Determination 453353

Delayed 2013 loan decision after 2012 loan contract was not funded

FirmFinancial Firm (Unknown - Credit)
Decided2017-06-28
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded$9,290
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

A borrower said his lender wrongly lent for an owner-builder rebuild, misled him about further funds, did not fund a 2012 loan and delayed its final decision in 2013. AFCA upheld the delay and the breach of the 2012 loan contract, awarding $9,290 for rent less avoided interest plus $3,000 non-financial loss, and rejected the 2009 claims.

Where a lender unreasonably delays a decision, compensation is measured by what would have happened without the error, namely rent paid during the extra delay less interest avoided, and non-financial loss may be awarded for substantial stress.

Issues

Subjects and remedies

pay compensationpay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 453353 Determination Page 1 of 6 Case number: 453353 31 May 2017 1 Overview 1.1 Dispute The applicant says that the Financial Services Provider (FSP) made several errors in relation to his loan applications. The applicant says that in 2009, the FSP approved an investment loan but provided insufficient funds to finish building a new home even though it knew the loan was for construction purposes. He also says that in 2009, a FSP officer misled him to believe that the FSP would provide more funding if he required it in due course. The applicant says that in 2012, the FSP did not provide loan funds despite him accepting its loan offer of $690,000 in writing. He also says that the FSP unreasonably delayed telling him its final decision in 2013 when it ultimately declined to provide further loan funds. The case manager provided the parties with a recommendation dated 31 March 2017 on the issues in dispute. The recommendation was partly in favour of the applicant. A copy of the recommendation is attached to this determination. The FSP accepted the recommendation. The applicant rejected the recommendation on the basis that the compensation figure was insufficient but made no further submissions. 1.2 Issues and key findings Were the findings of the recommendation correct? Based on all the available information, the findings contained in the recommendation were correct and are adopted in this determination . Did the FSP make an error in relation to the 2009 loan? In the recommendation the case manager correctly balanced the available information and placed more weight on the available documents than the applicant ‟s recollections, which were either unsupported or conflicted with the documents. The applicant has not made any new submissions after the recommendation about this issue and I consider that the recommendation appropriately dealt with this aspect of the dispute. Based on all the available information it has not been established the FSP made an error in the provision of the 2009 loan. Nor has it been shown that the FSP misled the applicant in 2009 in relation to further funding. Case No: 453353 Determination Page 2 of 6 Did the recommendation correctly calculate the applicant ’s loss? Based on all the available information I agree with the recommendation‟s f inding that the FSP breached an agreement in 2012 to provide a loan to the applicant and also unreasonably delayed assessing the 2013 application for further funding. The assessment of financial loss calculated by the case manager in the recommendation was appropriate and reasonable in the circumstances. The applicant has not provided any new information to show that the eventual building cost was higher due to the delay. However, the FSP should also compensate the applicant for the stress and inconvenience it caused him because of its actions in 2012 and 2013. Given the FSP‟s breaches as set out in the recommendation, the FSP should pay the applicant $3,000 compensation for non-financial loss. 1.3 Determination This determination is partly in favour of the applicant. I agree with the case manager‟s reasons for the recommendation and the recommended outcome, with the exception that compensation for non-financial loss is appropriate in the circumstances. The FSP should pay the applicant a total of $12,290 , which includes compensation for stress and inconvenience. If the applicant accepts the determination, the FSP is entitled to ask him to sign a binding release consistent with the determination. Case No: 453353 Determination Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragrap hs of the Terms of Reference and any relevant law. 2.2 Did the FSP make an error in relation to the 2009 loan? The applicant says that the FSP made several errors with the 2009 loan The applicant says that: 1. In 2009, he applied to the FSP for a loan to demolish his existing home and then rebuild a new home. The FSP approved a loan, but did not approve enough funds to finish the construction 2. The FSP told him that when he had used all the 2009 loan funds it would provide