Summary

After a storm damaged his awning, the applicant sought the cost of rectifying a pre-existing design fault and more for storm repairs. AFCA rejected the design fault claim and the higher repair figure, and ordered payment of the FSP's $17,882.87 storm repair offer on acceptance.

The policy covers only accidental loss or damage during the period of insurance, so it does not pay to rectify a design fault that existed before cover began.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 449891 Determination Page 1 of 8 Case number: 449891 11 October 2017 1 Overview 1.1 Dispute The applicant holds a Home and Contents Insurance Policy with the financial services provider (FSP). The policy includes cover for accidental damage. The applicant lodged a claim after an awning was damaged by strong winds on 1 March 2015. The FSP accepted the claim and agreed to repair the awning. While inspecting the home, the FSP discovered that the home was built with a design fault which meant that it was not strong enough to support the awning. The FSP decided to settle the claim by paying the applicant what it would have cost to repair the awning. The applicant wants the FSP to pay the cost of rectifying the design fault in addition to the cost of repairing the storm damage. 1.2 Issues and key findings Does the policy cover rectification of a design fault? The policy does not provide cover for the cost of rectifying a structural or design fault which existed before the commencement of the period of insurance. Did the applicant know about the design fault? The policy does not provide cover for the cost of rectifying the design fault, regardless of whether the applicant knew, or ought to have known, about the fault. Therefore, it is not necessary to determine whether the applicant knew about the design fault. Is the FSP’s offer sufficient to fulfil its obligations under the policy ? The applicant has not established that the FSP‟s offer is insufficient to cover the cost of repairing the damage caused by the storm. Therefore, the FSP is not required to increase its offer to settle the claim. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to increase its offer to settle the claim. Case No: 449891 Determination Page 2 of 8 2 Reasons for determination 2.1 Does the policy cover rectification of a design fault ? Applicant’s home was built with a design fault The applicant employed a project manager to oversee the construction of his home. The structure of the home was based on engineering drawings which specified the use of steel beams in the roof. An email from the applicant to the project manager dated 28 June 2006 says: „ We will be flexible in looking at changes to the specifications or design to bring the building within our budget and are happy to make the changes suggested by you in our last telephone discussion including… Using timber framing for the house (note that some structural steel may be required to support the proposed awning). ‟ The home was constructed with timber beams in the roof instead of steel beams. The applicant says that this change was suggested by the project manager, who said that using timber instead of steel would still leave the structure strong enough to support the awning. The applicant says that he accepted this advice at the time, but he now agrees with the FSP that the timber beams do not provide sufficient support. The panel is of the view that the use of timber beams instead of steel beams constitutes a “structural or design fault”. Applicant seeks cover for the cost of rectifying design fault The applicant says that rectification of the design fault is covered under the policy. The applicant cites page 60 of the product disclosure statement (PDS), which contains the following provision: ‘ Dealing with defects … We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at your home that you knew about (or should reas onably have known about). ‟ The applicant submits that this provision means that the FSP will pay extra to rectify a structural or design fault at the applicant‟s home, as long as it is not a fault that the applicant knew about (or should reasonably have known about). The applicant further submits that the provision could have been drafted to read only: We will not pay extra to rectify a structural or design fault at your home . The addition of the words …that you knew about (or should reasonably have known about) means that the first part of the sentence only applies if the applicant knew (or should have known), about the fault. This implies that if an insured party does not know (and it is reasonable for them not to know) about a structural or design fault, there are at least some circumstances in which the FSP will pay extra to rectify the fault. The FSP submits that the provision “ does not imply that the FSP will automatically pay extra to rectify a structural or design fault ” if it is not a fault that the applicant knew about (or should have known about). Case No: 449891 Determination Page 3 of 8 Policy excludes cover for faults existing prior to insured event The FSP refers to the following provisions, which are found on page 54 of the PDS: „ We will not: …  pay extra to repair or replac e your home or contents to a better standard, specification or quality than it was before the loss or damage occurred…  fix a fault that existed before the loss or damage occurred; …‟ There is no dispute that the fault existed before the storm. There is no dispute that the rectification of the design fault would repair the applicant‟s home to a better standard than it was before the storm. The FSP refers to the following provision, which is found on page 56 of the PDS: „ We will only repair or rebuild the parts that are damaged in the insured incident…‟ The panel is satisfied that rectifying the design fault would constitute repairing part of the home that was not damaged by the storm. P age 18 of the PDS states as follows, under the heading “ What you are covered for ”: „…your home is covered for accidental loss or damage at the insured address in the period of insurance, subject to the conditions, limits and exclusions in this policy . ‟ There is no dispute that the fault existed before cover commenced and was not created or exacerbated during the period of insurance. As stated above, the provision titled “ We do not rectify structural or design faults ”, when read in isolation, implies that the FSP will sometimes pay extra to rectify a structural or design fault. However, the provision must be read in the context of the policy as a whole. When the whole of the