Text of the determination
Determination
Case No: 449790 Determination Page 1 of 13
Case number: 449790 22 February 2018
1 Overview
1.1 Dispute
The applicant held a landlord insurance policy with the financial services provider
(FSP) which provided cover for her home, which she had rented to a tenant on a
temporary basis.
In April 2011, the applicant lodged a claim under the policy for theft and malicious
damage by the tenant. The FSP initially denied the applicant’s claim for malicious
damage but later accepted liability for some of the damage and agreed to undertake
repairs.
However, the applicant was dissatisfied with the scope of works for the repairs and
lodged a dispute with FOS in June 2013. That dispute (326048) was resolved by
agreement, on the basis that the FSP would complete the repairs in accordance with
an agreed scope of works and cash settle the applicant for certain additional items.
However, further issues arose during the repair process. In mid-2014, the FSP
ceased work and sought to cash settle the applicant for the estimated cost of the
outstanding claim-related repairs.
The applicant says the cash settlement paid by the FSP is insufficient. She says the
FSP has failed to complete the agreed repairs and restore her home to a habitable
condition. The applicant is also dissatisfied with the quality of the repairs and the
manner in which the FSP has handled her claim.
1.2 Issues and key findings
Is the FSP liable for additional works at the property?
The FSP is required to pay the applicant an additional amount of $15,000 to allow
for:
the costs of restoring additional damage to the property for which the FSP has
previously accepted liability
outstanding works required due to the demolition process undertaken by the
FSP’s contractors during the repair process
expenses incurred by the applicant as a result of the manner in which the FSP’s
contractors ceased work.
Case No: 449790 Determination Page 2 of 13
Is the applicant entitled to compensation?
The applicant is entitled to compensation of $2,000 due to the manner in which the
FSP handled her claim since the first FOS dispute was resolved.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant an additional amount of $17,000 within 14
days of receipt of notification that the applicants has accepted the determination. The
FSP is not required to pay interest on this amount.
Case No: 449790 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP responsible for additional works at the property?
Dispute has a long and convoluted history
The current dispute concerns the extent of the FSP’s liability for further repairs to the
applicant’s property. However, this dispute needs to be considered in the context of
the long and convoluted history of the applicant’s claim.
The applicant’s property consists of two steel railway carriages which have been
converted into a residence by the addition of a steel sheet frame roof, timber wall and
floor frames and wall cladding. The carriages are connected to each other by a
timber framed annex.
In early 2010, the applicant leased the property to a tenant for approximately twelve
months while she temporarily relocated to a different area. On her return, the
applicant wished to move back into the property so she issued her tenant with a
notice to vacate.
The applicant says that, on returning to the property, she found it to be in a damaged
condition with various items missing.
The applicant believes her tenant was carrying on hydroponic activities which caused
moisture damage to various parts of the property. She says the tenant also damaged
a number of fixtures at the property (such as the toilet cistern, sewerage pipes and a
fire fighting pump) by deliberately filling them with mud.
Applicant lodged previous FOS dispute about scope of repairs
In April 2011, the applicant lodged a claim for theft and malicious damage to the
property. The cover for malicious damage provided under the policy extends to cover
for any intentional or deliberate acts of the tenant (subject to specified exclusions).
The FSP initially denied the malicious damage claim based on a report from its
assessor, which concluded that the bulk of the damage had been caused by tenant
neglect and unhygienic living standards (which are excluded from cover).
After the applicant disputed the denial of her claim, the FSP appointed a building
consultant (CS of SB) to undertake a further assessment. Based on CS ’s
assessment, the FSP accepted liability for some of the claimed damage (including
damage which CS considered was consistent with hydroponic activities).
The applicant had not elected to take up the optional ‘replacement benefit’ cover
available under the policy. Accordingly, the FSP was only required to repair the
property to the condition it was in before the malicious damage occurred. The FSP
was not required to repair the property to its condition when new or upgrade it to
meet current building standards.
The FSP sought quotations from several builders to carry out the repairs set out in
the scope of works prepared by CS . However, the FSP’s builders either declined to
Case No: 449790 Determination Page 4 of 13
quote or advised that they would be unable to guarantee the repairs, due to concerns
that the property did not comply with applicable building standards.
