Text of the determination
Determination
Case No: 449151 Determination Page 1 of 15
Case number: 449151 17 January 2018
1 Overview
1.1 Dispute
This dispute arises in relation to a claim lodged by the applicants with the financial
services provider (FSP) on their home and contents insurance policy.
In February 2013, the applicants lodged a claim after the discovery of water entering
their home. The FSP accepted internal resultant damages. The applicants raised
concerns with the quality of work undertaken, which was accepted by the FSP.
The dispute considers whether the FSP has any additional liability under the claim
and whether the FSP was entitled to cash settle rectification repairs.
1.2 Issues and key findings
Was the roof damaged by an event covered under the policy?
Save for the near left corner of the metal roof, the available material establishes the
metal roof and tiled roof were not damaged by an event to which the policy responds.
As such the FSP was entitled to decline cover for this aspect of the claim and is not
required to pay anything further to the applicants.
Is the FSP required to expand its scope for rectification repairs?
The FSP is required to expand the scope of rectifications to include the paintworks to
the family room ceiling, the paintworks to a cupboard wall in the family room, the
recurring blistering to the veranda‟s soffit lining and any other internal damage
sustained in these areas as a result of the FSP‟s inadequate repairs and inadequate
initial assessment of the cause of damage.
Was the FSP entitled to cash settlement additional rectification works?
The FSP is entitled to cash settle additional rectification works and is to promptly
proceed to resolve the cash settlement for rectification repairs, as outlined in Section
2.3 of this determination.
Have the FSP’s repairs exposed the applicants to asbestos?
The FSP‟s report does not address the applicants‟ concerns about the 2013 work
undertaken by the FSP‟s repairer. At the FSP‟s expense, a further report is to be
prepared by an asbestos expert about the 2013 work.
Case No: 449151 Determination Page 2 of 15
Are the applicants entitled to compensation?
The applicants are entitled to compensation as the FSP‟s conduct regarding the
serious matter of concerns about asbestos have interfered with the applicants‟
expectation of enjoyment or peace of mind and there has been an unusual amount of
time taken to resolve the matter.
1.3 Determination
This determination is substantially in favour of the applicants.
If the applicants accept this determination, then within seven days of acceptance, the
FSP is to:
pay to the applicants $3,000 compensation
instruct its contractor (J) to prepare a revised estimate of additional rectifications
and cash settle these works as outlined in Section 2.3 of the determination
arrange (at its expense) a further report by an asbestos expert about the 2013
work as outlined in the determination.
Case No: 449151 Determination Page 3 of 15
2 Reasons for determination
2.1 Was the roof damaged by an event covered under the policy?
Policy covers damage caused by specific events
The applicants must establish, on the balance of probabilities, they have suffered a
loss caused by a risk insured under the terms of the policy. This is called a prima
facie claim.
Once the applicants establish a prima facie claim, the onus shifts to the FSP to
establish an exclusion applies to defeat the claim.
The applicants‟ policy provides cover for 14 specific events, including storm, subject
to terms, conditions and exclusions.
The applicants say the roof was damaged as a result of a storm. The onus is
therefore on the applicants to establish, on the balance of probabilities, any roof
damage was caused by a storm.
Circumstances of the loss and claim
The FSP appointed a builder (A) to inspect the applicants‟ property, and to establish
the cause of damage and water entry. A says water damage was visible to the
ceiling, wall cupboard and flooring in the lounge room. A also noted damage to the
TV antenna and the soffit linings to the front entrance.
A inspected the skillion roof above the lounge room. He found guttering at the end
was blocked and this blockage was directly above the internal damage. He said leaf
debris from the gable roof contributed to the damage. He noted previous temporary
repairs had been carried out to the flashings above the damaged area.
A also inspected the soffit linings. He noted inadequate downpipes to the front and
left-hand side of the property. He said this enabled water to escape the back of the
guttering and enter the ceiling area resulting in damage.
He said the lights and air-conditioning units were working when he inspected them.
The material provided indicates discussion continued between the applicants and the
FSP about rectification repairs for a rattling window and a sp lit system air conditioner
during January 2014. The material provided also indicates these issues were
eventually resolved.
