Home / Financial Firm (Unknown - Insurer) / Determination 452070

Determination 452070

Storm damage to commercial awning claim wrongly declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-19
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded$11,750
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' storm claim for water damage to the underside of a commercial awning was declined on exclusion grounds. AFCA found the exclusions did not apply and ordered the FSP to cash settle $11,750 per the builder's invoice.

Under section 46 of the Insurance Contracts Act an insurer cannot rely on a pre-contract defect exclusion where the insured was unaware and could not reasonably have been aware of the defect.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 452070 Determination Page 1 of 7 Case number: 452070 8 December 2017 1 Overview 1.1 Dispute In May 2015, the applicants lodged a claim for damage to their commercial property (the property) as a result of a storm event that occurred on 27 November 2014. The financial services provider (FSP) agreed to provide cover for the majority of the damage claimed. The dispute is about the FSP’s decision to decline the applicants’ claim for water damage to the front awning of the property. 1.2 Issues and key findings Have the applicants established a claim under the policy? The applicants’ policy was a business insurance policy (the policy) which provided cover for insured events, including storm, wind and water. As the claim is for water damage caused by a storm event the applicant has established a claim under the policy. Was the FSP entitled to deny the claim? The available information does not establish that, on the balance of probabilities, the damage to the awning was caused by factors excluded under the policy. Accordingly, the FSP is liable for this damage. 1.3 Determination This determination is in favour of the applicants. The FSP is to cash settle the applicants’ claim for $11,750. Case No: 452070 Determination Page 2 of 7 2 Reasons for determination 2.1 Have the applicants established a claim under the policy? Structure by issues and reasoning There was a significant storm event The policy was an insured events policy that included cover for loss occurring as a result of storm, wind and water. The applicants’ claim was for damage to the property as a result of a significant weather event that occurred on 27 November 2014. The nature of the event was described by the FSP’s assessor as follows: ‘Around 4pm on Thursday 27 November 2014, a number of severe storm cells passed across Brisbane producing wind gusts of more than 140km/hr, huge hailstones, lightning, heavy rain and flash flooding. The Bureau of Meteorology reported that this was the biggest storm to hit Brisbane in around 30 years. Damage was widespread and parts of Br isbane were declared a natural disaster zone.’ There is no dispute that the applicants’ property suffered damage as a result of the storm. The FSP assessed the applicants’ claim and accepted liability for the majority of the damage. The applicant has, therefore, established a prima facie claim under the policy. 2.2 Was the FSP entitled to deny the claim? The policy was subject to exclusions The policy document includes nine exclusions under the insured event storm, wind and water. In denying cover for damage to the awning of the property the FSP relies upon the following exclusion: ‘You are not covered for: Loss or Damage caused… …4. By water entering the building due to inadequate maintenance, or through an openin g made for any building renovation or repair work, or because of structural defect, faulty design or faulty workmanship when the building was constructed;…’ The FSP also maintains that the policy provides that loss or damage caused by or resulting from wear and tear is excluded from cover under all sections of the policy. The building was more than 50 years old The engineer appointed by the FSP to assess the damage noted that the building was 50 to 60 years old. In summary the engineer noted the following in relation to the awning of the building:  the iron roof and fixings were in poor condition  there was evidence of multiple attempts to apply sealant to damaged sections of the roof sheeting, to seal previous and possible current leaks Case No: 452070 Determination Page 3 of 7  the pitch of the roof is less than the recommended five degrees that custom orb is to be fitted  the roof was incorrectly installed and not fit for purpose. This would have contributed to the awnings failure to remain water tight  the box gutter revealed a very shallow profile with one 90mm dropper and no overflow fitted  the damage noted was clearly older in age and is consistent with the box gutter overflowing over a long period of time and water entering the incorrect roof sheet profile. Section 46 of the Act applies to the exclusion clause Section 46 of the Insurance Contracts Act 1984 (the Act) provides that an insurer may not rely on an exclusion relating to a defect or imperfection of a thing where:  it relates to the existence of a thing prior to the policy being taken out  the insured was not aware of the defect or imperfection and  a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection at that time. An exclusion clause that does not operate by reference to a condition of being or an event at a time before the contract was