Determination 450579

Refusal to cover stump replacement after rot damage

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$11,300
Non-financial loss$1,500
Amount claimed$90,000
SourceAFCA PDF

Summary

The applicant sought about $90,000 to replace rotted stumps after the FSP cash settled internal repairs, and claimed losses from a protracted claim. AFCA found the stump damage was gradual deterioration and not covered, but ordered $8,000 towards worsened bathroom damage, $3,300 consequential loss and $1,500 non-financial loss.

Gradual deterioration and rot are excluded, but the FSP's poor claim management delayed repairs and worsened the damage, supporting compensation.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 450579 Determination Page 1 of 12 Case number: 450579 9 February 2018 1 Overview 1.1 Dispute The applicant lodged a claim under her home insurance policy with the financial services provider (FSP) for movement and cracking damage to her property. Based on the advice of her re-stumping contractor, the applicant considered the damage had been caused by a leaking pipe. After assessing the damage to the property, the FSP authorised its builder (JL) to carry out repairs to the property. However, during a preliminary site visit, the FSP’s contractors identified that the timber stumps at the property were rotten and required replacement. The FSP says the damage to the timber stumps was not caused by a leaking pipe (or by any other event insured against under the policy). On this basis, the FSP denied cover for the cost of replacing the stumps and sought to cash settle the applicant for the remainder of the repairs. The applicant disputes the FSP’s decision and seeks cover for the cost of restumping the property (approximately $90,000). The applicant also seeks compensation for various losses incurred as a result of the manner in which the FSP handled her claim. 1.2 Issues and key findings Is the FSP liable for the damage to the stumps? The available information establishes that the damage to the timber stumps was not caused by a leaking pipe (or by any other event insured against under the policy). The damage to the stumps was caused by gradual deterioration over an extended period of time due to long-term drainage issues at the property. Damage caused in this manner is not covered under the policy. Accordingly, the FSP is not liable for the damage to the stumps. Is the applicant entitled to any additional amounts? The FSP is required to contribute an additional amount to the cost of the internal repairs because the damage has worsened during the claim process. The FSP is also required to compensate the applicant for financial and non-financial losses suffered by the applicant as a result of the manner in which it handled her claim. Case No: 450579 Determination Page 2 of 12 1.3 Determination This determination is partly in favour of the applicant. The FSP is not liable for the cost of replacing the stumps. However, the FSP is required to pay the applicant a total of $12,480, comprising:  $8,000 in respect of additional damage to the bathroom which occurred during the claim process  $3,300 as compensation for consequential loss  $1,500 as compensation for non-financial loss. Case No: 450579 Determination Page 3 of 12 2 Reasons for determination 2.1 Is the FSP liable for the damage to the property? Policy provides cover for insured events subject to exclusions The applicant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant’s policy provides cover for loss or damage caused by the events listed in the policy, subject to the conditions and exclusions set out in the policy. The insured events covered include ‘escape of liquid’ – which is defined to include liquid leaking, overflowing or bursting from a drain, fixed pipe, roof gutter, rain water downpipe or drainage system. The policy also provides cover for damage caused by a storm. The policy contains general exclusions for damage caused by:  wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot or gradual deterioration  naturally occurring earth movement (other than landslide or subsidence of a kind which is specifically covered under certain other insured events). FSP’s liability depends on proximate cause of damage The various contractors who inspected the applicant’s property have confirmed there is extensive cracking and movement damage throughout a number of rooms. Level surveys indicate that the eastern side and north-west corner of the building have dropped significantly relative to the central part of the house. However, the FSP is only liable for the damage to t he applicant’s property if the proximate cause of the damage is an insured event under the policy (and no exclusion from cover applies). Accordingly, in order to determine the FSP’s liability for the claimed damage, it is necessary to identify the proximate cause of the damage (that is, the real, effective or dominant cause). During the course of the claim process, the FSP and its contractors have appointed three engineers (MC, HE and FM) to inspect the property and determine the cause of the damage. I hav e carefully reviewed the reports provided by the FSP’s engineers (together with the other information provided) to determine the proximate cause of the disputed damage. Case No: 450579 Determination Page 4 of 12 Initial inspections identified various moisture issues at the property The movement issues were identified when the applicant sought to sell the property in early 2015. The applicant lodged a claim under the policy after her re-stumper (RL) observed that 70% of the sub-floor area was wet and advised that the damage might have been caused by a leaking pipe. The builder (A) appointed by the FSP to inspect the property identified several issues which he thought might be contributing to the moisture in the sub-floor area, including the following:  water was leaking through the waste grate in the floor and the walls of the shower (although A considered this leak was likely to have affected the area in the immediate vicinity only)  there were insufficient storm water downpipes and the spouts were undersized, meaning the downpipes would overflow in the event of medium to heavy rain  there was a leak in the storm water system on the east side of the house, at the point where the downpipe met the storm