Text of the determination
Determination
Case No: 449795 Determination Page 1 of 10
Case number: 449795 3 May 2017
1 Overview
1.1 Dispute
The applicant owns a freestanding unit which is insured under a strata title insurance
policy issued by the financial services provider (FSP). A claim was lodged under the
policy after a vehicle accidentally drove into the front of the unit in October 2015.
The FSP accepted the claim and arranged for its builder (SC) to carry out the
necessary repairs. After the applicant expressed concerns about the quality of the
repairs, the FSP arranged for rectification works to be completed.
However, the applicant remains dissatisfied with the works and the further offers
made by the FSP to remedy the situation. She says the FSP should be required to
cash settle her for $46,550 for the cost of rectifying the works, based on a quotation
provided by her builder (IC).
The applicant also seeks compensation for various financial and non-financial losses
suffered as a result of the manner in which the FSP has managed her claim.
1.2 Issues and key findings
Is the FSP ’s settlement offer fair and reasonable?
The scope of works and the quotation on which the FSP’s cash settlement offer is
based are generally fair and reasonable.
The quotation provided by the applicant’s builder (IC) appears excessive, given the
nature and extent of the rectification repairs required. The scope of works also
includes the replacement of the lounge room bay window, for which the FSP is not
liable under the policy.
However, the cash settlement amount should be increased to allow for variables
such as volume discounts and rebates, cost increases since the date of the quotation
and any potential variations during the works.
Is the applicant entitled to any other amounts?
The policy does not provide cover for loss of rent, as the unit was not leased at the
time the damage occurred.
Given the circumstances of the dispute and the compensation paid by the FSP to
date, the applicant is not entitled to any further compensation for financial loss.
Case No: 449795 Determination Page 2 of 10
However, the applicant is entitled to compensation of $750 for non-financial loss due
to the manner in which the FSP handled her claim.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant the amount of $22,225.50 in full and final
settlement of her claim for damage to the property, plus interest on this amount as
set out in section 2.1 below.
The FSP is required to pay the applicant an additional amount of $750 as
compensation for non-financial loss.
Case No: 449795 Determination Page 3 of 10
2 Reasons for determination
2.1 Is the FSP’s settlement offer fair and reasonable ?
Dispute concerns cash settlement for rectification works
Under the terms of the strata policy, the FSP may decide to settle a claim for damage
to the property by arranging for its contractors to repair the damage or by paying the
applicant the amount it would cost to do so.
In the present case, the FSP elected to repair the damage to the property and
authorised its builder (SC) to conduct the necessary repairs. After the applicant
raised concerns about various aspects of repairs, the FSP arranged for SC to attend
the property and undertake various rectification works.
However, the applicant remained dissatisfied with the quality of the repairs. Among
other matters, she was concerned about the manner in which the damaged bay
window in the bedroom had been replaced and the surrounding brickwork repaired.
In addition to concerns about the quality of the works, the applicant says the
replacement bedroom window and surrounding brickwork no longer match the bay
window in the lounge room, which is also visible from the front of the property.
The FSP offered to arrange for SC to install a new custom-built bay window in the
bedroom and to replace the undamaged bay window in the lounge room so the two
areas would match. SC also undertook to replace any individual mismatched bricks
and treat the new mortar so as to reduce any inconsistency.
However, the applicant advised that she had lost confidence in SC’s ability to carry
out the rectification works and would no longer allow him access to the property.
The applicant sought a cash settlement for the cost of having the repairs carried out
by her own builder (IC), based on a quotation from IC for $46,550. The applicant also
provided a second quotation for $49,808 from a second builder (KB).
The FSP says the amount quoted by IC (and KB) for the rectification works is
excessive. The FSP has offered to cash settle the applicant for $17,780.40 based on
a quotation provided by SC in July 2016.
The FSP considers its settlement offer is sufficient to carry out the rectification works
necessary to comply with its obligations under the policy.
Policy sets out how claims will be settled
Under the terms of the strata policy, the FSP is required to pay the reasonable cost
of restoring the property to its condition when new. However, the FSP is not required
to rebuild or replace any undamaged parts of the property.
The policy states that where any materials used in the original construction of the
property are not readily available, the FSP will use the nearest equivalent available.
Case No: 449795 Determination Page 4 of 10
Builders have quoted significantly different amounts
As outlined above, the amount quoted by the applicant’s builders (IC and KB) for the
rectification repairs is more than two and a half times the amount quoted by the
FSP’s builder (SC).
The amount quoted by IC and KB is also approximately four times the amount quoted
by SC (and the FSP’s other panel builder, JN) for the initial repair of the impact
damage (although these quotations did not include the replacement of the lounge
room window).
SC’s quotation for the rectif ication repairs includes a detailed breakdown of costs,
which itemises the cost of labour and materials for each aspect of the work to be
carried out. IC’s quotation is less detailed but provides a breakdown of the total costs
for each area of work.
A comparative review of the two quotations indicates that IC has quoted significantly
higher costs in each area. For example:
SC has quoted a total amount of $2,050 for replacing each of the bay windows,
while IC has quoted $4,815 for each window; and
SC has quoted $1,345 for repairs to the timber floorboards and plaster finishes,
while IC has quoted $8,040.
