Declined claim for cracking damage to home allegedly caused by neighbouring construction

FirmFinancial Firm (Unknown - Insurer)
Decided2017-09-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed cracking damage from neighbouring earthworks and construction. AFCA found the expert evidence showed the damage was due to reactive clay soil and tree roots, which the policy excludes as earth movement, so the FSP was entitled to decline.

The onus was on the applicants to show a covered event caused the damage, and they did not overcome the FSP's engineering evidence attributing it to excluded earth movement.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 448003 Determination Page 1 of 3 Case number: 448003 20 September 2017 1 Overview 1.1 Dispute This dispute follows a claim lodged by the applicants with the financial services provider (FSP) for damage sustained to their home during construction of a neighbouring property. The applicants believe that during the constructions works, in particular, the earth works, vibrations and impact from the machinery has caused cracking to their property. The FSP denied the claim and says:  it has been prejudiced by the applicants ‟ delay in lodging a claim  there is no evidence of damage caused during the construction works  the most likely cause of damage was due to earth movement which was excluded from cover under the terms of the policy. This dispute has been subject to a recommendation. The recommendation was in favour of the FSP. A copy of the recommendation is attached. 1.2 Issues and key findings Is the FSP entitled to refuse payment of the claim? I agree with the findings contained in the recommendation in this regard. Whilst there is some cracking to the applicants‟ property, I am not satisfied that there is sufficient information to establish the cracking was caused during the construction of the neighbouring property. I am satisfied, based on the information available, that most likely the damage was caused by earth movement related to the settling and shrinkage of the soil. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to deny the applicants‟ claim in ac cordance with the terms and conditions of the policy. Case No: 448003 Determination Page 2 of 3 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Following rejection of the recommendation, the applicants have provided information of a discussion held with a building inspector for the local city council. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to relevant legal principles, the terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP entitled to refuse payment of the claim? I agree with the findings contained in the recommendation. The available information does not assist the applicants in establishing a claim for damage associated with the construction work of the neighbouring property. Based on the available information, most lik ely the damage to the applicants‟ property is due to earth movement occurring over time. RC’s report is not persuasive The applicant has relied upon a report from RC, an engineer who inspected the property approximately 12 months prior to the applicants submitting their claim. RC noted that there was evidence of some pre-existing damage to the property but could not rule out the possibility that the construction of the neighbouring building had contributed to the cracking observed. Council report does not s upport the applicants’ claim Following complaints by the applicants, the council arranged for an engineer, NM, to carry out further investigations. NM conducted a site visit on 21 August 2015 and found no evidence to associate any of the damage to the applicants‟ property with the construction work. FSP’s engineering report is persuasive The FSP arranged for an engineer, FM to inspect the property. FM concluded that the reactive clay soil was the cause of any movement which was exacerbated by the drying effects of tree roots sucking moisture out of the ground. FM noted evidence of previous movement to the building consistent with the comments of RC. The applicant provided a soil analysis report from RS. RS considered the soil was of moderate reactivity. This is consistent with the comments made by NM where he made reference to the soil profile being of moderate reactivity. FM confirms that the analysis of the soil sample shows a moderate reactivity but notes that when this is combined with the added impact of the trees, it becomes Case No: 448003 Determination Page 3 of 3 highly reactive. He confirmed his view that the property was settling due to the root drying at the soil due to the presence of nearby plants. The applicant has most recently referred to a conversation with a former building inspector who he asked „why is this building touching our house?‟ The applicant says the inspector advised that the „ piers were not dug properly ‟ . Whilst I accept the applicant may have had this discussion, this comment is inconsistent with the engineering report provided by the council from NM. No other information available to support the applicant‟s claim. There is no other information available to support the applicants‟ claim. Whilst the policy provides cover for accidental damage, it excludes loss or damage caused by earth movement. I agree with the findings contained in the recommendation. The FSP has provided expert evidence to show the damage to the applicants‟ proper ty was not caused by the construction of the earthworks but most likely caused by the effects of ground movement and the effects of tree roots drying the soil. I accept in these circumstances the FSP is entitled to refuse payment of the applicants‟ claim. Recommendation Case No: 448003 Recommendation Page 1 of 5 Case number: 448003 11 January 2017 3 Overview 3.1 Dispute The applicants lodged a claim with the financial services provider (FSP) saying construction of a residence and earthworks next door damaged their property. The FSP denied the claim saying:  there is no expert evidence to show the construction works caused the damage  the FSP has been prejudiced by the delay in claim lodgment  the FSP rely on the exclusions under the policy to deny the claim. The applicants disagree with the FSP‟s decision saying:  the construction works next door caused considerable damage to their property by way of cracking internally and externally, movement of walls and the lounge floor had dropped. 3.2 Issues and key findings Can the FSP deny the claim? The FSP deny the claim because:  the applicants have not provided sufficient evidence to establish the construction of the property next door caused the damage  the expert evidence shows reactive clay soil was the cause of any movement and damage  the FSP has been prejudiced by the delay in lodging the claim  the policy provides accidental damage cover, but exclusions apply. 