A noted no storm damage to the roof. As A indicated there were maintenance issues
not related to the storm event, he recommended roof repairs be made by the
applicants before internal repairs were undertaken.
The applicants engaged R (a roofing specialist). The material provided indicates R
provided a quote on 6 March 2013. An extract from the quote is provided in a letter
from the FSP dated 22 March 2016.
In relation to the leak to the front corner of the flat metal roof over the garage, the
extract shows R was to install a new downpipe to cope with volume, remove rusted
Case No: 449151 Determination Page 4 of 15
gable flashing, fold back the leaf guard at corner and investigate, and lift sheets if
possible to ease water flow to the gutter.
R also provided a report to the applicant stated 16 March 2013 in which he indicated:
„…. during the storms of recent weeks that the strength of wind uplift and the volume of
rainfall deposited on this roof was responsible for the damage at the near left corner. ‟
A provided a scope of works which included repair work and painting in the lounge
room, removal of the TV antenna, and preparation and painting the soffit linings to
the front and right hand side of the property.
The material shows not long after the painting work was completed, there were
complaints about the internal and external painting work. Particularly, the applicants
complained the paintwork on the front porch bubbled when it rained.
Due to the applicants‟ ongoing concerns with A, the FSP appointed a further builder
(J) to report on and conduct rectification repairs.
In August 2014, J provided a scope of works to rectify the work in the family room,
(referred by A as the living room), front entry and front eaves lining.
The material provided indicates this work was carried out in late 2014. The applicants
continued to complain about issues particularly after rain and particularly to the
painting at the front of the house.
In early December 2014, the applicants arranged for the repair of cracked tiles above
this area. The applicants contend this damage was caused in the February storm
event. They say the cracked roof tiles were near where tree branches had damaged
the TV antenna in the February storm.
The FSP reviewed the applicants‟ photographs and considered the cracks were
recent and not related to the 2014 event.
The applicants asked J continue to be involved and undertake repairs as J should be
responsible for work done. Complaints included repairs to the eaves as well as paint
marks on brickwork.
J appointed a roofing specialist (D) to provide a report on the condition of the roof
above the eaves. D inspected and pho tographed the tiled roof only in January 2016.
His report focuses particularly on the leak to the front patio roof.
D said the roof leaked due to blocked water courses, additionally noting:
„ There is significant debris built up in the water courses at the tiles and especially in
heavy rain water can not flow correctly and is overflowing the sides of the tile.
This is a maintenance issue and there is no storm or impact damage to this roof.‟ [sic]
The FSP also appointed a building consultant (IT) to provide an opinion. IT inspected
and photographed the applicants‟ property including the roof in April 2016.
IT inspected the applicants‟ tiled and metal roofs, and was unable to locate any
damage to the roofs caused by storm. He says the tile and metal roof covers are
susceptible to rain water penetration because of tile side lap blockage caused by the
many nearby trees, the poor condition of sarking and valley gutter overflow.
Case No: 449151 Determination Page 5 of 15
He also identified the metal skillion roof above the family room was under pitched,
there was a concentration of rain water run-off and some of the fastener fixing holes
are exposed to rain water ingress.
He saw no damage to the tile roof caused by the 2013 antenna damage.
He also reported:
„ My inspection of the terracotta tile roof cover, above the formal living room, revealed
no broken, no crac ked and no displaced roof tiles.‟
As set out earlier, the applicants provided a report from their roofing specialist (R) in
support of their claim. Correspondence from the applicants indicates R inspected the
tiled roof, but if R did so, there is no report of this inspection.
Rather, the applicants have only provided a report from R about the March 2013
inspection of the metal roof on the left-hand side of the home. R said the storm was
responsible for the damage at the near left corner and repairs there should be done.
Material provided establishes R provided a quote in March 2013 to repair the metal
skillion section of the roof in the amount of $1,386 and repairs were made soon
thereafter.
In its letter dated 14 July 2016, the FSP said it had provided a cash settlement of
$636 for some of this work.
The applicants also provided a report from (E). The report was obtained prior to
purchasing the home in December 2012.
