Home / Financial Firm (Unknown - Insurer) / Determination 448790
Determination 448790
claim_handling
Summary
The landlord claimed for storm damage to a tenanted property, which the FSP accepted and repaired over six months. AFCA found the FSP erred in its longer-term claim management and withdrew its apology, and ordered $250 for non-financial loss without waiving the excess.
Initial delays were unavoidable given the widespread weather event, but the FSP's later claim management was deficient and its withdrawn apology left no adequate remedy, justifying a small conservative award.
Issues
- Poor claim handling primary · upheld
“I do not accept the FSP managed the claim as well as it could have, including gaps in claim activity and an unfinished light replacement.”
- Delay secondary · not upheld
“I accept any delays in the initial weeks following the applicant's claim were likely unavoidable due to the weather event.”
Subjects and remedies
pay non financial loss
Text of the determination
Determination
Case No: 448790 Determination Page 1 of 6
Case number: 448790 16 June 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his landlord insurance policy held with financial
services provider (FSP) for storm damage to his tenanted property.
The FSP accepted the claim and the damage has now been repaired. However, the
applicant expects the FSP to waive the $500 policy excess and/or provide
compensation for non-financial loss in light of its management of the claim.
Whilst in itially apologising for the applicant’s claim experience (although not offering
any compensation) by way of its IDR letter, the FSP appears to have withdrawn this
apology and now maintains it did not err in its management of the claim.
1.2 Issue and key findings
Is the applicant entitled to compensation for non-financial loss?
The applicant is entitled to a small award of compensation for non-financial loss
because the FSP appears to have withdrawn its initial apology for the applicant’s
claim experience which otherwise would have been a sufficient remedy.
On this basis, and in light of the conservative approach taken by FOS towards
compensation for non-financial loss, the applicant is entitled to compensation in the
amount of $250.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is to provide the applicant with compensation for non-financial loss in the
amount of $250 within 14 days of any acceptance of this determination by the
applicant.
Case No: 448790 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the applicant entitled to compensation for non-financial loss?
Applicant dissatisfied with the FSP’s handling of the claim
The applicant says he is very disappointed with the FSP’s handling of the claim on
the following grounds:
the claim took over six months to be finalised
his elderly tenant remained without a kitchen light for the duration of this period
the tenant’s furniture was not removed and re -instated as quoted for
there were too many staff members dealing with the claim and this involved
extended periods of time on the telephone
he is a loyal long term gold member who holds multiple policies with the FSP.
For these reasons, the applicant expects the FSP to waive the policy excess and/or
provide compensation for non-financial loss.
The associated timeline of events is summarised in section 3 of this determination.
FOS awards compensation for non-financial loss conservatively
FOS can award up to $3,000 for non-financial loss if the FSP caused the applicant to
suffer an unusual degree or extent of inconvenience, delay or interference.
It is important to note that an award is based on an unusual degree or extent. This
would not encompass the normal degree of inconvenience a person would suffer
when lodging an insurance claim or in a dispute with their insurer.
FOS takes a very conservative approach when considering any award of
compensation.
FSP initially apologised for the applicant’s claim experience
The FSP initially acknowledged by way of its IDR letter the followi ng with regards to
the applicant’s claim experience:
the timeframe to finalise the claim
the applicant feeling he was not listened to
the applicant being placed on hold for extended periods of time.
The FSP apologised in this letter for the applicant’s cla im experience, although it did
not deem any such issues as justifying an award of compensation.
FSP appears to have retracted the initial apology
In its subsequent response to the applicant and FOS, the FSP appears to have
withdrawn any such apology saying:
“these repairs were actioned in an appropriate manner
…
his repairs were organised efficiently as requested”
The FSP also omits any reference to the other concerns raised by the applicant, in
particular the time spent on the telephone with different claims staff. Instead, the FSP
Case No: 448790 Determination Page 3 of 6
now suggests the nature of some telephone calls and contradictory instructions by
the applicant hindered progression of the claim.
Initial delays likely unavoidable due to nature of the weather event
There is no dispute a significant weather event occurred in the vicinity of the
applicant’s property causing the damage claimed and affecting many other properties
in the area.
Considering good industry practice is to prioritise claims involving significant property
damage and/or issues relating to health and safety, I accept any delays in the initial
weeks following the applicant’s claim were likely unavoidable.
The damage to the applicant’s property appears to have been primarily cosmetic in
the form of painting and replacement of a light, although there is contradictory
information as to whether a temporary light was installed prior to its replacement
taking place in March.
However, the applicant’s claim was not finalised until some six months after original
lodgement. Therefore, it needs to be considered whether the FSP’s on -going claim
management was appropriate in the circumstances.
FSP did err to a certain degree in its longer term claim management
I accept the relationship between the parties broke down as the claim progressed
which likely resulted in some level of miscommunication. I also accept the applicant
was overseas for a period in April and May which delayed an on-site reinspection.
