Home / Financial Firm (Unknown - Insurer) / Determination 448740

Determination 448740

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-01-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$5,097
SourceAFCA PDF

Summary

The applicant claimed storm and water damage to a garage ceiling, which the FSP denied on the basis of faulty workmanship, gradual deterioration and inadequate flashings. AFCA found the exclusions applied and declined non-financial loss compensation for claims handling.

The insurer bears the onus to prove an exclusion applies, and the unrefuted expert evidence established that excluded causes such as faulty workmanship and inadequate flashings caused the damage.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 448740 Determination Page 1 of 9 Case number: 448740 25 January 2018 1 Overview 1.1 Dispute The applicant claims storm damage to his garage ceiling which occurred sometime before the claims were made. The claims were denied by the financial services provider (FSP), on the basis of faulty repairs carried out by the applicant‟s plumber at the time of the storm event and defective issues with the roof. The applicant disputes this decision and says:  he undertook the repairs to the r oof at the FSP‟s instruction  as there was no roof leak after the repairs, the storm should be considered the proximate cause of the loss. The applicant also complains about the FSP‟s claims handling. 1.2 Issues and key findings Is the FSP entitled to deny the claims? The FSP is entitled to deny the claims because:  the available expert evidence establishes the cause of damage was faulty workmanship and defect issues with the roof  the policy excludes any liability caused by these factors  the available material does not establish the applicant was told to undertake repairs at the time of the storm damage. Is the applicant entitled to compensation? The applicant is not entitled to compensation as the material provided does not establish there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or peace caused by the FSP‟s claims handling. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to deny the claims and need take no further action in relation to the claims or the dispute. Case No: 448740 Determination Page 2 of 9 2 Reasons for determination 2.1 Is the FSP entitled to deny the claims? The applicant has established a prima facie claim It is accepted insurance law the applicant must establish on the balance of probabilities an insurance event has occurred. This is known as a prima facie claim. Once the applicant has established a prima facie claim, the onus shifts to the FSP if it wishes to deny the claim on the basis of an exclusion under the policy or some other basis. There is no dispute the applicant‟s property has been damaged by water ingress. Accordingly, the applicant has established a prima facie claim under the terms of the policy. It is now up to the FSP to establish it is entitled to deny the claims. The FSP must establish policy exclusions apply The FSP relies upon a number of exclusions to deny the claims. Both policies provided have the same relevant policy terms, namely: „ You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of: … gradual deterioration including wear and tear inherent defects, structural faults, faul ty workmanship or faulty design.‟ „ You are not covered for Loss or damage: … to the interior of your home or to your contents if the damage or loss has not occurred as a result o f an opening made by the storm…‟ Therefore, the FSP has the onus of proof in establishing the application of these policy exclusions to deny the claims. The FSP relies on builders’ opinions As a result of the claims made by the applicant, the FSP engaged building contractors to inspect and assess the damage. The builders inspected and photographed the damage and the roof in March 2016 a nd May 2016. In the first inspection, the builder said the damage was caused by gradual deterioration of the plasterboard adhesive due to a long-term exposure to air with a higher moisture content which is common in garages. In the second inspection, the builder inspected and photographed both the roof and the ceiling and provided the following comments and opinions about the inspections:  the flashing covering the junction where the edge of the end of the hip capping tiles adjoins the Dutch gable is inadequate and only providing minimal cover to the affected ceiling above the front roller door Case No: 448740 Determination Page 3 of 9  a large amount of sealant has been applied over the top of the flashing presumably by the applicant‟s repairer to render it watertight  the application of the sealant is not a recommended method of repair as it is restricting the flow of rainwater, which may be resulting in water banking against the sealant applied before overflowing and penetrating in underneath the flashing  the flashings installed beneath the hip cappings above the affected garage ceiling above the rear roller door are inadequate  during past heavy