him another loan to finish construction. However, when he used all the loan funds and returned to the FSP for more funds, the FSP declined to provide him more funds to finish building his home. FOS places greater weight on the available documents The FSP provided its loan assessment notes a nd contact notes from 2009. These record several different loan purposes were discussed at the time, but there is no record the parties discussed a complete demolition and rebuild on the property. The applicant provided his recollection of the events in 2009. He says that he provided all documents to the FSP to support a construction loan, including council approved plans. However, the available documents indicate that the council did not approve plans until 2010. The FSP has specifically denied that it received documents such as council approved plans prior to the 2009 loan approval or that a demolition and rebuild was discussed. The available documents do not support the applicant ‟s position. His recollection is unsupported by contemporary documents or any other information, and is partly inconsistent with the available documents. FOS places more weight on documents produced at the time of the disputed events than in an unsupported recollection provided later in time. Having reviewed all the available information, the applicant ‟s claim cannot be established. Case No: 453353 Determination Page 4 of 6 It is likely the applicant knew the extra funds were not approved before demolition The available information does not show that the FSP approved an owner -builder loan for demolition or rebuild in 2009, or that it misled him that it would provide further funds. The applicant has not provided any new information or documents in relation to the findings in the recommendation. Even if the applicant did show the FSP made an error in relation to the 2009 loan approval, he has not shown that the FSP caused his loss. By 2010, the FSP‟s loan policy had changed and it no longer provided owner -builder loans. The FSP contact notes from 2010 show further discussions between the FSP and the applicant about a top-up loan. The FSP contact notes are significant because they indicate that:  the FSP told the applicant he needed to provide a building contract from a licensed builder; and  the applicant had applied for a top-up loan, which indicates he knew he did not have enough funds to finish construction. Despite the loan approval in 2009, the applicant did not start using the loan funds to demolish his home until late 2010. The contact notes show that it is more likely than not that the applicant was aware by this time that the FSP would not approve more funds for an owner-builder loan. The available information indicates the applicant demolished his home after he became aware of uncertainty that the FSP would lend him the additional funds he needed. Therefore, the FSP is not responsible for the losses caused by the demolition in 2010. 2.3 Did the recommendation correctly calculate the applicant ’s loss? The recommendation stated that the FSP unreasonably delayed its response The recommendation found that:  The FSP entered into a loan contract with the applicant in 2012, but then in 2013 declined to provide the loan funds needed to finish construction and  In 2013, the FSP unreasonably delayed in giving its final decision to the applicant that it would not provide loan funds. Based on all the available information I agree with the recommendation‟s finding that the FSP breached an agreement in 2012 to provide a loan to the applicant and also unreasonably delayed assessing the 2013 application for further funding. The FSP has not disputed the findings in the recommendation. I note that the case manager found that:  The FSP delayed its decision for a period of around 12 months and  The FSP should compensate the applicant for the difference between the extra rent he paid and the extra interest he would have paid had the loan been fully drawn sooner. Case No: 453353 Determination Page 5 of 6 The method of calculating the applicant‟s loss due to the unreasonable delay is the most appropriate method of asses sment and accords with FOS‟s general approach to such claims. The FSP should compensate the applicant for the unreasonable delay The applicant has not made any written submissions following his rejection of the recommendation, but verbally stated that he believes the FSP should be held responsible for a longer period of delay than 12 months. He says that he was unable to finish construction and move his family back into their property until 2015. He says that we have only awarded compensation for the period up until about August 2013. When assessing compensation, we will consider what would have happened if the error had not happened. In this case, the FSP‟s final decision to decline the loan in mid-2013 was based on the building contract not being industry standard. Proper enquiries by the FSP when it first approved the loan in 2012 should have led it to become aware of