Text of the determination
Determination
Case No: 450502 Determination Page 1 of 7
Case number: 450502 15 March 2017
1 Overview
1.1 Dispute
This dispute has been the subject of previous determinations of the Service (411010
and 411209).
The earlier determinations made findings in relation to a number of matters including
the development of mould at the property.
However, the earlier determinations also required the FSP to further investigate the
cause of pooling of water and greening of the bricks at the property.
1.2 Issues and key findings
Is the FSP required to meet the applicants’ claim for pooling of water and
greening of the bricks at the property, under the terms and conditions of the
policy?
The FSP is not required to meet the applicants‟ claim for the pooling of water and
greening of the bricks at the property.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny the balance of the applicants‟ claims.
Case No: 450502 Determination Page 2 of 7
2 Reasons for determination
There has been a full exchange of material between the parties a nd each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the rele vant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
The Panel has had regard to all of the information exchanged both prior to and
subsequent to the earlier determinations referred to above.
Whilst the Panel has considered all of the exchanged material, only that material
relevant to the final outcome, will be referred to in this determination.
2.1 Is the FSP required to meet the applicants’ claim for pooling of water
and greening of the bricks at the property, under the terms and
conditions of the policy?
Earlier determinations
As stated, this dispute has been the subject of earlier determinations of the Service,
dated 1 February 2016.
Within the earlier determinations, the Panel concluded:
„…
Having considered all of the available evidence, the Panel is of the view that any
development of mould at the property is more likely related to poor sub-floor ventilation
issues at the property, as distinct from the one off failure of the hot water system in
August 2014.
The result is that the Panel is not satisfied that the Applicants have established that the
proximate cause of the development of mould (that is, the dominant, effective or
operating cause) of the damage, was the listed event of water leaking from the hot
water system, but is more likely the result of faulty design or workmanship within the
home, resulting in long-term and continuing dampness.
Further, the Panel notes the specific exclusion for loss and damage arising from mould,
which, in the absence of any effective listed event, would entitle the FSP to refuse the
claim.
The FSP is therefore entitled to deny this aspect of the Applicants‟ claims.
For the sake of completeness, the Panel notes that firstly, it does not accept that the
failed hot water system was the proximate cause of the mould development and
secondly, even if it could be said that the water leak (which is said to have caused
damage to the skirting boards) has contributed to any mould development, that would
not assist the Applicants.
This is because the Panel has determined that the Applicants have not established that
the water leak is an event covered under the terms and conditions of the policy and
Case No: 450502 Determination Page 3 of 7
further, any loss or damage from the water leak is excluded under the general
exclusions for gradual deterioration, depreciation, wear or tear and faulty design or
workmanship.‟
In light of the Panel‟s determination, the Panel is satisfied that the Service has
determined that the applicants‟ claims in respect to mould from all events , including
the snow storm, have been finalised with the Panel‟s finding that the FSP has no
liability with regard to the issue of mould at the property.
The Panel notes the most recent submission from the applicants‟ representative,
which argues that there has been a significant time delay and specifically, no
microbial testing as to the existence of mould was undertaken at the recent
inspections. However, as outlined above, the issue of mould had already been
determined by the Service in its previous determinations, and no additional facts
have been presented since that time.
5.1 of the Terms of Reference of the Service provide:
“ The Service may not consider a Dispute:
…
k) where the dispute raises the same events and facts and is brought by the same
Applicant as a Dispute previously dealt with by FOS or a Predecessor Scheme and
there is insufficient additional events and facts raised in the new Dispute to warrant
FOS‟s consideration of the new Dispute;”
The result is that the Panel will not reconsider the issue of mould as part of this
determination.
However, within the earlier determinations it is detailed:
‘ FSP should investigate the cause of pooling of water and greening of the bricks
The FSP has partially accepted the claim for damage caused by the snowstorm.
Damage to a section of the gutters has been repaired by the FSP, however, the
Applicant says that puddles continue to appear in the storage room and that the snow
event of July 2015 has caused dampness, greening of the brick work and puddles in
the lounge room.
