Home / Financial Firm (Unknown - Insurer) / Determination 453694

Determination 453694

Cash settlement amount for malicious tenant damage to investment property

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-08
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$42,357
Non-financial loss$1,500
Amount claimed$272,955
SourceAFCA PDF

Summary

Landlords claimed for malicious tenant damage and sought $260,605 for building repairs, disputing the FSP's settlement. AFCA adopted the independent consultant's scope, added a 15% allowance and bathroom works, ordered six weeks' loss of rent and $1,500 non-financial loss, with interest.

Settlement must reflect the reasonable cost of necessary reinstatement works, and the independent scope was preferred over quotes that were insufficiently explained or included unrelated items.

Issues

Subjects and remedies

pay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 453694 Determination Page 1 of 9 Case number: 453694 5 April 2018 1 Overview 1.1 Dispute This dispute arises from an insurance policy, held by the applicants with the financial services provider (FSP) covering an investment property. The applicants lodged a claim on 26 February 2016, after discovering damage to the property caused by their former tenants. The FSP assessed and accepted the claim, and offered a cash settlement based on its expert‟s reports. The applicants reje cted the FSP‟s settlement offer, saying quotations they obtained suggested the cost of repairs was higher than proposed by the FSP. The applicants also say the scope of works proposed by the FSP is insufficient to cover the necessary works. 1.2 Issues and key findings Does the FSP’s settlement offer discharge its claim obligations ? The FSP is to increase its settlement offer to include a 15% allowance for contingencies and builders margin and allow full reinstatement works for an upstairs bathroom as noted in section 2.1. Are the applicants entitled to compensation for non-financial loss? The applicants are entitled to compensation for non-financial loss as there were errors on the part of the FSP which resulted in delays . Are the applicants entitled to loss of rent? The applicants are entitled to a further 6 weeks loss of rent. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is to:  pay a further $25,489.43 covering potential contingencies and builders margins associated with the scope of works  pay a further $12,967.87 including GST for additional works required to the upstairs bathroom  apply interest on this additional sum from 2 No vember 2016 in accordance with section 57 of the Insurance Contracts Act 1984  pay an additional $3,900 being six weeks loss of rent  pay compensation of $1,500 for non-financial loss. Case No: 453694 Determination Page 2 of 9 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination has been made by a panel consisting of an Ombudsman, together with two representatives with extensive experience in consumer claims and the insurance industry. This determination follows consideration of all the information exchanged, and is based on what is fair in all the circumstances, having regard to the relevant legal principles, good industry practice, and, where applicable, prior determinations. 2.1 Does the FSP’s settlement offer discharge its clai m obligations? Policy covers damage from malicious acts by tenants The applicants‟ policy provides cover for loss or damage to the building arising from malicious acts or theft by tenants, as well as optional accidental damage cover. The policy defines a malicious act as being: “An act done with the intention of causing loss or damage, or with reckless disregard for the consequences” The parties agree the actions of the applicants‟ tenants were malicious. Accordingly, the applicants have established a valid claim under the policy. History of the dispute From a review of the material, the panel is satisfied the following points are not in dispute:  On 26 February 2016, the applicants lodged the claim after evicting their tenants.  The FSP appointed a builder (SH) to prepare a scope of works for repair.  On receiving the SH scope of works dated 16 March 2016, concerns were raised regarding errors and omissions.  SH provided two further proposals, dated 16 and 20 May 2016, however these scopes were not considered satisfactory.  On 15 June 2016, the applicants received a scope of works and quotation from OS. OS proposed repairs to the value of $362,511.  On 22 June 2016, the applicants received a quotation from AL. AL provided an estimated cost of repairs of $382,027.80, said to be based on an estimate prepared from an inspection in April 2016.  The FSP appointed a new builder (CB) to prepare a revised scope of works and quotation.  On 28 June 2016, CB provided its scope of work and quotation, with proposed costs of $213,573.75, including GST.  The FSP assessed the CB quotation to a total of $137,357.05, and offered this sum to the applicants. Case No: 453694 Determination Page 3 of 9  On 30 June 2016, the applicants obtained a scope of works and quotation from their preferred builder (RR). RR proposed repairs would cost $265,488 including GST, with a further provisional sum.  On 21 July 2016, the applicants provided a quotation from SC. SC stated the cost of repairs was $387,244.55 including GST. The applicants did not provide a copy of the scope of works on which SC based its estimate.  As the parties were unable to agree on the scope and cost, the FSP appointed an independent building consultant (IC) to inspect the property and provide a scope for repairs.  On 10 October 2016, IC provided its report and scope. IC stated it based the scope of repairs as a comparison to RR‟s scope.  On 2 November 2016, CB provided a revised quotation based on the IC scope of works.  