these issues with the building contract. If the FSP had told the applicant in 2012 that it would not provide a loan, he could have then gone to another lender to seek finance. This is what the applicant eventually did, and he obtained finance to complete the construction of his home in 2014. The applicant had to keep renting a property while construction was actually completed, whether the FSP provided the loan or a different lender. Therefore, the FSP is not liable to compensate the applicant for the whole of the period until he could move back into his new home. The FSP is only responsible for the costs associated with the delay during the period between when it should have declined the loan during 2012 and when it actually declined the loan in 2013. The available information shows that he paid $23,040 in rent during that extra period. However that figure has to be adjusted to account for any benefit he received because of the delay, in this case avoiding an interest liability. Accordingly the way that compensation for financial loss was calculated in the recommendation was reasonable and appropriate. The applicant has not shown that the building costs he paid were higher The applicant claimed compensation for the increase in building costs caused by the delay. The applicant did not respond to our request for a copy of documents showing what he actually paid to complete construction of his home. Therefore, the applicant has not established his claim that the FSP‟s delay caused him to incur higher building costs. FOS can award compensation for non-financial loss FOS has the power to award compensation for non-financial loss such as claims for undue stress or inconvenience caused by an error of its member. The maximum amount we can award for non-financial loss is $3,000 for each claim. FOS will only award compensation for non-financial loss if there has been an unusual degree or extent of inconvenience. FOS will not necessarily award compensation for Case No: 453353 Determination Page 6 of 6 loss that a customer may incur as a result of pursuing a dispute or rectifying an FSP‟s err or. If we do award compensation, it is unlikely to be substantial. The FSP caused the applicant substantial stress and inconvenience The available information shows that p roper enquiries by the FSP would have led it to it declining the loan in 2012. Instead, it entered into a loan contract with the applicant that it later declined to fund. It also asked the applicant to provide information and make changes to the building contract which were not relevant to its ultimate decision to decline the loan in 2013. During this time, the applicant had a partially completed home and was incurring rental costs for housing his family. The FSP‟s actions have caused substantial stress and inconvenience to the applicant. The FSP should pay the applicant $3,000 as compensation for his non-financial loss. The FOS Terms of Reference states that the FSP is entitled to request a release Paragraph 8.8 of the FOS Terms of Reference states: “ 8.8 Applicant acceptanc e of a Recommendation or Determination In order to accept a Recommendation or a Determination, the Applicant must provide the Financial Servic es Provider (if the Financial Services Provider so requests) with a binding release of the Financial Services Provider from liability in respect of the matters resolved by the Recommendation or Determination. ” The FSP is therefore able to ask that the applicant to sign a binding release consistent with this determination. Recommendation Case No: 453353 Recommendation Page 1 of 9 Case number: 453353 31 March 2017 3 Overview 3.1 Dispute In 2009, the FSP provided the Applicant with a home loan. The Applicant says that the loan was for the demolition of his home and starting the rebuild of a new home. He says that the FSP acted irresponsibly by not lending enough funds to finish construction, and that it misled him about whether it would provide the further loan funds required. The FSP denies that the loan purpose was to fund a complete demolition and rebuild, or that it misled the Applicant. In 2012, the FSP approved a loan increase to fun d completion of the Applicant‟s new home by a licensed builder. The Applicant says that he signed a loan contract, but the FSP refused to provide the loan funds. The FSP denies that the Applicant returned a signed loan contract. The Applicant says that the FSP unreasonably delayed in giving its final decision about whether it would provide the loan funds. 