Text of the determination
Determination
Case No: 453353 Determination Page 1 of 6
Case number: 453353 31 May 2017
1 Overview
1.1 Dispute
The applicant says that the Financial Services Provider (FSP) made several errors in
relation to his loan applications.
The applicant says that in 2009, the FSP approved an investment loan but provided
insufficient funds to finish building a new home even though it knew the loan was for
construction purposes. He also says that in 2009, a FSP officer misled him to believe
that the FSP would provide more funding if he required it in due course.
The applicant says that in 2012, the FSP did not provide loan funds despite him
accepting its loan offer of $690,000 in writing. He also says that the FSP
unreasonably delayed telling him its final decision in 2013 when it ultimately declined
to provide further loan funds.
The case manager provided the parties with a recommendation dated 31 March 2017
on the issues in dispute. The recommendation was partly in favour of the applicant. A
copy of the recommendation is attached to this determination.
The FSP accepted the recommendation. The applicant rejected the recommendation
on the basis that the compensation figure was insufficient but made no further
submissions.
1.2 Issues and key findings
Were the findings of the recommendation correct?
Based on all the available information, the findings contained in the recommendation
were correct and are adopted in this determination .
Did the FSP make an error in relation to the 2009 loan?
In the recommendation the case manager correctly balanced the available
information and placed more weight on the available documents than the applicant ‟s
recollections, which were either unsupported or conflicted with the documents. The
applicant has not made any new submissions after the recommendation about this
issue and I consider that the recommendation appropriately dealt with this aspect of
the dispute.
Based on all the available information it has not been established the FSP made an
error in the provision of the 2009 loan. Nor has it been shown that the FSP misled the
applicant in 2009 in relation to further funding.
Case No: 453353 Determination Page 2 of 6
Did the recommendation correctly calculate the applicant ’s loss?
Based on all the available information I agree with the recommendation‟s f inding that
the FSP breached an agreement in 2012 to provide a loan to the applicant and also
unreasonably delayed assessing the 2013 application for further funding.
The assessment of financial loss calculated by the case manager in the
recommendation was appropriate and reasonable in the circumstances. The
applicant has not provided any new information to show that the eventual building
cost was higher due to the delay.
However, the FSP should also compensate the applicant for the stress and
inconvenience it caused him because of its actions in 2012 and 2013. Given the
FSP‟s breaches as set out in the recommendation, the FSP should pay the applicant
$3,000 compensation for non-financial loss.
1.3 Determination
This determination is partly in favour of the applicant.
I agree with the case manager‟s reasons for the recommendation and the
recommended outcome, with the exception that compensation for non-financial loss
is appropriate in the circumstances.
The FSP should pay the applicant a total of $12,290 , which includes compensation
for stress and inconvenience. If the applicant accepts the determination, the FSP is
entitled to ask him to sign a binding release consistent with the determination.
Case No: 453353 Determination Page 3 of 6
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragrap hs of
the Terms of Reference and any relevant law.
2.2 Did the FSP make an error in relation to the 2009 loan?
The applicant says that the FSP made several errors with the 2009 loan
The applicant says that:
1. In 2009, he applied to the FSP for a loan to demolish his existing home and
then rebuild a new home. The FSP approved a loan, but did not approve
enough funds to finish the construction
2. The FSP told him that when he had used all the 2009 loan funds it would
provide him another loan to finish construction. However, when he used all the
loan funds and returned to the FSP for more funds, the FSP declined to provide
him more funds to finish building his home.
FOS places greater weight on the available documents
The FSP provided its loan assessment notes a nd contact notes from 2009. These
record several different loan purposes were discussed at the time, but there is no
record the parties discussed a complete demolition and rebuild on the property.
The applicant provided his recollection of the events in 2009. He says that he
provided all documents to the FSP to support a construction loan, including council
approved plans. However, the available documents indicate that the council did not
approve plans until 2010. The FSP has specifically denied that it received documents
such as council approved plans prior to the 2009 loan approval or that a demolition
and rebuild was discussed.
