Home / Financial Firm (Unknown - Insurer) / Determination 449530
Determination 449530
Sum insured settlement and faulty accident repairs
Summary
The applicant's comprehensive claim on a 1976 vehicle was accepted for accident damage, but he sought the sum insured after pre-existing rust was found during repairs that proved pre-emptive. AFCA rejected the sum insured claim but ordered $3,000 consequential loss and $440 towards an engineer's report.
Pre-existing rust was excluded from cover, but the FSP's repairer should have identified it before repairing, causing consequential financial loss.
Issues
- Claim amount dispute primary · not upheld
“I accept that insofar as the rust to the chassis existed prior to the accident the FSP is not liable to meet the cost of repairing the rust.”
- Repairs or contractors secondary · upheld
“The FSP should pay the applicant an additional $3,000 to cover the consequential financial loss from the pre-emptive repairs, which the repairer should have identified.”
Subjects and remedies
motor vehicle collisionpay compensation
Text of the determination
Determination
Case No: 449530 Determination Page 1 of 4
Case number: 449530 5 October 2017
1 Overview
1.1 Dispute
The applicant lodged a claim on his comprehensive motor vehicle policy with the
financial services provider (FSP) on 9 November 2014 after he was involved in a
motor vehicle accident.
The FSP accepted liability and authorised repairs through WF. During the repair
process WF identified rust affecting the chassis which was not related to the accident
on 9 November 2014. The rust was not repaired and the applicant was advised the
vehicle was not safe to drive.
The applicant says the vehicle was in good running order prior to the accident and
that the accident not the rust made the vehicle unsafe to drive. Further the FSP
should have identified the rust prior to the repairs being undertaken and as a result
the applicant incurred additional costs in having the rust rectified.
1.2 Issues and key findings
Is the FSP required to settle the claim for the sum insured?
The FSP is liable under the terms of the policy for the loss or damage caused by the
accident on 9 November 2014. The policy specifically excludes cover for loss or
damage not caused by the accident and loss or damage caused by wear and tear,
rust, corrosion or depreciation. As the rust was not caused by the accident, the FSP
is not liable to cover the cost to repair the rust to the vehicle.
Has the FSP met its liability in accordance with the terms of the policy?
The repairs performed by the FSP were rendered ineffective as a result of the need
to repair the rust affecting the chassis. This should have been identified before the
repairs commenced. I am satisfied in the circumstances that the FSP should pay the
applicant $3,000 by a way of consequential loss as a result of the additional expense
incurred as a result of repairs completed by the FSP.
1.3 Determination
This determination is partially in fa vour of the applicant.
The FSP is to pay the applicant $3,000 pursuant to paragraph 9.3 of the Terms of
Reference (TOR) for consequential loss and $440 pursuant to paragraph 9.4 of the
TOR as contribution to the costs of the report from H. Otherwise the FSP has met its
liability in accordance with the terms and conditions of the policy.
Case No: 449530 Determination Page 2 of 4
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all of the information exchanged including
information provided following the recommendation and is based on what is fair in all
the circumstances, having regard to the relevant legal principles, terms of the policy,
good industry practice including codes of practice and prior determinations where
applicable.
2.1 Is the FSP required to pay the applicant the sum insured?
Applicant’s policy is a comprehensive policy covering accidental loss and
damage
The applicant holds a comprehensive policy with the FSP covering the insured
vehicle, a 1976 Jensen Healey for an agreed value of $16,537.
The certificate of insurance identifies the applicant declared the vehicle had no pre-
existing damage at the time of renewal of the policy in 2013 and provides cover for
accidental loss or damage sustained to the vehicle.
There is no dispute that the applicant’s vehicle sustained accidental damage when
involved in a collision on or about 9 November 2014.
Policy excludes cover for pre-existing damage
The policy contains a number of exclusions and specifically excludes cover for:
loss or damage not caused by the accident or event you are claiming for
faulty repairs or workmanship
any wear and tear, rust, corrosion or depreciation
These exclusions apply to all claims under the terms of the policy.
Rust in the sub structure was pre-existing
I accept the information provided by the FSP’s repairer and the applicant’s repairer H
that the vehicle did have rust in the sub structure and sill area. This is confirmed by
the photographs provided. I accept that most likely this damage existed prior to the
accident although the applicant may have not been aware of the extent of the
damage. I accept the rust is pre-existing damage under the terms of the policy
I accept that insofar as the rust to the chassis existed prior to the accident the FSP is
not liable to meet the cost of repairing the rust but is only liable to meet the cost of
repairing the damage sustained in the accident.
FSP liable to meet the cost of the accident related damage.
The quotation provided by the FSP’s repairer WF indicates the total cost to repa ir the
accident damage of $5,216.76. In addition to this the FSP has paid the applicant the
Case No: 449530 Determination Page 3 of 4
sum of $1,650 to cover the costs to rectify faulty repairs, in particular the
imperfections in the paint and repairs as identified by the applicant’s engineer H.
I accept that this is the extent of the FSP’s liability for the accident related repairs.
FSP should pay for cost of report from H
The FSP declined the request to pay for the cost of H’s report. In my view the report
was reasonably obtained by the applicant in order to identify the imperfections in the
repairs. It was relied upon by the FSP to identify the cost of the rectification and has
been relied upon in determining this dispute.
I am satisfied under to paragraph 9.4 of the Terms of Reference that the FSP should
contribute $440 to the cost of the report subject to the applicant providing the invoice
for the report.
2.2 Is the FSP liable for the consequential loss?
Under paragraph 9.3 of the Terms of Reference the Service can award up to $3,300
by way of consequential financial loss in circumstances where an applicant has
suffered losses which are indirectly caused by the FSP’s conduct.
The applicant’s engineer H has identified that the FSP’s repairer should have been
aware of the rust within the vehicle given the photographs that have been provided.
According to H adopting standard industry practice for these types of repairs any
quality repairer would have noticed this before or during the repair process.
I accept that this is a reasonable proposition. The FSP has not provided any
information to dispute this.
Repairs were pre-emptive
I accept that it is unusual that the repairer would have preceded to complete the
repairs to the accident related damage without either contacting the applicant to
discuss the vehicle’s condition . I accept the opinion of H that the repairs may have
been pre-emptive as the structural and rust issues had not been addressed and to
this extent the repairs were a waste of time and expense.
It is apparent from the information provided that the applicant in order to complete the
rust repairs had to strip down the already repaired sections of the vehicle. This is an
expense that would not normally have been required.
I acknowledge the FSP has already paid the applicant $1,650 towards the
rectification of the poor quality paint and repairs. However this does not cover the
additional cost or inconvenience caused by the pre-emptive repairs.
FSP liable for consequential financial loss
I am of the opinion the FSP should pay the applicant an additional $3,000 to cover
the consequential financial loss suffered as a result of the additional expenses
incurred by the applicant to have the underlying rust complaint repaired and the
vehicle restored to its pre accident condition.
Case No: 449530 Determination Page 4 of 4
FSP conduct not deceptive
Insofar as the applicant has suggested that the FSP’s conduct was deceptive I do not
accept that this has been established.
I accept that the FSP’s repairer failed to conduct the work in an appropriate manner
but I do not believe this is sufficient to establish deliberate or deceptive conduct on
behalf of the FSP or its repairer.
Whilst it is unclear why the repairer commenced the repairs at the time it did I am
satisfied that the FSP acted appropriately in notifying the applicant of the rust issues
and of its concern of the safety of the vehicle.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.