The applicants say these two reports establish the condition of the roof prior to the
storm event, and the resultant damage to the roof was caused by the storm.
Evidence establishes roof not damaged by an insured event
The applicants‟ expert E said the overall condition of the roof was acceptable and the
overall condition of the roof coverings is fair.
However, I consider E‟s statement must be qualified as E did not actually access the
roof but reports the roofing materials were viewed from a distance only.
He recommended further investigation should be carried out prior to purchase.
Relevantly, E states it:
„…cannot and does not offer an opinion or warranty as to whether the roof leaks or
may be subject to future leakage… If any sections of the roof were inaccessible …
further invest igations should be carried out prior to purchase… It should be noted that
when roofing cannot be inspected in detail, other associated aspects of the roofing are
often not inspected in detail. These may include items such as gutters, eaves,
flashings, chimneys and other items that would require a detailed and close inspection
of the roof surface… A roofing expert should further evaluate the roof area.‟
Although E recommended further inspection of the roof area, there is no material to
establish this occurre d. I am satisfied E‟s report sufficiently demonstrates the roof
was not inspected closely on or behalf of the applicants prior to the storm event.
In the circumstances, I do not accept E‟s report is sufficiently persuasive about the
condition of the roof prior to the February 2013 storm event.
Case No: 449151 Determination Page 6 of 15
I have considered the other submissions, reports and photographs.
I note the other inspections of the roof of the applicants‟ home. None of them note
storm damage to the roof. The contemporaneous reports by A and by R note no
storm damage to the tiled roof. R only notes relatively minor storm damage to the
near left corner of the metal roof.
D says he did not observe any impact or storm related damage. His focus was on the
tiled roof only and the leak to the front pa tio roof.
IT states he did not observe any damaged tiles nor did he note any storm caused
damage to the “external fabric.”
IT suggests the cause of water entry to the home was because of maintenance and
structural issues not storm damage to the roof.
Both D and IT inspected the roof in 2016. The metal roof repairs recommended by R
were already done.
R makes no comment about the tiled roof. R inspected the metal roof a short time
after the storm event and only identified storm damage at the near left corner of the
metal roof. R does not describe the storm damage specifically nor is there a
photograph of the roof from him at the time of his inspection.
While the applicants make other submissions about R‟s opinion, these submissions
are not sufficiently persuasive compared to the only written report provided by R
which refers to relatively minor storm damage to the near left corner of the metal roof
only. In the circumstances, I am not satisfied the material from R establishes there
was storm damage to the tiled roof.
A also inspected the roof a short time after the storm event. A describes a skillion
roof. A describes a number of reasons for water ingress but does not identify the
damage at the near left corner of the metal roof as identified by R.
I have considered the submissions made by the applicants concerning other rainfall
events before the pre-purchase inspection and before the rain event of 23 February
2013. However, in view of the inspections of the roof by the various experts, this
submission is insufficiently compelling.
In the absence of other independent expert evidence, and taking into account the
observations made by those experts who have examined the roof, I am not
persuaded from the material provided that on the balance of probabilities the tiles
above the eaves, the gutter or the fascia board suffered impact damage in the storm.
Further, contentions made about the lack of independence by IT are insufficiently
compelling. The criticisms made by the applicants of the IT‟s report are either not
supported by independent expert evidence or do not detract from the overall
preponderance of the expert evidence.
Having carefully considered the available material, I am not satisfied the applicants
have established on the balance of probabilities the tiled roof was damaged by storm
or by impact damage in the storm.
Case No: 449151 Determination Page 7 of 15
On the information provided, the FSP is entitled to decline cover for storm damage to
the tiled roof.
As R is a roofing professional, I prefer his opinion over the opinion of A and I am
satisfied there was damage to the left corner of the metal roof caused by the storm
event in February 2013.
The FSP has paid already $636 for damage to the near left corner of the metal roof.
The material provided indicates the remaining part of R‟s quote referred to the
installation of a downpipe to cope with volume. This is not storm damage.
In all the circumstances, on the material provided, I am not satisfied on the balance
of probabilities the applicants have established there was any other storm damage to
the metal roof or the tiled roof.