The available documents do not support the applicant ‟s position. His recollection is
unsupported by contemporary documents or any other information, and is partly
inconsistent with the available documents.
FOS places more weight on documents produced at the time of the disputed events
than in an unsupported recollection provided later in time. Having reviewed all the
available information, the applicant ‟s claim cannot be established.
Case No: 453353 Determination Page 4 of 6
It is likely the applicant knew the extra funds were not approved before
demolition
The available information does not show that the FSP approved an owner -builder
loan for demolition or rebuild in 2009, or that it misled him that it would provide further
funds. The applicant has not provided any new information or documents in relation
to the findings in the recommendation. Even if the applicant did show the FSP made
an error in relation to the 2009 loan approval, he has not shown that the FSP caused
his loss.
By 2010, the FSP‟s loan policy had changed and it no longer provided owner -builder
loans.
The FSP contact notes from 2010 show further discussions between the FSP and the
applicant about a top-up loan. The FSP contact notes are significant because they
indicate that:
the FSP told the applicant he needed to provide a building contract from a
licensed builder; and
the applicant had applied for a top-up loan, which indicates he knew he did not
have enough funds to finish construction.
Despite the loan approval in 2009, the applicant did not start using the loan funds to
demolish his home until late 2010. The contact notes show that it is more likely than
not that the applicant was aware by this time that the FSP would not approve more
funds for an owner-builder loan. The available information indicates the applicant
demolished his home after he became aware of uncertainty that the FSP would lend
him the additional funds he needed. Therefore, the FSP is not responsible for the
losses caused by the demolition in 2010.
2.3 Did the recommendation correctly calculate the applicant ’s loss?
The recommendation stated that the FSP unreasonably delayed its response
The recommendation found that:
The FSP entered into a loan contract with the applicant in 2012, but then in
2013 declined to provide the loan funds needed to finish construction and
In 2013, the FSP unreasonably delayed in giving its final decision to the
applicant that it would not provide loan funds.
Based on all the available information I agree with the recommendation‟s finding that
the FSP breached an agreement in 2012 to provide a loan to the applicant and also
unreasonably delayed assessing the 2013 application for further funding.
The FSP has not disputed the findings in the recommendation.
I note that the case manager found that:
The FSP delayed its decision for a period of around 12 months and
The FSP should compensate the applicant for the difference between the extra
rent he paid and the extra interest he would have paid had the loan been fully
drawn sooner.
Case No: 453353 Determination Page 5 of 6
The method of calculating the applicant‟s loss due to the unreasonable delay is the
most appropriate method of asses sment and accords with FOS‟s general approach
to such claims.
The FSP should compensate the applicant for the unreasonable delay
The applicant has not made any written submissions following his rejection of the
recommendation, but verbally stated that he believes the FSP should be held
responsible for a longer period of delay than 12 months. He says that he was unable
to finish construction and move his family back into their property until 2015. He says
that we have only awarded compensation for the period up until about August 2013.
When assessing compensation, we will consider what would have happened if the
error had not happened. In this case, the FSP‟s final decision to decline the loan in
mid-2013 was based on the building contract not being industry standard. Proper
enquiries by the FSP when it first approved the loan in 2012 should have led it to
become aware of these issues with the building contract. If the FSP had told the
applicant in 2012 that it would not provide a loan, he could have then gone to another
lender to seek finance. This is what the applicant eventually did, and he obtained
finance to complete the construction of his home in 2014.
The applicant had to keep renting a property while construction was actually
completed, whether the FSP provided the loan or a different lender. Therefore, the
FSP is not liable to compensate the applicant for the whole of the period until he
could move back into his new home. The FSP is only responsible for the costs
associated with the delay during the period between when it should have declined
the loan during 2012 and when it actually declined the loan in 2013. The available
information shows that he paid $23,040 in rent during that extra period. However that
figure has to be adjusted to account for any benefit he received because of the delay,
in this case avoiding an interest liability.
