Determination 451907

Irresponsible lending of a line of credit for an owner-builder build, with debt reconstruction and compensation

FirmFinancial Firm (Unknown - Credit)
Decided2017-05-11
ProductCredit · Home loan
OutcomeFor the complainant
Amount awarded$8,955
Non-financial loss$6,000
Amount claimed—
SourceAFCA PDF

Summary

Two applicants complained that the insurer's bank approved an owner-builder line of credit that was outside policy, unsuitable and based on an undisclosed basis, leaving an unfinished home. AFCA found irresponsible lending, reconstructed the debt to a reduced balance with an interest-free period, refunded costs and awarded $6,000 non-financial loss.

The FSP approved lending that was outside its policy, did not address the completion cost, and failed to disclose the basis of approval, so the loan was unsuitable under the NCCP responsible lending obligations.

Issues

Subjects and remedies

debt waiver or reductionloan or hardship variationpay compensationpay non financial lossrefund fees or charges

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 451907 Determination Page 1 of 7 Case number: 451907 4 May 2017 1 Overview 1.1 Dispute This dispute relates to three loans totalling $518,900 the FSP approved in 2010 which were secured by mortgages over three properties. Loans 2 and 3 refinanced existing loans with another financial services provider and Loan 1, for $216,300, the principal subject of this dispute, was used to construct, in part, a home on vacant land (F property). The F property is incomplete. The Applicants say the FSP banker:  breached the FSP‟s policy not to lend to owner builders and fabricated the Loan 1 purpose and information in the application to facilitate its approval  breached the FSP‟s responsible lending obligations as Loan 1 was unsuitable given their requirements and objectives  misled them about how they would access funds to complete the F property  failed to respond to requests for assistance to complete the F property. On 1 March 2017, the case manager delivered a recommendation on the issues in dispute. The recommendation was in favour of the Applicants and a copy is attached to this determination. The Applicants accepted the recommendation, but the FSP rejected it on the basis that FOS should not have reconstructed the Loan accounts to apply the payments in fact made to (the interest and fee-free) Loan 1 to reduce the balance owing on Loan 2. The FSP subsequently made an offer to resolve the dispute which the Applicants rejected. 1.2 Issues and key findings Were the findings of the recommendation correct? Save for the amount of compensation awarded for the Applicants‟ non -financial loss suffered as a result of the irresponsible lending, the findings contained in the recommendation were correct and are adopted in this determination . Further submissions provided after the recommendation have been considered, and the calculation of the reconstructed outstanding debt has been updated. Is it appropriate to apply the payments made to Loan 1 to reduce the balance on Loan 2? Consistent with F OS‟s published approach, it is appropriate when reconstructing the Loans to account for the FSP‟s irresponsible lending to first apply the payments in fact made to the interest and fee-free Loan 1 to reduce the balance on Loan 2. Case No: 451907 Determination Page 2 of 7 Should the compensation fo r the Applicants’ non -financial loss be increased? The FSP should compensate the Applicants for their significant stress and inconvenience suffered as a result of its irresponsible lending by paying each Applicant $3,000. The total compensation of $6,000 payable for the Applicants ‟ non- financial loss is to be applied to reduce the reconstructed outstanding debt. 1.3 Determination This determination is in favour of the Applicants. The FSP should make the following adjustments to the Loans:  close Loan 2 leaving no outstanding liability as it has been repaid following the re-calculation contained in this determination.  vary Loan 1 by: o reducing the balance to $275,679.12 on which no interest is payable until six months from the date of the Applicants‟ acceptance of the determination. o at the end of the six month moratorium, changing Loan 1 so that it is repayable over 23 years by way of monthly payments of principal and interest at the FSP‟s standard variable home loan rate for principal and interest loans over 23 years. This is the remaining term of the original loan taken out in 2010.  The Applicants will be required to sign documentation confirming this variation and make the required minimum monthly payments. Case No: 451907 Determination Page 3 of 7 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. Save for the amount of compensation awarded for the Applicants‟ non -financial loss suffered as a result of the irresponsible lending, the findings contained in the recommendation were correct and are adopted in this determination . 2.2 Is it appropriate to apply the payments made to Loan 1 to reduce the balance on Loan 2? FOS assesses what the Applicants are to repay Where, as here, FOS concludes that a financial services provider has not lent respo nsibly, we will assess the applicant‟s loss and decide what compensation may be payable. We consider the applicant‟s costs, how they used the irresponsibly - advanced loan funds, and what they have to repay. Applying the long standing FOS approach to the circumstances to this dispute means:  we reconstruct the irresponsibly-advanced loan account to exclude interest and fees  we reimburse or refund holding or other costs associated with the irresponsible lending  where there are other loan accounts that are not tainted by the irresponsible lending, we apply the payments in fact made to the irresponsibly-advanced loan to first satisfy “legitimate” debts on which interest and fees are payable in the ordinary course. If, on the account reconstructions, the legitimate debt is paid out, the payments that were in fact made are next applied to the “illegitimate” debt to reduce the principal amount owed. The FSP is to compensate the Applicants by reducing their outstanding debt Adopting the formula used in the recommendation, the FSP is to compensate the Applicants for their loss arising from its irresponsible advance of Loan 1 on the following bases:  The FSP should refund all interest and fees charged to Loan 1  The Loan 1 debt is reconstructed on the basis of comprising all drawings (excluding