On the information provided, and for the reasons stated, the FSP is not obliged to
make any further payment to the applicants for storm damage to the tiled or metal
roof.
2.2 Is the FSP required to expand its scope for rectification repairs?
Applicants must establish entitlement to repair guarantee
The parties accept internal repairs were conducted by A and J, under the instruction
of the FSP. The terms of the applicants‟ policy states repairs conducted in this
manner are subject to a lifetime repair guarantee.
Consistent with previous determinations, the onus is on the applicants to establish an
entitlement under the repair guarantee. This means there must be evidence which
establishes the repairs have failed, or are otherwise unsatisfactory, as a result of the
FSP‟s tradespersons‟ work or the FSP‟s conduct.
FSP paid $3,053 to the applicants for rectification repairs
The applicants told IT there were five areas require rectification, being:
quality of paintworks to the family room ceiling
quality of paintworks to a cupboard wall in the family room
recurring blistering t o the veranda‟s soffit lining
discolouration to the ceiling around smoke alarm in the living room
paint marks on external brickwork following repainting of the soffit lining.
The FSP paid to the applicants $3,053 for rectification. Although the FSP refers to
various estimates from J the actual estimate from J was not provided.
FSP’s expert criticises original assessment of the FSP’s assessor
In relation to rectification repairs, the FSP relies on the report from IT who inspected
the family room, formal living room and front veranda soffit and surrounds.
IT noted recent water stains in the ceiling of the family room and said this was
because the roof was under pitched, received concentrated rainwater run-off from the
Case No: 449151 Determination Page 8 of 15
tile roof valley gutters and had exposed fastener fixing holes in the roof sheet pans
which had previously secured the tree leaf gutter guard.
IT said the latter accounts for the paint degradation to the back wall within the family
room cupboard.
Because A‟s report made no mention of these three roof defects, IT said A‟s
assessment was flawed.
As for the complaint about recurring blistering paint to the front veranda‟s soffit lining,
IT noted the front veranda roof drainage was inadequate in that there was excessive
spacing between the downpipes.
Again IT criticised A‟s assessment. IT said contrary to the advice of A, the excessive
spacing between downpipes was not the cause of gutter overflow onto the back of
the soffit. Rather, IT said improper installation was the cause because the top of the
gutter was not low enough but was finished flush with the top of the fascia board. IT
says had it been properly installed, water overflowing from the gutter would have
discharged to the exterior rather than onto the back of the soffit linings (as it still is).
In summary, IT says the cause of first three items of the resultant damage is not
because of the storm. Generally speaking, IT says the cause of the resultant damage
are design flaws or maintenance issues which are excluded from cover.
IT says the damage in the cupboard in the family room was caused by water entering
holes in roof sheet pans. These holes are said to have been in place to affix a leaf
gutter guard which was missing when IT inspected.
The applicants provided a photograph of the leaf gutter guard, said to have come
from A‟s report. The photograph, while in monochrome, appears to show a leaf gutter
guard. The applicant contends the leaf gutter guard was re moved during A‟s repair.
The FSP has not responded to this contention.
Fair the FSP make contribution to some further rectification repairs
I have carefully considered the available material, and note A does not identify any
missing mesh or issues with the leaf guard, or holes in the roof sheeting proximate to
the leaf guard. If such an issue of missing mesh, and holes in the roof were present
at the time of the initial claim, and contributing to water ingress as proposed in the IT
report, it would be reasonable to expect such issues to be raised as maintenance
concerns, such as the maintenance concerns raised by A at that time.
Rather, the available evidence suggests issues arising from the missing leaf guard
occurred sometime after A‟s assessment and during or after A‟s repairs.
Taking all matters into account, while I consider the available expert material
indicates issues with the applicants‟ roof to which the policy does not respond, I also
consider it is fair in all the circumstances the FSP make some contribution to the
applicants‟ claim for rectification repairs to the following:
the paintworks to the family room ceiling
the paintworks to a cupboard wall in the family room
the recurring blistering to the veranda‟s soffit lining
Case No: 449151 Determination Page 9 of 15
This is because the FSP undertook the repairs which are still not satisfactory and,
while there were ongoing complaints by the applicants to the FSP about the quality of
repairs, the FSP has not rectified its repairs and did not identify the reason why its
repairs required rectification until the report from IT. This report clearly criticises the
assessment made by A about the cause of damage. Had the FSP properly repaired
and properly assessed and identified the initial cause of the damage and cause of
the continuing damage the applicants would have had opportunity to rectify all the
issues with the roof before repairs were commenced.