The FSP say that this damage is a result of drainage issues at the property and
therefore will continue until the drainage issues are rectified.
The FSP says that stormwater runoff drains towards the property and gets trapped
underneath the property and damage resulting from this is not covered by the terms
and conditions of the policy.
However, the FSP has said that with respect to the alleged pooling of water in the
storage and lounge room, it is prepared to assess the cause of the water pooling.
The Panel is satisfied that it is fair and appropriate that the FSP assesses both the
cause of the greening of the bricks and the pooling of the water in the storage and
lounge rooms to determine whether any loss and damage is covered by the terms and
conditions of the policy.
Case No: 450502 Determination Page 4 of 7
It is appropriate that the FSP takes steps in this regard and it should make
arrangements for an appropriately qualified expert to attend the property, for which the
Applicants are required to provide reasonable access. Should reasonable access not
be allowed the FSP is entitled to deny the Applicants‟ claim.‟
The earlier determination also details:
„ In relation to the damage from the snow storm, the FSP is required to investigate
both the greening of the bricks in the main area and the water puddles appearing
in the storage and lounge room areas, to determine whether it is required to meet
these claims under the terms and conditions of the policy.
If it is shown that these areas of damage have resulted from the snow storm in
July 2015, then the FSP is required to indemnify the Applicants for such damage
in accordance with the terms and conditions of the policy. ‟
The exchanged material confirms that the FSP initially did not arrange for a properly
qualified expert to attend the property, which it argues was due in part to the
applicants‟ failure to allow reasonable access.
The Panel does not accept that the applicants did not provide reasonable access to
the property and the failure to initially arrange for a properly qualified expert to attend
the property was simply a matter for the FSP.
That said, the FSP has subsequently arranged for structural building engineers (EC)
and building consultants (IP), to attend on site with the applicants on 21 February
2017.
Both EC and IP have provided reports following that inspection.
As stated, the Panel has reviewed all of the exchanged material, which included
reports provided both prior to and subsequent to the earlier determinations.
Coverage of the policy
The coverage provided by the a pplicants‟ Home Building and Contents Insurance
Policy provides coverage in the event of loss or damage caused by a listed event
detailed within the policy.
This means that not all loss and damage is automatically covered, but rather only
loss and damage caused by a listed event detailed within the policy.
The coverage provided by the policy is detailed within the Product Disclosure
Statement (PDS).
The PDS details:
‘The events we cover
We cover your home or contents when certain things happen. These are known as
„listed events‟. You can make a claim if a listed event takes place and causes loss or
damage to your home or contents during the policy period.
In this section, we tell you what events you‟re covered for and any specific exclusions
and conditions that apply to the event. General exclusions may also apply – see
Section 5.
Case No: 450502 Determination Page 5 of 7
…
Table 3.1 – Listed events
Listed events Buildings Insurance Contents Insurance
Home Home Plus
Storm
…
Storm
Home Home Plus
If loss or damage is caused by a storm.
For example, hail damages your roof or a storm in your local area may cause water to
build up in your street gutters.
Covered
► violent wind, cyclone or tornado
► thunderstorm, hail, rain or snow
► sudden, excessive run-off of water as a direct result of a storm in your local area. ‟
It is accepted insurance law that the insured carries the onus to establish that the
loss and damage is covered by the terms and conditions of the policy.
As such, the applicants carry the onus to establish that the loss and damage for
which they claim is caused by a listed event within the policy.
Discussion
The applicants have provided commentary from an Environmental Mycology
Laboratory (M) which noted that moisture in the property was coming from above and
not below and concluded therefore that it was most likely that the leaking gutters
caused the moisture intrusion to the property and that the most likely cause of brick
saturation was the overflow of water from the gutters.
On the other hand, the builder HK, was of the view that the moisture was entering
through the sub-floor structure.
In addition to the greening of the bricks, both M and HK stated that they observed a
puddle in the store room in approximately the period September to November 2015.