rain, water has penetrated inside the garage ceiling cavity above the doors through the inadequate flashings and into the ceiling cavity below softening the plasterboard linings resulting in fixing failure occurring . The builders‟ reports are expanded upon in section 3.1 of this determination. The applicant has provided no expert opinion The applicant has provided no expert opinion. The applicant has provided annotated photographs and quotes from repairers. The applicant makes various criticisms of the FSP‟s builders‟ opinions and independence. Most critically, the applicant has provided no material in relation to the repairs he says took place at the time of storm damage. While a photograph is provided of a replaced tile, no independent expert opinion is provided to corroborate the applicant‟s contentions or to rebut the FSP‟s expert opinion about the cause of damage. One of the quotes obtained by the applicant on 1 May 2016 says the damage was caused by cracked tiles on the garage roof. Another dated 2 May 2016 refers to repairs required to the garage ceiling caused by water flooding. A third quote was obtained and paid for in May 2016 after the second attendance by the FSP‟s builder. This document quotes $350 to repair and: „ to make roof watertight with lead flashings to both gables to garage. water in roof due to storm (sic).‟ The applicant also relies on a text message from the repairer who says there was a storm seal underneath. The applicant says because the garage roof was damaged by a storm a period of time before the FSP‟s builders‟ inspections, the storm is the proximate cause of the damage to the ceiling. The FSP‟s experts refute this, con cluding the proximate cause is both faulty workmanship, gradual deterioration and faulty flashings. While it is noted the reports offer differing causes of the resultant damage, all are causes of damage to which the exclusions can be applied. Proximate cause of the damage was faulty flashings or faulty repairs The FSP‟s experts are suitably qualified to provide opinions on the cause of the damage. The reports are plausible, supported by the photographic evidence, and offer persuasive findings on the damage which has occurred. Significantly, the reports are unrefuted by any other expert. Case No: 448740 Determination Page 4 of 9 While the quotes provided by the applicant may support contentions there was damage to the ceilings because of storm water, there is no independent expert material which r ebuts the opinion of the FSP‟s experts which is water has penetrated into the garage ceiling cavities but because of the inadequate state of the roof above. The applicant points out the first builder was mistaken in relation to the age of the property. The second builder said it is about 8 to 10 years old as asserted by the applicant. While the property may have been in good condition as asserted by the builders, this and the mistake made by the first builder about the age of the property, does not derogate from the uncontested opinion about the cause of the damage to in the applicant‟s garage. The FSP is entitled to deny the claims Taking all matters into account, and on the available information, I am satisfied the FSP has met its onus in establishing the damage was caused either by faulty workmanship and/or gradual deterioration and/or because of the inadequate flashings. As these causes of damage are excluded from cover, the FSP is entitled to deny the applicant‟s claims. 2.2 Did the FSP advise the applicant to undertake repairs? The applicant has not established he was told to undertake repairs The applicant says, upon the advice of the FSP, he engaged a plumber to repair the roof at or about the time of the storm damage. The applicant has been unable to say exactly when the storm occurred. The available information indicates the applicant claims storm damage occurred at least a year or perhaps a year and a half before the claims were made. The claims were made in March 2016 and April 2016. The applicant has not been able to provide any corroborative material from the plumber engaged to repair the roof at or about the time of the storm damage. The only material provided about repairs undertaken is a quote dated 19 May 2016 which is annotated with a note the amount of $350 was paid on 24 May 2016. Presumably this work was done after the observations made by the FSP‟s builder when he examined the roof on 3 May 2016. The work done was to make the roof watertight with lead flashings to both gables to the garage. The FSP says the applicant‟s description of the call and the advice to undertake repairs does not correlate with the claims teams usual process to lodge a claim and have damages inspected by an assessor and repaired by a specialist. The FSP also says there is no evidence a conversation took place in which this advice was given at or about the time alleged by the applicant. The FSP investigated this allegation. After investigation, the FSP submitted it found no call or notes on the policy confirming any conversation of