The material indicates the applicants have had the roof inspected both by R and by a
roofer who repaired the cracked tiles at the front of the house. However, the issues
identified by IT were not identified by the applicants‟ own trades either.
Therefore, taking this into account, I am satisfied it is fair in the circumstances the
FSP make a 50% contribution to the applicants‟ claim for rectificat ion repairs to the
paintworks to the family room ceiling, the paintworks to a cupboard wall in the family
room and the recurring blistering to the veranda‟s soffit lining.
The applicants have indicated concern there may be other internal damage such as
the insulation in the ceiling in the family room. I am also satisfied it is fair in the
circumstances the FSP contribute 50% of the cost of any other internal damage
sustained in the areas of the family room ceiling, the cupboard wall and the veranda
soffit lining as a result of the FSP‟s inadequate repairs and initial assessment of the
cause of damage.
The FSP is not obliged to make any contribution to discolouration to the ceiling
around smoke alarm in the living room. This is because I am satisfied the available
information establishes there are no broken tiles above this area of damage and the
damage is caused by obstruction of the valley gutter which is a maintenance issue
and excluded from cover.
The applicants also claim the sarking is in poor condition. However, I am satisfied the
available information establishes on the balance of probabilities this is caused by the
debris from the numerous surrounding trees causing blockage of the roof tiles side
lap channels through accumulated sediment. This is a maintenance issue and not
covered by the policy.
The parties agree the FSP will remove the paint marks. However, the parties do not
agree on the cost of the removal of paint marks.
This will be discussed in greater detail in section 2.3 below.
2.3 Was the FSP entitled to cash settlement additional rectification
works?
Cash settlement is appropriate to finalise dispute
The FSP says it agreed to accept the applicants‟ resultant damages, in
circumstances where it was otherwise entitled to deny the claim. The FSP says it has
discharged its obligations in this instance.
Case No: 449151 Determination Page 10 of 15
FOS has drawn FSP‟s attention to the proposition that an insurer cannot arbitrarily
change its election once it has chosen to carry out repairs. This means, if an insurer
elects to carry out repairs, it is bound by that election until completion. In line with
that well established proposition, FOS will not readily accept a change of election by
an insurer.
However, in the circumstances of this claim, having considered the policy terms,
repairs undertaken, the status of the dispute, and the available evidence in relation to
the condition of the roof, I consider cash settlement is the most appropriate way to
bring finality to the dispute.
Notably, the available material suggests there are ongoing issues with the roof.
Therefore, should additional rectification works be undertaken by the FSP, the
available material suggests the works will not be successful.
FSP has not established cash settlement is sufficient
The applicants provided no independent expert material about the cost of the
rectification repairs.
The FSP says it offered $3,053 for the rectification works, comprising $2,553.42 from
a verbal estimate from J, and $499.58 as a good will gesture.
FOS requested a copy of J‟s estimate or costings f or consideration. This was not
provided. In any event, given the findings further rectification works are to be
attended to, J‟s estimate is no longer reflective of the required works.
In order to resolve the dispute, and subject to the applicants‟ accepta nce of this
determination, the FSP is to instruct J to prepare a revised estimate, which includes
the additional rectification works of the paintworks to the family room ceiling, the
paintworks to a cupboard wall in the family room and the rectification of the recurring
blistering to the veranda‟s soffit lining.
J is also to address the cost of any other internal damage sustained in the areas of
the family room ceiling, the cupboard wall and the veranda soffit lining as a result of
the FSP‟s inadequate rep airs and inadequate assessment of the cause of damage.
The FSP is liable to pay to the applicants 100% of the cost to rectify the paint marks
on the brickwork following repainting of the soffit linings and 50% of the cost of the
additional rectification works to the paintworks to the family room ceiling, the
paintworks to a cupboard wall in the family room and the rectification of the recurring
blistering to the veranda‟s soffit lining and any other internal damage identified by J.