water pipe  the barrel drain at the front of the house was likely to become charged and overflow during severe storms. Following receipt of A’s report, the FSP appointed an engineer (MC) to carry out a further inspection and to specifically advise whether the movement damage at the property had been caused by ‘a possible blocked stormwater drain’. In his report, MC concluded that the cracking and movement damage had been caused by differential movement of the timber stumps, due to changes in the moisture content of the reactive clay foundation soils (causing the soils to expand and contract). In particular, MC concluded that the areas on the east side and north-west corner of the property had settled (ie dropped) due to a weakening of the foundation soils. MC identified a number of specific factors which he considered were contributing to variations in the moisture content of the soils. In particular, MC noted that:  the parts of the house which had dropped were located next to unpaved ground and garden areas, where the soil was more likely to be exposed to moisture variations from seasonal rainfall and overflow from the eaves gutters and downpipes  the sub-floor area was generally lower than the surrounding ground, which meant that rainwater run-off would be trapped under the house. In his report, MC concluded that the damage to the property was unlikely to have been caused by a fractured or leaking pipe because the pattern of settlement was general (rather than localised to a particular area). MC observed that part of the movement damage in the south-east corner of the property was long-term and had occurred over a number of years. However, MC considered there was additional damage which had occurred as a result of more recent movement. He advised that this damage was likely to have been caused by a combination of the following:  partially blocked eaves gutters and/or pipes Case No: 450579 Determination Page 5 of 12  overflow from gutters and/or pipes  rainwater run-off entering the sub-floor from the higher surrounding ground and accumulating under the house, particularly in periods of heavy rainfall. FSP accepted liability for partial repairs based on MC’s findings As outlined above, w hile MC’s report identified several ongoing issues with the stormwater system at the applicant’s property, he concluded that the bulk of the damage was not consistent with having been caused by a fractured or leaking pipe. When the FSP’s assessor (DG) initially reviewed MC’s report, he recommended that the claim be declined. DG reached this view on the basis that the policy does not provide cover for ongoing issues resulting from the design of the stormwater system and/or inadequate drainage at the property. However, DG’s view was overridden by the FSP’s case manager who decided that the FSP was liable for that part of the movement and cracking damage which MC advised had occurred in recent months. Accordingly, the FSP advised the applicant the claim had been partially accepted and instructed MC to prepare a scope of works to repair that part of the damage. The scope of works prepared by MC provided for the repair of internal cracking and movement damage to a number of rooms at the property. It also included the jacking and packing of 48 timber stumps on the east side and north-west corner of the property, which MC considered had settled due to the effects of moisture on the surrounding soils. The FSP subsequently obtained quotations from two builders to carry out the repairs set out in the scope of works and, in September 2015, agreed to authorise the winning builder (JL) to undertaken repairs. In accordance with the scope of works, the FSP advised the applicant that she was required to engage a plumber to make good the stormwater system at the property (including the roof gutters, downpipes and drainage pipes) before the repairs would commence. In October 2015, the applicant completed the necessary works to the stormwater system, including installing new downpipes and a new stormwater pipe at the front of the property to discharge stormwater run-off to the kerb. Further damage to stumps was identified during repairs When the FSP’s builder (JL) carried out a site visit in preparation for the repairs, he identified that the timber stumps were badly rotted and it would not be possible to re- level the floors by jacking and packing the stumps (as provided for in the scope of work). JL’s view was confirmed by a newly a ppointed engineer (HE) who advised that the stumps would need to be replaced (at an estimated cost of $90,000). HE reached this conclusion for two reasons – firstly, because the stumps had rotted and secondly, because the extent of movement across the property meant that the Case No: 450579 Determination Page 6 of 12 jacking and packing method of repair would not comply with applicable building standards. The FSP then appointed MC to re-inspect the property to determine the cause of the damage to the stumps. MC advised that the stumps had rotted o ver an extended period of time, due to exposure to moist soils as a result of the drainage issues affecting the site. On this basis, the FSP denied cover for the damage to the stumps and cash settled the applicant for the cost of repairing the internal damage included in the scope of works (based on a quotation provided by JL). The FSP’s claim notes indicate that a payment of $10,578.40 was made to the applicant in September 2016. FSP’s e ngineers have expressed differing opinions As outlined above, the FSP’s assessing builder (A) and engineer (MC) identified a number of moisture-related issues affecting the property. Several of these issues were caused by factors which are not covered under the policy - for example, the design of the drainage system - including the absence of sufficient downpipes, the presence of uncovered areas adjacent to the sub-floor and lack of grading away from the house. These issues could be expected to cause or contribute to moisture variations leading to differential foundation movement in the ordinary course of usual rainfall events. During his further inspection in 2016, MC reconfirmed his earlier advice that the more recent movement damage to the property had been caused by a number of factors, including the disconnected downpipe at the south east corner of the property. In his