3.2 Issues and key findings Did the FSP act as a responsible lender when it approved the loan in 2009? The available documents do not support the Applicant‟s recollection that the loan was for construction of a new home as an owner builder. The documents instead record other purposes, such as cosmetic renovations and personal investment. The Applicant‟s recollection also conflicts with other documents, in parti cular about whether he had council approval. In these circumstances, the documents produced in 2009 hold greater weight than the Applicant‟s unsupported recollection. Did the FSP mislead the Applicant about whether it would provide further funds? The Applicant has not shown that the FSP approved the 2009 loan for the purpose of starting construction of a new house. There is no objective information available which shows that the FSP told the Applicant it would provide a further loan to complete construction. Even if the FSP misled the Applicant in 2009, the Applicant was likely aware that the FSP no longer provided owner-builder construction loans before he demolished his existing home in late 2010. Did the parties enter into a loan contract in November 2012? While the Applicant has provided varying recollections, his detailed recollection of signing the loan contract matches the FSP officer‟s recollection that he signed the loan contract. Based on the information available, the Applicant signed the loan Case No: 453353 Recommendation Page 2 of 9 contract at the FSP branch, and the FSP breached the loan contract by not providing loan funds. Did the FSP unreasonably delay its assessment of whether it would provide the loan funds? In 2013, the FSP declined the loan because it did not cover all construction costs, and because the building contract was too „low cost‟ and did not reflect industry standards. However, these matters were raised in the first valuation in August 2012, and could have been dealt with then if the FSP had properly assessed the valuation and the building contract. For this reason, the FSP unreasonably delayed its loan assessment. What is an appropriate outcome to this dispute? The Applicant has not provided documents showing the amount he paid for his home to be completed, an d has not shown that the FSP‟s delay was the cause of any price increase. The Applicant‟s family did incur rental costs for longer than necessary due to the delay in completing construction. The FSP should compensate the Applicant for the difference between his rent and the interest he would have paid on the loan increase if it had been fully drawn. 3.3 Recommendation This recommendation is partly in favour of the Applicant. If both parties accept this Recommendation, the FSP should pay the Applicant $9,290 within 14 days of the FOS file closing. Case No: 453353 Recommendation Page 3 of 9 4 Reasons for recommendation 4.1 Did the FSP act as a responsible lender when it approved the loan in 2009? The FSP has an obligation to act as a responsible lender The FSP has a general obligation to act as a diligent and prudent lender. If a customer applies for a loan to demolish and rebuild their home, the FSP should assess whether the customer will have sufficient funds to complete construction before approving the loan. The documents show that a variety of reasons for borrowing were discussed The FSP has provided its loan assessment documents for the 2009 loan, including its credit assessment and contact notes. A timeline of the changing loan purpose shown in these documents is set out in Section 3.1 below. These documents show that there were discussions about lending for building a new home in early 2009. However, the FSP‟s lending officer (HHW) records that he asked the Applicant to get a fixed price building contract. There is no record of discussions about an owner-builder loan. The valuation completed in January 2009 was for the Applicant‟s existing home „as is‟. If a lender is considering a construction loan application, it will usually get an „as if complete‟ valuation. An „as if complete‟ valuation is a valuat ion that contains the valuer‟s estimate of the value of the property once construction is completed. The „as is‟ valuation in January 2009 does not support the Applicant‟s claim that the 2009 loan was a loan for construction of a new home. The FSP started its formal loan application on its system in September 2009. The FSP changed the loan purpose on a couple of occasions, and in the end stated that the loan was for personal investment and cosmetic renovations. There is no indication that the loan was for a complete demolition and rebuild. Parts of the Applicant’s recollection is inconsistent with the documents The Applicant has denied that he ever discussed borrowing for investment purposes or cosmetic renovations. He says that discussions were only about demolishing and rebuilding the home. He recalls that the FSP asked whether he had council approval, and that he provided them with all the approval documents. However, the documents show that the Applicant did not obtain council approval until 2010. The FSP ‟s contact notes for 2010 show that the Applicant applied for a top -up loan. In March 2010, it records that a top-up loan was conditionally approved subject to council approved plans and a building contract. A later valuation refers to council approved plans being stamped on 17 March 2010. These documents do not support the Applicant‟s statement that the council approved plans were provided to the FSP as part of the 2009 loan