entered into, does not offend section 46 of the Act. Exclusion clauses relating to inherent defects, structural faults, faulty workmanship and faulty design but not by reference to a time before the contract was entered into do not necessarily offend section 46 of the Act. The exclusion relates to the condition of the building at time of construction The FSP’s exclusion extends beyond a general exclusion to include a structural defect, faulty design or faulty workmanship ‘when the building was constructed’ (my emphasis). I am satisfied that this refers to the condition at the time before the contract was entered into. The applicants’ say that at the time of purchasing the property, they obtain ed a building inspection report. There was no suggestion the property did not meet relevant building regulations at the time it was constructed. The available information indicates that the awning operated largely without fault over an extended period of time. I do not accept the FSP’s arg ument that the exclusion clause operates by reference to how the damage occurred and not when the underlying defect arose. FSP cannot rely upon the exclusion relating to a defect at a time before the contract was entered into I accept based on the information available that the applicants were not aware and a reasonable person in the circumstances could not be expected to have been aware of any defect in the construction or fitting of the awning. I accept that the applicants or a reasonable person in the circumstances could not have been aware of either the structural defect, faulty design or any faulty workmanship when the building was constructed. Case No: 452070 Determination Page 4 of 7 I accept that the exclusion clause relates specifically to the time when the building was constructed and in this respect, accept that the applicants are entitled to rely upon section 46 of the Act. I am satisfied the FSP cannot rely upon the argument with respect to either the structural defect, faulty design or faulty workmanship of the building when it was constructed. Overflow of the box gutter was the proximate cause The FSP obtained three reports on the damage to the awning all of which note that the proximate cause of the damage was water ingress through the roof due to overflowing or leaking of the box g utter. The builder who attended to the repair of the awning also noted that the cause of the damage was the overflow of the box gutter, which would also have been impacted by the presence of a soft drink can in the s- bend of the gutter. It is not clear that water entered at the site of previous repairs The engineer reported that there were multiple areas where sealant had been applied to previous damage to the roof to seal previous and possible current leaks [emphasis added]. The FSP has also provided Google images of the awning from 2009 that purport to show water damage to the underside of the awning. Given the aspect of the images it is difficult to conclude that there was water damage or its extent. The FSP’s engineer also submitted a Google image from March 2013 purporting to show existing damage to the underside of the awning. The image is neither entirely clear, conclusive of existing damage, nor the extent of that damage. The presence of multiple repairs to the awning roof suggests that there was p revious water ingress to the awning roof. The engineer suggested that it is possible that the roof leaked at the site of the previous repairs. However the engineer’s conclusion was that: ‘The poor installation of the awning roof and gutter is not storm rel ated and water entry to the ceiling below is directly related to poor workmanship during installation of the roof sheeting and gutter system and has been occurring for a long period of time.’ There is no evidence that the water ingress, which caused the lining of the awning to bow, occurred at the site of the previous repairs. It is not clear that the water ingress was an ongoing condition The FSP’s appointed assessor and engineer say that the damage to the awning was consistent with the overflow of the box gutter and subsequent ingress of water to the awning over an extended period. The applicant says that there was minor water damage to the underside of the awning before the storm event. In commenting on the damage the assessor noted: ‘ There are specific isolated locations where severe damage has been sustained to the awning which we believe are long term and we would suspect that are due to rusting out of the box gutter’ Case No: 452070 Determination Page 5 of 7 Based on the information before me, I am satisfied there was existing damage to the underside of the awning, prior to the storm event. However, there is insufficient information to show that this was an ongoing issue. In commenting on the damage the FSP’s assessor noted: ‘ There are specific isolated locations where severe damage has been sustained to the awning which we believe are long term and we would suspect that are due to rusting out of the box gutter’ The engineer made similar comments about the damage occurring over time. It is my view that, given the time that elapsed between the storm event in November 2014 and the assessment in May/June 2015, it would be difficult to establish how old the damage was. The builder that completed the works to the awning commented that: ‘When both the roof and soffit linings were removed an inspect ion of the exposed timber framing showed no sign of water damage or timber rot. Both the awning frame and the box gutter framing were in sound condition’ The builder went on to say: ‘ It is our opinion that the damage to the lining to the underside of the awning came as a result of the high volume of water during a storm, most likely the severe storm that occurred on 27 November 2014.’ I accept that it would have been more likely than not that the internal timber framing would have shown some deterioration or rot, had it been exposed to continued water ingress over time. It is likely that the storm event caused the damage The applicant says that there was minor damage to the awning prior to the storm event however this was not an ongoing issue. As a result of the storm the awning suffered significant damage and caused it to sag by approximately 500mm. Given the severity of the storm that hit Brisbane on 27 November 2014, as previously described, I am satisfied that the presence of hail and significant rainfa ll led to the failure of the gutter system at the property. This in turn led to a high level of water ingress to the roof and causing significant damage to the underside of the awning. On this basis the FSP should accept the applicants’ claim for damage t o the roof awning. As the awning has been replaced by the applicants’ due to safety concerns the FSP should cash settle the applicants in accordance with the builders invoice. Case No: 452070 Determination Page 6 of 7 3 Supporting information 3.1 I NSURANCE CONTRACTS ACT 1984 - SECT 46 Pre - existing de fect or imperfection INSURANCE CONTRACTS ACT 1984 - SECT 46 Pre-existing defect or imperfection (1) This section applies where a claim under a contract of insurance (other than a contract of insurance that is included in a class of contracts declared by the regulations to be a class of contracts in relation to which this section does not apply) is made in respect of a loss that occurred as a result, in whole or in part, of a defect or imperfection in a thing. (2) Where, at the time when the contract was entered into, the insured was not aware of, and a reasonable person in the circumstances could not be ex pected to have been aware of, the defect or imperfection, the insurer may not rely on a provision included in the contract that has the effect of limiting or excluding the insurer's liability under the contract by reference to the condition, at a time before the contract was entered int o, of the thing. 3.2 Key documents Document Relevant excerpts Product Disclosure Statement and Policy Wording 13 March 2014 Policy Exclusion ‘ 4. By water entering the building due to inadequate maintenance, or through an opening made for any building renovation or repair work, or because of structural defect, faulty design or faulty workmanship when the building was constructed .’ Assessor report 22 May 2015 ‘ 5.9 It is the opinion of the write that the leaks to the underside of the awning are due to overflowing or leaking box gutters. 5.10 The gutter extends along the full length of the building at the rear of the awning (at the connection between the building and the awning) and only one (1) downpipe exists. There are specific isolated locations where sever damage has been sustained to the awning which we believe are long t erm and we would suspect are due rusting out of the box gutter. Engin eers Report 12 June 2015 ‘Front awning 9.7m x 3.4m The roof iron to the front Awning is of heavier usage iron and not impact damage was noted however, poor condition of the iron roof sh eeting and its fixings was clearly visible with countless attempts by persons unknown to apply sealants to the cut and damaged sections of the roof sheeting to seal previous and possible current leaks. The pitch of the roof is less that the recommended 5 degrees that custom orb is to be fitted to be fitted to and as such has been incorrectly installed and not fit for purpose and would also be a contributing factor to the awnings failure to remain water tight. An inspection of the Awning box gutter reveal ed a very shallow profile with one 90 mm dropper and no over flow fitted. Owners are claiming that damage to the Awnings ceiling is a result of the storm, however the damage noted was clearly older in age and is consistent with the box Gutter over flowing a long period of time and water entering from the incorrect roof sheet profile. Case No: 452070 Determination Page 7 of 7 Builder letter 10 August 2015 ‘[company] was engaged by [applicants] to remove and replace the roof sheeting to the awning, and sheeting to the underside of the awning at [property]. The sheeting on the underside of the awning has sagged as a res ult of water damage. When bot h the r oof sheeting and soffit lining were removed an inspection of the exposed timber framing showed no sign of damage or timber rot. Both awning framing and box gutter framing were in sound condition. During the removal of the rainwater dis posal system, a soft drink can was discovered in the S - bend of a down pipe, which may have cause the box gutter not to drain properly. It is our opinion that the damage to the lining of the underside of the awning came as a result of the high volume of water during a storm, most likely the severe storm that occurred on 27 November 2014…’

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.