reinspection report, MC also referred to an overflow of water from the stormwater pipes in the sub-floor area (following a week-long flood which occurred in 2012). However, the relevance of this event appears limited, given the applicant has subsequently confirmed that her property was unaffected by the flood. During the dispute process, the FSP engaged another engineer (FM) who expressed views which conflicted with MC’s findings. FM c oncluded that none of the damage to the property had been caused (or contributed to) by a leaking stormwater pipe. FM considered that the differential foundation movement at the property had occurred solely as a result of seasonal variations in the moisture content of the reactive soils, exacerbated by the drying effects of nearby trees and inadequate drainage. FM advised that the stumps had rotted due to the inadequate stormwater drainage system, contributing to the unevenness of the floors throughout the property. Applicant seeks cover for cost of replacing stumps As outlined above, the FSP has cash settled the applicant for the repair of the internal cracking and movement damage to the property, based on a quotation provided by JL in June 2016. Case No: 450579 Determination Page 7 of 12 Accord ingly, the FSP’s liability for this damage is no longer in dispute ( other than in relation to quantum, as discussed further in section 2.2 below). However, the applicant says the FSP should be liable for the cost of replacing the rotten stumps at the property. She notes that the re-jacking and repacking of the stumps was included in the original scope of works prepared by MC. The applicant says the FSP only sought to dispute liability for the damage to the stumps when it became apparent that the stumps needed to be replaced at considerable expense. FSP is not liable for damage to stumps Having carefully reviewed the available information, I am not satisfied that the rotting damage to the timber stumps was caused by a leaking stormwater pipe (or any other event insured against under the policy). The available information indicates that a number of the timber stumps have suffered significant rotting damage below ground level (although the extent of the damage is unclear as most of the stumps have not been exposed). While the FSP’s initial investigations indicated that the stumps had settled, the rotting damage did not become apparent until one of the stumps at the edge of the dining room was excavated in preparation for the proposed repairs. Both MC and FM have advised that the rotting damage to the timber stumps has occurred over a prolonged period of time, as a result of ongoing exposure to sub-soil moisture due to inadequate stormwater drainage at the property. The stumps which have been clearly identified as rotted are located near the perimeter of the house and would therefore be more exposed to excess moisture due to the nature of the stormwater system and the topography of the site. I have taken into account the fact that MC appears to have reversed his original conclusion, given the repacking of the stumps was included in his initial scope of works. However, I am satisfied that MC initially assumed that the stumps were in good condition because the section of the stumps that was visible above ground level did not show any signs of rot (as is apparent from the photographs taken by MC during his inspection). MC also noted that the floors appeared sound. Accordingly, MC attributed all of the settlement at the property to differential foundation movement (when it seems more likely that at least some of this movement was due to the stumps having rotted). Further, while MC changed his conclusion about the cause of the damage to the stumps, the adverse factors affecting the drainage at the property were clearly identified in his initial report. While the reports prepared by the various contractors refer to a possible leak from a stormwater pipe, I am not satisfied that the nature and extent of the damage to the stumps is consistent with it having been caused by a leak of this kind. Case No: 450579 Determination Page 8 of 12 The level surveys carried out at the property reflect a general pattern of settlement towards the perimeter of the property and do not show evidence of localised heave (as would be expected in the event of a significant leak). Further, the extent of the rotting damage (to those stumps which are visible) is more consistent with the damage having occurred over the life of the building than due to a more recent leak. For the reasons outlined above, I am satisfied that the rotting damage to the stumps was caused by gradual deterioration over an extended period of time. Accordingly, the FSP is not liable for this damage and is not responsible for the cost of replacing the stumps. 2.2 Is the applicant entitled to any additional amounts? Claim process has been protracted It is clear that the resolution of the applicant’s claim has been a long and protracted process. The claim history reflects that:  the applicant lodged her claim in May 2015  the bulk of the claim (other than certain pre -existing damage) was accepted in July 2015  arrangements to commence the repairs were not progressed until March 2016 (even though the applicant had completed the upgrade of the storm water system five months earlier)  in May 2016, the FSP declined the claim in its entirety  the FSP subsequently revised its position to accept liability for the internal damage but decline cover for the stumps. The FSP cash settled the applicant for the cost of the internal repairs in September 2016. The applicant says the delays experienced during the claim process have caused the damage at the property to worsen. Among other things, she says:  mould developed in the bathroom which meant she and her family had to vacate the property  the cost to re-stump the property have increased as it is now necessary to remove the floors in order to access the sub-floor area. FSP is required to increase cash settlement for internal repairs by $8,000 The FSP says the claim was delayed due to the protracted investigations required to determine the cause of the damage. The FSP has also referred to the need to allow the soils under the property to dry out (following remediation of the drainage system) before the repairs could commence. I accept that the nature