application process. Case No: 453353 Recommendation Page 4 of 9 The Applicant has not shown that the 2009 loan was for demolition and rebuild We do not have the power to take or test evidence on oath. We consider available documents, the recollections of the parties and all relevant circumstances. We give most weight to documentary information. The Applicant says that the 2009 loan was to pay for the demolition of his existing home, and then for him to start rebuilding the home as an owner builder. The Applicant is effectively saying that HHW misled the FSP‟s credit area by recording a loan purpose which did not reflect the true loan purpose. HHW no longer works for the FSP, and we do not have a statement from him. The Applicant‟s version of events is partly inconsistent with the available documents. The Applicant has not provided any documents showing substantial planning of a new home prior to 2010. In all these circumstances, there is not sufficient proof that the loan documents from 2009 do not accurately record the real loan purpose. Therefore, the FSP does not need to show that it assessed whether there were sufficient funds to completely rebuild the home. 4.2 Did the FSP mislead the Applicant about whether it would provide further funds? We can consider a dispute about misleading conduct We can investigate a claim that a financial services provider misled a customer and caused the customer to suffer loss. If we find that the customer was misled, we assess how much worse off they are as a result of relying on the representation. The remedy for misleading conduct is not to make the promise come true. There is no objective proof that the FSP promised further funds The Applicant says that in 2009: 3. The FSP allowed him to borrow against the existing equity in his property to start the rebuilding of his home as an owner-builder. 4. The FSP told him that, once he had started rebuilding, to come back to the FSP when he had used the existing loan funds. The FSP would get a new valuation as the property would be worth more, and it would then lend him the funds to complete construction. As outlined above, the Applicant has not shown that the 2009 loan was for construction of a completely new home. It follows that the Applicant has not shown that the FSP knew that he was going to use the loan funds to demolish the existing home and start building. There is no objective information available which shows that, in 2009, the FSP told him it would provide further funds for him to complete construction. The Applicant was aware circumstances had changed before he demolished The FSP‟s contact notes show that it had further dealings with the Applica nt in early 2010 about a „top - up‟ home loan. Most relevant is the FSP‟s file note dated 13 March 2010. In this file note one FSP officer instructs another officer to follow up the Case No: 453353 Recommendation Page 5 of 9 Applicant. This is because the “top -up loan conditionall [sic] approved subject to valuation (still waiting for client to provide us with council approved plans and building contract)”. This note is significant as it refers to a building contract with a licensed builder, not an owner-builder loan. The Applicant says that he moved his family out of their home in mid-2010, and demolished the home in late 2010. However, the available documents indicate that the Applicant was likely aware by early 2010 that the FSP needed a fixed price building contract. This is significant because, even if the FSP had misled the Applicant about providing further funds for an owner-builder loan, he was likely aware by early 2010 that circumstances had changed and that the FSP would not be providing him further funds for construction as an owner-builder. Therefore, the FSP is not liable for the loss the Applicant incurred from demolishing his home in late 2010. 4.3 Did the parties enter into a loan contract in November 2012? The FSP approved a new loan in November 2012 In June 2012, the Applicant approached the FSP for a new loan to complete construction, and provided a building quote for $252,000. The FSP obtained an „as if complete‟ valuation in August 2012, and then asked the Applicant for a fixed price building contract in October 2012. In November 2012, the FSP approved a loan for $690,000 to refinance his existing home loan and provide about $250,000 to complete construction. The FSP issued a loan approval letter on 29 November 2012. The approval letter stated that conditions included verification of income and identity. However, on the same date the FSP also issued its home loan contract for $690,000. The point in dispute is whether the Applicant signed and returned the loan contract to the FSP, therefore forming a binding contract. This is significant, as the FSP later declined to provide the loan funds. If there was a binding loan contract, then the FSP would be in breach of its contract unless it could show it was entitled under the terms of the contract to withhold funding. The Applicant says that he signed the loan contract The Applicant has provided a copy of a signed loan contract. However, on its own, this is not enough to show that the loan contract was actually returned to the FSP. The Applicant has also provided a detailed recollection of atte nding the FSP‟s branch to sign the loan contract. He says that:  At the time he signed the loan contract, the FSP told him that the loan could not be funded until his builder had obtained warranty insurance. The FSP said that once he provided the required i nsurance certificate, the FSP would issue a letter of commencement.  