Home / Financial Firm (Unknown - Insurer) / Determination 452516

Determination 452516

Claim denial for cracking and movement damage to rear wall

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed under his home policy for cracking and movement damage, which the FSP declined as not caused by a storm or stormwater. AFCA upheld the denial but ordered the FSP to pay $500 for non-financial loss due to poor claim communication.

The applicant did not establish that a storm caused the damage, while the FSP's delays and communication failures warranted modest non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 452516 Determination Page 1 of 7 Case number: 452516 19 December 2017 1 Overview 1.1 Dispute On 19 April 2016, the applicant lodged a claim for cracking and movement damage to the southern (rear) area of the property with the financial services provider (FSP). The applicant says this was due to a storm on or around 26 December 2015. The FSP assessed the applicant‟s claim and determined the cause of damage is not a result of an insured event. Rather the FSP says its experts considered the damage to be caused by factors the policy excludes. Given this, the FSP declined the claim. The applicant is dissatisfied with the outcome of his claim. Additionally, the applicant says the FSP‟s expert reports are incorrect, the conduct of the FSP‟s agents was dishonest and the FSP illegally recorded a conversation. 1.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim ? The evidence does not show that storm water caused the damage to the southern wall to the property. Theref ore, the FSP is entitled to decline the applicant‟s claim. Is the FSP entitled to rely on its expert reports? There is insufficient basis to conclude the FSP or its agents engaged in misconduct. Accordingly, the FSP is entitled to rely on its expert reports. Is the applicant entitled to compensation? The applicant is entitled to compensation of $500 for non-financial loss due to the FSP‟s handling of the claim. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not required to carry out any further action in respect to this claim. The FSP is required to pay the applicant $500 as compensation for non-financial loss. Case No: 452516 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP entitled to deny the applicant’s claim ? Applicant has to establish an insured event caused the damage The applicant carries the initial onus to establish an insured event caused loss or damage to the property. This is known as a prima facie claim. The applicant‟s policy is a defined events policy. This means the policy only responds where one or more of the listed events causes damage to the applicant‟s property , subject to any exclusions. The applicant says the damage to his property resulted from a storm on 26 December 2015. The FSP does not dispute a storm occurred on 26 December 2015. However, the FSP does dispute this storm caused the damage being claimed. The applicant believes stormwater caused the damage The applicant has provided reports showing a defective storm water pipe allowed storm water to run backwards and penetrate the clay surrounding the damaged area. It is not in dispute the applicant‟s property is built on highly reactive clay which will move when in contact with water. The review of the applicant‟s building plans and soil report shows this is the case. However, the FSP‟s expert says the defects in the applicant‟s stormwater line are not causing any issues with the functionality of the stormwater system. The FSP has provided a report saying long term settlement of the soil has caused gradual movement and cracking to the wall of the rear living area (southern wall of the property). PBPS’s opinion is preferred regarding stormwater system issues The basis of the applicant‟s claim is that on 26 December 2015, the defective storm water line was unable to process the volume of storm water. This caused storm water to run backwards and over the roof into the property‟s foundations where cracking is now evident. Based on the content of the FSP‟s (PBPS) and the applicant‟s (HP) plumbing reports, I am satisfied the storm water line has some defects. However, the nature and the extent of the defects are in dispute. HP‟s report says the storm water line is crushed in several areas, causing water to run backwards. However, PBPS‟s report says the line is partially crushed in the north east corner only where there is evidence of minor tree intrusions. PBPS‟s opinion is supported by CCTV footage and available images. Having carefully viewed both, I am satisfied they are consistent with PBPS‟s f indings. Case No: 452516 Determination Page 3 of 7 Given all this, I prefer PBSP‟s report regarding the extent of issues identified with the stormwater system. The applicant failed to establish an insured event caused the damage The applicant is relying upon HP and engineer OD in support of his claim. However, neither provide