policy is considered, it is clear that the policy is only intended to cover accidental loss or damage caused by events occurring during the period of insurance. The policy is not intended to cover damage which existed before the commencement of the period of insurance. Commercial purpose of the contract As the relevant provision must be interpreted in the context of the policy, the policy must be interpreted in the context of the commercial environment in which it was incepted. The policy is a contract of insurance. The purpose of insurance is to indemnify insured parties against unforeseen and unintended losses, not to oblige insurers to rectify pre-existing damage, or to allow insured parties to make improvements or upgrades at their insurers‟ expense. Consideration of the commercial purpose of the contract supports the conclusion that the policy should not be interpreted as covering damage which existed before the commencement of the period of insurance. Consideration of fairness The FSP submits that by using timber beams in the roof instead of steel beams, the applicant “ chose a more cost effective optio n”, and rectifying this fault would require Case No: 449891 Determination Page 4 of 8 upgrading the applicant‟s property to a higher standard than that chosen by the applicant at the time of construction. The FSP submits that it would not be fair in all the circumstances to require the FSP to cover the full cost of this work. The applicant replies: “I did not choose a more cost effective option. I accepted the expert advice of a professional project manager engaged to run the building project.” The panel accepts that the applicant relied on the advice of his project manager. However, this does not change the fact that rectifying the fault would constitute an upgrade to the applicant‟s property, compared to the property‟s condition at the commencement of the period of insurance. The panel considers it fair in all the circumstances that the policy only cover damage caused by events occurring during the period of insurance. Contra proferentem rule not determinative The applicant submits that the provision titled “ We do not rectify structural or design faults ” means that the FSP will pay to rectify a structural or design fault; this conflicts with the other sections of the PDS mentioned above. The applicant says: “ This conflict can only be resolved by applying the interpretation of the PDS that is most favourable to the policyholder. ” The legal principle known as contra proferentem provides that, where the meaning of a contract is ambiguous, the meaning preferred should be the one that is least favourable to the party that drafted the contract. The reasoning for this rule is that the party drafting the contract is responsible for the wording, and so should bear the consequences of any ambiguity. The contra proferentem rule does not mean that any interpretation proposed by an insured party will prevail over any interpretation proposed by an insurer. The rule only applies where there is genuine ambiguity and a reasonable argument could be made for either party‟s interpretation. Australian courts generally consider the principle a „rule of last resort‟, to be applied only when ambiguity cannot reasonably be resolved any other way (see section 3.2 of this determination). The contra proferentem rule favours interpreting the policy as providing cover for the cost of rectifying a design fault which existed before the inception of the policy. However, there are stronger reasons to favour the opposite interpretation:  The provision titled “ We do not rectify structural or design faults ” implies that the FSP may provide cover in the applicant‟s circumstances, but the provisions on page 54 of the PDS explicitly say that it will not.  The interpretation advanced by the applicant is not consistent with the intended meaning of the policy as a whole.  The interpretation advanced by the applicant is not consistent with the purpose of insurance generally.  It is fair in all the circumstances that the policy only cover damage caused by events occurring during the period of insurance. Case No: 449891 Determination Page 5 of 8 For these reasons, the panel is satisfied that the policy does not provide cover for the cost of rectifying a structural or design fault which existed before the commencement of the period of insurance. 2.2 Did the applicant know about the design fault? No need to consider whether the applicant knew about the design fault For the reasons set out in section 2.1 of this determination, the panel is satisfied that the policy does not provide cover for the cost of rectifying a design fault which existed before the commencement of the period of insurance. These reasons do not depend on whether the applicant knew, or ought to have known, about the fault. Therefore, it is not necessary for the panel to determine whether the design fault was something that the applicant “ knew about (or should reasonably have known about) ” for the purposes of the policy. Unknown defect not the cause of the damage Page 60 of the PDS contains the following provision: ‘ Dealing with defects … If an unknown defect is the cause of the damage If an insured incident covered by your policy damages your home and and [ sic ] an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of your home is also damaged by the same incident, we will fix this as well. ‟ In this case, the “insured incident” is the storm and the potential “unknown defect” is the design fault: the use of wooden beams instead of steel beams (the applicant knew about this, but did not know that it constituted a design fault). No evidence has been presented to establish that the wooden beams were “the cause or part of the cause” of the storm damage, or that the wooden beams were damaged by the storm. Therefore, even if the design fault is an “unknown defect”, this provision does not apply to the applicant‟s claim. 