interest, fees and repayments that were in fact made to Loan 2, which have also been removed as credits to Loan 2 to offset) but excluding deposits Case No: 451907 Determination Page 4 of 7  The deposits originally made to Loan 1 including the net proceeds ($138,197.29) from the sale of the 49N property are applied to Loan 2 (the interest bearing loan) on the basis that but for Loan 1, these payments would have been applied to Loan 2  The FSP should refund the refinance costs as it is more likely than not that but for the Loan 1 approval, the Applicants would not have refinanced their existing loans to the FSP  The FSP should reimburse the Applicants for the insurance premiums paid on the F property from February 2013 to February 2017. This reimbursement recognises that the Applicants have paid house insurance for both their home at the 37N property and for the F property for seven years. Since there would likely have been a doubling-up of insurance costs for approximately three years even if the construction project had gone to plan, it is appropriate to reimburse four years‟ premiums for the F property. Following delivery of the recommendation, the Applicants provided invoices for insurance premiums for the F property for three years, to supplement the previously-provided insurance premium invoice for the F property for the year ending 9 February 2018  The FSP should reimburse the Applicants for their $220 cost of extending the building permit in September 2011  The FSP should reimburse the Applicants for their $500 cost of obtaining valuations of the 37N and F properties in September 2011  The remaining reconstructed outstanding debt will be interest and fee free for six months from the date the Applicants accept this determination. It is appropriate to allow the FSP to commence charging interest and fees after six months (and for the Applicants to commence making principal and interest repayments at that time), since they would always have been required to borrow funds to complete the F property to the standards they have chosen. I agree with the case manager that it is not appropriate to include the following costs in assess ing the Applicants‟ loss :  The costs of obtaining building permits, owner builder permits and plans as these were incurred before the FSP approved the irresponsible lending.  The costs associated with living in and retaining the 37N property because without the completed house on the F property, the Applicants would likely have lived there or elsewhere.  The costs associated with the sale of the 49N property because even if the Applicants would not have sold their investment property, they nonetheless sold it themselves at market rates so it is not evident they suffered a loss. 2.3 Should the compensation for the Applicants’ non -financial loss be increased? The Applicants have each suffered non-financial loss for which they should be compensated Where, as here, there is more than one applicant and each has suffered non- financial loss as a result of a financial services provider‟ s error, each can be awarded compensation. Case No: 451907 Determination Page 5 of 7 I accept  the FSP‟s irresponsible advance of Loan 1 and all that has flowed from this has caused each Applicant significant stress and inconvenience and interference with their expectation of enjoyment and peace of mind.  the Applicants‟ statements that the FSP‟s conduct in providing the unsuitable lending has caused great “stress, anxiety, and difficulties regarding [their] family‟s current living arrangements. There has been a breach of trust and confidence between [them] and the [FSP]”.  the Applicants are very disappointed that Property F has remained at lock-up stage since March 2012 in circumstances where their expanding family has remained living in cramped accommodation at the 37N property. I require the FSP to compensate the Applicants for their non-financial loss by paying each of them $3,000. The FSP should pay the Applicants the total $6,000 compensation for non-financial loss by crediting this amount to the reconstructed outstanding debt. FOS‟s approach to assessing compensation for non-financial loss is summarised at 3.1 below. 2.4 For what amount are the Applicants liable under the reconstructed outstanding debt? The balance owed under the reconstructed outstanding debt is $275,679.12 Adopting the above formula, the reconstructions of Loans 1 and 2 are set out in Appendices 1 and 2 to this determination. The summary of the reconstructions is as follows: Details Amount Loan 1 Principal borrowed (drawings to 3 April 2017 ) ($336,235.99 ) Refinance costs $1,705 Building permit extension and valuation costs $ 720 Insuranc e on F property for four years $6,530 * Revised Balance Loan 1 ($326,630.99 ) Loan 2 Principal Borrowed ($250,400.40) Plus Interest due (FOS reconstruction calculation) ($ 35,580.61 ) Settlement Proceeds 49N property $138,197.29 Less deposits made to Loan 1 now applied to Loan 2 $193,385.59 Revised Balance Loan 2 $45,601.87 (CREDIT) Case No: 451907 Determination Page 6 of 7 Non - financial loss compens ation $6 ,000 $ 51,601.87 Total outstanding debt (non - interest bearing) ($275,679.12 ) (*) The insurance premium invoices provided were paid in April 2012, Marc h 2013 and March 2014. FOS has used these, plus the insurance premium invoice provided for the year from February 2017 to February 2018, to estimate the additional insurance charged for the F property for four years from February 2013 to February 2017. The FSP should make the following adjustments to the Loans:  close Loan 2 leaving no outstanding liability as it has been repaid following the re-calculation contained in this determination.  vary Loan 1 by: o reducing the balance to $275,679.12 on which no interest is payable until six months from the date of the Applicant s‟ acceptance of the determination. o at the end of the six month moratorium, changing Loan 1 so that it is repayable over 23 years by way of monthly payments of principal and interest at the FSP‟s standard variable home loan rate for principal and interest loans over 23 years. This is the remaining term of the original loan taken out in 2010.  