Accordingly the way that compensation for financial loss was calculated in the
recommendation was reasonable and appropriate.
The applicant has not shown that the building costs he paid were higher
The applicant claimed compensation for the increase in building costs caused by the
delay. The applicant did not respond to our request for a copy of documents showing
what he actually paid to complete construction of his home. Therefore, the applicant
has not established his claim that the FSP‟s delay caused him to incur higher building
costs.
FOS can award compensation for non-financial loss
FOS has the power to award compensation for non-financial loss such as claims for
undue stress or inconvenience caused by an error of its member. The maximum
amount we can award for non-financial loss is $3,000 for each claim.
FOS will only award compensation for non-financial loss if there has been an unusual
degree or extent of inconvenience. FOS will not necessarily award compensation for
Case No: 453353 Determination Page 6 of 6
loss that a customer may incur as a result of pursuing a dispute or rectifying an
FSP‟s err or. If we do award compensation, it is unlikely to be substantial.
The FSP caused the applicant substantial stress and inconvenience
The available information shows that p roper enquiries by the FSP would have led it
to it declining the loan in 2012. Instead, it entered into a loan contract with the
applicant that it later declined to fund. It also asked the applicant to provide
information and make changes to the building contract which were not relevant to its
ultimate decision to decline the loan in 2013. During this time, the applicant had a
partially completed home and was incurring rental costs for housing his family. The
FSP‟s actions have caused substantial stress and inconvenience to the applicant.
The FSP should pay the applicant $3,000 as compensation for his non-financial loss.
The FOS Terms of Reference states that the FSP is entitled to request a release
Paragraph 8.8 of the FOS Terms of Reference states:
“ 8.8 Applicant acceptanc e of a Recommendation or Determination
In order to accept a Recommendation or a Determination, the Applicant must provide the
Financial Servic es Provider (if the Financial Services Provider so requests) with a binding
release of the Financial Services Provider from liability in respect of the matters resolved by the
Recommendation or Determination. ”
The FSP is therefore able to ask that the applicant to sign a binding release
consistent with this determination.
Recommendation
Case No: 453353 Recommendation Page 1 of 9
Case number: 453353 31 March 2017
3 Overview
3.1 Dispute
In 2009, the FSP provided the Applicant with a home loan. The Applicant says that
the loan was for the demolition of his home and starting the rebuild of a new home.
He says that the FSP acted irresponsibly by not lending enough funds to finish
construction, and that it misled him about whether it would provide the further loan
funds required. The FSP denies that the loan purpose was to fund a complete
demolition and rebuild, or that it misled the Applicant.
In 2012, the FSP approved a loan increase to fun d completion of the Applicant‟s new
home by a licensed builder. The Applicant says that he signed a loan contract, but
the FSP refused to provide the loan funds. The FSP denies that the Applicant
returned a signed loan contract. The Applicant says that the FSP unreasonably
delayed in giving its final decision about whether it would provide the loan funds.
3.2 Issues and key findings
Did the FSP act as a responsible lender when it approved the loan in 2009?
The available documents do not support the Applicant‟s recollection that the loan was
for construction of a new home as an owner builder. The documents instead record
other purposes, such as cosmetic renovations and personal investment. The
Applicant‟s recollection also conflicts with other documents, in parti cular about
whether he had council approval. In these circumstances, the documents produced
in 2009 hold greater weight than the Applicant‟s unsupported recollection.
Did the FSP mislead the Applicant about whether it would provide further
funds?
The Applicant has not shown that the FSP approved the 2009 loan for the purpose of
starting construction of a new house. There is no objective information available
which shows that the FSP told the Applicant it would provide a further loan to
complete construction. Even if the FSP misled the Applicant in 2009, the Applicant
was likely aware that the FSP no longer provided owner-builder construction loans
before he demolished his existing home in late 2010.
Did the parties enter into a loan contract in November 2012?