However, I do not accept the FSP managed the claim as well as it could have. For
example, it appears it was only on 14 March 2016 (following contact being made by
the applicant) that the FSP identified that replacement of the strip light had yet to be
completed. Further, there appears to have been little claim activity from mid-February
to early March, and again from mid-March to mid-April.
I also note rectification works regarding some paint work was required. This suggests
some issue with quality control (also raised by the applicant during the course of the
claim) and likely further inconvenience in arranging these rectification works to be
completed.
A small award of compensation appropriate in the circumstances
As stated above, FOS takes a conservative approach towards any compensation for
non-financial loss. In circumstances such as these, if it had not already done so, I
would ordinarily take the view that the FSP should provide a letter of apology to the
applicant.
However, as discussed above, the FSP appears to have withdrawn its original written
apology by way of its subsequent formal response to the applicant and FOS.
Therefore, I am not satisfied the applicant would deem any further written apology as
being genuine on the part of the FSP.
Case No: 448790 Determination Page 4 of 6
For this reason and as an alternative, I am satisfied the FSP should pay a small
award of compensation to the applicant. In my view, an amount of $250 is fair in all
the circumstances.
If the applicant accepts this determination, this amount should be paid within 14 days
of such acceptance.
Case No: 448790 Determination Page 5 of 6
3 Supporting information
3.1 Timeline of events
Date Action
12 Dec 2015 Applicant lodges the claim.
17 Dec 2015 The FSP’s repairer (HR) contacts the applicant to obtain contact details for the
tenant and managing agent. The applicant directs HR to the FSP to whom he had
already given these details to.
23 Dec 2015 Make safe works undertaken to the roof of the property.
29 Dec 2015 The applicant expresses a desire for a different repairer to be appointed. The FSP
appointed a second repairer (RC) and requests contact be made to arrange for an
assessment. The request notes the real estate agent and tenant should be
contacted to arrange a site visit and the applicant kept up to date on progress.
19 Jan 2016 The applicant raises a complaint with the FSP saying not hing is happening with the
claim and requests the excess be waived. FSP contacts RC to make urgent
contact.
29 Jan 2016 RC cont acts the applicant to advise an assessment has been organised with the
tenant for 1 February 2016, but the applicant not appreciative of being contacted
directly.
8 Feb 2016 The appl icant contacts the FSP to raise issue with the fact he is being contacted by
RC when the real estate agent is the main contact.
9 Feb 2016 RC advis e the applicant was not appreciative of a call to try and arrange an
assessment. RC advise its appointed paint er also contacted the applicant by
mistake. RC says it will arrange for repairs with the tenant and provide a roof report
regarding condition and m ake - safe works completed. During this week, the internal
painting is also completed.
7 Mar 2016 The applicant calls to follow up on progress of the claim. The FSP advises it is
waiting on the roof report from RC. The FSP agrees an on - site assessment with the
applicant can then be undertaken. The applicant also advises if he thought it was
just painting required, he would have withdrawn the claim and organised this
himself.
The FSP contacts RC for an update as to works completed to date and an
associated sc ope of works.
9 Mar 2016 The FSP receives the roof report.
11 Mar 2016 The real estate agent attends the property and provided a report to the applicant.
The FSP also forwards RC reports to the applicant.
14 Mar 2016 The applicant raises issue with the fact the FSP does not know what repairs have
been complet ed, and it is relying on the real estate agent to provide associated
advic e. The applicant believes the fluorescent light has yet to be replaced (RC
advis e a single strip light was installed as a tem porary measure and a double strip
light due to be installed). The applicant requests an on - site meeting to review
Case No: 448790 Determination Page 6 of 6
repairs to date. The applicant again requests the excess be waived due to claim
handling and the fact he could have arranged for re - painting h imself.
The FSP follows up with RC regarding the light replacement which is excluded from
the scope of works.
15 Mar 2016 RC confirm arrangements have been made to replace the light.
21 Mar 2016 RC replaces the temporary light with a permanent one.
18 Apr 2016 The applicant suggests a re - inspection date of 27 May 2016.
5 May 2016 RC confirm all repairs have been completed.
26 May 2016 The re - inspection is cancelled as the applicant has been uncontactable.
1 Jun 2016 The re - inspection takes place.
An issue with the paintwork to the ceiling is identified and requiring rectification.
6 Jun 2016 The applicant raises issue with the service level for which the FSP apologises.
11 Jun 2016 All rectification works are completed.
30 Jun 2016 The applicant contacts the FSP to raise issues with the service levels.
1 Jul 2016 The applicant raises issue with the fact the repairs should have been completed
within two weeks and for less than the excess. The applicant says an on - site
assessment did not take place until June despite repeated requests prior (the FSP
says the applicant was overseas).