The FSP revised its settlement offer to the applicants, based on the CB quotation of 2 November 2016. Applicants ’ estimates do not provide sufficient detail explaining why works are required In their email of 29 May 2017, the applicants confirm they seek $260,605.01 in full and final resolution for building repairs. They say they are entitled to this amount as additional works are required which were previously excluded from the scope of works proposed by the FSP, or were costed incorrectly. The panel has carefully reviewed the scopes provided by the applicants. After reviewing the AL quotation, the panel is not satisfied there is sufficient information demonstrating the scope of works considered when this estimate was prepared. There is little indication as to why AL has proposed the works in the estimate, and therefore the associated costings. SC‟s estimate provides less information again, stating the cost of works is $387,244.55, GST inclusive. As the applicants elected not to provide the SC scope of works, it is difficult for the panel to reconcile the proposed works with any damages associated with the claim. The applicants provided a further estimate from builder RB, dated 28 July 2016. RB stated malicious damage and works were extensive, and provided a brief breakdown on repairs. However, RB does not detail the type of works, or explain why the works proposed are required. For instance, RB‟s quotation includes “Tiling Complete” for the sum of $82,500, but does not provide cost itemisation for rooms or areas. The applicants provided a report from JL dated 6 February 2018 indicating the measured tiled areas of the property at 249.9m2. The applicants maintain this justifies the quotes previously provided by RB and others for the retiling of the property. Case No: 453694 Determination Page 4 of 9 Whilst the panel accepts that if the entire property required retiling these quotes may be reasonable, the panel is not satisfied the information as provided is sufficient to establish that all areas required to be retiled as a result of the malicious damage. The panel considered the RR quotation and scope of works. Having reviewed this scope, the panel is not satisfied RR‟s proposal can be considered a complete quotation. This is because the quotation does not include repairs deemed necessary to a dining room, as identified by IC. OS‟s quotation and scope of works for the applicants‟ pr operty provides a comprehensive list of damages requiring repair. However, the OS scope and quotation does not explain why the proposed works are required. That is, OS does not discuss whether damages are malicious, as opposed to any other cause. The panel notes the works proposed by OS includes items such as blinds and carpets, which have already been cash settled by the FSP. The applicants additionally provided quotations from two kitchen renovation firms, AE and EK. The applicants say these quotations de monstrate the FSP‟s recommended works are insufficient. The AE quotation suggests the FSP‟s scope is inadequate, as the FSP intends to replace „kick boards‟ as opposed to „kick bases‟. AE says a kick base forms the foundation of the kitchen cabinetry, and requires a full strip out. EK does not provide commentary on whether „kick boards‟ or „kick bases‟ are present. Rather, the panel notes the works proposed by EK appear to fall within the IC scope of works, through items 1.3.1 to 1.3.10. The panel reviewed other providers ‟ scopes and quotations, and notes there is no co nsistency on approach on this point. The OS scope support‟s AE‟s position, and the RB quotation mentions works for kick bases. However, the RR scope supports works proposed by EK. AL and SC‟s proposal does not appear to support either view. The panel acknowledges the various providers have their own costing considerations, which factor into a final quotation. This does not mean a quotation which is the least expensive is indicative of being incomplete, in the same way a more expensive quotation does not necessarily reflect the required claim-related works. In the panel‟s view, having carefully considered the various scopes provided by the applicants, there is insufficient information establishing a link between the required claim-related works to reinstate the property, and the proposed works and costings for the above providers. Further, as the applicants‟ experts are unable to confirm whether the kitchen has „kick boards‟ or „kick bases‟, the panel is not convinced IC has made an error in preparing the necessary reinstatement works in the applicants‟ kitchen. For these reasons, the panel is not satisfied reliance should be placed on these scopes, or the respective quotations. Case No: 453694 Determination Page 5 of 9 IC identified damages which appear inconsistent with malicious damage The panel has reviewed the scope of works prepared by IC, noting this scope was prepared as a comparison to the RR quotation. Throughout its review of the scope, IC identified line items works which were not required, such as blinds which had already been cash settled. IC also identified works it did not consider necessary, such as removal of skirting boards in the front entry/hallway area, should due care be taken by trades. In addition, IC identified what it considered minor scuffing unrelated to malicious damage on study and stairwell walls, and noted an absence of damage of any kind to skirtings in the kitchen, foyer area and bedrooms. There is insufficient evidence demonstrating IC‟s assessment is incorrect for these items. Accordingly, the panel accepts IC has appropriately assessed the scope of works for these items. Upstairs bathroom affected by pre-existing leak In addition, IC states floorboards in an upstairs bathroom sustained damage from an ongoing long-term shower recess leak, unrelated to any malicious damage. The applicants says they obtained a pre-purchase report which demonstrated there were no issues with the property, save for those rectified by the previous owners in 2014. The applicants provided an extract of the report which suggests there were no water proofing or moisture concerns. However, the extract also suggests the person conducting