Text of the determination
Determination
Case No: 451593 Determination Page 1 of 5
Case number: 451593 16 May 2017
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under a Strata Insurance Policy, held
with the financial service provider (FSP), following damage to a wall at the property.
The FSP has accepted the claim but a dispute has arisen as to the extent of damage
and the FSP‟s obligations under the terms and conditions of the policy.
1.2 Issues and key findings
Does the FSP’s offer represent the full ext ent of its obligations under the terms
and conditions of the policy?
The FSP‟s offer does represent the full extent of the FSP‟s obligations under the
terms and conditions of the policy.
1.3 Determination
This determination is in favour of the FSP.
Upon acceptance by the applicant of this determination, the FSP is to pay the
applicant the offered amount.
Case No: 451593 Determination Page 2 of 5
2 Reasons for determination
This dispute has been the subject of a recommendation issued by the Service on
4 January 2017.
It was the case manager‟s recommendation that the FSP‟s offer of settlement
adequately discharges its liability under the policy terms.
The applicant has disputed the recommendation.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination and a copy of the
recommendation is attached to the determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Does the FSP’s offer represent the full extent of its obligations
under the terms and conditions of the policy?
Coverage of the policy
The coverage provided by the Strata Insurance Policy is detailed within the Product
Disclosure Statement (PDS).
The PDS details:
‘What we insure
We insure You up to the Sum Insured shown for Policy 1 on the Schedule, against
ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the
Period of Insurance.‟
The coverage provided by the policy is subject to the exclusions which are detailed
within the policy.
The PDS details:
‘Exclusions – what we do not insure
1 We will not pay for loss or damage:
…
c. caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear,
fading, gradual corrosion or gradual deterioration, concrete or brick cancer,
developing flaws, wet or dry rot, or failure to maintain Your Insured Property
in a reasonably good state of repair.
…‟
Some of the words within the policy have been given specific meanings and these
are also detailed within the PDS:
Case No: 451593 Determination Page 3 of 5
‘Wear, Tear
Means damage or a reduction in value through age, ordinary use or lack of
maintenance.‟
It is accepted insurance law that the insured carries the initial onus to establish that
he has suffered loss and damage which is covered by the terms and conditions of the
policy.
There is no dispute that there was accidental loss and damage at the property which
is covered by the terms and conditions of the policy. The FSP agrees that this is the
case.
However, the FSP seeks to limit the extent of its liability under the policy on the basis
of exclusions contained within the policy.
Given the applicant has established accidental loss or damage at the property
covered under the policy, the onus is now upon the FSP to establish the application
of the policy exclusions to limit its liability under the terms and conditions of the
policy.
The evidence
It is accepted that a wall at the property was damaged by a third party‟s unattended
truck, which passed through and over the wall.
In support of its position that it is entitled to rely upon the exclusions within the policy
to limit its obligations under the policy, the FSP relies upon a report from a builder
(RK) and three reports from a structural and civil engineer (MC).
The applicant relies upon two reports from a builder and structural and civil engineer
(DN).
Numerous helpful photographs have been provided, together with some explanatory
diagrams.
The FSP accepts that the incident caused damage to the wall but argues that it is
entitled to limit its liability under the policy because there was pre-existing damage to
the wall.
Within recent correspondence from a representative of the applicant, they advised
that they appealed to the FSP to agree to the engineer acting for the FSP to meet
with the engineer acting for the applicant, together with a representative from each
company, to discuss the matter at the property and on the site, where the damage
occurred.
The Service notes that it is unfortunate this meeting did not take place.
The decision regarding this dispute will be made on the basis of the evidence
exchanged.
Case No: 451593 Determination Page 4 of 5
Discussion
Having reviewed all of the exchanged material, the Service is satisfied that the
conclusions of DN to the effect that the FSP is responsible for the whole of the wall is
based upon two significant matters:
DN‟s opinion that the wall was satisfactorily performing its intended function.
DN‟s commentary to the effect that no evidence of pre-existing cracking was
found or has been provided by any party and no evidence of any pre-existing
bowing to the face of the wall has been provided by any party.
Whilst DN‟s first comment is true, the Service has concerns regarding his se cond
comment.
Within the original report from MC dated 30 August 2016, MC confirmed that there
was cracking in the wall which he said was „clearly old‟ and pre -existed the incident.
MC advised that this can be determined by the fact that grass can be seen growing
through the crack.
Further, MC pointed to what he said appeared to be old repair of the wall which MC
said could be seen because the mortar changes colour.
MC also advised that the wall was leaning.
In each case, MC supported his position with photographs showing the grass, the
mortar and the bowing of the wall.
On the basis of his inspection, MC estimated that 686mm of the crack is new and has
been caused by the impact and approximately 765mm is old.
MC noted that this also coincides with the height of the single leaf of brick and
suggests that the old cracking was located in the retaining wall at the base.
Further, MC said a possible explanation for the aged cracking is that the wall has
been bowing inwards for some time under the soil load and had cracked near to the
return wall which acts as a support.
MC advised that the reason for the bowing was most likely to be the inadequate
mass in the retaining wall.