The FSP offered to cash settle the applicant for the estimated cost of completing the
repairs, based on a quotation provided by its builder (BB). However, the applicant
was dissatisfied with both the cash settlement offered and the scope of works (which
omitted many items which the applicant considered should be covered).
The FSP subsequently arranged for a further inspection of the property by a loss
adjustor (DW), who had not previously been involved with the claim.
DW reported that many of the additional items of damage raised by the applicant
were consistent with having been caused by hydroponic activities carried out at the
property.
Among other things, DW advised that the mud found in the plumbing systems and
the need for the property to be restumped may have been caused by the tenant’s
excessive use of water to cultivate crops at the property (or by malicious actions
taken after being issued notice to vacate).
DW noted that the absence of any condition reports completed either before or
during the tenancy made it very difficult to accurately determine which aspects of the
damage fell within the scope of cover. However, he recommended that additional
items of damage should be accepted because the FSP had already accepted liability
for parts of the claim.
Following receipt of DW’s report, the FSP arranged for an additional scope of works
to be prepared and obtained a second quotation from its builders (BB). BB
subsequently prepared a third scope of works and quotation to cover additional items
which needed to be addressed so that the repairs could proceed.
The FSP then authorised BB to carry out the repairs, in accordance with the three
scopes of work and quotations totalling $56,694.22.
However, the applicant remained dissatisfied with the proposed scope of repairs. In
June 2013, she lodged a dispute with FOS.
Previous dispute was settled by agreement
The applicant’s first FOS dispute (326048) was settled following conciliation in
September 2013.
Under the settlement arrangements, the FSP agreed to:
arrange for BB to undertake the repairs set out in the three scopes of work
accept in principle variations to the scopes of work for additional damage
caused by the insured event and discovered during the repairs
cash settle the applicant for $2,887.25 for various costs incurred
pay the applicant $5,300 as a good faith offer of compensation for loss of rent
and $3,000 as compensation for non-financial loss
Case No: 449790 Determination Page 5 of 13
Further issues arose during repair process
The repairs commenced shortly after settlement of the first FOS dispute. The repairs
were carried out by the FSP’s builder (BB) and managed by the loss adjuster (DW).
However, during the course of the repairs, it became apparent that the damage to the
property was far more extensive than had previously been realised.
Among other things, the entire interior of the property had to be gutted due to rot and
mould caused by water damage. The builders also found termite damage to the
timber wall, floor and ceiling framing throughout the property.
Further issues arose when the council became aware that repairs had commenced
without a permit and issued a building notice. Subsequent enquiries with the council
cast doubt as to whether the necessary approvals had been obtained when the
railway carriages were initially converted for use as a dwelling.
The reports provided by the FSP’s contractors confirm that the works undertaken
during the course of the repairs went far beyond those provided for in the three
scopes of work approved by the FSP.
During the first few months of the repair process, DW approved variations requested
by BB totalling $48,307.12, (taking the total cost of the repairs to $105,001.34). In
February 2014, BB sought approval for a further variation of $87,890.94, which DW
reduced to $71,478.84.
At this stage, DW raised concerns that the total cost of the repairs was likely to
exceed the building sum insured of $84,000 (at the time of the claim) and the
adjusted sum insured of $108,536.16 (after allowing for indexation). It appears that
this issue had not previously been considered by the FSP or its contractors.
When it became clear that the sum insured had been exceeded, the FSP appointed
its building consultant (SB) to undertake a detailed audit and cost review of the
repairs carried out to date. SB’s report was prepared by an employee who had not
previously been involved with the claim.
It appears the FSP intended that SB would compare the repairs carried out by BB
against the three approved scopes of work (and subsequent variations) and identify
any items which had not yet been completed. This would have allowed the FSP to
accurately identify the repairs which remained outstanding.
However, SB ’s audit result ed in the preparation of the two lists which were not
directly related to the approved scopes of works, as follows:
the first list outlined the works required to restore the property to a ‘habitable’
condition (but did not identify whether these works had been included in the
approved scopes of work or whether they were claim-related).
the second list identified the works which had been carried out at the property
prior to SB’s inspection of 1 April 2014 (but did not identify whether these works
had been included in the approved scopes of work or subsequent variations).
SB estimated that the cost of completing the works included in both lists exceeded
$150,000 (thereby indicating that the amounts charged by BB were fair and
reasonable).