While the Applicant has provided varying recollections, his detailed recollection of
signing the loan contract matches the FSP officer‟s recollection that he signed the
loan contract. Based on the information available, the Applicant signed the loan
Case No: 453353 Recommendation Page 2 of 9
contract at the FSP branch, and the FSP breached the loan contract by not providing
loan funds.
Did the FSP unreasonably delay its assessment of whether it would provide the
loan funds?
In 2013, the FSP declined the loan because it did not cover all construction costs,
and because the building contract was too „low cost‟ and did not reflect industry
standards. However, these matters were raised in the first valuation in August 2012,
and could have been dealt with then if the FSP had properly assessed the valuation
and the building contract. For this reason, the FSP unreasonably delayed its loan
assessment.
What is an appropriate outcome to this dispute?
The Applicant has not provided documents showing the amount he paid for his home
to be completed, an d has not shown that the FSP‟s delay was the cause of any price
increase. The Applicant‟s family did incur rental costs for longer than necessary due
to the delay in completing construction. The FSP should compensate the Applicant
for the difference between his rent and the interest he would have paid on the loan
increase if it had been fully drawn.
3.3 Recommendation
This recommendation is partly in favour of the Applicant.
If both parties accept this Recommendation, the FSP should pay the Applicant
$9,290 within 14 days of the FOS file closing.
Case No: 453353 Recommendation Page 3 of 9
4 Reasons for recommendation
4.1 Did the FSP act as a responsible lender when it approved the loan in
2009?
The FSP has an obligation to act as a responsible lender
The FSP has a general obligation to act as a diligent and prudent lender. If a
customer applies for a loan to demolish and rebuild their home, the FSP should
assess whether the customer will have sufficient funds to complete construction
before approving the loan.
The documents show that a variety of reasons for borrowing were discussed
The FSP has provided its loan assessment documents for the 2009 loan, including its
credit assessment and contact notes. A timeline of the changing loan purpose shown
in these documents is set out in Section 3.1 below.
These documents show that there were discussions about lending for building a new
home in early 2009. However, the FSP‟s lending officer (HHW) records that he asked
the Applicant to get a fixed price building contract. There is no record of discussions
about an owner-builder loan.
The valuation completed in January 2009 was for the Applicant‟s existing home „as
is‟. If a lender is considering a construction loan application, it will usually get an „as if
complete‟ valuation. An „as if complete‟ valuation is a valuat ion that contains the
valuer‟s estimate of the value of the property once construction is completed. The „as
is‟ valuation in January 2009 does not support the Applicant‟s claim that the 2009
loan was a loan for construction of a new home.
The FSP started its formal loan application on its system in September 2009. The
FSP changed the loan purpose on a couple of occasions, and in the end stated that
the loan was for personal investment and cosmetic renovations. There is no
indication that the loan was for a complete demolition and rebuild.
Parts of the Applicant’s recollection is inconsistent with the documents
The Applicant has denied that he ever discussed borrowing for investment purposes
or cosmetic renovations. He says that discussions were only about demolishing and
rebuilding the home. He recalls that the FSP asked whether he had council approval,
and that he provided them with all the approval documents.
However, the documents show that the Applicant did not obtain council approval until
2010. The FSP ‟s contact notes for 2010 show that the Applicant applied for a top -up
loan. In March 2010, it records that a top-up loan was conditionally approved subject
to council approved plans and a building contract. A later valuation refers to council
approved plans being stamped on 17 March 2010.
These documents do not support the Applicant‟s statement that the council approved
plans were provided to the FSP as part of the 2009 loan application process.
Case No: 453353 Recommendation Page 4 of 9
The Applicant has not shown that the 2009 loan was for demolition and rebuild
We do not have the power to take or test evidence on oath. We consider available
documents, the recollections of the parties and all relevant circumstances. We give
most weight to documentary information.
The Applicant says that the 2009 loan was to pay for the demolition of his existing
home, and then for him to start rebuilding the home as an owner builder. The
Applicant is effectively saying that HHW misled the FSP‟s credit area by recording a
loan purpose which did not reflect the true loan purpose. HHW no longer works for
the FSP, and we do not have a statement from him.