Should J‟s revised estima te exceed $3,053, the FSP is to pay interest on the
difference from 14 July 2016, being the date the original cheque was issued.
However, it is fair in all the circumstances that should the revised estimate be lower
than $3,053, the FSP is not entitled to recoup its losses and need pay nothing further
in relation to the rectification work.
Case No: 449151 Determination Page 11 of 15
2.4 Have the FSP’s repairs exposed the applicants to asbestos?
Applicants’ concerns regarding exposure to asbestos first raised in 2014
Both before and after the dispute came to FOS, the applicants expressed concern
about potential asbestos exposure from repairs. The applicants contend the repairs
were not carried out properly in relation to the asbestos eaves linings. They say A did
not i dentify asbestos in the eaves. Therefore, they have concerns A‟s work was not
carried out to best practice guidelines as the eaves were scraped and sanded back
next to bedrooms and a living area. They contend the eaves should not been
repaired this way. They say the work commenced while they were at home and so
they have concerns the likelihood of exposure to asbestos is high.
The applicants say it supports their contention the FSP has not carried out correct
repairs and cut corners. They also say the FSP has not adequately addressed this
issue.
The FSP referred to the Notice of Response and said the concerns were unrelated to
the issues in dispute before FOS and asked FOS proceed to determination.
In the meantime, the FSP said it noted the asbestos concerns which it would treat
with care and correspond with the applicants directly.
Environmental assessment arranged by FSP in 2017
The FSP arranged for an environmental assessment from BE. The instructions to BE
indicated the eaves were initially prepared and painted but after additional damage
the eaves linings were too damaged to repaint and were replaced. The instructions
indicated the affected area would have been around 10m2. Scopes of work,
photographs, and reports were provided to BE from the FSP.
BE reviewed the documentation and concluded the works performed did not disturb a
significant amount of asbestos bearing materials in a manner that would cause harm
to the applicants or to their family.
But he also said it was not best practice to cut, grind or sand asbestos materials
without careful containment except if working with less than 10m² material and in any
event, to avoid sanding with power tools.
In making his decision, BE made the following observations:
it was likely but not certain the original eaves were asbestos bearing
the reports did not indicate visibly friable asbestos
the eaves would not have been friable as if friable, the eaves would have been
too soft for painting and would not have had enough integrity to act as sheets
hanging under the eaves
the eaves are not in an habitable part of the house
a test for asbestos would have been helpful in 2013 prior to the later removal of
the original eaves
the report from J of 14 April 2016 describe the paintwork is blistered and
proposed a scope for sanding back an area of about 5m²
Case No: 449151 Determination Page 12 of 15
as the area was less than 10m² it would lawful for an unlicensed person to
remove the non-friable asbestos sheets
nonetheless, work procedures should minimise the release of dust or fibres using
only non-powered hand tools and avoiding scraping or scrubbing the surface.
Upon receipt of the report, the FSP provided a copy to the applicants. The FSP
further advised the applicants the scope of works to J in August 2014 included a
scope about the front eaves work in an area of about 5m².
The FSP agrees that in October 2014, J discovered asbestos behind the paint which
needed to be scraped back and a variation for additional work was submitted.
In November 2014, the FSP says J completed the work removing the front eaves and
veranda sheets. It says the eaves were covered and once certificates arranged, the
eaves were removed approximately five days later.
The FSP acknowledges it did not address concerns raised by the applicant in 2014
and apologised the concerns were not previously addressed.
Applicants submit FSP’s report does not address their concerns
The applicants challenged BE‟s report noting mistakes such as the date of the
removal of the eaves. Further, they allege the report does not address their concern
about the work done by A in 2013.
The applicants also rely on the original scope of work from A in 2013 which contained
an estimate of 27 m² for scraping blistered paint work. And, unlike J‟s 2014 scope of
works, A‟s scope of works make no reference to asbestos.
The applicants say J had the eave linings tested/inspected by an asbestos
professional and they were correctly removed under asbestos guidelines.