clear evidence nor a detailed explanation as to how the storm water line is running backwards. HP‟s report suggests the water is continually running backwards. However HP has not provided any material to show the mechanism b y which the conclusion was reached or evidence that the storm water is running backwards in the manner proposed. OD says on 26 December 2015 the partial blockage has caused water to back up. Amongst other information, OD‟s report explains this as follows: Two other drains down pipes feed into the underground pipe. It was clear that the rain hitting the south roof and collecting in the south wall gutter could not escape down the drain pipe from the fact that the inner paint had delaminated. The water backed up over the roof tiles and leaked into the rear wall plaster causing paint delaminating. It is difficult to reconcile OD‟s conclusion with the location of the pipe blockages. As the FSP‟s expert (HCE) noted, the damage was “well away from where the crack ing and movement is occurring”. Logically, it would be expected that water backing up from such a blockage would result in issues within close proximity to it. Neither OD nor HP provide a persuasive explanation addressing this. OD‟s explanation about this process appears to be mainly based on the applicant saying there was paint delaminating and that the south wall faces the oncoming weather. However, OD does not consider other possibilities for this delamination to occur. This could include issues with the roof or guttering coping with the amount of water falling at a particular period of time as opposed to water backing up the stormwater system and saturating the foundation. Given all this, I am not persuaded by OD‟s opinion that the cracking and moveme nt was caused by water flash flooding the soil next to the wall affected. Therefore, I am not satisfied the storm caused the cracking and movement damage to the southern area of the property. Accordingly, as the applicant has not established a prima facie claim for this damage, the FSP is entitled to deny liability. 2.2 Is the FSP entitled to rely on its reports? Applicant’s concerns regarding the reports The applicant disputes PBPS‟s report saying it is based on „implausibly erroneous logic that a squashed pip e cannot slow the flow of water through it‟. Further, the applicant says HCE has issued an „erroneous‟ report and the builder (JPF) who issued the said report has admitted it is incorrect. Case No: 452516 Determination Page 4 of 7 FSP entitled to rely upon reports For reasons already explained, I am satisfied PBPS‟s conclusion was supported by the CCTV footage and images. Regarding HCE‟s report, the applicant provided a copy of a statutory declaration containing a written transcript of a telephone conversation between him and JPF. The transcripts shows JPF contacted the applicant on 27 June 2016 to arrange a suitable time to attend the property in order to finalise the assessment process. As HCE‟s report is dated 20 June 2016, this would indicate the engineer‟s repo rt was issued prior to the telephone conversation. Regardless, I have carefully reviewed HCE‟s report. I am satisfied the opinion provided in relation to the footings and reticulated sewer pipe within the easement are based on the applicant‟s building pla ns. Further, I am satisfied HCE does not indicate in its report that tests have been carried out (on the depth of the footings), or conceal the way in which the opinion is reached. Given this, I am satisfied it was appropriate for the FSP to have regard to these expert reports in assessing the applicant‟s claim. 2.3 Is the applicant entitled to compensation? FOS may award compensation for non-financial loss FOS may award compensation (capped at $3,000) for non-financial loss where the applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with a dispute. The applicant is dissatisfied with the FSP’s handling of the claim The applicant is dissatisfied with the manner in which the FSP has managed his claim. In particular, among other things, the applicant says:  the FSP and its agents attempted to conceal the outcome of the plumbing report from the applicant – this shows the FSP and its contractors have behaved in a dishonest, misleading and fraudulent manner  the FSP has repeatedly failed to respond to the applicant‟s queries and requests for clarification  the FSP delayed issuing a final decision letter  the FSP provided an incomplete expert report  the FSP recorded a telephone conversation without the applicant‟s express consent in an attempt to deceive the applicant. Case No: 452516 Determination Page 5 of 7 The applicant is entitled to compensation for non-financial loss I acknowledge there were occasions during the claim process when the FSP did not respond to the applicant‟s que ries and correspondence as promptly as he required. This would include:  failing to provide PBPS‟s report in a timely manner  failing to provide a