Text of the determination
Determination
Case No: 450653 Determination Page 1 of 8
Case number: 450653 8 September 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) for cracking and movement damage to her property following
an earthquake on 19 June 2012.
In August 2013, the FSP cash settled the applicant for a total of $43,944.40, being
the estimated cost of repairing certain parts of the damage. The FSP subsequently
determined that none of the damage was subject to cover.
The applicant says the cash settlement amount is not sufficient to repair all of the
damage to her property caused by the earthquake (including damage to the roof,
garage, external walls and veranda). She says the past repairs have been ineffective
and the property is experiencing ongoing issues due to the earthquake.
The applicant also seeks compensation for stress and inconvenience suffered as a
result of the manner in which the FSP handled her claim.
1.2 Issues and key findings
Is the FSP liable for the damage to the property?
The available information establishes that the damage to the applicant’s property was
not caused by the earthquake in June 2012, but by factors which are excluded from
cover under the policy. Accordingly, the FSP is not liable for the damage.
Is the applicant entitled to compensation?
The applicant suffered considerable stress and inconvenience due to the manner in
which the FSP managed her claim. However, the FSP has already paid the applicant
a sum which significantly exceeds its liability under the policy. Accordingly, further
compensation is not justified.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to take any further action.
Case No: 450653 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the FSP liable for the damage to the property?
Policy provides cover for insured events subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the applicant is able to establish a valid claim, then the onus shifts to the FSP to
show that, on the balance of probabilities, it is entitled to rely on an exclusion under
the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for damage caused by the events listed in the
policy (including the insured event of earthquake), subject to the conditions and
exclusions set out in the policy.
The policy contains general exclusions for damage caused by soil movement or
settlement and/or gradual deterioration.
Parties disagree about cause of damage
The reports prepared by the various contractors appointed to inspect the applicant’s
property confirm there is cracking and movement damage to various internal and
external walls. There are also ongoing creaking and cracking noises coming from the
roof cavity.
The FSP is only liable for the damage to the applicant’s property if the proximate
cause of the damage (that is, the real, effective or dominant cause) was one of the
events insured against under the policy.
The applicant says all of the damage to her property was caused by the earthquake
in June 2012. She says the earthquake shook the house, cracking the walls,
dislodging the fences and causing the roof to become unstable.
However, the FSP disputes that any of the damage was caused by the earthquake.
The FSP says the cracking and movement damage was caused by naturally
occurring earth movement over an extended period of time, due to changes in the
moisture content of the foundation soils as a result of seasonal variations and the
drying effects of nearby trees.
The FSP says any damage to the roof is due to maintenance issues.
FSP changed its position several times during claim process
The FSP initially denied the applicant’s claim, after its builder (BB) inspected the
property and advised that the damage had not been caused by the earthquake, but
by naturally occurring earth movement.
Case No: 450653 Determination Page 3 of 8
However, the FSP later accepted liability based on a report provided by its engineer
(MC) in October 2012, which concluded that most of the damage had been caused
by the earthquake.
Following receipt of MC’s report, the FSP appointed a building consultant (SB) to
prepare a scope of works for the necessary repairs and sought quotations from its
builders to carry out the repairs.
During this process, c oncerns were raised about the findings in MC’s report. These
concerns led to the FSP limiting the items of damage for which it was prepared to
accept liability.
In August 2013, the FSP cash settled the applicant for a total of $43,944.40, being
the estimated cost of repairing those aspects of the damage for which it accepted
liability (together with an allowance for temporary accommodation and other costs).
After the applicant disputed the amount of the cash settlement, the FSP’s Internal
Dispute Resolution (IDR) department reviewed the claim and noted the conflicting
opinions which had been provided by the various consultants.
The IDR department recommended that the FSP appoint a second engineer (FM) to
undertake a further assessment to determine the extent of the damage which had
been caused by the earthquake.
In his report dated October 2013, FM concluded that none of the damage to the
property had been caused or contributed to by the earthquake in June 2012. FM
advised that all of the damage was caused by naturally occurring earth movement.
Consultants have provided conflicting reports
As outlined above, the consultants appointed by the FSP have provided conflicting
reports about the cause of damage to the applicant’s property. The applicant has
also obtained a report from her own engineer (RB).
I have carefully reviewed the various reports provided (including the photographs
included therein) for the purpose of determining the proximate cause of damage to
the applicant’s home.
Intensity of earthquake was not sufficient to cause damage
The available information establishes that, given the nature of the earthquake and
the location of the applicant’s property, the effects of the earthquake would not have
caused damage to the applicant’s home.