The Applicants will be required to sign documentation confirming this variation and make the required minimum monthly payments Case No: 451907 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to assessing compensation for non-financial loss Non-financial loss claims include claims for stress or inconvenience caused by an error of a financial services provider. The maximum amount FOS can award an applicant for non-financial loss is $3,000 for each claim. FOS will only award compensation for non-financial loss if there has been an unusual degree or extent of inconvenience. FOS does not award compensation for loss that an applicant may incur as a result of pursuing a dispute or rectifying a financ ial services provider‟s error. FOS assesses any claims for non-financial loss in accordance with its Terms of Reference and, if compensation is awarded, it is unlikely to be substantial. Recommendation Case No: 451907 Recommendation Page 1 of 17 Case number: 451907 1 March 2017 4 Overview 4.1 Dispute This dispute relates to three loans the FSP approved in 2010 totalling $518,900 secured by mortgages over three properties. Loan 2 and 3 refinanced existing loans with another financial services provider and Loan 1, the principal subject of this dispute, of $216,300 contributed to the cost of construction of a home on vacant land (F property). The F property is incomplete. The Applicants say the FSP banker:  Breached the FSP‟s policy not to lend to owner builders and fabricated the Loan 1 purpose and information in the application to facilitate its approval.  Breached the FSP‟s responsible lending obligations as Loan 1 was unsuitable.  Misled them about how they would access funds to complete the construction.  Failed to respond to requests for responses and assistance. 4.2 Issues and key findings Did the FSP approve Loan 1 outside its policy? The FSP was aware Loan 1 was to be used for owner builder construction which was outside its policy. Did the FSP breach its responsible lending obligations when approving Loan 1? The FSP breached its responsible lending obligations by approving Loan 1 because it failed to complete a proper assessment and the FSP ought to have been aware it would not meet the Applicants‟ requirements and objectives so it was unsuitable. What is the appropriate resolution of the dispute? The FSP is liable to adjust the balance of the outstanding debt in accordance with FOS‟s standard approach when irresponsible lending is established. Additionally the FSP should provide time, by virtue of an interest and fee free period for the Applicants to make arrangements before the outstanding debt returns to commercial terms. 4.3 Recommendation This recommendation is in favour of the Applicants. The FSP should:  Close Loan 2 leaving no outstanding liability. Case No: 451907 Recommendation Page 2 of 17  Place the remaining reconstructed outstanding debt ($289,930 as at 31 December 2016) in a non-interest bearing account for six months from the date of acceptance of the recommendation after which the FSP will be entitled to restart charging interest and fees.  Complete a calculation in accordance with this recommendation for transactions processed to Loans 1 and 2 from 31 December 2016 to the date of implementation of this recommendation and make a further adjustment to the final debt balance. The FSP should provide its workings to FOS and the Applicants within 30 days of the date of this Recommendation.  Prior to the end of the above six months, the Applicants should provide the FSP with a statement of financial position and propose an affordable repayment arrangement of principal and interest repayments for the outstanding debt to commence six months after the acceptance of the recommendation sufficient to repay the debt within a reasonable timeframe . Case No: 451907 Recommendation Page 3 of 17 5 Reasons for recommendation The three loans the FSP approved in 2010 are set out below. The loans were secured by mortgages over three properties (the F property, the 37N property and the 49N property). Loan Amount Line of Credit (Loan 1) $216,300 Home Loan (Loan 2) $250,300 Investment home loan (Loan 3) $52,300 Total $518,900 The Applicants used Loan 1 to owner build a house on the F property which is partially complete. Loan 3 was paid out in 2011 when the Applicants sold the 49N property. Loans 1 and 2 remain on foot with a combined balance as at 31 December 2016 (the most recent statements held) of $420,061. 5.1 Did the FSP approve Loan 1 outside policy? The FSP banker originally approved Loan 1 outside his authority The FSP‟s loan assessment notes recorded the original lending purpose in May 2010 as follows: „…refinance [another financial services provider] plus extra funds to build holiday home on vacant land. Considering relocating an existing home and renovating …‟ The FSP banker approved the loans and issued the three loan contracts on 25 May 2010 which the Applicants signed and returned on 10 June 2010. Subsequently, however, on 17 June 2010, the FSP banker recorded on the loan assessment notes that he had approved the loans outside his authority and he referred the application to the FSP‟s credit area for approval. The FSP approved Loan 1 for owner builder construction outside policy After receiving the FSP banker‟s application, the FSP‟s credit area referred it back to the banker and in a loan assessment note dated 18 June 2010 said: „..we are not clear on who is building on the land -there is a mention in client profile that he was to build on land himself, however, owner builder is now outside policy. Also if it is a contract builder project or a transportable home placing on property, we would not fund on a [line of credit] a [home loan] would be preferred as we need control over release of funds‟. The FSP‟s policies say an „excluded purpose‟ of a line of credit facility is „construction loans on an owner builder purpose‟. In response, the FSP banker recorded the following note on 7 July 2010: „Changed product as not a construction, there will be no fixed price con tract, in the next 12-18 months, client will purchase existing house, have it moved to the site and then renovate in his own time, lending against vacant land value only, not on an „as if completed‟. Case No: 451907 Recommendation Page 4 of 17 Subsequently, the FSP‟s credit area approved Loan 1 as a relocation loan. The Applicants say they never had any intention of relocating a home and that this was an FSP fabrication. They have provided copies of a building permit, owner builder certificate of consent and building plans dated October and Septembe r 2009 they say they showed the FSP banker in or about May 2010. The FSP has not provided any plans or other related documentation including any in relation to relocation of an