Home / Financial Firm (Unknown - Insurer) / Determination 448003
Determination 448003
Declined claim for cracking damage to home allegedly caused by neighbouring construction
Summary
Homeowners claimed cracking damage from neighbouring earthworks and construction. AFCA found the expert evidence showed the damage was due to reactive clay soil and tree roots, which the policy excludes as earth movement, so the FSP was entitled to decline.
The onus was on the applicants to show a covered event caused the damage, and they did not overcome the FSP's engineering evidence attributing it to excluded earth movement.
Issues
- Claim denial primary · not upheld
“I accept in these circumstances the FSP is entitled to refuse payment of the applicants' claim.”
- Inadequate claim investigation secondary · not upheld
“I am not satisfied the applicants have provided any persuasive information or expert reports to challenge the FSP's engineer evidence.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 448003 Determination Page 1 of 3
Case number: 448003 20 September 2017
1 Overview
1.1 Dispute
This dispute follows a claim lodged by the applicants with the financial services
provider (FSP) for damage sustained to their home during construction of a
neighbouring property.
The applicants believe that during the constructions works, in particular, the earth
works, vibrations and impact from the machinery has caused cracking to their
property.
The FSP denied the claim and says:
it has been prejudiced by the applicants ‟ delay in lodging a claim
there is no evidence of damage caused during the construction works
the most likely cause of damage was due to earth movement which was
excluded from cover under the terms of the policy.
This dispute has been subject to a recommendation. The recommendation was in
favour of the FSP. A copy of the recommendation is attached.
1.2 Issues and key findings
Is the FSP entitled to refuse payment of the claim?
I agree with the findings contained in the recommendation in this regard.
Whilst there is some cracking to the applicants‟ property, I am not satisfied that there
is sufficient information to establish the cracking was caused during the construction
of the neighbouring property.
I am satisfied, based on the information available, that most likely the damage was
caused by earth movement related to the settling and shrinkage of the soil.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny the applicants‟ claim in ac cordance with the terms and
conditions of the policy.
Case No: 448003 Determination Page 2 of 3
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Following rejection of the recommendation, the applicants have provided information
of a discussion held with a building inspector for the local city council.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to relevant legal
principles, the terms of the policy, good industry practice including codes of practice
and prior determinations where applicable.
2.1 Is the FSP entitled to refuse payment of the claim?
I agree with the findings contained in the recommendation. The available information
does not assist the applicants in establishing a claim for damage associated with the
construction work of the neighbouring property. Based on the available information,
most lik ely the damage to the applicants‟ property is due to earth movement
occurring over time.
RC’s report is not persuasive
The applicant has relied upon a report from RC, an engineer who inspected the
property approximately 12 months prior to the applicants submitting their claim.
RC noted that there was evidence of some pre-existing damage to the property but
could not rule out the possibility that the construction of the neighbouring building had
contributed to the cracking observed.
Council report does not s upport the applicants’ claim
Following complaints by the applicants, the council arranged for an engineer, NM, to
carry out further investigations. NM conducted a site visit on 21 August 2015 and
found no evidence to associate any of the damage to the applicants‟ property with
the construction work.
FSP’s engineering report is persuasive
The FSP arranged for an engineer, FM to inspect the property. FM concluded that
the reactive clay soil was the cause of any movement which was exacerbated by the
drying effects of tree roots sucking moisture out of the ground. FM noted evidence of
previous movement to the building consistent with the comments of RC.
The applicant provided a soil analysis report from RS. RS considered the soil was of
moderate reactivity. This is consistent with the comments made by NM where he
made reference to the soil profile being of moderate reactivity.
FM confirms that the analysis of the soil sample shows a moderate reactivity but
notes that when this is combined with the added impact of the trees, it becomes
Case No: 448003 Determination Page 3 of 3
highly reactive. He confirmed his view that the property was settling due to the root
drying at the soil due to the presence of nearby plants.
The applicant has most recently referred to a conversation with a former building
inspector who he asked „why is this building touching our house?‟ The applicant says
the inspector advised that the „ piers were not dug properly ‟ .
Whilst I accept the applicant may have had this discussion, this comment is
inconsistent with the engineering report provided by the council from NM.