written claim decision until about four weeks after a verbal one was given  failing to obtain the applicant‟s ex press consent to record a telephone conversation on 8 September 2016  failing to arrange a written statement from its builder JPF to respond to the applicant‟s allegations. I also accept these factors would have caused an unusual degree of stress and inconvenience. However, based on the available information, I am not satisfied the FSP deliberately omitted to provide PBPS‟s report or colluded with its contractor to disadvantage or deceive the applicant. Beyond the applicant‟s assertion, there is no other evi dence to support such a serious allegation. Further, the FSP acknowledges that its failure to seek the applicant‟s express consent to record a telephone conversation on 8 September 2016 was due to a human error. Whilst the applicant asserts otherwise, I am not satisfied there is sufficient basis to reject the FSP‟s explanation or find the FSP intended to deceive the applicant. In addition, having considered all information before me, I am not satisfied any misconduct (of the kind asserted by the applicant) on the part of the FSP and its agents has been established. Given this, and taking into account FOS‟s conservative approach, the FSP should pay $500 in non-financial loss compensation. Case No: 452516 Determination Page 6 of 7 3 Supporting information 3.1 Key points from the reports Report Findings Applicant’ s plumber (HP) Invoice 18 April 2016  “ Attended site and CCTV stormwat er line.  It was found that the stormwater line has several defects.  Sections of the line are crashed & section are running backwards.  Which are causing multiple plumbing defects.  The stormwater line will have to be dug up & renewed. ” FSP’s plumber (PBPS) Report 28 April 2016  Minor tree roots in the north east corner of the property  Water holding at the front north east corner, along the west side and near the rear south east corner of the applicant‟s property  Partial squas hing of the line near the front north east corner of the property FSP’s engineer (HCE) Report 20 June 2016  A copy of PBPS report was made available.  Minor tree roots are int ruding the drain at the front north - east corner – this is well away from where the cracking and movement is occurring.  The soil is highly reactive.  Cracking and movement occurred to the wall linings and of the ceiling cornice of the rear living room at the junction of the family room.  Floor in the living room is out of level with a fall towards the rear.  East side wall has stepped diagonal cracks evident at the junction between the living and family room.  Tapering gap evident at the west wall of rear living room.  Brickwork of rear living room is out of plumb. Inspection of concrete paving around living room showed it settled and moved horizont ally. Conclusions  Plumbing investigation has shown minor defects of stormwat er drains but would not result in escape of water.  Cracking and mo vement of rear living room is typical of problems that can occur due to footings founded above angle of repose line of service assets.  Cracking and movement indicates a settlement of rear of the living room which is closest to the rear easement.  “Therefore , in our opinion, the cracking and movement that has occurred of the rear living room is a result of the footings being founded above the angle of repos e line of service assets within the easement such as a reticulat ed sewer pipe.” Case No: 452516 Determination Page 7 of 7 Applicant’ s expert (OD) Report 10 December 2016  There is internal plaster cracks, paint delamination, external brick crack on east wall and gaps either side of west wall three panes glass sliding door.  Southern lounge floor had dropped.  Previous repairs indicated there were no c racks at the time the job was handed over in September 2015 – this indicates the foundation had not dropped.  Paint delamination is only possible from water leaking in from the roof subs equent to the repairs.  This storm largely contribut ed to these defects.  It is clear that rain hitting the south roof and collected in the south wall gutter could not escape down the drain pipe – this is supported by the paint delamination.  The water backed up over roof tiles and leaked int o the rear wall plaster.  The flood so aked the clay soil under the foundation of the south wall – this caused the south wall to act as a cantilever overhanding on the soft soaked clay soil.  This then deflected rapidly and settled heavily at the line separation of the rest of the house footing.  Logically, the drop had to occur after the Sept ember repairs – it is unlikely the wall dropped gradually bet ween September and 25 December.  “I do not hesitate to state the cause of the movement in the south wall is a result of flash flood caused water fro m storm water unable to escape down partially blocked drain pipe.”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.