existing house. On the face of it, there is no substantive reason to explain why the FSP banker would fabricate the relocation purpose given it is in the original loan assessment notes as an option together with building and at this stage he believed he had the authority to approve the loans. But the important point is, regardless of whether relocation was an option, building as an owner builder was not because it was outside the FSP‟s policy. The FSP‟s banker‟s note set out above mentions a change in product as well as purpose. There is no information which properly explains what the product change was between the original application in May 2010 and the subsequent application in June 2010 as the FSP has not provided the original application. But, based on the note above, on the face of it, it was a change from a construction type loan. The FSP says the reference to owner builder in its loan assessment notes arose as the FSP internally had located a needs analysis completed in October 2007 which did not proceed but which said: „client is a builder looking to financ e a self build project … Requested finance facility of $250k line of credit for building project.‟ It is unlikely, however, that this alone would have prompted the credit area comments given the time which had elapsed (almost three years). It is more likely than not that the original application indicated that this may be for a construction loan. And further that it was on the basis of the Applicants as owner builders. Otherwise, as standard practice, it would be reasonable to expect that the FSP would have obtained the relevant documentation including building plans, permits and a contract from a third party builder to assess the loan proposal. The Applicants dispute there was any discussion at the time about a change in purpose, that the FSP had informed them that building themselves was outside policy or that the banker had originally mistakenly approved the loans outside his authority. They say after they met originally to discuss the loans, they later met with the banker for a short period of time to sign new loan documents in July 2010 as they had advised the FSP that the loan amounts were incorrect. The May 2010 and July 2010 loan offers differ only in relation to the loan amount; they do not show any change in product. In his responses to the FOS dispute, the FSP banker has said: „Clients intention was to relocate or build something in his own time so this was acceptable.‟ and „ Client was adamant that they would contribute their own funds along the way and eventually sell the other propertys [sic] if req uired to finish … Case No: 451907 Recommendation Page 5 of 17 Client made it clear that this was an ongoing project he would work on in his own time using his own funds as available and then would sell existing dwelling to complete if required‟. and „I do know that i made clear that we would not fund a construction loan on an owner builder basis, and if he required additional funds to finish the project it would have to be done on a construction loan basis. It is not unusual for us to do this when we have fixed prices to complete the works on an on completion basis where we controlled the drawdowns as a construction loan. Even now this is done on a case by case basis depending on equity position.‟ It is evident from the above statements that the FSP banker was still aware that, despite his comments in the loan assessment notes, the Applicants were building themselves. Further this would have been evident when the FSP went through the valuation process in September 2011. If the FSP had approved finance for the relocation of an existing home and building a home was outside policy, it would be reasonable to expect that the FSP would have raised this apparent breach of their lending approval with the Applicants at this time and it further may have impacted on a decision to release funds to them to continue their owner builder construction. But it did not do so. Over the course of the dispute, however, the FSP has provided responses which appear to have made a distinction between the FSP relying on vacant land security solely rather than any reliance on the value of the building to secure its position. And the FSP‟s policies provide for lines of credit to be used for „personal expenditure‟, in other words discretionary spending. And taking into account the FSP‟s responses, it may have regarded the lending in this sense. But the FSP‟s policies do not set out circumstances when an owner builder loan may be acceptable. Accordingly, given the FSP banker was aware that the finance was to be used for owner builder construction, the lending was approved outside policy. A financial services provider‟s decision, however, to approve finance outside policy does not alone render lending irresponsible if the financial services provider provides its reasons for such an approval and it complies with all its obligations including its responsible lending obligations. 5.2 Did the FSP breach its responsible lending obligations when approving Loan 1? The FSP has responsible lending obligations At law, under the National Consumer Credit Protection Act 2009 (NCCP), financial services providers have “responsible lending” obligations which apply to loans or increases in loans. The NCCP applies to loans from 1 July 2010 and in this case the relevant loan contracts were issued on 9 July 2010 (replacing those issued in May 2010). A financial services provider‟s obligations under the NCCP include that it must not enter into a credit contract with a consumer if the credit contract is unsuitable for the consumer. A loan will be not unsuitable if: Case No: 451907 Recommendation Page 6 of 17  it meets the consumer‟s requirements and objectives, and  the consumer has the capacity to repay the loan without experiencing substantial hardship. The lending was unsuitable Aside from the Loan 1 approval being outside policy:  Loan 1 was a line of credit which was not sufficient to complete the building and the FSP was aware of this.  There were no savings apparent in the application and the FSP‟s credit area had raised originally concerns about servicing so it was not apparent there would be cashflow generated sufficient to cover any substantive part of the building cost.  