The applicants agree a test for asbestos would have been helpful in 2013 and
asserts because this was not done A put the applicants and their family at great risk
performing work on the asbestos eaves.
Asbestos issue relates to dispute about unsatisfactory repairs
I acknowledge this issue was not referred to in the applicants‟ referral to FOS and
was therefore not referred to in the Notice of Response. I accept there was no
deliberate intention to exclude information in these circumstances.
However, I do not accept the issue is unrelated to the issues in dispute. This is
because this is a dispute about the unsatisfactory repairs by the FSP.
Furthermore, I am satisfied from the material provided this issue was the subject of
correspondence between the parties in 2014 and yet not addressed by the FSP until
the dispute came to FOS. The FSP acknowledges this oversight and has apologised.
The FSP’s report does not address the applicants’ concerns about 2013 work
I have carefully considered the material provided. I am satisfied of the following:
the eaves were lined with asbestos fibre sheeting
Case No: 449151 Determination Page 13 of 15
A assessed the damage and did not identify asbestos
Item 9 of A‟s scope of works says: “scrape blistered paint work and prepare and
paint soffit linings to the front and RHS of the property. Approx 27 m² (painter)
in a letter of 28 March 2014, the applicants referred to concerns regarding the
paint on the asbestos eaves at the front of the house
on 5 August 2014, the applicants first raised the concern the painters were
allowed to paint and scrape back asbestos eaves
on 6 August 2014, the FSP indicated it would allocate the matter to J to attend
and review the workmanship and it would address the asbestos concern
J‟s scope of works was after this complaint
J‟s scope refers to seal and paint the eaves with the area being approximately
5m² and addresses the issue of the care required when handling asbestos
the asbestos concern does not appear to have been addressed until after the
matter came to FOS.
Having considered the material provided, I am satisfied the report from BE does not
address the applicant s‟ concerns about the work done in 2013 with sufficient
particularity. It agrees a test for asbestos in 2013 would have been helpful yet this is
this was not done until 2014.
The report says when working with less than 10 m² of bonded asbestos a specific
license is not required. However, A‟s material from 2013 indicates work was
undertaken to up to 27 m². Further, even when working with less than 10 m², BE says
work procedure should minimise the release of dust or fibres including using only
non-powered hand tools. It is not known how the work was done in 2013.
Further report to be prepared by an asbestos expert about 2013 work
Having considered the material provided, I am satisfied it is fair in all the
circumstances the FSP arrange, at its expense, for a further report to be prepared by
BE or by an asbestos expert to be agreed by the parties. Both parties can make
written submissions to the expert, if required.
The report is to focus on what work was done to the asbestos eaves by A in 2013
and exactly how that work was carried out. The report is to determine whether the
work was carried out in accordance with regulations. The report is also to determine
whether the work was carried out safely and thoroughly analyse and report on the
risk of asbestos exposure (if any) to the applicants and their family.
2.5 Are the applicants entitled to com pensation?
Compensation paid in some circumstances
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant‟s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
Case No: 449151 Determination Page 14 of 15
The applicants make a number of complaints about the FSP‟s claims handling. The
applicants also complain the FSP wrongfully tried to force the applicants to accept
money offered for paint damage rectification works as a full and final settlement of
the dispute.
FSP to pay the applicant $3,000 compensation
However, whatever the approach taken to the applicants‟ other complaints, I have
particular concern about the FSP‟s response to the applicants‟ concerns regarding
asbestos exposure.
I consider the FSP‟s conduct in this regard has interfered with the applicants‟
expectation of enjoyment or peace of mind and there has been an unusual amount of
time taken to resolve the situation.
The concerns regarding asbestos were serious. They were not addressed in 2014.
They were still not properly addressed recently.
While acknowledging the apology from the FSP, I am satisfied it is fair in the
circumstances the FSP pay to the applicants $3,000 compensation.
Case No: 449151 Determination Page 15 of 15
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP‟s Notice of Response dated
2 September 2016. Both the policy document and the Notice have been exchanged
with the applicants.
3.3 Other relevant material considered and relied on
Parties‟ submissions, emails, photographs, reports and all attachments to all
submissions.
Correspondence between the parties.