of the claim contributed to some of the delays experienced – for example, the extent of the damage to the stumps was not apparent until the FSP’s builder sought to commence repairs. Case No: 450579 Determination Page 9 of 12 However, having carefully reviewed the claim history, I am not satisfied that the FSP managed the claim effectively. Among other things, I note that:  there was a significant lack of clarity in the engineer’s reports obtained and the FSP’s application of t he policy terms given the findings contained therein (as shown by the multiple different opinions expressed internally during the course of the claim). This contributed to the difficulty in resolving the claim  while the FSP has referred to delays required in order to allow the soils to dry, there is very limited information in the claim no tes which supports this. There is also evidence that the progress of the repairs was delayed for other reasons, including administrative errors and a change of personnel at the FSP’s builder . The FSP’s claim records confirm that the applicant notified it of mould at the property in April 2016. The restoration contractor (R) appointed by the FSP confirmed that additional damage had occurred to the bathroom because the applicant had to keep using the shower (as no other alternative available at the property). It appears from the various reports provided that the leaks from the shower had originally been caused by the movement issues at the property (which caused gaps to open up in the floor and walls). Following his inspection, R confirmed there was mould present in the bathroom and possibly the sub-floor. He advised that the mould growth could not be addressed (and repairs to the shower carried out) until the property had been re-stumped. In his report prepared in March 2016, the FSP’s engineer (HE) advised that, due to the extent of movement, the entire bathroom would need to be stripped out and new waterproofing installed before the fixtures and fittings were replaced and new tiles installed. The extent of the bathroom repairs outlined in HE’s report is significantly greater than those included in the scope of works prepared by MC approximately eight months earlier. While I acknowledge that the FSP was not responsible for the whole of this additional damage, I am satisfied that the worsening of the damage was in part due to the delays which arose from the FSP’s management of the claim. On this basis, I consider it is fair in the circumstances that the FSP pay the applicant an additional amount of $8,000 as a contribution to the cost of the internal repairs. The FSP is not required to pay interest on this amount. However, I am not satisfied that the delays have resulted in an increase in the costs of replacing the stumps at the property. The available information establishes that the need to lift the floors to re -stump the property arises as a result of the manner in which it was originally constructed (and not due to any additional damage which occurred during the claim process). The floors needed to be lifted due to the low clearance between the ground and the floor framing of the house. Case No: 450579 Determination Page 10 of 12 Applicants are entitled to total compensation of $4,800 Under its Terms of Reference, FOS may award compensation (capped at $3,300) for consequential financial loss suffered by an applicant in connection with a claim. FOS In addition, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The applicant says she and her family suffered financial losses because they had to vacate the property due to the mould issues in April 2016. The applicant and her family moved into another property they owned, which meant that they were unable to rent out the second property. For the reasons outlined above, I consider that the FSP’s management of the claim (including its multiple changes of position) delayed resolution of the matter, including payment of the cash settlement. Given the time period involved, I am satisfied that the delays experienced caused the applicant to suffer additional financial losses due to the need to vacate the property. I am also satisfied that the issues experienced during the claim process caused the applicant and her family additional stress and inconvenience, beyond that which would ordinarily be associated with an insurance claim. In the circumstances, I consider the circumstances justify an award of:  $3,300 as compensation for consequential financial loss  $1,500 as compensation for non-financial loss. Case No: 450579 Determination Page 11 of 12 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS preliminary view and has proceeded directly to determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice, and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Cover for insured events We cover the building for loss or damage at the insured address caused by an insured event during the period of insurance. There are some things we do not cover and these are shown in the ‘We do not cover’ section of the following tables … and in the ‘What we do not cover – general exclusions’ … Insured event – escape of liquid We cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following: …  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewerage systems … We do not cover …  the cost of repairing or replacing the item from which the liquid escaped …  loss or damage caus ed by wear, tear … rot Insured event – storm We cover Loss or damage to the building caused by a storm. We do not cover …  loss or damage caus ed by flood …  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or damage to the building caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly becaus e of, a storm and not because of erosion over time, structural fault or design fault … Case No: 450579 Determination Page 12 of 12 Subject Terms General exclusions You are not covered under any section of your policy for damage …that is caused by, arises from or involves: Ground movement  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: - ‘Storm’ - ‘Flood’ (but only if you have cover for insured event ‘Flood’ - ‘Earthquake and Tsunami’ … Wear, tear and gradual deterioration  w ear, tear, rust, fading, rising damp, mould, mildew, corrosion , rot … or gradual deterioration ….

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.