Case No: 449790 Determination Page 6 of 13
FSP sought to cash settle applicant for costs of outstanding repairs
Due to concerns about the ongoing costs of the repairs and after discussions with
DW, BB prepared a fourth scope of works which was intended to include only the
outstanding, claim-related repairs.
BB’s in itial quotation for these repairs was $39,438.96. However, this amount :
included some repairs for which the FSP considered it was not liable (such as
the replacement of the septic tank)
did not include other items which DW had advised remained outstanding.
BB completed some of the outstanding repairs before ceasing work at the property in
or around July 2014.
In September 2014, the FSP cash settled the applicant for a total of $10,010.80,
which it considered reflected the remainder of the claim-related repairs.
The FSP considered a cash settlement was appropriate on the basis that the
outstanding repairs could not be completed until the applicant had attended to other,
non-claim related issues at the property.
Applicant lodged a second FOS dispute in October 2014
In October 2014, the applicant lodged a second dispute with FOS. Among other
matters, the applicant disputed the cash settlement and the quality of the repairs
which had been undertaken at the property. She sought to have the FSP complete
the works required to restore the property to a habitable condition (as outlined in SB’s
List 1), together with certain other items.
In her submissions, the applicant advised that she had also lodged complaints with
the Victorian Building Authority (VBA) in relation to the quality of the building and
plumbing works carried out by the FSP’s contractors .
The second FOS dispute (378627) was closed in April 2016, on the basis that it was
not appropriate for the dispute to be determined while the VBA investigation
remained ongoing. The FOS case manager advised the parties the dispute could be
reopened once the VBA process had been concluded.
In mid-2016, VBA confirmed that it was conducting a criminal investigation into
whether BB had breached the Building Act 1993 (Vic). However, VBA advised that it
did not have the authority to require building work to be rectified or award financial
compensation.
On that basis, the current FOS dispute was opened in an attempt to resolve these
matters.
Parties disagree about FSP’s liability for further repairs
The applicant is dissatisfied with the repairs carried out at her property.
Among other things, the applicant says that:
Case No: 449790 Determination Page 7 of 13
the FSP’s builder ( BB) has not completed all of the items included in the three
scopes of work agreed to at conciliation and the subsequent variations
approved by the FSP’s contractors
BB did not carry out the repair process in accordance with council requirements
and did not obtain the necessary permits
the repairs have not been completed to an adequate standard and further
damage has been caused during the repair process
the FSP authorised the builders to cease work, leaving the property in an
uninhabitable condition
she has incurred significant additional costs as a result of the manner in which
the FSP and its contractors had conducted the repairs.
The FSP disputes that it is liable for the cost of undertaking any additional works at
the property. The FSP says its contractors have repaired all of the claim-related
damage and have also upgraded various parts of the property during the course of
the repairs.
The FSP notes that the cost of the repairs carried out to date exceeds $245,000,
which is almost three times the original building sum insured. The FSP considers it
has fulfilled its obligations under the policy by completing the works undertaken to
date and cash settling the applicant for $10,010.80 in September 2014.
Claim was poorly handled by FSP’s contractors
Having carefully reviewed the lengthy history of this dispute, the panel is of the view
that the claim (and especially the repair process) was very poorly handled by the
FSP and its contractors.
The FSP’s handling of the claim has significantly contributed to t he difficulty of
resolving the current dispute.
In particular, any determination of the scope of the FSP’s liability is complicated by:
the various conflicting assessments obtained and the FSP’s change of position
regarding acceptance of the claim
the resulting lack of clarity as to the nature and extent of the malicious damage
to the property by the tenant
the FSP’s eventual decision to carry out repairs after initially seeking to cash
settle the claim (and despite the warnings provided by its builders that the
property may not be compliant with applicable building requirements).
Further, it is apparent that the FSP did not put in place a clear and well documented
process for its contractors to obtain approval for variations to the approved works
once the repair process commenced. The absence of such a process created the
potential for critical misunderstandings between the applicant, the builder (BB) and
the loss adjuster (DW).
The FSP’s claim file indicates that DW blamed BB for undertaking repairs in excess
of the authorised scopes of work, while BB considered that DW had provided verbal
approval for the additional works to be carried out. These works included the
complete strip out of the interior of the property to address water and termite
damage.
Case No: 449790 Determination Page 8 of 13
The FSP says the applicant pressured its contractors to undertake extensive works
which were outside the scope of the approved repairs.