As stated, MC‟s position was supported by photographs and explanatory diagrams.
In his most recent report dated 2 February 2017, DN advised that the scope of his
report was to submit further evidence from the site particularly to illustrate and
quantify the nature and extent of damage to the retaining wall from the truck impact.
DN confirmed that he understood that reports by others had been provided but he
also made the significant statement:
„I did not have access to (the MC) original report or the photos included, and still have
not seen these.‟
It is not clear to the Service as to why the report and photographs from MC were not
provided to DN.
Case No: 451593 Determination Page 5 of 5
The Service is of the view that the report from MC dated 30 August 2016 and the
associated photographs should have been provided to DN.
This is particularly so, given that part of the basis of the opinion expressed by DN is
that he says there was no evidence of pre -existing cracking found or provided by
either party and the comment that the wall is out of plumb is unsubstantiated.
Having had the opportunity to review all of the exchanged material and given DN did
not have access to the report or photographs provided by MC, the Service prefers
the opinion of MC in respect to the damage caused in the incident and the fact that
there was pre-existing damage.
In the circumstances, the Service is sat isfied that the FSP‟s offer of settlement
adequately discharges its liability under the policy.
Recommendation
Case No: 451593 Recommendation Page 1 of 6
Case number: 451593 4 January 2017
1 Overview
1.1 Dispute
The applicant is a beneficiary of a strata insurance policy held by the owner‟s
corporation at his residence, and underwritten by the financial services provider
(FSP).
On 15 July 2016 a claim was lodged under the policy for damage to the retaining wall
and paved courtyard at the applicant‟s unit, caused by a truck coming to rest in his
courtyard.
The FSP accepted the claim. However, it considered the retaining wall had pre-
existing damage. It offered a cash settlement reflective of the cost to repair the
impact related damage only. The applicant disputes this, and seeks the cost of
replacing the entire retaining wall.
1.2 Issue and key findings
Was the FSP entitled to limit its liability for the claim?
The FSP was entitled to limit is liability for the claim because:
the amount offered fairly reflects the amount to reinstate the claim related
damage
the FSP is not liable for damage to the retaining wall, which existed prior to the
claimed event.
1.3 Recommendation
This recommendation is in favour of the FSP.
The FSP‟s offer of settlement adequately discharges its liability under the policy
terms.
Case No: 451593 Recommendation Page 2 of 6
2 Reasons for recommendation
2.1 Was the FSP entitled to limit its liability for the claim?
Onus rests with the applicant to establish the cause and extent of any loss
There is no dispute between the parties the applicant suffered a loss from a risk
insured against or that the FSP accepted the claim. However, a dispute arose
between the parties as to the FSP‟s proposed settlement fo r the damaged retaining
wall. The FSP says the wall had pre-existing damage and rectification of this is not
covered by the policy terms. It therefore offered the cost to repair the impact related
damage only.
The applicant maintains the wall did not have any existing damage and all damage is
related to the claimed event. The wall functioned as intended prior to the impact, and
would have continued to do so but for the claimed event.
As the party seeking the benefit under the policy terms, the onus rests with the
applicant to establish the policy covers his entire loss.
FSP’s experts concluded the wall had pre -existing damage
The FSP relies on the opinions of its experts in support of its decision to limit its
liability for the claim.
Building firm “RK” i nspected the property for the purposes of preparing a quotation.
RK noted the wall had a significant amount of earth behind it, which had caused
cracking due to the extensive amount of retaining. RK noted the wall was no longer
plumb, which had happened over time.
RK concluded the wall was not repairable, as the existing lower brick courses of the
wall would remain out of plumb. The only viable solution was to demolish the wall
and rebuild it.
The FSP appointed engineering firm “MC” to inspect the wall and provide an opinion
as to whether any of the damage was pre-existing.
MC noted the original construction of the wall was inadequate. Due to the volume of
earth being retained behind it, the wall should have been double skin rather than the
existing single skin. MC noted the cracking which runs the entire height of the wall i s
clearly old at the base, as it had grass growing out of the cracks. MC believed the
cracking was due to the pressures caused by the weight of the soil the wall is
supporting.
MC also noted cracking evident in the side wall, which had not been affected by the
impact.
MC concluded approximately 47% of the existing crack was new damage caused by
the truck, with the remainder existing.
Case No: 451593 Recommendation Page 3 of 6
The applicant’s report insufficient to conclude all damage arose from impact
In support of his position, the applicant presented an engineer‟s report from “DN”. I
considered this report as part of my review.
However, DN did not specifically comment on MC‟s findings regarding the crack
extending through the height of the brickwork. Rather, DN states the impact caused
bondin g and fracture patterns to the „top courses‟ and does not comment on the
cracking to the lower courses of bricks. Therefore, MC‟s opinion on this matter is
unchallenged.
DN also largely agreed with MC on both the shortcomings of the original construction
and that the impact from the truck had displaced the top eight courses of brickwork.
Although DN confirms the dislocation outwards of the wall throughout its entire height
„as continuations of the dislocation of the central and southern section of the wall‟, he
has not provided any rationale for this conclusion.