this nature. It searched its recording database using the applicant‟s mobile and home phone numbers and found only one telephone call on 14 March 2015 regarding a missed payment and a total of 11 calls in 2016 regarding the current claims. Case No: 448740 Determination Page 5 of 9 The FSP also provided uncontested material (a telephone recording and transcript of the telephone recording) to establish the only other contact made before the claims the subject of this dispute were phone calls made in relation to a motor vehicle claim which occurred in June 2013. I have listened to the call recordings provided. I am satisfied the applicant‟s contentions are not made out in these recordings. The FSP acknowledged in a minority of situations, it will advise an applicant to undertake minor make-safe repairs. In an effort to resolve this aspect of the dispute previously, the FSP offered the applicant $500 for having to repair the roof tile initially. The applicant rejected the FSP‟s offer and it has since been withdrawn. Based upon the available information, the applicant has not established the FSP told the applicant to repair the roof at or about the time of the claimed storm damage. Even if this was established (which it has not been), this does not advance the applicant‟s position. Th is is because, given the FSP was entitled to decline the claims, the applicant was liable for any costs to repair the roof. 2.3 Is the applicant entitled to compensation? Compensation paid in some circumstances only The applicant complains about FSP‟s claims handling. For example, he says the FSP admitted it made a mistake in handling the case, the builders‟ reports are contradictory and/or mistaken about the age of the house and two claims should not have been opened. The applicant contends the FSP failed to follow its claims resolution process properly and because of the stress and pressure caused by the FSP‟s claims management and denial of his claims, he has suffered a heart attack. Relying on the claim file notes, the FSP says a second claim was lodged to accommodate the applicant‟s request for another assessment. It says the FSP was not at fault in lodging a second claim in circumstances where another possible storm event was alleged. Further, it says the applicant has not been prejudiced in this regard. The FSP otherwise denies it has mishandled the claim. FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. Based on the available information, I am not satisfied the applicant is entitled to compensation under FOS‟s Terms of Reference. This is because the available information establishes there was a telephone call between the applicant and the FSP on 27 April 2016 in which there was discussion about an event which occurred “a year and a half ago.” At the time, the applicant was dissatisfied with the FSP‟s claims decision and wanted another assessment. The FSP‟s notes indicate it Case No: 448740 Determination Page 6 of 9 considered that if there was a different event then a new claim should be lodged. Because of this, a new claim was lodged and a second assessment took place. The FSP concedes had it known the applicant was in fact referring to the same storm event which occurred either a year ago or a year and half ago, it would not have opened a second claim. But I am not satisfied the available information establishes the FSP‟s claims decision at the time of the telephone call in April 2016 was unreasonable in the circumstances or that the applicant was prejudiced by the decision to open a second claim or by the different assessments provided by the FSP‟s builders. The material provided shows a claim was first made on 21 March 2016. The claim was assessed on 30 March 2016, and again on 3 May 2016 after the telephone call on 27 April 2016. The claim was first denied on 13 April 2016. The claim was denied again on 8 June 2016. A final claims decision was made on 10 June 2016. In the circumstances, I consider the time taken to make a final claims decision was not unreasonable. Whilst acknowledging claims and disputes are stressful, the material provided does not establish there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or pe ace caused by the FSP‟s claims handling. I am satisfied the FSP is not required to pay the applicant compensation pursuant to the Terms of Reference. Case No: 448740 Determination Page 7 of 9 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their s ubmissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 5 September 2016. Both the policy documents and the Notice have been exchanged with the applicant. 