However, once the FSP had accepted the claim and agreed to conduct the repairs, it
was responsible for ensuring that the scope of the repairs (including any approved
variations) were clearly defined in a manner which was understandable to the
applicant. Further, the FSP was responsible for the actions of its contractors during
this process.
Among other things, it appears that the applicant was never provided with a
consolidated scope of works or clearly advised in writing of any maintenance issues
which she was required to remedy in order for the repairs to proceed.
In these circumstances, the panel does not accept that the FSP’s liability to compl ete
the required repairs should necessarily be limited to the sum insured.
If the FSP had sought to limit its liability to this amount, it could have done so by
exercising its discretion to cash settle the claim (as initially proposed).
Instead, the FSP and its contractors undertook extensive works at the property
before abruptly ceasing work, leaving the applicant in a position where her home
remained uninhabitable.
Parties have provided conflicting versions of events
In her submissions, the applicant has raised concerns about over thirty individual
items at the property, which she says were not properly addressed by the FSP and
its contractors during the repair process.
The FSP has provided an explanation as to why it considers it is not liable for the
outstanding items.
However, i n many cases, the FSP’s response is based on reports provided by its
contractors which directly conflict with the version of events provided by the
applicant.
Among other things, the parties disagree about:
the condition of the property prior to the insured event (eg the extent of cladding
and flashing installed and the quality of the flywire screens)
the actions taken by themselves and their contractors during the repair process
(eg in relation to the hot water service, the firefighting pump, the bathroom
redesign, the skylights and the concrete pavers)
whether certain items were approved by the FSP’s contractors (even if not
formally authorised by the FSP (eg the repair of termite damage).
Some repairs were not completed to an acceptable standard
The FSP’s builder (BB) has acknowledged that the property was left in an
uninhabitable condition following the cessation of works.
BB expressly stated that he did not complete the rebuild of the areas which were
demolished during the repair process (on DW’s authority) because the FSP
subsequently advised that these works were outside the approved scope.
Case No: 449790 Determination Page 9 of 13
As outlined above, the applicant lodged complaints with the VBA regarding the works
carried out at the property.
FOS has been provided with the following limited information in relation to these
complaints:
BB was convicted in the Magistrates Court of carrying out work without a
building permit and failing to put a building contract in writing.
VBA has advised that two plumbers involved in the insurance works were found
to have carried out defective works at the property. The works carried out by the
one plumber (relating to ground sanitary drainage and gas fitting issues) had
been rectified while those carried out by the other plumber (relating to the
relocation of the wood heater) have not.
FOS has not been provided with a copy of any inspection reports prepared by VBA.
There is no information to confirm whether VBA identified any defects in the building
works carried out by BB.
FSP is required to increase cash settlement amount by $15,000
As outlined above, the FSP’s contractors have acknowledged that the areas of the
property which were demolished during the repairs were not fully rebuilt.
The panel considers it was not appropriate for the FSP to refuse to reinstate the
property in these circumstances (regardless of whether or not the damage being
repaired was claim-related).
However, the panel has also had regard to the fact that, when considered overall, the
applicant’s property has been significantly upgraded as a result of the repair process.
In these circumstances, the panel considers the FSP should be required to increase
the cash settlement amount to indemnify the applicant for the cost of undertaking
some of the additional works required, as well as additional expenses she incurred
due to works having ceased prior to the property being restored to a liveable
condition.
The panel has considered whether the FSP should be required to undertake the
additional works. However, the panel considers a cash settlement is appropriate,
given BB was the only builder who was willing to undertake the repairs and in light of
the deterioration in the relationship between BB and the applicant.
The panel has carefully reviewed all of the information provided by the parties,
including the audit report prepared by SB in April 2014 and the various photographs
showing the property before and after the repairs were completed.
Having done so, the panel considers the FSP is not liable for all of the items of
damage claimed by the applicant. In particular, the panel is satisfied that the FSP is
not liable for:
the replacement of skillion roof over the property, which the reports provided
confirm was at the end of its serviceable life at the time the insured event
occurred
Case No: 449790 Determination Page 10 of 13
any costs arising out of the need to obtain a permit for the use of the property
as a dwelling when it was initially converted in 2003 (given the available
information indicates, on balance, that no such approval was ever obtained)
loss of rent, given the applicant had issued the tenant a notice to vacate the
property because she wished to re-occupy it.