On balance, after considering the available information, I prefer the conclusions of
MC. On this basis, I accept the retaining wall had damage which existed prior to the
impact.
The FSP’s offer of settlement is adequate to discharge its liability
Both engineers agree the top eight courses of brickwork sustained damage from the
claimed event. Accordingly, the FSP can limit its settlement of the claim to an amount
which adequately reflects the costs to restore the section damaged by the claimed
event.
The applicant has not challenged the settlement offered by the FSP based on RK‟s
quotation for the reinstatement of eight brick courses, being $4,850 (less excess).
Therefore, I accept this amount is r easonable and represents the FSP‟s liability in the
matter. Further, the policy terms allow the FSP to cash settle its liability in lieu of
completing repairs.
Although the wall may not be a viable repair option due to the pre-existing issues, I
am not satisfied the onus for remedying this passes to the FSP simply by virtue of
this claim.
The policy also specifically excludes loss caused by wear and tear and gradual
deterioration, exclusions which would operate in the circumstances.
On this basis, the FSP ‟s offer of settlement adequately fulfils its obligations under the
policy terms.
Case No: 451593 Recommendation Page 4 of 6
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to FOS. For the purpose of this
recommendation, I have restricted commentary to only those issues considered
relevant to the outcome.
This recommendation follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to:
relevant legal principles
the terms of the policy
good industry practice
where applicable, prior determinations (although FOS is not bound by these).
3.2 Expert reports
Record Key points
FSP’s expert (RK )
Builder‟s r eport and quotation
19 - 07 - 2016
Wall is single leaf with a bricked retaini ng section behind it.
It retains a very large amount of earth topside.
The wall has prior cracking to the extensive amount of ret aining.
Four courses of brick work have been damaged by the impact.
The wall is out of plumb, more than likely due to the exces sive
retaining. This has most likely happened over time.
The first and best option for repair is to remove the earth and then
re - brick a new wall.
The second option is to replace the damaged courses of brickwork
however this is not a viable option as the wall is already out of
plumb.
The impact also caused damage to the paving which needs to be
re - laid, prior to the impact the paving was only of average
condition.
FSP ’s expert ( MC )
Engineer‟s r eport
30 - 08 - 2016
The wall is single leaf with brickwork rubbl e behind it in some
sections, and one attached central pier.
The original form of construction is inadequat e.
A minimum of two leafs should have been used to retain this
height.
It is possible the wall did not originally retain soil, which would
explain it s construction.
A vertical crack can be seen running from the top to the bottom of
the wall.
It is difficult to determine exactly where the old crack stopped and
where the new began or if the crack has continued from top to
bottom for some time.
Case No: 451593 Recommendation Page 5 of 6
At the lea st, the top section of the crack has been affected by the
impact.
After surveying the crack for signs of age (ant holes, grass and
wearing away of mortar), it is my estimation eight courses of
brickwork at the top have been caused by impact.
This coincides with the height of the single leaf construction and
suggests the old cracking was located in the retaining wall at the
base.
The cracking at the base is clearly old, as grass is growing through
the crack.
A possible explanation for the cracking at the bas es is the wall has
been bowing inward for some time under soil load.
The reason for the bowing is inadequate mass in the retaining wall.
The wall did not appear to be in imminent danger of collapse
however it is inadequate and repairs should be conducted a s soon
as possible.
Applicant’s expert (DN )
Engineer‟s r eport
16 - 10 - 2016
The purpose of the inspection was to ascertain the nature and
extent of the wall damage and provide advice for reinstatement
and repairs.
The wall is estimated to be more than 25 years old and of 26
courses of brick.
The face brickwork appears not to have been tied to the mass
brickwork behind it as no wall ties were evident, and the cent ral
pier was not engaged by ties or bonding to the fac e brickwork.
This suggests the original intention was not for the fac e brickwork
to act integrally for the mass brickwork behind it although the top
eight courses were performing this function.
It is not the intention of this report to comment on the original
design alt hough it is to be assumed the wall has performed
adequately since construction and may be reinstated to that
original condition.
The top brickwork down to eight courses has been fractured and
dislocated by the impact.
The brickwork below this level has been partially deformed outwa rd
as continuation of the dislocation of the central and southern wall.
The face brickwork of the central and southern sections has been
dislocated sufficiently over almost its full height.
The impact of the truck has destroyed the capacity of the retainin g
wall to fulfil its function.
Repair is not considered viable due to the extent of fracturing and
the outward dislocation of the face brickwork.
FSP’s expert (MC )
Supplement ary engineer‟s
report
10 - 11 - 2016
Have reviewed the contents of DN‟s report.
The purposes of DN‟s report differs. MC”s original report was to
report on the cracking and whether this was existing, whereas
DN‟s report was to ascertain nature and extent of the damage and
advis e on reinstatement and repairs.
DN did not comment on the inad equacies in the construction.
DN did not comment on the crack extending from top to bottom.
None of the content of DN„s report causes my original opinions to
alter.
Case No: 451593 Recommendation Page 6 of 6
There was pre - existing cracking to the wall caused by
inadequacies in the original construction.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.