The earthquake had a magnitude of 5.4 and the epicentre occurred approximately
125 kilometres from the applicant’s home.
Information about the effect of the earthquake is available on the public website of
Geoscience Australia, the Federal Government agency responsible for monitoring
earthquake activity.
This information indicates that, while the earthquake would have been felt by people
up to 252 kilometres away, it would only be expected to cause damage to properties
Case No: 450653 Determination Page 4 of 8
within an immediate area of 20 kilometres (less than one fifth of the distance to the
applicant’s property).
The FSP has provided a copy of an isoseismal map prepared by a seismologist (ES)
which shows the intensity of the earthquake as it affected various areas within the
surrounding region, using the Modified Mercalli (MM) scale for earthquake intensity.
The isoseismal map indicates that the intensity of the earthquake at the applicant’s
property was rated as MM 4, which is described on the MM scale as:
“ Generally noticed indoors, but not outside. Very light sleepers may be
awakened. Vibration may be likened to the passing of heavy traffic, or to the jolt
of a heavy object falling or striking the building. Walls and frame of building are
heard to creak. Door and windows rattle. Glassware and crockery rattle. Liquids
in open vessels may be slightly disturbed. Standing motorcars may rock,, and
the shock can be felt by their occupants. ”
The information contained on the GSA website and reflected in the isoseismal map is
consistent with the applicant’s statement that, during the earthquake, she felt the
couch move and heard loud noises.
However, the MM scale indicates that even minor damage to buildings is only likely
to occur in areas where the intensity of the earthquake reaches MM6 or above.
The FSP’s second engineer (FM) confirmed that, based on the isoseismal map, he
would not have expected the earthquake to have caused any structural damage to
the applicant’s house.
While the FSP’s first engineer (MC) acknowledged the data provided by GSA and
ES, he stated that notwithstanding this information, he considered the forces
experienced during the earthq uake had caused extensive damage to the applicant’s
property.
However, MC did not provide any further explanation as to the basis for his
conclusion. This is somewhat surprising, given MC’s findings were in direct conflict
with the information provided by GSA and ES.
In the absence of any such explanation, I do not consider any significant weight can
be placed on MC’s report. I note that the engineer (RB) appointed by the applicant in
November 2016 expressly disagreed with the conclusions in MC’s report tha t most of
the damage to the property had been caused by the earthquake.
For the reasons outlined above, I do not consider that the earthquake on 19 June
2012 was the proximate cause of the damage to the applicant’s home.
Cracking damage was caused by naturally occurring earth movement
Based on the available information, I am satisfied that the proximate cause of the
cracking and movement damage to the property was naturally occurring earth
movement over an extended period of time, as identified by the FS P’s second
engineer (FM).
Case No: 450653 Determination Page 5 of 8
In his report dated October 2013, FM concluded that differential footing movement
had occurred over an extended period of time, due to seasonal variations in the
moisture content of the highly reactive clay soils at the property.
FM considered the moisture changes in the soil had been exacerbated by the
presence of several large trees at the property and on the nearby nature strip, which
had a drying effect on the surrounding soil. These trees are clearly visible in the
photograph s included in FM’s report.
The floor level surveys carried out by FM at the property reflected differential
movement of up to 66 millimetres across the property. FM identified a notable pattern
of settlement towards the east side of the building, which was consistent with the
location of several large trees.
I consider FM’s report provides a logical explanation as to the mechanism by which
the damage occurred, which is consistent with the nature and extent of the damage
observed at the property.
The cracking to the internal and external walls, and the movement of the boundary
fences is reflective of the effects of naturally occurring earth movement over an
extended period of time.
The applicant’s engineer (RB) who inspected the property in November 2016 agr eed
with FM that the movement affecting the building was more properly attributable to
the drying effects of the large tree in the nature strip than to the earthquake (although
he did suggest the effects may have been enhanced by the earthquake).
RB noted that the extent of the differential movement (as reflected in his comparative
floor level surveys) appeared to have reduced since FM’s inspection in 2013. This
appears to have been partly due to underpinning and re -levelling works undertaken
at the property in the meantime.
Damage to roof was caused by gradual deterioration
The applicant is particularly concerned about the cracking and creaking noises in her
roof, which she believes is unstable and at risk of collapse.
Issues with the roof were identif ied by the FSP’s first engineer (MC) in his report in
October 2012. MC concluded that the forces experienced during the earthquake had
shaken the heavy mass of tiles on the roof, placing stress on the roofing timbers and
causing the roof structure to deform.