3.3 FSP’s records Transcript of claim recording 21 March 2016 …. Customer: Right over the garage here. Ah... Possible the sheeting has come uh, come off. And we want to claim for that, you know. Because it's damage due to water. There was a storm and uh, a couple of tiles got mixed in and slipped, you know. And there was leakage, you know. Agent: Okay. So tiles have moved due to storm and water's got in your roof and damaged your ceiling? Customer: Yes. Actually it was uh, about uh... more than one year ago that this thing happened. And we rang up, uh (FSP). Uh, they said that uh, actually there was a hole and water was dripping from the, uh... the sheet boards, you know. Uh, then we called the plumber at the same time... Agent: Mm-hm. Claim file note 27 April 2016 … (applicant asks FSP) what about damages from event year and half ago? Case No: 448740 Determination Page 8 of 9 3.4 FSP’s expert reports Record Key points FSP’s expert (A) Report 30 - 03 - 2016  Inspected and photographed claimed damage on 30 March 2016.  Photographs are annotated noting “external no damage to roof” and noting “poor ceiling repairs” .  Building about 20 to 30 years old and has been maint ained in good condition .  Applicant refers to a storm over a year ago which caused the ceiling to fall at that time: ceili ng fixed: no recent storm event.  During recent months, ceiling started to sag and rub on roller door .  Plaster ceiling had sagged across the front roller door and rear single roller door .  No evidence of any insur ed event that caused the damage.  Ceiling sagged due to wear and tear .  Damage caused by gradual deterioration of the plasterboard adhesive due to long - t erm exposure to air with higher moisture content which is common for garages .  “On inspection of the plaster we found no evidence of any water ingress or damage to the plasterb oard other than the areas directly above the roller doors. It is common for plasterboard ceilings in garages to sag above the roller doors due to the increas ed moisture content in the air in garages, as they are not air tight, especially above the roller d oors where gaps are always pres ent. This long term exposure to air with a higher moisture content det eriorates the plaster adhesion over a long time and eventually the plasterboard pulls away from the timber fixings above.” Applicant’ s expert (B) Report 03 - 05 - 2016  Further attend ance and photographs 3 May 2016.  Building 8 to 10 years old and maint ained in good condition .  Applicant described a storm event about 18 months ago when water leaked through the plasterboard ceiling linings above the front and rear roller doors of the garage .  Plumber came and repaired the roof but ceiling has water stains due to leaking roof .  Applicant advised roofer attended who told him there was a defect with the flashing to the Dutch gable above the affected area of the ceiling a bove the front roller door roof.  Applicant said roofer completed repairs to the roof above the ceiling above the rear roller door but unsure what works involved .  Applicant could not provide an invoice or name of the person who completed roof repa irs .  Applicant said he tried to patch repair the damage to the ceiling linings but could not and linings continue to sag .  B agreed plasterboard ceiling linings above the front and rear doors are water damaged and the door is damaged due to rubbing against the ceiling linings .  Entire ceiling needs to be replaced at an estimated cost of $5,097.40 .  Damage caused by rainwater penetrating through the identified maintenance/ defect issue with the roof above the affected area .  Inspected Dutch gable above the ceiling above the front roller door and wrote: Case No: 448740 Determination Page 9 of 9  “Closer inspection revealed that the flashing covering the junction where the edge of the end of the hip capping tiles adjoins the Dutch gable is inadequate and only providing minimal cover. We noted tha t a large amount of sealant has been applied over the top of this flashing which we assume was done by the insured‟s roofer to render it watertight. This is not a recommended method of repair as the sealant applied is restricting the flow of rainwat er whic h may result in water banking against the sealant applied before overflowing and penetrating in underneath the flashing [sic].  We believe that during past heavy rain, water has penetrated inside the garage ceiling cavity above the front roller door through this inadequate flashing and into the ceiling cavity below. The ingress that occurred has softened the plasterboard linings resulting in fixing failure occurring. This fixing failure has then been exacerbated by vibrations experienced in the roof frame wh en the roller door is opened and closed causing the ceiling linings to sag further.”  Inspected the roof above the rear roller door and wrot e: “Inspection of the affected garage ceiling linings above the rear roller door revealed that an issue exists with t he flashing installed underneath the hip cappings above the affected area being inadequate. Inspection of this area of the roof revealed that 2x tiles had been placed over the inadequate flashing we assume in an attempt to render it watertight.” 3.5 Other relevant material considered and relied on  Parties‟ submissions, emails, quotes for repair, photographs, reports, call recordings, transcript of call recordings, and all attachments to all submissions .  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.