Home / Financial Firm (Unknown - Insurer) / Determination 449433

Determination 449433

Cash settlement for water damage floorboards disputed; claim handling and assessor conduct

FirmFinancial Firm (Unknown - Insurer)
Decided2017-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The applicants disputed the FSP's cash settlement for water damage, arguing undamaged floorboards in other areas should be replaced. AFCA found the settlement met the policy and ordered $500 non-financial loss for the FSP's claim handling failures and the assessor's photographs.

The policy limits replacement of undamaged floorboards to the room where the damage occurred, and the lounge, hallway and entry are separated by walls or partitions.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 449433 Determination Page 1 of 7 Case number: 449433 4 July 2017 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP) for water damage to their home caused by a leaking dishwasher. The FSP accepted the claim and cash settled the applicants for a total of $21,785.81, being the estimated cost of repairing the water damage to their kitchen/dining area and play room (including replacing the floorboards in these rooms). The applicants say the cash settlement is inadequate because the proposed repairs will result in a mismatch between the new floorboards in the repaired areas and the original floorboards in other areas of the house. They say the cash settleme nt should be increased to cover the replacement of the floorboards in these areas. The applicants are also dissatisfied with the manner in which the FSP has handled their claim. 1.2 Issues and key findings Is the FSP required to increase the settlement amount? The policy limits the FSP’s liability for replacing undamaged floorboards to the room in which the water damage occurred. The lounge, entry area and remainder of the hallway are separated by walls and/or partitions from the kitchen/dining and play room areas in which the actual damage occurred. Accordingly, the FSP is not responsible for replacing the undamaged floorboards in these areas and therefore is not required to increase the cash settlement amount. Are the applicants entitled to compensation? The applicants are entitled to compensation of $500 due to the manner in which the FSP handled their claim. 1.3 Determination This determination is substantially in favour of the FSP. The FSP has settled the applicants’ claim in accordance with the terms of t he policy and is not liable for the cost of replacing the floorboards in the additional areas. Case No: 449433 Determination Page 2 of 7 However, the FSP is required to pay the applicants the amount of $500 as compensation for non-financial loss. Case No: 449433 Determination Page 3 of 7 2 Reasons for determination 2.1 Is the FSP required to increase the settlement amount ? Policy sets out how claims will be settled The applicants’ policy provides that the FSP will settle a building claim by , at its discretion:  repairing the damaged part of the building to the same condition as when it was new; or  paying the applicants the reasonable cost of doing so, less any discounts available to the FSP. The FSP’s obligations in settling building claims are subject to certain conditions, which are clearly set out in the policy. These conditions include:  where materials used in the original construction are not readily available, the FSP will use the nearest equivalent available;  the FSP will not pay to repair or replace property which has not been physically damaged; and  where a claim relates to loss or damage to fixed floor coverings, repair or replacement is limited to the ‘room, hall or passage way’ in which the loss or damage actually occurred. Applicants say FSP should be required to replace undamaged floorboards The leaking water from the dishwasher da maged the floorboards in the applicants’ kitchen and play room. The FSP has accepted liability for the cost of replacing the damaged floorboards. The FSP’s builders have confirmed that it is not possible to replace the floorboards with materials which match the original. Accordingly, the FSP has settled the claim on the basis that the nearest equivalent materials will be used. However, the proposed repairs will result in a mismatch between the new floorboards and the existing, undamaged floorboards used in the remaining parts of the house (including the lounge, hallway and entry area). The FSP has agreed to pay for the cost of replacing undamaged floorboards in the dining area and part of the hallway on the basis that these areas are effectively part of the same ‘room’ as the kitchen , due to the open plan design of the home . The applicants say the cash settlement should be increased to also cover the cost of replacing the undamaged floorboards in the lounge, the remainder of the hallway and the entry area. The applicants note that the flooring extends through the area in a continuous flowing pattern with no start and end point. Accordingly, they say the entire area (including the kitchen/dining room) is effectively one ‘open plan’ area. Case No: 449433 Determination Page 4 of 7 FSP is only required to replace floorboards which are part of same room As outlined above, the policy states that the FSP is only required to replace floor boards in the ‘room’ where the damage actually occurred. This is an extension of the FSP’s general obligations under the policy, which do not extend to replacing undamaged property. The word ‘room’ is not defined for the purpose s of the policy and therefore should be given its natural and ordinary meaning, having regard to the context in which it is used. The Macquarie dict ionary (online edition) defines ‘room’ to mean ‘a portion of space within a building or structure, separated by walls or partitions from other parts’. The dictionary definition is consistent with the ordinary meaning a reasonable person would give the expression, as used in the policy. Accordingly, the FSP is only required to replace undamaged floorboards in areas of the property which are not separated by walls or