The Applicant‟s version of events is partly inconsistent with the available documents.
The Applicant has not provided any documents showing substantial planning of a
new home prior to 2010. In all these circumstances, there is not sufficient proof that
the loan documents from 2009 do not accurately record the real loan purpose.
Therefore, the FSP does not need to show that it assessed whether there were
sufficient funds to completely rebuild the home.
4.2 Did the FSP mislead the Applicant about whether it would provide
further funds?
We can consider a dispute about misleading conduct
We can investigate a claim that a financial services provider misled a customer and
caused the customer to suffer loss. If we find that the customer was misled, we
assess how much worse off they are as a result of relying on the representation. The
remedy for misleading conduct is not to make the promise come true.
There is no objective proof that the FSP promised further funds
The Applicant says that in 2009:
3. The FSP allowed him to borrow against the existing equity in his property to
start the rebuilding of his home as an owner-builder.
4. The FSP told him that, once he had started rebuilding, to come back to the FSP
when he had used the existing loan funds. The FSP would get a new valuation
as the property would be worth more, and it would then lend him the funds to
complete construction.
As outlined above, the Applicant has not shown that the 2009 loan was for
construction of a completely new home. It follows that the Applicant has not shown
that the FSP knew that he was going to use the loan funds to demolish the existing
home and start building. There is no objective information available which shows
that, in 2009, the FSP told him it would provide further funds for him to complete
construction.
The Applicant was aware circumstances had changed before he demolished
The FSP‟s contact notes show that it had further dealings with the Applica nt in early
2010 about a „top - up‟ home loan. Most relevant is the FSP‟s file note dated 13 March
2010. In this file note one FSP officer instructs another officer to follow up the
Case No: 453353 Recommendation Page 5 of 9
Applicant. This is because the “top -up loan conditionall [sic] approved subject to
valuation (still waiting for client to provide us with council approved plans and building
contract)”. This note is significant as it refers to a building contract with a licensed
builder, not an owner-builder loan.
The Applicant says that he moved his family out of their home in mid-2010, and
demolished the home in late 2010. However, the available documents indicate that
the Applicant was likely aware by early 2010 that the FSP needed a fixed price
building contract. This is significant because, even if the FSP had misled the
Applicant about providing further funds for an owner-builder loan, he was likely aware
by early 2010 that circumstances had changed and that the FSP would not be
providing him further funds for construction as an owner-builder.
Therefore, the FSP is not liable for the loss the Applicant incurred from demolishing
his home in late 2010.
4.3 Did the parties enter into a loan contract in November 2012?
The FSP approved a new loan in November 2012
In June 2012, the Applicant approached the FSP for a new loan to complete
construction, and provided a building quote for $252,000. The FSP obtained an „as if
complete‟ valuation in August 2012, and then asked the Applicant for a fixed price
building contract in October 2012. In November 2012, the FSP approved a loan for
$690,000 to refinance his existing home loan and provide about $250,000 to
complete construction.
The FSP issued a loan approval letter on 29 November 2012. The approval letter
stated that conditions included verification of income and identity. However, on the
same date the FSP also issued its home loan contract for $690,000. The point in
dispute is whether the Applicant signed and returned the loan contract to the FSP,
therefore forming a binding contract. This is significant, as the FSP later declined to
provide the loan funds. If there was a binding loan contract, then the FSP would be in
breach of its contract unless it could show it was entitled under the terms of the
contract to withhold funding.
The Applicant says that he signed the loan contract
The Applicant has provided a copy of a signed loan contract. However, on its own,
this is not enough to show that the loan contract was actually returned to the FSP.
The Applicant has also provided a detailed recollection of atte nding the FSP‟s branch
to sign the loan contract. He says that:
At the time he signed the loan contract, the FSP told him that the loan could not
be funded until his builder had obtained warranty insurance. The FSP said that
once he provided the required i nsurance certificate, the FSP would issue a
letter of commencement.