MC identified two splits in the ridge boards and bowing in the timber and collar ties at
the opposite ends of the roof ridges. He considered the entire roof structure had been
compromised.
As outlined above, MC’s conclusions as to the effects of the ea rthquake on the roof
are inconsistent with the available information regarding the intensity of the
earthquake and its likely effect on the applicant’s property.
Subsequent inspections (including by a specialist roofer) have not revealed any
significant da mage to the applicant’s roof.
Case No: 450653 Determination Page 6 of 8
The FSP’s building consultant (SB) has advised that the splits in the ridge boards
and the bowing of the collar ties are more likely to have occurred due to natural
shrinkage of the hardwood timbers and ordinary building move ment.
The applicant’s engineer (RB) concluded that the creaking noises in the applicant’s
roof were caused by movements at the junctions between the plasterboard ceilings
and the timber joists, as a result of changes in environmental conditions such as
temperature and humidity (exacerbated by the lack of sarking in the roof).
RB explained that, as the plaster and glue became brittle and the roofing timbers
dried out, gaps developed between the plaster and the joists, allowing pieces of the
plaster to crack and make a noise, before subsequently resealing.
RB confirmed this process had occurred primarily due to the age of the building,
possibly accentuated by the effects of the earthquake.
FSP is not liable for damage to the property
For the reasons outlined above, I am satisfied that the damage to the applicant’s
property was caused by naturally occurring earth movement and gradual
deterioration (and not by the earthquake in June 2012).
Damage caused in this manner is excluded from cover under the policy. Accordingly,
the FSP is not liable for the damage to the applicant’s pro perty.
2.2 Is the applicant entitled to compensation?
FOS may award compensation for non-financial losses
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The applicant says she has suffered considerable stress and inconvenience due to
the manner in which the FSP managed her claim.
Among other matters, the applicant says the FSP unreasonably delayed the
resolution of her claim and forced her to accept a cash settlement rather than
repairing her property. The applicant has provided a letter from her doctor advising
she suffered anxiety due to the claims process.
FSP failed to manage claim appropriately
Having carefully reviewed the claim history, I consider the FSP failed to manage the
applicant’s claim appropriately.
As outlined above, the FSP changed its position significantly on several occasions
during the claim process.
At various stages during the claim, the FSP:
denied liability for any of the damage (based on BB’s report)
Case No: 450653 Determination Page 7 of 8
accepted liability for a significant scope of work (quoted by one builder at
approximately $165 ,000) based on MC’s report
sought to reduce its liability to approximately $10,000 based on SB’s report
cash settled the claim for approximately $35,000 (excluding temporary
accommodation)
subsequently sought to deny all liability based on FM’s report, whi le agreeing to
honour the cash settlement previously paid.
I accept that the various changes in the FSP’s position during the course of the claim
occurred due to the conflicting reports received from its various contractors (rather
than any attempt to minimise its liability to the applicant).
However, the FSP was responsible for engaging contractors with appropriate
qualifications and experience to assess the applicant’s claim. Where material
differences in the view of its contractors became apparent, the FSP should have
acted quickly and decisively to resolve the outstanding issues.
The FSP’s failure to do so has resulted in the claim taking a considerable period of
time to resolve. Further, the constant shifts in the FSP’s position have left the
applicant understandably concerned that she has not been treated fairly.
The applicant has also experienced significant stress and anxiety due to the advice
provided by the FSP’s initial engineer (MC) that her property was in danger of
collapse, which resulted in her moving to temporary accommodation for an extended
period of time. Subsequent inspections have not substantiated MC’s concerns.
Circumstances do not justify award of compensation
For the reasons outlined above, I am satisfied that, despite having previous ly
accepted liability, the FSP was ultimately entitled to deny the claim because the
damage to the property was not caused by the earthquake.
Accordingly, the FSP had no obligation to repair the property or to cash settle the
applicant for the cost of doing so.
During the claim process, the FSP paid the applicant a total of $43,944.40 based on
its assessed liability at that time. The FSP has not sought to recover this amount
from the applicant despite subsequently determining it had no liability for her claim.
In circumstances where the applicant has received a cash settlement which
significantly exceeds the FSP’s liability under the policy, I do not consider the FSP
should be required to pay her any additional compensation.
Case No: 450653 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to the dispute
This dispute has not been the subject of a Financial Ombudsman Service (FOS)
recommendation. Due to the nature of the dispute, it has been referred directly for
determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
During the course of this dispute, the applicant has been represented by her son and
daughter. For the purpose of this determination, submissions made by the applicant’s
son and daughter have been treated as if they had been made by the applicant
herself.