the inspection did not observe any certificate of completion or water proofing in the documentation provided. In addition, the applicants say they undertook waterproofing works following purchase of the property in July 2015, and again in January 2016. The panel notes however, invoices provided for these works do not explain what works were undertaken, and in what room(s) the works occurred. It is unclear exactly what works were conducted by the previous owners, and whether floorboards were replaced as part of these works. However, the available information does suggest there was no issue with the shower in this bathroom. The panel notes both OS and RR state the shower and fittings can be set aside and reinstalled following retiling works (items 17.2, and items 11.11.7 and 11.11.9 of the respective scopes). The panel considers the above builders ‟ approaches suggest there is no issue with the shower in this bathroom. Given the parties acknowledge a water leak occurred at a time prior to the applica nts‟ purchase of the property, and as there appears to be no issue with the shower, it would appear the floorboard damage occurred at some earlier point in time than the malicious damage. Having carefully considered the available material, the panel considers there is insufficient evidence demonstrating IC‟s assessment is incorrect. Accordingly, the panel accepts IC‟s view the floorboards should not be included in the scope of works. Case No: 453694 Determination Page 6 of 9 IC scope appears consistent with the necessary works to cover claim related damage IC highlighted the absence of works required in the dining room at the applicants‟ property, noting the need for removal and replacement of tiles, skirting boards and wall linings. IC additionally commented that various systems, such as a ducted vacuum, ducted air conditioning and hot water service, should be tested prior to incorporation into the scope of works. The panel accepts IC, as a building consultant, has the necessary skills and expertise to make such decisions. The panel also accepts testing of componentry prior to claim inclusion is acceptable industry practice. The panel considers the IC scope of works is an adequate representation of the works required to reinstate the applicants‟ property , subject to the following commentary. Additional works to be included The panel notes IC assessed the upstairs bathroom scope of works to replacement of three tiles only, as opposed to replacement of all tiles in the room. IC states if a suitable tile match can be found, then this will be the only repair necessary to the damaged tiling. IC states waterproofing would be required, and could be patched for the replaced tiles. The applicants provided a report from a building consultant, EC. EC states the removal of individual tiles in the bathroom would likely result in delaminating of the waterproofing bed, which would result in water penetration in time. EC recommended the whole floor and corner tiles be removed, waterproofing reinstalled, and then tiling replaced. The FSP has not responded to EC‟s sta tement in this regard. In the absence of any information to the contrary, the panel accepts EC‟s view that waterproofing will likely be compromised as a result of tile removal. The panel considers EC‟s proposed method of repair is consistent with good ind ustry practice. The panel additionally notes CB included full replacement of tiles and waterproofing in its quotation dated 2 November 2016. Accordingly, the FSP is to include works proposed by RR in the IC scope as items 1.11.1 to 1.11.9. FSP entitled to decline cover for unrelated items In the course of dispute negotiations, the applicants requested the FSP consider covering costs not included in the scope of works. This resulted in the FSP increasing its settlement by $34,202.96 including GST to cover items such as an alarm system, air conditioning system and external ground lights. In addition to the amounts, the applicants requested the FSP consider costs associated with a new hot water service. The FSP advised it could not include the hot water service within the scope of works without establishing the cause of damage. Case No: 453694 Determination Page 7 of 9 The applicants provided an email from a plumber who attended the property following a burst event. The plumber noted superficial damage to the exterior of the hot water service, and damage to the thermostat, burner, gas clock and other components, as well as what was considered irreparable damage to the outdoor hot water heater. However, the panel notes the plumber did not identify the cause of the irreparable damage. At this time, the panel is not satisfied there is sufficient information which establishes how the hot water service damage relates to the claimed event. Accordingly, the FSP is not liable for replacement of the hot water service. CB quotation most closely follows IC scope of works The panel has carefully reviewed the various scopes and quotations. The panel notes both the SC and AL quotations do not include sufficient detail explaining why the proposed costs are required. While RR, RB and OS provide scopes of varying detail, none of these providers have prepared quotations against the IC scope of works. Further, the panel notes these latter providers include unrelated works for the purpose of the malicious damage claim, such as inclusions of contents items previously cash settled, repairs for wall scuffs, and removal of skirting boards when not necessary for replacement of carpet and tiling. In contrast, CB‟s quotation of 2 November 2016 was prepared in consideration of the IC scope of works. The panel notes some items on the CB had no costing (items 4- 18-2 to 4-18-4 in its quotation), however, the parties resolved these, along with items noted for testing, through the course of the dispute. As the CB quotation more closely reflects the IC scope of works, and as the IC scope more accurately reflects the works necessary to repair