No other information available to support the applicant‟s claim. There is no other
information available to support the applicants‟ claim. Whilst the policy provides cover
for accidental damage, it excludes loss or damage caused by earth movement.
I agree with the findings contained in the recommendation. The FSP has provided
expert evidence to show the damage to the applicants‟ proper ty was not caused by
the construction of the earthworks but most likely caused by the effects of ground
movement and the effects of tree roots drying the soil.
I accept in these circumstances the FSP is entitled to refuse payment of the
applicants‟ claim.
Recommendation
Case No: 448003 Recommendation Page 1 of 5
Case number: 448003 11 January 2017
3 Overview
3.1 Dispute
The applicants lodged a claim with the financial services provider (FSP) saying
construction of a residence and earthworks next door damaged their property.
The FSP denied the claim saying:
there is no expert evidence to show the construction works caused the damage
the FSP has been prejudiced by the delay in claim lodgment
the FSP rely on the exclusions under the policy to deny the claim.
The applicants disagree with the FSP‟s decision saying:
the construction works next door caused considerable damage to their property
by way of cracking internally and externally, movement of walls and the lounge
floor had dropped.
3.2 Issues and key findings
Can the FSP deny the claim?
The FSP deny the claim because:
the applicants have not provided sufficient evidence to establish the
construction of the property next door caused the damage
the expert evidence shows reactive clay soil was the cause of any movement
and damage
the FSP has been prejudiced by the delay in lodging the claim
the policy provides accidental damage cover, but exclusions apply.
3.3 Recommendation
The recommendation is in favour of the FSP.
The FSP is not required to take any further action in relation to the claim.
Case No: 448003 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Can the FSP deny the claim?
Applicants required to establish an event covered by the policy caused the
damage
As the applicants are seeking to make a claim under a policy, legal principles state
the obligation is upon them to establish, on the balance of probabilities, the policy
responds to their loss.
The applicants‟ policy provides cover for accidental loss or damage. However, this
cover is subject to exclusions. The onus is on the applicants to establish an event
covered by the policy caused the loss.
The evidence does not support the applicants’ position
The applicants engaged an engineer (RC) to assess their property 12 months prior to
submitting a claim. RC concluded that some cracks had been previously repaired,
indicating some movement in the past. RC could not rule out the possibility that the
construction had contributed to the cracks observed.
RC made no reference to observations prior to the construction of the earthworks so
was unable to determine if the cracks pre-dated the construction.
The FSP then appointed its own engineer (FM) who concluded that reactive clay soil
was the cause of any movement which was exacerbated by the drying effects of tree
roots sucking moisture out of the ground. FM also noted evidence of previous
movement of the building.
The council does not attribute the damage to the home from the construction
work
(NM) carried out further investigations for the local council. The scope of this
investigation did not directly include cracking to the applicants‟ house walls, but
limited to:
substandard workmanship of a wall
carport alignment
subsidence causing the neighboring building to move towards the applicants‟
property.
NM could not find anything of significance to assist the applicants. NM did make
reference to the soil profile being of moderate reactivity and as this differed slightly to
the FSP‟s engineering evidence.
FM responded by saying the tree effects increase the magnitude of the moderate
clay‟s soil potential movement, making the result appear to be more like a highly
reac tive clay. This did not alter FM‟s opinion or report.
The applicants‟ broker submitted a soil analysis report from (RS) which was referred
to FM for further comment.
Case No: 448003 Recommendation Page 3 of 5
FM concluded that the property was settling due to root drying from plants extracting
moisture from the reactive clay, causing it to shrink and cause building footings to
settle. FM‟s opinion remained unchanged.
The policy provides accidental damage cover, but exclusions apply.
All of the evidence provided by FSP and applicants does not establish the damage
was caused by construction works next door or any other event which would be
covered by the policy terms.
The FSP has provided expert evidence to show the damage to the applicants‟
property was not caused by the construction of the earthworks. The evidence
provided concludes:
there is evidence nearby in the street of settlement cracking to masonry
structures caused by tree root drying effects
this movement exacerbated by the drying effects of tree roots sucking moisture
out of the ground.
the lack of immediate damage at the time of the impact of the backhoe and
compacting device, suggests the cause is reactive clay soil movement. There is
evidence of previous movement
reactive clay soil was the cause of any movement.