As shown by the FSP banker‟s statements, the FSP was aware that the Applicants were relying on the sale of other properties already mortgaged to the FSP to release funds to allow it to be completed. It is not clear what the Applicants were expecting the building to cost. They have not provided FOS with any documents showing their original budget or costings. They say they „valued the build‟ at $10,000 per square and the residence was approximately 68 squares (so $680,000). But it is not clear whether this was with or without labour and is not consistent with the other documents supplied. The Applicants‟ building permit shows a „Value of Work‟ of $450,000 but a floor area of 455.45 including the shed which the Applicants had constructed on the property before obtaining the FSP finance approval. Such a floor area seems to be below the 68 squares mentioned above. The owner builder certificate of consent shows „Estimated Cost of Works‟ of $300,000. The Applicants say the permi ts are only an estimate and were always subject to change. Ultimately it seems the cost was somewhere between $300,000 and $680,000. The Applicants say they did not provide any costings to the FSP as it did not request them but say they showed the banker the permits and plans. The FSP banker said he cannot recall any information about cost: „ As we were not lending on a construction loan basis I didn‟t collect [information about the construction cost]...‟ But the information was relevant in the context of an assessment as to whether the lending was unsuitable because, if the funds were not available, the Applicants were at risk of having a partially completed house when the two other security properties were sold. In terms of the FSP, given it was relying on the F property as security, in a realisation situation, it could have a partly built house on the land which could potentially adversely impact on even land value. The properties intended to release the funds (the 37N and 49N properties) were mortgaged to the FSP as security for the three loans. In the normal course, when asked to release its mortgage, a financial services provider will complete a credit assessment which may include revaluations of any remaining security properties to determine how the settlement proceeds should be disbursed. Case No: 451907 Recommendation Page 7 of 17 There was likely to be modest funds available following sale due to the selling costs and because the FSP had approved finance at 80% of valuation, which the FSP banker had said was the maximum amount the FSP could lend. The properties on which they were relying to release the funds (the 49N and 37N properties) were located in the same rural town and the FSP had valued them in May 2010 at a total of $450,000. Assuming sale at the valuation price, selling costs and the FSP seeking to maintain an 80% lending ratio, the FSP may have been prepared to release perhaps about $70,000 (ie: $450,000 @ 20% say less $20,000 in selling costs). With the original lending of $216,300, this would bring the construction monies up to $286,300. On the face of it, this would not seem sufficient and was well below even the permit costs. Any higher and more realistic amount would rely on either a substantially higher sale price achieved over the construction period or unachievable capital growth in the F property as vacant land. That is unless the FSP was prepared to value the F property taking into account the improvements. The FSP ultimately in 2011, lent based on a 90% loan to valuation but this had not been based on any original agreement reached in relation to the original lending as both parties agree that at the time of the original approval the FSP was lending the maximum it could. The Applicants claim misleading conduct The Applicants say the FSP told them it would revalue the F property on an as is basis at lock up stage so taking into account the building improvements for security purposes so as to allow it to release more funds from the sale of the security properties. The Applicants reached lock up stage in March 2012. The FSP banker disputes this and says he had told the Applicants that if they needed additional monies to complete the project they would need to do it as a construction loan with a third party building contract. Broadly, to succeed in a claim for misleading cond uct the Applicant must be able to show that:  the financial services provider made a statement or engaged in conduct that was false or misleading (misrepresentation),  the Applicant relied on that misrepresentation to change their position, and  the Applicant suffered detriment as a consequence. A financial services provider may be held to have engaged in misleading conduct by omission in circumstances where it fails to disclose relevant information to a customer when under an obligation to do so. FOS principally relies on contemporaneous primary documents FOS is an independent dispute resolution service established as an alternative to the courts for customers of financial services providers with specific types of disputes. FOS is not a court of law. We do not have the power to take or test evidence on oath. Case No: 451907 Recommendation Page 8 of 17 When we assess disputes, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to contemporaneous documentary information. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established The FSP misled the Applicants by omission There are no records which establish that the FSP banker told the Applicants that it would revalue the F property at lock up taking into account the improvements. However, having received approval for only $216,300, the Applicant ini tiated a building program which was to cost substantially more and it seems possible they were at least under a misapprehension about on what basis the FSP would be releasing funds from the security properties if sold. But there are also no records available to show that the FSP banker had informed the Applicants:  He had originally approved Loan 1 outside his authority and had to submit it for re-approval.  The approval of a loan to build a home on the F property as owner builders was outside policy.  The credit area had approved a relocation loan rather than a loan to build a new property so they could not use the loan to build.  Unless the values of the security properties increased, including the F property as vacant land, there may not be sufficient funds released to meet the project cost.  