For various reasons, it took his builder a few months to organise insurance.  When he provided the insurance certificate to the FSP, the FSP told him the loan approval had expired and he would have to start his application again. Case No: 453353 Recommendation Page 6 of 9 The FSP’s officer has also recalled that a loan contract was signed In 2012 and early 2013, the Applicant dealt with an FSP lending officer with the initials SD. SD‟s has recalled that, after the FSP assessed the lo an as conditionally eligible, that: “Loan docs issued and I met with clients to sign. I advised client that prior to issuing commencement letter to builders we still required further docs(can‟t remember clearly but it may have been insurance for builder‟s contract of works/public liability etc” SD goes on to note that the loan application expired because the Applicant‟s builder took too long to arrange insurance. SD‟s recollection matches the recollection given by the Applicant. The Applicant has provided several recollections about these events, and one of these provides a different version of when the FSP issued loan documents. However, the more detailed recollection provided by the Applicant matches with SD‟s recollection and with the date of the loan co ntract. When the Applicant first lodged his complaint, the FSP‟s customer relations area sought information from the lender who dealt with the loan after SD (initials VM ). The customer relations area asked why the loan documents were signed in November 2012 but the loan was not funded. VM was unsure as she did not deal with the loan application until June 2013. However, the premise of the question was that the loan contract was signed. This conflicts with the FSP‟s submission to FOS that the Applicant did not return a signed loan contract. Overall, the available information indicates that the Applicant attended the FSP‟s branch on around 29 November 2012 and signed the home loan contract. If the parties made a loan contract, then the FSP was in breach of that contract if it did not provide the loan funds. This is unless the FSP showed it was allowed to withhold the loan funds under the terms of the contract, which it has not shown. 4.4 Did the FSP unreasonably delay its loan assessment? The FSP did not properly assess the valuation and the building contract A lender is obliged to assess a loan application within a reasonable time and tell the customer whether or not the loan is approved. At the time that the Applicant applied for a new loan in 2012, he had already demolished his home and started to rebuild. To consider the loan application, the FSP obtained an „as if complete‟ valuation in August 2012. The valuer stated that:  The Applicant had not provided a progress payments schedule, and therefore the valuer could not evaluate whether it was reasonable  The nature of the property (an incomplete single level residence) meant the valuer could not comment on whether the builder‟s tender price was reasonable. The valuer recommended that “the exact costings and progr ess claims be calculated by a certified quantity surveyor”. Because of this, the valuer did not provide a check cost.  The valuer noted that he had been provided a quote for kitchen works totaling $16,390 to be completed outside of the building contract. Case No: 453353 Recommendation Page 7 of 9 Th e FSP‟s credit area accepted the valuation, subject to confirming that the Applicant had sufficient funds to complete construction. The Applicant had applied for enough funds to cover the building quote of $252,000. However, there is no record that the FSP reviewed whether the Applicant had funds to cover out-of-contract costs such as the kitchen works. In October 2012, the FSP asked the Applicant to provide a fully itemised building contract. The Applicant provided a building contract in November 2012, and the branch checked with the FSP‟s credit area. The credit area stated that the contract was acceptable as long as it was the same as the quote reviewed by the valuer. However, the FSP had not addressed the following issues raised by the valuer:  The building contract the Applicant provided in November 2012 contained an itemised list of works, but still did not provide a progress payment schedule.  Due to the unusual nature of this situation (semi-complete dwelling), the valuer had recommended a quantity surveyor review the costings. The FSP did not get such a review.  