As outlined above, under the terms of the policy, the FSP is required to pay the
applicant the reasonable costs of the necessary repairs.
The fact that t he applicant’s builder (IC) has quoted a significantly higher amount for
the rectification repairs than the FSP’s builder (SC) does not of itself establish that
SC’s quotation is inadequate.
The applicant says SC’s quotation should be rejected because he did not carry out
the initial repairs to an adequate standard.
However, I am not satisfied that this necessary renders the amount of SC’s qu otation
irrelevant, particularly when considered together with the quotation provided by the
FSP’s second builder ( JN) for the initial works.
Other than providing for the replacement of the lounge room bay window, the
rectification repairs are not significantly more extensive than the repairs required
following the initial impact damage.
Further, having reviewed the reports and photographs provided, I am not satisfied
that the amounts quoted by the applicant’s buil der (IC) are consistent with the extent
of the rectification repairs required.
Among other issues:
the amounts quoted by IC for carpentry and plastering ($8,040) and painting
($3,300) appear excessive, given the nature and extent of the works required;
and
the amount of $5,400 for floor coverings seems unduly high, given the only
damage to the carpet is in the area immediately adjacent to the bedroom bay
window. By contrast, SC’s quotation includes an amount of $750 for the
replacement of all of the carpet in the main bedroom.
Case No: 449795 Determination Page 5 of 10
Having said that, I also accept that the amount quoted by the FSP’s builder (SC) is
likely to underestimate the cost to the applicant of engaging a builder to carry out the
works herself.
Among other things, SC’s quote is likely to reflect volume discounts and rebates
which are available to the FSP but would not be available to the applicant. Further, all
of the quotations provided are now out of date and it is likely that building costs have
increased in the interim.
Scope of rectification works extends beyond repairs required
The scope of work underlying each of the different quotations is broadly similar –
except that, as outlined above, IC’s quotation appears to anticipate that various
aspects of the works (such as plastering and painting) will be more extensive.
However, I consider that the proposed rectification works extend beyond what is
required to satisfy t he FSP’s obligations under the policy.
In particular, I do not consider that the FSP is required to replace the undamaged
lounge room bay window, in order to maintain consistency with the newly installed
bedroom window.
As outlined above, the policy provides that, where any materials used in the original
construction of the property are not readily available, the FSP will use the nearest
equivalent available.
It is apparent from the information provided that the FSP’s builder (SC) experienced
significant difficulties in attempting to replace the damaged bay window, as a result of
being unable to identify the original manufacturer.
SC advised that he had the original window inspected by five different manufacturers,
who were unable to identify the exact model. Accordingly, SC arranged for a one -off
replacement to be constructed.
There is no dispute that the replacement window was not the same size as the
original window. The assessor appointed by the FSP (DL) to inspect the repairs
confirmed that the window was narrower (and possibly taller) than the window which
it replaced.
However, while DL agreed that the replacement window was not identical to the
lounge room on the opposite side, he considered it to be a ‘close match’.
Giving the difficulties of sourcing an identical replacement for the damaged window, it
was likely that any replacement used would differ in some way from the existing
lounge room window.
Having carefully viewed the available information (including the various photographs
provided by both parties), I do not consider that the extent of the differences were
such as to require the FSP to replace the undamaged lounge room window in order
to ensure the adequacy of the repairs.
The policy clearly states that the FSP is not required to replace any undamaged part
of the property.
Case No: 449795 Determination Page 6 of 10
Accordingly, while it was appropriate for the FSP to undertake to rectify the issue with
the installation of the bedroom window, the FSP was not required to replace the
lounge room window.
Further, I am not satisfied that all of the inconsistencies with the brickwork of the
pillar identified by the applicant were such as to require the pillar to be completely
demolished and rebuilt. Rather, I consider that the isolated rectification measures
initially proposed by SC would have been sufficient to address these issues.
The FSP’s assessor (DL) advised that the brickwork was satisfactory and any
difference in the vertical mortar course was a minor issue. DL noted that any
inconsistencies in the sizing of the bricks were consistent with variations in the
existing brickwork.
The applicant says DL’s report should be discounted because he was engaged by
the FSP to review the works carried out by SC (and therefore cannot be considered
to be independent).
However, I am satisfied that DL’s report provides an accurate assessment of the
quality of the initial repairs, which is supported by several close-up photographs of
the relevant areas.
Cash settlement amount should be increased to $22,225.50
For the reasons outlined above, I consider that the quotation of $46,550 provided by
the applicant’s builder (IC) significantly exceeds the fair and reasonable cost of
rectifying the repairs carried out by the FSP’s builder (SC).
However, I consider the cash settlement amount be increased to allow for variables
such as volume discounts and rebates, cost increases since the date of the quotation
and any potential variations during the works.
I consider it is fair in all the circumstances that the FSP be required to pay the
applicant the amount of $22,225.50, being an increase of 25% in the settlement
amount offered to date.
The FSP is required to pay interest on the settlement amount at the rate calculated in
accordance with section 57 of the Insurance Contracts Act 1984 (Cth) for the period
from 11 August 2016 until the payment date.