Additional lending against the F property could only take into account the improvements if there was an arms-length construction contract with a third party builder in place. The above was relevant to the viability of the project and the FSP ought to have provided the above information to the Applicants; in particularly the basis on which it had approved finance as they were placing substantial reliance on future FSP decisions about the release of funds. This mean the Applicants were exposed to the very real risk they would have insufficient funds to complete the home The FSP‟s failure to provide this information was misleading conduct by omission. The FSP breached it responsible lending obligations as the lending was unsuitable The lending was unsuitable because it would not meet the Applicants‟ requirements and objectives. There was a real risk that the Applicants would be left with an incomplete home even if they sold their two other properties. This is because:  The lending was outside policy  The FSP misled the applicant about the purpose for which it was lending the monies.  The lending failed to properly address the completion cost. Case No: 451907 Recommendation Page 9 of 17  The potential source of completion funding was unrealistic. The FSP, therefore, breached its responsible lending obligations in this case because it approved lending which was unsuitable. 5.3 What is the appropriate resolution? It is more likely than not that the Applicants relied on incomplete information from the FSP to proceed with their building plans. As a consequence, they have suffered detriment. They have an incomplete home which is at lock up and not able to be lived in, insufficient funds to complete it, and a loan against it which is accruing interest and fees. In addition, they refinanced existing loans from another financial services provider incurring associated costs and it is possible that they may not have sold the 49N property. When assessing loss, FOS, however, also considers whether the Applicants contributed to the loss or failed to take reasonable steps which were available to them to mitigate all or part of the loss. The Applicants were aware they did not have finance in place to complete the project Notwithstanding that the FSP‟s approval of Loan 1 in 2010 was inappropriate, the Applicants were aware at the time that this lending would not be sufficient to complete the building project. Even so, for the reasons given earlier in the Recommendation, the Applicants reasonably believed as a result of omissions by the FSP that there would be funds available to progress the building so I do not accept there should be a reduction in compensation on this basis. The Applicants did not have reasonable opportunity to mitigate their loss In March 2012, the Applicants became aware that the FSP would not release the funds they needed to continue the project. The property remains incomplete and at lock up some five years later which is an extended period or time and clearly and foreseeably not in the Applicants interests. On the face of it, the Applicants had the following options in the period after March 2012 to minimise their potential losses:  Sell the F property as is; or  Apply to a financial services provider for construction finance against a building contract with a third party to complete the project. Realistically, selling a partially completed owner builder property is likely to result in losses to the Applicant so I do not accept that it is reasonable to conclude they were under an obligation to have done so to mitigate losses. A construction loan may have been a more realistic and palatable, albeit more expensive, solution. But it is uncertain and potentially unlikely that they would Case No: 451907 Recommendation Page 10 of 17 achieve finance approval as well as a builder in a rural area prepared to take on a partially completed project. Accordingly, whilst the Applicant have not taken steps which may have mitigated their loss, this does not make them liable for all or part of the loss, as it is not established that there were reasonable, realistic and achievable options to do so. The Applicants exceeded their budget As previously mentioned, it is apparent the Applicants exceeded their original planned budget and they say:  „The property was insured before construction started as an owner builder for $700,000 with v aluations and escalations of another $140,000.‟  They have spent $350,000 to lock up including higher than budgeted costs because „they have used better quality concrete, more expensive bricks, posts and windows etc.‟  They estimate they will need to spend a further $225,000 to $250,000 to complete the build. This would mean an all up cost to them of $575,000 to $600,000 which is well above the permits. And the value of the build may have since increased given the Applicants have provide an insurance policy showing the improvements are now insured for replacement value at $920,000. If the Applicants had built on the basis of the permits, they would have been further advanced. The decision to exceed their original estimate of costings was their decision and meant that the house only reached lock up. This does not absolve the FSP from liability for losses they have caused but it does serve to limit them. On payment of the compensation monies set out below, the Applicants will have six months to make arrangements such as to sell the 37N property, refinance and complete further work on the property before the outstanding debt reverts to commercial terms. Remedy for irresponsible lending If we decide that a financial services provider has not lent responsibly, we will consider what amount of the loan the consumer is liable to repay. The FSP is liable to compensate the Applicants’ by reducing their outstanding loans The FSP is liable to calculate the compensation amount to be paid to the loans on the following basis:  It should refund all interest and fees charged to Loan 1.  The Loan 1 debt will be reconstructed on the basis of comprising all drawings (excluding interest, fees and the Loan 2 repayments which have also been removed as credits to Loan 2 to offset) but excluding interest and fees and deposits. Case No: 451907 Recommendation Page 11 of 17  The deposits originally made to Loan 1 including the net proceeds ($138,197.29) of the sale of the 49N property are to be allocated to Loan 2 (the interest bearing loan) on the basis that but for Loan 1 these payments would have been available to Loan 2.  The FSP should refund refinance costs as it is more likely than not that but for the Loan 1 approval, the Applicants would not have incurred the cost of refinancing the loans even despite their stated long term intention to return their banking to the FSP.  