Within the most recent report provided by EK dated 25 February 2017, it was noted
that internal floor levels at the back of the house can, in certain locations (laundry in
particular) be below external ground levels and the bulk of the under floor foundation
is also located below external open and finished ground levels.
EC was of the view that this implies that the external walls of the building have been
continually subject to exposure to external ground moisture, possibly for the life of the
building.
Case No: 450502 Determination Page 6 of 7
Further, as a consequence of the layout of the area, surface water would have
drained the length of the path at the property due to the natural downhill grade, but
was not shed away from the side wall of the building and was in contact with the side
wall.
EC also noted the long term decayed condition of the floor plate timbers for the full
length of the external walls of bedrooms 2 and 3 and commented that the previous
presence of borers was suggestive of long term dampness exuding from the exposed
side of the bathroom base.
In conclusion EC noted:
„ There is no comparison between the assumed occurrence of stormwater
overflow from the damaged gutters hitting the ground and rebounding against the
walls of the house in a 7 week period and the number of times the wind has
naturally blown the rain against the walls over the 90+ year life of the building.
There was no evidence, on the exposed ground at the south east side of the
house, or surface damage from reported water cascading from the previously
splayed eaves gutter.
The natural rise of moisture through the brickwork from foundation level has
accounted for the long term decay of the floor plates on the uphill side of the
house, but the floor plate timbers did not decay in a 7 week period.
The property is a naturally damp site from downhill storm water seepage and
surface runoff. Measures to protect the building walls from ground supplied
moisture are absent, as with a reliable system to adequately collect and remove
storm water from around the house/site.
EC found no evidence to support the contention that conditions within the
dwelling were made conducive to mould growth by the potential for storm water
from (snow) damaged eaves, gutters to rebound from the external ground on to
the side walls of the house.‟
The report from IP noted a number of findings:
water could not have entered the home as a result of the damaged guttering
and water would run down until it disburses onto the foundation wall
the greening into the external brick work is algae which IP says when first
observed by the insured was wet and dark in colour. IP, during inspection noted
the algae growth to be in a dry state as expected during the summer season.
IP specifically says:
„The site to which the home is located has a gentle continuous slope, however, the
building envelope has been positioned in a manner that sees the West end corner in
close proximity to the external ground level with little or no consideration towards
collecting and disbursing of surface water away from the building perimeter.‟
IP concluded that the claim being made for resultant damage as a direct result of,
and only as a result of sagging gutters due to a snow event, is very unlikely.
IP reached this conclusion on the basis of the evidence of fungal decay to various
timbers has resulted in profile collapse.
IP says this position is supported by the evidence of remedial repairs being
completed suggesting the issues with rising damp, water seepage and higher relative
Case No: 450502 Determination Page 7 of 7
humidity have led to the service ability of one or more building elements being
compromised.
In conclusion IP noted that the extent of the damage visually observed cannot occur
in a short period of time.
Notwithstanding the opinion expressed by M, the Panel prefers the views of the
experts EC and IP.
The reports provided by EC and IP are thorough and logical and their conclusions
are compelling.
The Panel is satisfied that M‟s comments to the effect that the moisture in the
property is coming from above and not from below and there was no drainage
problem at the property are not supported by the other available evidence.
Conclusion
The onus to establish the damage was caused by an insurable event remains with
the applicants. Considering the exchanged information as a whole, on the balance of
probabilities, the available evidence does not suggest brickwork greening or water
puddles throughout the home has occurred from an event covered by the policy.
Having reviewed all of the exchanged material, the Panel is satisfied that the
greening of the bricks and any pooling of water within the home is more likely the
result of site drainage issue, lack of sub -floor ventilation and design and construction
issues.
Further, the Panel is satisfied that the problems at the property pre-existed the
events claimed by the applicants and are ongoing.
The Panel is not satisfied that the applicants have met their onus to establish that the
loss and damage claimed is caused by a listed event detailed within the policy.
The result is that the FSP is entitled to deny the applicants‟ claims.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.