For various reasons, it took his builder a few months to organise insurance.
When he provided the insurance certificate to the FSP, the FSP told him the
loan approval had expired and he would have to start his application again.
Case No: 453353 Recommendation Page 6 of 9
The FSP’s officer has also recalled that a loan contract was signed
In 2012 and early 2013, the Applicant dealt with an FSP lending officer with the
initials SD. SD‟s has recalled that, after the FSP assessed the lo an as conditionally
eligible, that:
“Loan docs issued and I met with clients to sign. I advised client that prior to issuing
commencement letter to builders we still required further docs(can‟t remember clearly but it may
have been insurance for builder‟s contract of works/public liability etc”
SD goes on to note that the loan application expired because the Applicant‟s builder
took too long to arrange insurance. SD‟s recollection matches the recollection given
by the Applicant.
The Applicant has provided several recollections about these events, and one of
these provides a different version of when the FSP issued loan documents. However,
the more detailed recollection provided by the Applicant matches with SD‟s
recollection and with the date of the loan co ntract.
When the Applicant first lodged his complaint, the FSP‟s customer relations area
sought information from the lender who dealt with the loan after SD (initials VM ). The
customer relations area asked why the loan documents were signed in November
2012 but the loan was not funded. VM was unsure as she did not deal with the loan
application until June 2013. However, the premise of the question was that the loan
contract was signed. This conflicts with the FSP‟s submission to FOS that the
Applicant did not return a signed loan contract.
Overall, the available information indicates that the Applicant attended the FSP‟s
branch on around 29 November 2012 and signed the home loan contract. If the
parties made a loan contract, then the FSP was in breach of that contract if it did not
provide the loan funds. This is unless the FSP showed it was allowed to withhold the
loan funds under the terms of the contract, which it has not shown.
4.4 Did the FSP unreasonably delay its loan assessment?
The FSP did not properly assess the valuation and the building contract
A lender is obliged to assess a loan application within a reasonable time and tell the
customer whether or not the loan is approved.
At the time that the Applicant applied for a new loan in 2012, he had already
demolished his home and started to rebuild. To consider the loan application, the
FSP obtained an „as if complete‟ valuation in August 2012. The valuer stated that:
The Applicant had not provided a progress payments schedule, and therefore
the valuer could not evaluate whether it was reasonable
The nature of the property (an incomplete single level residence) meant the
valuer could not comment on whether the builder‟s tender price was
reasonable. The valuer recommended that “the exact costings and progr ess
claims be calculated by a certified quantity surveyor”. Because of this, the
valuer did not provide a check cost.
The valuer noted that he had been provided a quote for kitchen works totaling
$16,390 to be completed outside of the building contract.
Case No: 453353 Recommendation Page 7 of 9
Th e FSP‟s credit area accepted the valuation, subject to confirming that the Applicant
had sufficient funds to complete construction. The Applicant had applied for enough
funds to cover the building quote of $252,000. However, there is no record that the
FSP reviewed whether the Applicant had funds to cover out-of-contract costs such as
the kitchen works.
In October 2012, the FSP asked the Applicant to provide a fully itemised building
contract. The Applicant provided a building contract in November 2012, and the
branch checked with the FSP‟s credit area. The credit area stated that the contract
was acceptable as long as it was the same as the quote reviewed by the valuer.
However, the FSP had not addressed the following issues raised by the valuer:
The building contract the Applicant provided in November 2012 contained an
itemised list of works, but still did not provide a progress payment schedule.
Due to the unusual nature of this situation (semi-complete dwelling), the valuer
had recommended a quantity surveyor review the costings. The FSP did not get
such a review.
The FSP had not dealt with whether the Applicant had funds to cover out -of-
contract costs.