3.3 Recommendation The recommendation is in favour of the FSP. The FSP is not required to take any further action in relation to the claim. Case No: 448003 Recommendation Page 2 of 5 4 Reasons for recommendation 4.1 Can the FSP deny the claim? Applicants required to establish an event covered by the policy caused the damage As the applicants are seeking to make a claim under a policy, legal principles state the obligation is upon them to establish, on the balance of probabilities, the policy responds to their loss. The applicants‟ policy provides cover for accidental loss or damage. However, this cover is subject to exclusions. The onus is on the applicants to establish an event covered by the policy caused the loss. The evidence does not support the applicants’ position The applicants engaged an engineer (RC) to assess their property 12 months prior to submitting a claim. RC concluded that some cracks had been previously repaired, indicating some movement in the past. RC could not rule out the possibility that the construction had contributed to the cracks observed. RC made no reference to observations prior to the construction of the earthworks so was unable to determine if the cracks pre-dated the construction. The FSP then appointed its own engineer (FM) who concluded that reactive clay soil was the cause of any movement which was exacerbated by the drying effects of tree roots sucking moisture out of the ground. FM also noted evidence of previous movement of the building. The council does not attribute the damage to the home from the construction work (NM) carried out further investigations for the local council. The scope of this investigation did not directly include cracking to the applicants‟ house walls, but limited to:  substandard workmanship of a wall  carport alignment  subsidence causing the neighboring building to move towards the applicants‟ property. NM could not find anything of significance to assist the applicants. NM did make reference to the soil profile being of moderate reactivity and as this differed slightly to the FSP‟s engineering evidence. FM responded by saying the tree effects increase the magnitude of the moderate clay‟s soil potential movement, making the result appear to be more like a highly reac tive clay. This did not alter FM‟s opinion or report. The applicants‟ broker submitted a soil analysis report from (RS) which was referred to FM for further comment. Case No: 448003 Recommendation Page 3 of 5 FM concluded that the property was settling due to root drying from plants extracting moisture from the reactive clay, causing it to shrink and cause building footings to settle. FM‟s opinion remained unchanged. The policy provides accidental damage cover, but exclusions apply. All of the evidence provided by FSP and applicants does not establish the damage was caused by construction works next door or any other event which would be covered by the policy terms. The FSP has provided expert evidence to show the damage to the applicants‟ property was not caused by the construction of the earthworks. The evidence provided concludes:  there is evidence nearby in the street of settlement cracking to masonry structures caused by tree root drying effects  this movement exacerbated by the drying effects of tree roots sucking moisture out of the ground.  the lack of immediate damage at the time of the impact of the backhoe and compacting device, suggests the cause is reactive clay soil movement. There is evidence of previous movement  reactive clay soil was the cause of any movement. I am not satisfied the applicants have provided any persuasive information or expert reports to challenge the FSP‟s engineer evidence. Based upon the evidence available provided, FSP can rely upon the engineering evidence and exclusions under the policy to deny the claim. FSP position has been prejudiced There was a considerable delay by the applicants in lodgement of their claim. The information available suggests the delay was because the applicants were holding the local council responsible for the damage. In my opinion, the del ay of approximately 17 months has prejudiced the FSP‟s position to verify whether the cracks appeared at the time the construction of the earthworks commenced. The applicants should have notified the FSP when they became aware of the damage. This would have allowed the FSP to examine the property earlier and possibly identify when the cracks were likely to have appeared. Therefore, the claim is to be evaluated solely on its merits. As set out above, the engineering evidence establishes the damage is attrib utable to reactive soil conditions at the site, which is specifically excluded from cover. Case No: 448003 Recommendation Page 4 of 5 5 Supporting information 5.1 Key reports Records Key points Applicants engineer (RC) Report 14 April 2014  No inspection of the property was carried out prior to the commencement of works on adjoining property  No defects list was available for comparison  Some cracks noted as being previously repaired indicating the dwelling had undergone some movement in the past  Dwelling generally free from dust and dirt making it impossible to determine if the cracks predated the construction on the adjoining property  Cracks look fresh and this office cannot rule out the possibility that the construction on the adjoining property has contributed to the cracks observed FSP enginee r (FM ) Report 10 July 2015  Residence located on a moderately highly reactive clay beneath a sandy layer  Evidence in this particular street that there is settlement cracking occurring to the masonry structures caused by tree root drying effects from street trees  Lack of immediate damage at the time of impact of the backhoe suggest reactive clay soil movement  Cracks so small suggest continuous movement and contraction during winter  Previous movement related to additional warm weather of plants and adjac ent g ravel driveway drying out on the eastern perimeter of the residence.  Movement in building caused by tree root drying effects of the highly reactive clay soil and unrelated to vehicle damage Applicants engineer (NM) Report 21 August 2015  Gap between appli cant’s gutter and the east wall of No 18:  Carport frame has no structural element effectively restraining outward bow in the fascia from the dead loading of the bull - nose roof sheet loading  Cracking in the east wall of No 18 :  Since rendering of the wall no movement has been indicated by cracking in that render  There may be a crack given a “shadow” in the appearance of the render but if that shadow was due to a crack, there was no indication of its width and it has not come back following the rendering work  Effect of excavation for the development footings on the car alignment  String line measurements of the concrete surface along the Case No: 448003 Recommendation Page 5 of 5 3.2 Policy Provisions Accidental Damage Cover If you have chosen Accidental Damage Home Insurance, we will cover your buildings or contents for accidental loss or damage … Any cover we provide is subject to exclusions: Under Accidental Damage, we will cover your buildings or contents for loss or damage as a result of a landslide or subsidence … We will only do this if the loss or damage occurs within 72 hours of  An earthquake or ex plosion  A storm, including rainwater or wind, or  Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or a drain. … Any cover we provide is subject to the following exclusions: We will NOT cover any loss or damage as a result of, or caused by:  Settling, shrinkage or any movement of earth  Roots from trees, plants, shrubs or grass  Landslide or subsidence, unless  We agree to cover the incident as described under „Landslide or Subsidence alignment of the posts shows the areas of the concrete where the posts are secured was in alignment with no heave or subside nce  Had there been subsidence in the alignment, there may have been support for the builders position but that was not the case as measured  Whilst not dismissing the possibility of slight subsidence in the east side of the No 18 floor slab, if there, it is not relevant to closing of the gap between the No 16 carport gutter and the No 18 garage wall as the garage walling on the boundary shows no rot ation toward the No 16 property.