partitions from the kitchen/dining and play room where the damage actually occurred. Additional areas are not part of same room The applicants and the FSP have provided several photographs of the relevant areas of the property. These photographs show that the lounge is separated from the kitchen/dining area by a wall. The wall contains a door frame which spans the width of the wall and incorporates a set of two hinged, glass panelled doors. Given the location of the wall and the doors, I am satisfied they separate the lounge from the kitchen/dining area. On this basis, the lounge constitute s a different ‘room’ from the area where the water damage occurred. The applicants say the doors are purely decorative and are always left open. Nevertheless, they form an effective partition between the lounge and the kitchen/dining area which makes the lounge a separate and distinguishable room. Accordingly, the FSP is not required to replace the undamaged floorboards in the lounge room. The photographs provided by the parties also show there is a doorway part way down the hallway from the kitchen to the entry area. The FSP has accepted liability for replacing the floorboards up until the doorway but not beyond this point. The section of the hall beyond the doorway is separated by a partition from the kitchen/dining area where the water damage occurred. Accordingly, the FSP is not required to replace the floorboards beyond this point. FSP is not required to increase the settlement amount For the reasons outlined above, I am satisfied that the FSP has complied with its obligations under the policy by paying the applicants an amount equivalent to the Case No: 449433 Determination Page 5 of 7 reasonable cost of replacing the undamaged floorboards in the same ‘room, hall or passageway’ where the damage occurred. The applicants say the FSP’s approach is inconsistent with the advice provided by its assessor, who recognised the unusual, open plan design of the house. However, I am not satisfied this is the case. The reports provided by the FSP’s assessor (CC) state that:  the water damaged kitchen flooring is in an open plan area which leads into the dining room and the hall; and  the floor plan is unusual, in that the front entry area is not separated from the lounge room by a dividing wall. The basis on which the claim has been settled is consistent with the above, in that the kitchen, dining room and part of the hall have been treated as one ‘room’, while the front entry and lounge have been treated as a separate ‘room’. The applicants say the replacement of the floorboards covered by the cash settlement will result in mismatched areas of flooring, which will decrease the value of their home. However, the policy only provides cover for physical damage to the property, subject to the exclusions and conditions contained in the policy (including the provisions outlining how claims will be settled). Any loss in the value of the property is appropriately characterised as a consequential loss, which is expressly excluded from cover. 2.2 Are the applicants entitled to compensation? FOS may award compensation for non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The fact that the applicants ’ policy excludes cover for consequential losses does not preclude the award of compensation where such losses have occurred as a result of the manner in which the FSP has handled their claim, rather than as a result of the insured event itself. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicants are entitled to compensation of $500 for non-financial loss The applicants are dissatisfied with the manner in which the FSP handled their claim. Among other things, they say the FSP’s contractors  failed to identify all of the damage during their initial inspection; and Case No: 449433 Determination Page 6 of 7  inappropriately included her children in photographs of the property taken for the purposes of the claim. The FSP has acknowledged that the initial settlement amount of $8,548.52 paid to the applicant in June 2016 omitted any allowance for damage to the kitchen cupboards, paint and skirtings. The cash settlement amount was subsequently increased (to $21,785.81) in August 2016. The significant increase in the cash settlement between June and August 2016 suggests that a significant portion of the damage was omitted from the initial assessment. This is of particular concern in circumstances where an insurer cash settles its liability, potentially leaving the policyholder at risk for any additional damage discovered later on. I am satisfied that the FSP’s failure to identify all of the damage delayed the final settlement of the applicants’ claim. I also consider it was inappropriate for the assessor to include photographs containing the applicants’ childr en in his report. Having regard to the above, I consider it is fair in all the circumstances that the FSP be required to pay the applicants the amount of $500 as compensation for non- financial loss. Case No: 449433 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Preliminary View and has proceeded directly to Determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Settlement of claims How we will settle your buildings claim At our option, we will:  repair or rebuild the damaged part of your building to the same condition as when it was new; or  pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new … If we pay you the reasonable cost of repairing or rebuilding, this means the cost of repairing or rebuilding less any discount avail able to use were we to repair or rebuild ... Where it is not possible to use original materials during the repair or rebuilding process, the nearest available equivalent to the original materials will be used. We will not pay to repair or rebuild property which has not been physically damaged … If the claim relat es to loss or damage to fixed wall, floor or ceiling coverings, repair or replacement is limited to the room, hall or passage in which the loss or damage actually occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.