Home / Financial Firm (Unknown - Insurer) / Determination 450847

Determination 450847

Denial of excavator boom damage claim as wear and tear

FirmFinancial Firm (Unknown - Insurer)
Decided2017-09-27
ProductGeneral Insurance · Other general
OutcomeFor the complainant
Amount awarded$13,090
Non-financial loss—
Amount claimed$13,090
SourceAFCA PDF

Summary

A company running an earthmoving business claimed $13,090 for additional excavator boom damage it said arose from an earlier log impact. The insurer denied it as wear and tear, but AFCA found that exclusion unproven and ordered cash settlement of the repair cost plus interest.

Once accidental damage was established as a prima facie claim, the insurer bore the onus of proving wear and tear was the proximate cause, which the conflicting expert evidence did not discharge.

Issues

Subjects and remedies

small businesspay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 450847 Determination Page 1 of 5 Case number: 450847 22 September 2017 1 Overview 1.1 Dispute The applicant held a plant and machinery insurance policy with the financial services provider (FSP), which provided cover for an excavator which was used in its earthmoving business. In November 2015, the applicant lodged a claim under the policy after the excavator was damaged while being used to handle logs. The FSP accepted the claim and authorised the necessary repairs. In March 2016, the applicant notified the FSP of additional damage to the excavator, which it believed had been caused by the initial incident in November 2015. The FSP denied the claim on the basis the additional damage was caused by wear and tear, which is excluded from cover under the policy. 1.2 Issues and key findings Is the FSP liable for the additional damage to the excavator? The applicant has established a prima facie claim for accidental damage under the policy. The available information is not sufficient to establish that the proximate cause of the damage was wear and tear (whether alone or in combination with other factors). Accordingly, the FSP is liable for the claim. 1.3 Determination This determination is in favour of the applicant. The FSP is required to cash settle the applicant’s claim for $13,090 (being the quoted cost of the repairs), plus interest calculated under section 57 of the Insurance Contracts Act 1984 (Cth) from 28 June 2016 until the payment date. Case No: 450847 Determination Page 2 of 5 2 Reasons for determination 2.1 Is the FSP liable for the additional damage to the excavator? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on the balance of probabilities, it has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the applicant is able to establish a valid claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant’s policy provides cover for ‘Insured Damage’ being damag e which is accidental, sudden and unforeseen. The reports prepared by the various contractors confirm that the boom of the excavator failed in March 2016 due to extensive cracking in the fabricated box section located at the knuckle joint between the boom and the dipper arm. This damage was discovered after the excavator had been returned to the applicant, following completion of repairs to the damage caused by the impact of a falling log in November 2015. The available information confirms that the damage to the boom was accidental, sudden and unforeseen. On this basis, the applicant has established a valid (or prima facie ) claim under the policy. FSP says damage was caused by wear and tear As the applicant has established a prima facie claim, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the claim. The FSP says the damage to the boom was not caused by the initial incident in November 2015, but by fatigue cracking which developed over an extended period of time. On this basis, the FSP says it is entitled to deny the claim based on the policy exclusion for damage caused by wear and tear. The FSP will be entitled to deny the applicant’s claim if it can show that, on the balance of probabilities, the proximate cause of the damage (that is, the real, effective or dominant cause) was wear and tear. If the damage was caused by two or more concurrent proximate causes (only one of which is excluded), then the FSP may rely on the excluded cause to deny the claim. Accordingly, it is sufficient for the FSP to establish that wear and tear was a proximate cause of the damage (even if it was not the only cause). Case No: 450847 Determination Page 3 of 5 Contractors have provided conflicting views The mechanical engineer (KS) appointed by the FSP to inspect the boom concluded the damage had been caused by substantial, pre -existing fatigue cracking. KS identified extensive fatigue cracking of the left side web and bottom flange, which had given rise to fresh overstress cracking causing the boom to fail while in use. KS advised that fatigue cracking develops incrementally over an extended period of time due to alternating stresses imposed under normal usage conditions. He noted that, in the case of the boom, the welded joint of the left side web had operated as a stress concentrator. Given fatigue crack development occurs over an extended period of time, KS concluded that the cracking which led to the failure of the boom in March 2016 would have been present before the impact with the log in November 2015 (and was not caused by that event). The applicant disputes KS’s findings that the failure of the boom was caused by long- term fatigue cracking. The applicant says:  the cracking was in an area near the prior damage  the failure occurred on the first occasion the excavator was used following the earlier repairs  the damage was caused by the severe pressure exerted on the offset boom when the offset boom hard link alongside it bent. The applicant has provided a report from the repairer (FS) who repaired the initial damage. In his report, FS concluded that the additional damage to the boom identified in March 2016 was caused by the initial impact from the log several months earlier. FS advised that:  the original impact from the log fractured the lower web on the boom next to the linkage arm. However, due to the location of the cracking, it was not visible at that time  when the boom was put back into service, it was subject to an outward pulling force which caused the further, more extensive cracking which resulted in the ultimate failure. FS noted that the lack of discolouration and prolonged rusting in the cracks was not consistent with them having developed incrementally over time. He considered the cracking appeared fresh. The applicant also provided a report from a manufacturer-approved repairer (DL) who agreed with FS’s findings that the additional damage had been caused by the impact of the log in November 2015. Available information is not sufficient to establish exclusion In his report, the FSP’s engineer ( KS) states that, when examined under magnification, the surfaces of the cracks in the left hand web and bottom flange exhibited the characteristic features of fatigue crack development. Case No: 450847 Determination Page 4 of 5 However, KS’s report does not provide any further explanation of these features (or include copies of the magnified images), which would have been helpful in confirming the cause of the damage. As a mechanical engineer, KS’ s views must be given substantial weight. Having said that, some of the information in KS’s report appears to be inconsistent with the facts of the claim. In particular, KS states that the twisting damage caused by the impact of the log in November 2015 was isolated to the bucket end of the dipper arm (and therefore was relatively distant from the area which failed in March 2016). However, the report provided by the repairer (FS) states that, as well as twisting the lower dipper arm, the initial impact also bent the offset boom hard link which runs parallel to the boom. This damage is reflected in the quotation issued by FS in November 2015 which confirms the authorised repairs included the repair of the bent linkage arm as well as the twisted dipper arm. FS has confirmed that the bent linkage arm was in the vicinity of the cracks which were subsequently discovered in March 2016. Accordingly, it appears that the additional damage to the boom occurred considerably closer to the area which was damaged in the November 2015 incident than had been assumed by KS. The applicant also states (and the FSP has not disputed) that the boom failed the first time the excavator was used after being repaired, which is indicative of a causal connection with the prior incident. The lack of rust and discolouration in the cracks is inconclusive. KS agreed with FS that the cracks appeared fresh and did not show the discolouration and rusting which was typical of fatigue cracking. However, KS considered this could be explained by the area having been covered in grease, which would have prevented corrosion. Given the conflicting information regarding the cause of the damage to the boom, I am not satisfied the FSP has established that, on the balance of probabilities, the proximate cause of the damage was wear and tear (whether alone or in conjunction with other causes). Accordingly, the FSP is liable for the cost of repairing the additional damage. Case No: 450847 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 23 February 2017. The recommendation was rejected by the FSP. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). During the course of this dispute, the applicant (the corporate policyholder) has been represented by its director and its insurance broker. For the purpose of this determination, submissions made by the applicant’s broker have been treated as if they had been made by the applicant itself.