Nevertheless, the panel considers it is fair in all the circumstances that the FSP pay
the applicant an additional $15,000. This amount has been determined taking into
account the need to allow for:
repairs included in the fourth scope of works prepared by BB that were not
carried out but do not appear to have been allowed for in the cash settlement of
$10,010.80 paid in September 2014, given the FSP advised the applicant the
settlement amount was for the gas connection ($805.20) and the replacement
of the carport ($9,205.68 only). Such items include the replacement of the
timber ramp, which was removed to facilitate re-stumping
an allowance for the testing of the solar hot water system (and any subsequent
repairs required) and the reconnection of plumbing to the residence, for which
the FSP had previously accepted liability
additional repairs reasonably required in the areas demolished by the FSP
(which the FSP has previously denied on the basis the demolition was not
required as a result of the insured event) – for example, the mirrors and external
power points
reimbursement of additional costs incurred by the applicant during the repairs
and so she could continue to live at the property in the condition in which it was
left (eg fuel for generator, portable bathroom hire)
an allowance for any minor additional rectification repairs which may be
required (given the difficulty of determining from the information provided to
what extent any such repairs were completed – for example, the touch-up of the
paintwork which BB identified as sub-standard but was included as a zero cost
item in BB’s fourth s cope of works).
In determining the additional settlement amount, the panel has taken into account the
passage of time. Accordingly, the FSP is not required to pay interest on this amount.
2.2 Is the applicant entitled to compensation?
Applicant is entitled to compensation of $2,000
Under Terms of Reference, FOS may award compensation (capped at $3,000) for
non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
As outlined above, it has taken an excessive amount of time to resolve the
applicant’s claim. It is now almost seven years since the claim was first lodged.
The applicant says she has suffered considerable stress and inconvenience as a
result of the manner in which the FSP has handled her claim.
Case No: 449790 Determination Page 11 of 13
The panel accepts that the FSP is not solely responsible for all of the issues
experienced during the claim process. The panel also acknowledges that the FSP
was attempting to assist the applicant when it agreed to undertake repairs (rather
than cash settling the claim).
However, for the reasons outlined above, the panel considers the FSP managed the
repairs poorly. There is no doubt that the inadequate communication and lack of
clarity by the FSP’ s contractors during the repair process exacerbated the stress and
inconvenience experienced by the applicant.
The panel acknowledges that the FSP paid the applicant $3,000 as compensation for
non-financial loss as part of the resolution of her first FOS dispute.
However, the panel notes that this was paid by the FSP by agreement (rather than
awarded by FOS). Further, it compensated the applicant for non-financial loss
experienced prior to September 2014 only.
In the circumstances, the panel considers the applicant is entitled to additional
compensation of $2,000 for stress and inconvenience experienced as a result of the
FSP’s claims handling since that date.
Case No: 449790 Determination Page 12 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered a ll of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Cover for
damage by
tenants
We will cover your buildings or contents for loss or damage caused by a tenant or
their visitors, or their visitors pets.
We will only do this if the loss or damage occurs as a res ult of: …
a deliberate or intentional act, vandalism or a malicious act, unless it is as a
result of:
- theft
- tenant neglect, carelessness, poor housekeeping or unhy gienic living
habits …
Settlement of
claims
We will decide how we will settle your claim
If your buildings suffer loss of damage, we will decide whether to:
repair
rebuild, or
pay you the cost to repair or rebuild that part of your buildings that suffered
loss or damage.
If we do, we will:
pay you up to the buildings sum insured, as listed on your schedule
only
If we decide to repair or rebuild your buildings and your current schedule shows
‘including replacement benefit ’ … we will repair or rebuild the part of your
buildings that suffered the loss or damage to a condition as close as possible to
n ew, but not better.
Case No: 449790 Determination Page 13 of 13
Subject Terms
If we rebuild your buildings, we will also pay the amount that you need to pay to
ensure your buildings comply with government legislation and loc al authority
bylaws, unless you were required to pay these amounts before the loss or
dama ge occurred and you did not do so …
If we decide to repair or rebuild your buildings and your current schedule does not
show ‘including replacement benefit’ … we will:
repair your building s to the condition they were in just before the loss or
damage occur red
pay you the cost of repairing your buildings to the condition they were in just
bef ore the loss or damage occurred …