Insurer declined most building damage claimed from mining blasting, accepted toilet and bathroom damage, and delayed assessment
Summary
The applicants claimed for building damage they attributed to mining explosions, and the FSP initially declined most of it. AFCA ordered the FSP to settle the toilet and bathroom damage by cash settlement and pay $500 for delay in assessing the claim, and found the balance was not caused by an insured event.
The applicants had to prove the damage was caused by an insured event such as explosion, and expert evidence supported only the toilet and bathroom damage being caused by blasting, while delay in engaging an engineer warranted non-financial loss.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny liability for those items, as the applicants cannot establish a prima facie claim for the balance of the damage.”
- Inadequate claim investigation secondary · upheld
“I accept the FSP's failure to engage MC earlier resulted in the applicants experiencing an unusual delay in the assessment of their claim.”
- Delay secondary · upheld
“Time taken to assess the claim was unreasonable... I accept an award of $500 for non-financial loss is warranted.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Text of the determination
Determination
Case No: 450711 Determination Page 1 of 5
Case number: 450711 11 October 2017
1 Overview
1.1 Dispute
The applicants held an insurance policy with the financial services provider (FSP)
covering their home. On 25 July 2013, the applicants lodged a claim for damage
following mining explosions on or around 8 July 2013. The FSP assessed the claim
and while declining cover for damage to the building, agreed to cover a pool filter and
pipework on a good-will basis.
In 2015, the applicants disputed this decision. Following this, the FSP engaged an
engineer (MC) to inspect the damage. The FSP partially accepted the claim based on
MC’s recommendations.
The applicants dispute the FSP’s claim decision, and seek to have the claim
accepted in full.
1.1 Issues and key findings
Were additional property damages caused by an insured event?
MC’s report establishes damage to the toilet and bathroom were likely caused by
explosion. Therefore, these damages should be included in the FSP’s settlement.
The FSP can decline the remaining balance of damages as the evidence does not
show they were caused by an insured event.
Are the applicants entitled to compensation?
The applicants are entitled to $500 compensation for non-financial loss due to the
time taken by the FSP to assess its liability.
1.2 Determination
This determination is substantially in favour of the FSP.
Within 21 days of th e applicants’ acceptance of this determination, the FSP is to:
settle the applicants’ claim in line with section 2.1
pay $500 compensation for non-financial loss.
Case No: 450711 Determination Page 2 of 5
2 Reasons for determination
2.1 Were additional property damages caused by an insured event?
Policy provides covers for specified events
The onus is on the applicants to establish, on the balance of probabilities, they have
suffered a loss caused by a risk insured under the terms of the policy. This is called a
prima facie claim. Only once the applicants have established such a claim does the
onus shift to the FSP to establish an exclusion applies to defeat the claim.
The applicants’ policy provides cover for 11 specific events, outlined in section 3.1
below, subject to terms, conditions and exclusions. The applicants says their property
was damaged as a result of explosions from a nearby mine.
The onus is therefore on the applicants to establish, on the balance of probabilities,
the property damage was caused by an explosion.
Circumstances of the loss and claim
These relevant facts are not in dispute:
the applicants purchased their home in 2002 in good condition aside from minor
rectifications
the property is approximately two kilometres from a mining site
this site commenced operations a few years after they moved to the present
location.
After lodging the claim in July 2013, the FSP appointed a builder (AG) to assess the
cause of damage. AG says it was unable to confirm the cause of a pool filter failing.
AG did consider the cracking and separation observed to be caused by movement in
and around the home and seasonal environmental changes. That is, AG did not
attribute any damage to an explosion.
I note AG recommended the appointment of an engineer to confirm the cause of
damage. The FSP did not do so at that time.
However, once the applicants re-engaged with the FSP about the claim, the FSP
appointed engineering firm MC to conduct a further site inspection on 28 November
2016.
MC accepted blasting possibly caused damage to:
cornice and bulkhead in the kitchen area
cornices, corners and walls of the toilet and bathroom.
The FSP agreed to cover damage in the kitchen area, offering $1,259.94 for repairs.