the malicious damage at the property, the panel accepts the CB quotation is the most appropriate in the circumstances. Accordingly, the panel is satisfied the FSP was entitled to rely on the CB quotation, save for the following comments. Quotation does not include allowance for contingencies/builders margin The panel notes the quotation from CB does not make any allowance for the contingencies that can occur during any building project. The panel notes no allowance is made for the possible variation in the scope of works once the works are commenced. In the panel‟s view it is not uncommon to see an allowance of between 10 and 25% for such variations. The panel considers it appropriate in the current dispute that a 15% allowance be made to cover possible variation in costs of the scope of works. CB to include works for the upstairs bathroom As noted above, the panel considers additional works are required to an upstairs bathroom. During its initial inspection of the property, CB noted works required to this room, denoted as item 1-10 in the 28 June 2016 scope of works. Case No: 453694 Determination Page 8 of 9 Under the initial IC scope of works, CB has allocated $1,535.07 including GST for materials and labour. CB‟s June scope and quotation provi ded a total quantum of $14,502.94 including GST for works more closely resembling those the panel considers necessary in this room. Taking into consideration what is fair in all the circumstances, with a view to finalising the dispute between the parties, the panel considers it reasonable for the CB quotation to be increased by $12,967.87 including GST, to take account for the additional works required. By increasing settlement for bathroom and allowing 15% for variations the FSP’s offer discharges its cla im related obligations To date, the FSP has accepted $156,961.68 for works required to reinstate the building. With the inclusion of bathroom related works costing $12,967.87 , the FSP‟s liability for building related works is $169,929.55. A 15% allowance of variations to the scope of works/builders margin of $25,489.43 should be added to this amount. Considering the $23,000 settlement for contents already issued, the FSP‟s total payment for the building and contents claim is $218,418.98. The panel is satisfied this figure fairly represents the extent of the FSP‟s liability with respect to the claim. To allow for the passage of time the panel considers it is fair that the FSP apply interest to the allowance of $25,489.43 and $12,967.87 for the bathroom related works in accordance with section 57 of the Insurance Contracts Act 1984 from 2 November 2016 to date of payment of the claim. 2.2 Are the applicants entitled to compensation? Non-financial loss compensation is warranted Under paragraph 9.3 of the Terms of Reference, compensation for non-financial loss of up to $3,000 may be awarded in circumstances where an applicant experiences an unusual degree of delay or inconvenience when dealing with a claim. In the present case, the applicants‟ investment prop erty has been uninhabited for the duration of the claim, which the applicants say has resulted in additional financial pressures. The applicants say the circumstances of this matter have resulted in hospitalisation for stress and anxiety, although to date there has been no medical documentation provided to support this view. The panel recognises by their very nature, most claims bring about a degree of inconvenience to an insured party, and the panel expect an insured to be reasonably robust. The panel is also mindful the FSP has continued to engage with the applicants when at times those parties have both failed to move the dispute forward and bring the matter to a suitable conclusion. In its response to this Service, the FSP agreed to provide $1,500 compe nsation as a result of the errors in assessing and inconvenience. Having carefully considered the history of this dispute, the interaction of the parties throughout the dispute, and acknowledging the property concerned is not the Case No: 453694 Determination Page 9 of 9 applicants‟ primary place of residence, the panel is satisfied this sum is appropriate compensation for non-financial loss for the inconvenience suffered, and the FSP‟s handling of the dispute. 2.3 Loss of Rent The applicants say they should receive a further $12,350, constituting payment of 12 weeks rent. They say they should receive this as the FSP already agreed to cover an additional four weeks outside the policy terms and conditions. With exception to the bathroom discussed in section 2.1, the panel is satisfied the scope of works prepared by IC adequately covered the necessary works to reinstate the applicants‟ property. This scope was prepared and available on 10 October 2016 , and the quotation from CB was prepared and available on 2 November 2016. The various proposals suggest the works would take between three to five months to complete. The panel acknowledges the repair proposals are, at best, an estimate of the required time to repair, and unknown variables such as weather may contribute to protracted repair timeframes. To date, the FSP has paid the full policy benefit for loss of rent, being 52 weeks. Through the course of negotiations, the FSP agreed to pay a further four weeks rent on an ex-gratia basis, bringing the total to 56 weeks. However, as the scope, and therefore the FSP‟s liability, was not finalised until 2 November 2016, it would not be reasonable to absolve the FSP of its policy obligations simply on the basis 52 weeks passed from the date of claim lodgement. Having considered all available material the panel considers it fair in all the circumstances the FSP provide a further 6 weeks rent, calculated at $650 and totalling $3,900. In doing so, the panel is satisfied the applicants have received adequate cover for the time taken to repair, with consideration to the necessary inclusions in the scope of works.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.