I am not satisfied the applicants have provided any persuasive information or expert
reports to challenge the FSP‟s engineer evidence.
Based upon the evidence available provided, FSP can rely upon the engineering
evidence and exclusions under the policy to deny the claim.
FSP position has been prejudiced
There was a considerable delay by the applicants in lodgement of their claim. The
information available suggests the delay was because the applicants were holding
the local council responsible for the damage.
In my opinion, the del ay of approximately 17 months has prejudiced the FSP‟s
position to verify whether the cracks appeared at the time the construction of the
earthworks commenced.
The applicants should have notified the FSP when they became aware of the
damage. This would have allowed the FSP to examine the property earlier and
possibly identify when the cracks were likely to have appeared.
Therefore, the claim is to be evaluated solely on its merits. As set out above, the
engineering evidence establishes the damage is attrib utable to reactive soil
conditions at the site, which is specifically excluded from cover.
Case No: 448003 Recommendation Page 4 of 5
5 Supporting information
5.1 Key reports
Records Key points
Applicants engineer (RC)
Report
14 April 2014
No inspection of the property was carried out prior to the
commencement of works on adjoining property
No defects list was available for comparison
Some cracks noted as being previously repaired indicating the
dwelling had undergone some movement in the past
Dwelling generally free from dust and dirt making it impossible
to determine if the cracks predated the construction on the
adjoining property
Cracks look fresh and this office cannot rule out the possibility
that the construction on the adjoining property has contributed
to the cracks observed
FSP enginee r (FM )
Report
10 July 2015
Residence located on a moderately highly reactive clay
beneath a sandy layer
Evidence in this particular street that there is settlement
cracking occurring to the masonry structures caused by tree
root drying effects from street trees
Lack of immediate damage at the time of impact of the backhoe
suggest reactive clay soil movement
Cracks so small suggest continuous movement and contraction
during winter
Previous movement related to additional warm weather of
plants and adjac ent g ravel driveway drying out on the eastern
perimeter of the residence.
Movement in building caused by tree root drying effects of the
highly reactive clay soil and unrelated to vehicle damage
Applicants engineer (NM)
Report
21 August 2015
Gap between appli cant’s gutter and the east wall of No 18:
Carport frame has no structural element effectively restraining
outward bow in the fascia from the dead loading of the bull -
nose roof sheet loading
Cracking in the east wall of No 18 :
Since rendering of the wall no movement has been indicated by
cracking in that render
There may be a crack given a “shadow” in the appearance of
the render but if that shadow was due to a crack, there was no
indication of its width and it has not come back following the
rendering work
Effect of excavation for the development footings on the
car alignment
String line measurements of the concrete surface along the
Case No: 448003 Recommendation Page 5 of 5
3.2 Policy Provisions
Accidental Damage Cover
If you have chosen Accidental Damage Home Insurance, we will cover your buildings or contents for
accidental loss or damage
…
Any cover we provide is subject to exclusions:
Under Accidental Damage, we will cover your buildings or contents for loss or damage as a result of a
landslide or subsidence
…
We will only do this if the loss or damage occurs within 72 hours of
An earthquake or ex plosion
A storm, including rainwater or wind, or
Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or a drain.
…
Any cover we provide is subject to the following exclusions:
We will NOT cover any loss or damage as a result of, or caused by:
Settling, shrinkage or any movement of earth
Roots from trees, plants, shrubs or grass
Landslide or subsidence, unless
We agree to cover the incident as described under „Landslide or Subsidence
alignment of the posts shows the areas of the concrete where
the posts are secured was in alignment with no heave or
subside nce
Had there been subsidence in the alignment, there may have
been support for the builders position but that was not the case
as measured
Whilst not dismissing the possibility of slight subsidence in the
east side of the No 18 floor slab, if there, it is not relevant to
closing of the gap between the No 16 carport gutter and the No
18 garage wall as the garage walling on the boundary shows
no rot ation toward the No 16 property.