The FSP should reimburse four years of house insurance for the F property from February 2013 to February 2017 (refer comments below).  The FSP should reimburse the cost of the extension to the building permit of $220 incurred in September 2011.  The FSP should reimburse the cost of the valuations of the 37N and F properties the Applicants obtained in September 2011 ($500)  The remaining outstanding debt will be interest free for six months from the date of acceptance of this Recommendation. In relation to insurance, the Applicants have obtained a benefit but, in fairness, they have paid building insurance for both their home at the 37N property and the F property for seven years now. Four years of insurance loss rather than seven recognises that there would always likely to have been an overlap even if the project had gone to plan. The Applicants have not provided all the insurance invoices. They have provided one showing the premium for the year to 9 February 2017 and would need to provide invoices and evidence of payment over the prior three years within 30 days of the date of this recommendation to obtain the further debt reduction. The following does not comprise part of the compensation assessment:  The cost of obtaining building permits, owner builder permits and plans as these were incurred before the FSP approved the finance.  The costs associated with living in and retaining the 37N property because without the house on the F property, the Applicants would likely have lived there or elsewhere.  Costs associated with the sale of the 49N property as even if they would not have sold, they sold it themselves at market so it is not evident there is a loss.  Three years of F property insurance for the reasons given above. The FSP is liable to pay compensation for non-financial loss FOS may award an applicant non-financial loss compensation which is intended to compensate an applicant for an unusual degree of stress, upset, inconvenience or loss of enjoyment as a result of a financial services provider‟s error or breach. Under FOS‟s Terms of Reference, the maximum amount FOS can award is $3,000. In the circumstances of this dispute, the impact of the FSP‟s error in granting the loans to the Applicants has been substantial and it is appropriate to award the maximum amount of $3,000. Case No: 451907 Recommendation Page 12 of 17 Summary Refer to Appendices 1 and 2 for the loan reconstructions. But in summary, the final position is: Details Amount Loan 1 Principal borrowed (drawings) ($335,585.99) Refinance costs $1,705 Building permit extension and valuation costs $720 Insuranc e F property covering „Classic Home‟ 9/2/17 (one year) $1,779 (*) Revised Balance Loan 1 ($331,382) Loan 2 Principal Borrowed ($250,400.40) Plus Interest due (FOS reconstruction calculation) ($35,580.61) Settlement Proceeds 49N property $138,197.29 Less deposits made to Loan 1 reconstructed to Loan 2 $186,235.59 Revised Balance Loan 2 $38,451.87 (CREDIT) Non - financial loss compens ation $3,000 $41,452 Total outstanding debt (non - interest bearing) ($289,930) (*) plus insurance premiums from February 2013 to February 2016 if paid invoices are provided The FSP should make the appropriate adjustments to the loans as follows:  Close loan 2 leaving no outstanding liability.  Place the remaining outstanding debt ($289,930 as at 31 December 2016) in a non-interest bearing account for six months.  Complete a calculation in accordance with this recommendation for transactions processed to Loans 1 and 2 from 31 December 2016 to the date of implementation of this recommendation and make a further adjustment to the final debt balance. The FSP should provide its workings to FOS and the Applicants within 30 days of the date of this Recommendation. Other matters As part resolution of the dispute, the Applicants sought that any debt be transferred solely against the F property so as to allow them to sell the 37N property and use the proceeds to complete the building. FOS cannot compel the FSP to change security arrangements and the outcome of this recommendation does not provide funds directly to the Applicants to allow them Case No: 451907 Recommendation Page 13 of 17 to complete the building. This is because the primary remedy for inappropriate lending is to determine the liability the applicant should owe. It is, therefore, a matter for the Applicants as to how they will proceed. The FSP should, however, provide the Applicants with six months to make their arrangements and during this period the outstanding debt will be interest free and no repayments will be required. At the end of the six months, the loan should return to commercial terms; that is the FSP will be entitled to charge interest and fees and principal and interest payments should commence. The FSP and Applicants will need to agree on a reasonable repayment arrangement calculated based over a term which is affordable for the Applicants. If the Applicants decide to sell the 37N property which is mortgaged to the FSP, FOS cannot compel the FSP to release the funds. The FSP is entitled to determine the amount it requires to discharge its mortgage. The parties may otherwise reach a negotiated resolution Even whilst a dispute is at FOS, the parties may continue to communicate and negotiate an outcome which may suit their circumstances. If, for example, the FSP is prepared to leave Loan 2 in place at its current balance with interest and fees applying in accordance with the loan contact and release the funds applied to the reduction of Loan 2 under this recommendation to the Applicants to allow the building to proceed, that will be a matter for the FSP to offer and the Applicants to accept. This is not an outcome FOS can provide under this recommendation. Case No: 451907 Recommendation Page 14 of 17 6 Supporting Information 6.1 Matters not addressed in the recommendation The Applicants say that the application was fraudulently altered without their knowledge including in relation to vehicle assets. This claim is not dealt with in this recommendation. FOS is not a regulator or a law enforcement agency. FOS investigates to the extent necessary to establish error, loss and the appropriate remedy and it is not necessary to further consider the above claim because it would not change the outcome of this recommendation. Additionally, the Applicants say the FSP failed to assist them subsequent to 2012 and until the FOS dispute they lodged in 2016. This issue arises as a result of the inappropriate lending and, for the same reasons as given above, would not change the outcome of the recommendation. The Applicants are also seeking disciplinary action against the banker. This is not a remedy FOS has the power to provide. 