The FSP later declined the application based on issues it originally overlooked
The Applicant returned to the FSP in March 2013, and was told his previous approval
had expired and he required a new loan assessment. The FSP got a new valuation,
which again noted that there were out-of-contract costs. The valuer also said that the
building contract was not in line with industry standards.
The FSP and the Applicant had further dealings between March and August 2013
about increasing the loan to cover the out-of-contract costs. However, even then the
FSP‟s credit area was unwilling to approve a new loan because the building contract
remained too low cost by industry standards.
The first valuer had alerted the FSP to issues about out-of-contract costs and the
building contract in the August 2012 valuation. If the FSP had reviewed funds
available to complete, and had followed the valuer‟s recommendation to get a review
by a quantity surveyor at that time, it could have provided its final loan decision
earlier. As it was, the FSP did not give the Applicant a final decision until about 12
months after the August 2012 valuation. For this reason, the FSP unreasonably
delayed its loan assessment.
The Applicant says the FSP has caused him various losses
Based on the information available:
The FSP entered into a loan contract in November 2012 with the Applicant, but
then declined to provide the loan funds; and
The FSP did not properly review the valuation and building contract in 2012,
which caused an unreasonable delay in its final loan assessment in 2013.
The Applicant says that the FSP caused him the following losses:
The Applicant incurred rental expenses during the delay for his home to be
rebuilt; and
Case No: 453353 Recommendation Page 8 of 9
The costs of completing construction increased due to the delay.
The FSP should compensate the Applicant for the extra rent he paid
The Applicant first moved his family into rental accommodation in 2010 so that he
could demolish the house. However, the Applicant has not shown that the FSP made
an error until late 2012. The FSP has caused a delay of about 12 months in its loan
assessment. This significantly contributed to the delay in the completion of the
Applicant‟s new home. While this caused the Applicant to pay more rent, we also
have to allow for the fact that the Applicant would have also paid more interest if he
had fully drawn down a construction loan earlier. Therefore, in the circumstances, it is
appropriate for the FSP to compensate him for the difference between the extra rent
he paid and the extra interest he avoided.
The Applicant has provided a tenant ledger stating that he paid $23,040 in rent
between August 2012 and August 2013. However, if he had used $250,000 of new
loan funds to build the home, he would paid $13,750 more in interest to the FSP
(based on an interest rate of 5.5% per annum). The FSP should compensate the
Applicant for the difference between these figures, which is $9,290 .
The Applicant says that the delay in getting a construction loan also caused a
substantial increase to the building costs. The Applicant has not provided any
documents showing the total building cost. In any event, even if he shows that the
building was completed for a higher cost than the original 2012 quote, the Applicant
would still have to show that the higher cost was due to the FSP‟s delay. In other
words, the Applicant would have to show that the original quote was realistic. In this
regard, I note the valuer‟s opinion that the original quote was low cost and out of line
with industry standards. The Applicant would also have to demonstrate that the
increased cost was not due to changes in the building plans, designs a nd materials.
Case No: 453353 Recommendation Page 9 of 9
5 Supporting information
5.1 Timeline of changing loan purpose for the 2009 loan
Date Document type Content of file note
January 2009 Cont act notes and
valuation
Discussions about borrowing, and the FSP gets an
„as is‟ valuation of the Applicant ‟s home
16/3/2009 Cont act note FSP‟s lender (HHW) says he‟s spoken with the
Applicant and he wants to build his property
17/4/2009 Cont act note HHW rec ords meeting with the Applicant and asking
him to obtain a fixed price building contract
May 2009 Cont act note Car finance is discussed
14/9/2009 Cont act notes & credit
assessment notes
The FSP starts the formal loan application. HHW
records that the Applicant is now more interested in
purchasing an investment property.
14/10/ 2009 Cont act notes HHW has altered the application to reflect that the
new purpose is property “alterations ”
16/10/ 2009 Credit assessment notes HHW rec ords that the Applicant will be doing
changes to the property, but not major structural
changes. The FSP‟s credit area says th at if the main
purpose is renovations, then the loan was approved
subject to a “p/draw basis”