2.2 Is the applicant entitled to any other amounts?
Policy does not provide cover for loss of rent
The strata policy provides benefits for loss of rent where the applicant’s unit becomes
unfit to be occupied due to an insured event. However, benefits are only payable
where a signed lease agreement is in place when the event occurs.
The applicant’s unit was unoccupied at the when the damage occurred. The
applicant was in an aged care home and her unit was being used periodically by
visiting family members.
Case No: 449795 Determination Page 7 of 10
As there was no lease agreement in place at the time of the insured event, the
applicant is not entitled to loss of rent benefits under the policy.
FOS may award compensation for financial and non-financial losses
Under the Terms of Reference, FOS may award compensation for consequential
financial losses suffered by an applicant in connection with their claim.
In addition, FOS may award compensation (capped at $3,000) for non-financial loss
where an applicant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
Applicant is not entitled to further compensation for financial loss
The applicant says she has suffered significant financial losses due to the time taken
to resolve her clam. In particular, she says the FSP’s failure to adequately repair the
property has meant that it has been unable to be sold or leased.
During the course of this dispute, the FSP paid the applicant a total of $8,605.49 as
compensation for the delays experienced due to the initial inadequate repairs.
The FSP calculated this amount based on the estimated market rent payable for the
period from 1 February 2016 to 30 June 2016 (even though the property was not
rented out at the time the damage occurred).
While it has taken a considerable period of time to finalise the applicant’s dispute, I
am not satisfied that the FSP has been solely responsible for the additional delays
experienced.
Having carefully reviewed the claim history, I consider the FSP acted reasonably in
attempting to resolve the dispute which arose regarding the rectification process.
As outlined above, the FSP offered to rectify the previous repairs and also replace
the lounge room bay window, in circumstances where it was not required to do so
under the policy.
The FSP offered to appoint an assessor who had not been involved in the initial
repairs to oversee the rectification work carried out by SC.
The FSP subsequently agreed to consider the quotation provided by the applicant’s
builder (IC), subject to IC providing a fully itemised quotation (for the purposes of
comparison with the quotation obtained from SC). However, an itemised quotation
was not made available for several months.
For the reasons outlined above, I have found that the amount of IC’s quotation
significantly exceeds the fair and reasonable cost of carrying out the rectification
repairs.
Case No: 449795 Determination Page 8 of 10
In these circumstances, and considering the amount of compensation paid by the
FSP to date, I do not consider the applicant is entitled to any further compensation
for financial loss.
The applicant notes the FSP had previously agreed to continue to pay compensation
for loss of rent until such time as the repairs were completed.
However, the FSP provided this undertaking on the basis that the rectification repairs
would be completed by its builder (SC), who provided an estimated completion date
of 31 July 2016.
I do not consider the FSP should be required to comply with its previous undertaking
in circumstances where the applicant advised in June 2016 that she was no longer
willing for SC to undertake the repairs.
Applicant is entitled to compensation for non-financial loss
I accept that the claim process has caused the applicant additional stress and
inconvenience. Among other matters, the extended repair process required her
relatives to travel long distances to rei nspect the property.
While the applicant has been compensated for the delays experienced during the
claim process, I consider she is entitled to additional compensation for non-financial
loss in the amount of $750.
Case No: 449795 Determination Page 9 of 10
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a Financial Ombudsman Service (FOS)
recommendation. Due to the nature of the dispute, it has been referred directly for
determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered to be directly relevant to the outcome only.
During the course of this dispute, the applicant has been represented by her
daughter, who is also her legal guardian.
For the purposes of this determination, submissions made by the applicant’s
daughter have been treated as if they had been made by the applicant herself.
Unless otherwise indicated, the applicant and her daughter have been referred to
collectively as ‘the applicant’.
3.2 Scope of determination
Applicant has not established FSP’s builder was unlicensed
During the course of her submissions, the applicant expressed concerns that the
FSP’s builder (SC) did not hold the appropriate licences required to carry out the
works at the property.
The FSP has provided information concerning the licence held by the director of the
company which carried out the works. On this basis, I am satisfied that the builder
was appropriately licensed.
Case No: 449795 Determination Page 10 of 10
3.3 Terms of policy
Subject Terms
Settlement of
claims
If Your Insured Property is damaged, We may choose to either rebuild,
replace, repair or pay the amount it would cost to rebuild, replace or repair.
The amount We pay under Policy 1 will be the cost of Replacement at the time
of Replacement subject to the following provisions: …
where Your Insured Property contains any architectural or structural feature
of an ornamental, heritage or historical character or where materials used in
the original constructi on are not readily available We will use the nearest
equivalent available to the original materials …
We will not pay for the cost to …
rebuild or replace Your undamaged Insured Property …
Special benefits
– loss of rent
Temporary accommodation / rent …
Rent
When you have leased out or can substantiate by means of a signed
agreement that You wo u ld have leased out your Lot/Unit or Common Area We
will pay the actual Rent You lose or would have lost if Your Lot/Unit or
Common Area is made unfit to be occupie d for its intended purpose by:
loss or damage that is admitted as a claim under Policy 1 …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.