1 FOS approach to the dispute
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issue raised.
All of the provided material has been read and considered. The parties raised
numerous issues in their submissions to FOS. For the purpose of this
recommendation, commentary is restricted to only those issues considered relevant.
5.2 Terms of the policy
Polic y term Key points
Storm Covered
Loss or damage caused by a storm
Loss of rent following an
insured event
If we accept your claim for loss or damage to your property due to
an insured event occurring, we will pay the weekly rental amount
for the reasonable amount of time we decide it should take to
repair or rebuild the property so it can be lived in again
We do not cover loss of rent
- If the tenant still has an obligation to pay the rent
- Once the insured address is able to be lived in again
Gener al exclusions You are not covered under any section of this policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
- Wear, tear, and gradual deterioration
5.3 Key documentation
Record Key points
Applicant’s expert ( RRS )
Quote
08 April 2015
Scuffing to the ACM roofing likely attributed to hail impact
The surface is broken and unstable in many places
Recommend replacement of the roofing as soon as possible
Removal and replacement of asbestos cement fibro roofing.
Amount $1 4,470
Applicant’s expert ( RRS)
Quote
10 October 2015
Removal and replacement of water damaged ACM (asbestos
containing material) int ernal ceilings caused by leaking roof from
hail storm 27.11.14
Amount $13,860
FSP’s expert (P)
Report
24 September 2015
Met on site with real estate agents and tenants
Said that every time it rains they have further wat er ingress,
resulting in staining to the plasterboard and asbestos ceilings
Polycarbonate roof to rear of property
- minor holes, consistent with hail impact
- roof has gone brittle due to age, wear & tear
Case No: 454070 Recommendation Page 7 of 8
Inspection of the roof revealed numerous maintenanc e issues
Main roof (asbestos)
- cracks evident to roof sheets
- cracks are old and have been painted over – water is coming
through the cracks
- Valleys and gutters are full of leaves and debris
Trimdeck roof
- underpitched, and has a hollow through the middle.
- short flas hing
- opening between flas hing and asbestos sheets allowing wind -
driven rain to enter
Corrugated roof at r/o property
- underpitched
- water ingress occurring via sheet laps
- loose fixings to this roof
Conclusion – maintenance issues need to be rectified by the
Insured prior to any repairs commencing
APP
Email to FSP
11 February 2016
Forwards FSP a quote from his roof contractor and also says he
has been told by roof contractor that the house needs to be empty
in order to carry out the ceiling repairs. Will inform FSP when
tenants vacate.
APP
Email to FSP
24 February 2016
Queries whether FSP will look after tenants whilst repairs are being
done
Says if FSP cannot do this he will wait until expiration of lease in
early May, and then forward cash settlement
FSP
Claim case notes
21.03. 16
APP’s real estate agent calls to say that due to asbestos repairs
cannot be done until tenants move out
FSP’s a sse ssor ( TK )
Report
19 January 2017
Reins pected premises to see whether new damage is a result of
poor workmanship by (P)
Entry ceiling wat er damage is the result of poor workmanship to
the main roof (APP’s trades ) – multiple issues
Is not part of t his claim, can be reassessed as a new claim
however (APP) would need to attend to maintenance issues
No issues with (P’s) previous repairs to internal hallway ceiling
(P) did previous repair the polycarbonate roof, and confirms there
are drill holes presen t which should not be there – this will be
repaired
There are screws protruding through the sheets in the trim deck
roof – however (P) did not work on this roof
Awnings (front) have been hail damaged. They are very old with
bent slats, but there is some da mage.
As (APP) had the roof replaced recently, he should contact the
trades to investigate as it may be under warranty
Overall replacement roofing arranged by APP is insufficient and
further water leaks may occur if not rectified
FSP’s expert (P) Numerous maintenance issues to existing flat roof and the new
Case No: 454070 Recommendation Page 8 of 8
Report
30 January 2017
Colorbond roof
Water ingress has occurred through the deteriorated lap in the
apron flashings, directly below the valley
Recommend (APP) engages a contractor to inspect the roof and
have all maintenance issues identified and rectified
There is resultant damage to the plasterboard ceiling in the
entry/living room
APP’ s expert (DSR)
Report
24 M arch 2017
Inspected front roof. The main roof of the house appears to have
numerous defects (dents due to foot traffic which have split the
sheeting)
No issues with their previous work, and are voiding APP’s warranty
APP’ s expert (GC)
Email
20 April 2017
Front flat roof has a bow in it causing water to pool
rags/ screws/pop rivots have been left on the roof from previous
attempts to repair
Back lean to roof is missing flashings back onto house
Roof valleys are full of leaf matter
Ridge capping joins require siliconing
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.