MC did not accept any other damage was caused by the explosion. For instance, MC
considered damage to a swimming pool to be from natural ground movement. MC
commented the heaving in the hallway could have occurred from a leaking pipe.
However, if this is not the case, MC believed it would have been natural movement or
construction.
Case No: 450711 Determination Page 3 of 5
I note tests were conducted which showed no plumbing leaks.
MC also states the movement of the paths at the front of the house was a result of
moist soil.
The applicants were invited to provide information or reports to challenge the FSP’s
position. To date no such informatio n has been provided.
Toilet and bathroom to be included, balance is excluded
Having carefully considered the available evidence, I note the following.
MC considered damage to the toilet and bathroom to be caused by “height
amplification factor of 4 discuss ed [earlier in its report] at the ceilings.” This supports
these damages were caused by an explosion.
It is also consistent with his earlier comments in the report which said this damage
could have been caused “possibly the blasting over time”.
Given this, I accept the FSP is to increase its scope of works to include the
necessary repairs to the toilet and bathroom areas noted in MC’s report.
As to the remainder of damages claimed, MC and AG did not accept they were
caused by the explosion. There is no other expert evidence refuting their opinion.
Whilst the applicants maintain the explosions caused the damage given it manifested
after the mining commenced operations, the available expert evidence refutes this.
Given this, I do not accept the evidence shows on the balance of probabilities that
the balance of the damage was caused by the explosion or any of the insured events
covered by the policy. Therefore, as the applicants cannot establish a prima facie
claim for the balance of the damage, the FSP is entitled to deny liability for those
items.
How the claim should be settled
The FSP is to amend its current scope of works to include the toilet and bathroom
damage identified by MC.
Once this scope of works are completed, the FSP is to cash settle the applicants for
the cost of completing these works. This amount is to be based on a quotation issued
by a contractor who is prepared to do the works for the applicants.
2.2 Are the applicants entitled to compensation?
Time taken to assess the claim was unreasonable
FOS can award up to $3,000 for non-financial loss if the FSP caused the applicants
to suffer an unusual degree or extent of inconvenience, delay or interference.
Any amount awarded will depend on the degree suffered. For instance, the more
extreme the circumstances experienced by an applicant, the higher the amount to be
awarded.
Case No: 450711 Determination Page 4 of 5
In this dispute, AG recommended an engineer’s appointment in August 2013.
However, this did not occur until November 2016 when MC was engaged. Further, I
note that MC’s report resulted in a partial acceptance of the applicants’ claim.
I accept the FSP’s failure to engage MC earlier resulted in the applicants
experiencing an unusual delay in the assessment of their claim. Further, I do not
accept the available information shows there was a reasonable basis for this delay.
Whilst part of this timeframe was due to the applicants not having pursued the
dispute for approximately one and a half years, it does not account for the whole
period.
Given this delay and FOS’s conservative appr oach, I accept an award of $500 for
non-financial loss is warranted.
Case No: 450711 Determination Page 5 of 5
3 Supporting information
3.1 Relevant policy wording
“If your home suffers loss or damage caus ed by an event listed below, we will choose to do one
of the following … :
Accidental breakage of:
• glass and mirrors fixed to your home,
• skylights,
• shower bases, basins, sinks, baths, lavat ory bowls or cisterns.
Earthquake
Electrical motor burnout of an electric motor in a mac hine which is part of your home
Escape of liquid from the following .
• Any water main or fixed pipe, gutter or guttering, fixed tank or drain.
• A sink, toilet, bath, basin or waterbed.
• A fixed heating or cooling system.
• A dishwasher or washing machine.
• An aquarium.
Fire, explosion and lightning …
Flood …
Impact of any vehicle, animal, aircraft, space debris, meteorite, aerial or mast that has broken,
collapsed or fallen, or a fallen or lopped tree or branch.…
Malicious damage and vandalism …
Riot, civil commotion or public di sturbance
Storm, hail or rainwater …
Theft, attempted theft, burglary or housebreaking
…
General exclusions applicable to your policy
You are not covered under any section of this policy for damage, loss or liability caused by,
arising from or involving any of the following.
…
Structural defe cts or faulty workmanship, settling, shrinkage or expansion.”