The FSP had not dealt with whether the Applicant had funds to cover out -of- contract costs. The FSP later declined the application based on issues it originally overlooked The Applicant returned to the FSP in March 2013, and was told his previous approval had expired and he required a new loan assessment. The FSP got a new valuation, which again noted that there were out-of-contract costs. The valuer also said that the building contract was not in line with industry standards. The FSP and the Applicant had further dealings between March and August 2013 about increasing the loan to cover the out-of-contract costs. However, even then the FSP‟s credit area was unwilling to approve a new loan because the building contract remained too low cost by industry standards. The first valuer had alerted the FSP to issues about out-of-contract costs and the building contract in the August 2012 valuation. If the FSP had reviewed funds available to complete, and had followed the valuer‟s recommendation to get a review by a quantity surveyor at that time, it could have provided its final loan decision earlier. As it was, the FSP did not give the Applicant a final decision until about 12 months after the August 2012 valuation. For this reason, the FSP unreasonably delayed its loan assessment. The Applicant says the FSP has caused him various losses Based on the information available:  The FSP entered into a loan contract in November 2012 with the Applicant, but then declined to provide the loan funds; and  The FSP did not properly review the valuation and building contract in 2012, which caused an unreasonable delay in its final loan assessment in 2013. The Applicant says that the FSP caused him the following losses:  The Applicant incurred rental expenses during the delay for his home to be rebuilt; and Case No: 453353 Recommendation Page 8 of 9  The costs of completing construction increased due to the delay. The FSP should compensate the Applicant for the extra rent he paid The Applicant first moved his family into rental accommodation in 2010 so that he could demolish the house. However, the Applicant has not shown that the FSP made an error until late 2012. The FSP has caused a delay of about 12 months in its loan assessment. This significantly contributed to the delay in the completion of the Applicant‟s new home. While this caused the Applicant to pay more rent, we also have to allow for the fact that the Applicant would have also paid more interest if he had fully drawn down a construction loan earlier. Therefore, in the circumstances, it is appropriate for the FSP to compensate him for the difference between the extra rent he paid and the extra interest he avoided. The Applicant has provided a tenant ledger stating that he paid $23,040 in rent between August 2012 and August 2013. However, if he had used $250,000 of new loan funds to build the home, he would paid $13,750 more in interest to the FSP (based on an interest rate of 5.5% per annum). The FSP should compensate the Applicant for the difference between these figures, which is $9,290 . The Applicant says that the delay in getting a construction loan also caused a substantial increase to the building costs. The Applicant has not provided any documents showing the total building cost. In any event, even if he shows that the building was completed for a higher cost than the original 2012 quote, the Applicant would still have to show that the higher cost was due to the FSP‟s delay. In other words, the Applicant would have to show that the original quote was realistic. In this regard, I note the valuer‟s opinion that the original quote was low cost and out of line with industry standards. The Applicant would also have to demonstrate that the increased cost was not due to changes in the building plans, designs a nd materials. Case No: 453353 Recommendation Page 9 of 9 5 Supporting information 5.1 Timeline of changing loan purpose for the 2009 loan Date Document type Content of file note January 2009 Cont act notes and valuation Discussions about borrowing, and the FSP gets an „as is‟ valuation of the Applicant ‟s home 16/3/2009 Cont act note FSP‟s lender (HHW) says he‟s spoken with the Applicant and he wants to build his property 17/4/2009 Cont act note HHW rec ords meeting with the Applicant and asking him to obtain a fixed price building contract May 2009 Cont act note Car finance is discussed 14/9/2009 Cont act notes & credit assessment notes The FSP starts the formal loan application. HHW records that the Applicant is now more interested in purchasing an investment property. 14/10/ 2009 Cont act notes HHW has altered the application to reflect that the new purpose is property “alterations ” 16/10/ 2009 Credit assessment notes HHW rec ords that the Applicant will be doing changes to the property, but not major structural changes. The FSP‟s credit area says th at if the main purpose is renovations, then the loan was approved subject to a “p/draw basis”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.