6.2 Loan information Loan Original Loan Amount Balance as at 31 Dec 2016 Loan 1 $216,300 $211,933 Loan 2 $250,300 $208,128 Loan 3 $52,300 Total $518,900 $420,061 Security and valuations Property May 2010 July 2011 September 2011 March 2012 F property $240,000 (*) $310,000 (**) $350,000 49N property $190,000 $190,000 Sold July 2011 $190,000 3 7N property $260,000 $220,000 (***) (*) API valuation (**) Applicant obtained valuation (***) Applicant supplied a valuation at $270,000 as at September 2011 Case No: 451907 Recommendation Page 15 of 17 6.3 Relevant chronology of events Date Event 7 May 10 FSP commenced the application 25 May 10 FSP credit assessment notes: ‘? Loan purpose ? refinance [other financial services provider] plus extra funds to build holiday home on vacant land. Considering relocating an existing home and renovating ? Balance sheet - only debts are current mortgages. all vehicle leases are payed [sic] out ? Employment ? MA self employed carpenter. ’ 25 May 10 FSP issued loan offers for 3 loans 10 June 10 FSP received back the signed loan offers 18 June 10 FSP credit assessment notes: Mitigants/Comments:Lender comments noted re tak eover of outside debts and build on land. Refer phone messages left for [FSP banker] . As advised, under Bank policy, as there is a >20% variance in S/E income bet ween 2008 and 2009,However, we have used the average as discussed with Lender, as client has reduced his costs. Servicing is failing on t hese figures by $474pm.In addition, we are not clear on who is building on the land - there is mention in client profile that he was to build on land himself, however owner builder is now outside policy. Also, if it is a contract builder project or a transpo rtable home placing on property, we would not fund on a [line of credit] - a [home loan] would be preferred as we need control over release of funds. 7 July 10 FSP credit assessment notes: „ changed product as not a construction. there will be no fixed pric e contract, in next 12 - 18mths client will purchase an existing house, have it moved to the site and then renovate in his own time. lending against vacant land value only, not on an "as if complete" ’ 9 July 10 Date loan contracts issued 19 July 10 Date FSP received signed loan contracts 13 Sep 11 Date of val uation of F property $31 0,000 obtained by Applicant Land $250 ,000 Imp $60 ,000 (shed) Total $310,000 The valuation include d the following comments: ‘ We note that Planning Permit no [***] has been issued for the erection of a dwelling on the property and work s are currently at base stage wit h frame commenced . As per your instructions , we have excluded the value of the dwelling from this assessment of v alue …’ 23 Sep 11 Settlement 49 N property – Sold for $190,000 $138,197.29 paid into Loan 1 Payout Loan 3 $50,242.92 Case No: 451907 Recommendation Page 16 of 17 6.4 Banker statements of recollection The FSP banker said in response to FOS:  This original loan was done over 5 years ago so the exact details are not clear. We refinanced his loans across from [anot her financial services provider], at the time he had his [37N [property], an investment property … and the [F property]. (the investment property has since sold, funds may have gone int o proj ect) He was considering relocating a house and renovating, or building a new home on [the F property]. He wanted to do as much of the work himself and under our policy we would only allow that if he had equity on an as is basis, which he did. His intention was to also contribute his own funds that he saved as he went along. It was made clear that we would not fund a construction loan on an owner builder basis, and if he required additional funds to finish the project it would have to be done on a constructi on loan basis. It is not unusual for us to do this when we have fixed prices to complete the works on an on completion basis where we controlled the drawdowns as a construction loan. Even now this is done on a case by case basis. On various occasions this was communicated to the client, I even suggested more than once that he gets a builder in to complete under a fixed price contract. The final option that we tried was on the basis of him selling his home and using the funds to finish the project. We sent a LM [lenders mortgage] request in with this scenario and this was declined on the basis that any funds to build had to be done as a construction loan which did not suit the client. As it currently stands the clients current land value [F property] on an as is basis is more than enough to cover the overall current debt if they sold their owner occupied home. I am not suggesting that we approve or lend this client any more money, only that we allow them to sell their home, keep the loan the same but only against [F property], and use the funds to complete the construction (subject to confirmation there would be enough funds to complete)  „I do not believe [FSP breached its lending policy] if client required us to do drawdowns under a construction loan then we would need a fixed price contract. If clients have equity in land or another property, as long as we are not relying on an “on completion valuation” then funds could be used at clients discretion. Clients [sic] intention was to relocate or build something in his own time so this was acceptable.  „As we were not lending on a construction loan basis I didn‟t collect [information about the construction cost] – client was adamant that they would contribute their own funds along the way and eventually sell the other propertys [sic] if required to finis h‟  „Client may have shown some of his document ation but I did not retain as not required‟  „Client made it clear that this was an ongoing project he would work on in his own time using his own funds as available and then would sell existing dwelling to co mplete if required.‟ 6.5 Refinance costs Date Details Amount 30 July 2010 Discharge Administration fee $250 30 July 2010 Limit cancellation Fee $1,454.45 Total $1,704.45 Case No: 451907 Recommendation Page 17 of 17 6.6 Loan reconstructions The Loan 1 and Loan 2 reconstructions are attached as Appendices 1 and 2.