2.3 Is the FSP’s offer sufficient to fulfil its obligations under the policy ? FSP offers to pay cost of repairing storm damage Page 18 of the PDS says that the policy covers accidental damage, including damage caused by a storm. Page 53 of the PDS says that the FSP may choose to settle a claim by paying what it would have cost the FSP to repair the damage. The FSP has offered to settle the claim by paying what it would have cost to repair the damage caused by the storm. The FSP says that the cost of repairing the damage caused by the storm is $17,882.87. The FSP has provided a quote for this amount dated 3 November 2015 from „JP‟, builder. The quote includes a builder‟s margin of 17%. Case No: 449891 Determination Page 6 of 8 Applicant has not established that FSP’s offer is insufficient The applicant says that the cost of repairing the damage caused by the storm is $44,500. The applicant has provided a report dated 3 February 2017 from „DB‟, builder, stating that the cost of repairing the s torm damage would be $42,500. The applicant says that this sum does not include the cost of remounting of the awning and associated electrical work and DB has advised that this work would cost an additional $2,000. DB‟s report contains an estimate of the c ost of repairing damage caused by the storm and a separate estimate of the cost of repairing damage attributable partly to the storm and partly to the design fault. Both estimates contain an identical list of work items and both lists are costed at $42,500. The portion of the cost attributable to each work item is not stated. DB‟s estimates include the cost of straightening the roof line. DB‟s report says that the deformation of the roof line is partly attributable to the storm: „ On our inspection, we obser ved… that the line of steel plate brackets supporting the awning along the fascia had twisted and the roof line behind these brackets deformed. In our view the twist of the fascia along the line of steel plate brackets is a result of high wind load on the awning when open. The damage to the roofline behind this is at a minimum partly attributed to high wind loads on the awning when open. ‟ The FSP says that the deformation of the roof line is due to the design fault and not due to the storm. The FSP has prov ided a report dated 6 October 2015 by „DK‟, engineer. DK‟s report states: „The obs erved sagging of the… roof appears to be consistent with a roof support structure that has been installed / constructed differently and wit h less robustness (strength) to that shown on the tender issue structural drawings… [It] is not related to the storm event or to the collapse of the retractable awning….‟ DK‟s report is more detailed than DB‟s report and is supported by photographs. The panel considers DK‟s report to be more reliable than DB‟s report. Having considered the above information, the panel is not satisfied that the applicant has established that the FSP‟s offer is insufficient to cover the cost of repairing the damage caused by the storm. Therefore, the FSP is not required to increase its offer to settle the claim. Upon acceptance of this determination by the applicant, the FSP must pay the applicant $17,882.87, if it has not already done so. The FSP is not required to pay interest on this amount as it was willing to pay the amount to the applicant, but the applicant refused to accept payment. Case No: 449891 Determination Page 7 of 8 3 Supporting information 3.1 FOS approach to this dispute A full exchange of the relevant information has taken place between the parties and each party has had the opportunity of addressing any issue raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions. For the purpose of this determination, commentary is restricted to only those issues considered relevant. 3.2 Relevant law Contra proferentem The contra proferentem rule provides that, where the meaning of a contractual term is ambiguous, the meaning preferred should be the one that is least favourable to the party that drafted the term. In McCann v Switzerland Insurance Australia Ltd [2000] HCA 65, Kirby J of the High Court of Australia stated: “ Courts now generally regard the contra proferentem rule (as it i s called) as one of last resort…” In AWB (International) Ltd v Tradesmen International (PVT) Ltd [2006] VSCA 210, the Supreme Court of Victoria held that the contra proferentem rule “ is a rule of last resort ”. The Supreme Courts of New South Wales (in G L Nederland (Asia) Pty Ltd v Expertise Events Pty Ltd [1999] NSWCA 62) and Queensland (in Bank of Queensland Ltd v Chartis Australia Insurance Ltd [2013] QCA 183) have held that the contra proferentem rule applies “ only when, having applied all other aids to construction, ambiguity remains ”. 3.3 Relevant policy terms What you are covered for page 18 Home cover When you have home cover, your home is covered for accidental loss or damage at the insured address in the period of insurance, subject to the conditions, limits and exclusions in this policy. Accidental loss or damage Accidental loss or damage includes l oss or damage from incidents such as: …  Storm; … How we settle your claim page s 53 – 55 We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will: Case No: 449891 Determination Page 8 of 8  repair damage to your home;  rebuild your home;  pay you what it would cost us to repair or rebuild your home;  pay you the sum insured for your home. We will not: …  pay extra to repair or replac e your home or contents to a better standard, specification or quality than it was before the loss or damage occurred…  fix a fault that existed before the loss or damage occurred; … Home claims page s 56 – 61 Repairing or rebuilding damaged parts We will only repair or rebuild the parts that are damaged in the insured incident covered by your policy. You cannot claim to replace undamaged parts of your home to create a uniform appearance… For the limited circumstances where we will repair or rebuild undamaged parts read pages 57 to 60. Dealing with defects (page 60) If a known defect is the cause of the damage We do not pay for loss or damage caus ed by a defect, structural fault or design fault at your home that you knew about (or should reas onably have known about) and did not fix before the loss or damage occurred. If an unknown defect is t he cause of the damage If an insured incident covered by your policy damages your home and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of your home is also damaged by the same in cident, we will fix this as well. We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at your home that you knew about (or should reas onably have known about). We will only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay us the extra amount it costs to rectify the structural or design fault at your home. If undamaged defective parts of your home will not s upport repairs If undamaged defective parts of your home you knew about (or should reasonably have known about) will not support repairing the damage caus ed by an ins ured incident covered by your policy, we will only pay what it would have cost us to repai r the damage had your home not been defective.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.