Storm damage to roof claim partly denied as pre-existing and excluded
Summary
The applicant claimed about $15,000 to replace storm-damaged roof sheeting. AFCA found most damage was pre-existing or from excluded deterioration, but ordered the FSP to pay the $6,000 cash settlement it had accepted, with interest.
Once the applicant establishes a prima facie claim, the insurer must prove an exclusion applies, and it did so for the bulk of the roof damage.
Issues
- Claim denial primary · not upheld“The bulk of the hail damage to the applicant's roof occurred before the commencement of cover in September 2014.”
- Claim amount dispute secondary · not upheld“The FSP's offer of $6,000 reflects the fair and reasonable cost of repairing the damage for which it has accepted liability.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 447806 Determination Page 1 of 7
Case number: 447806 19 June 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) for storm damage to the roof of his home. The applicant
considers the damage occurred during a severe hail storm in November 2014.
The FSP initially denied the applicant’s claim on the basis that the damage to his roof
was not caused by the storm in November 2014 or by any other insured event during
the period of cover.
The FSP subsequently accepted that some of the damage to the roof was caused by
the storm in November 2014 and offered to cash settle the applicant for $6,000
(being the estimated cost of repairing this portion of the damage).
However, the FSP says the bulk of the damage to the roof is pre-existing and/or
caused by factors which are excluded from cover under the policy (such as gradual
deterioration and a lack of maintenance).
The applicant disputes the FSP’s decision and seeks cover for the costs of replacing
the roof (approximately $15,000).
1.2 Issues and key findings
Is the FSP liable for the costs of replacing the roof?
The available information establishes that the bulk of the damage to the applicant’s
roof was not caused by the storm in November 2014 but occurred prior to the
inception of the policy and/or was caused by excluded factors . Accordingly, the FSP
is not liable for the costs of replacing the roof.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not liable for the costs of replacing the applicant’s roof.
The FSP is required to pay the applicant the amount of $6,000, being the estimated
cost of repairing the hail damage for which the FSP has accepted liability (if this
amount has not been paid already). The FSP is required to pay interest on this
amount at the rate determined in accordance with section 57 of the Insurance
Contracts Act 1984 (Cth), from 31 January 2016 until the payment date.
Case No: 447806 Determination Page 2 of 7
2 Reasons for determination
2.1 Is the FSP liable for the costs of replacing the roof?
Policy provides cover for accidental damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for sudden and unexpected accidental loss or
damage to the insured property that occurs during the period of insurance.
However, the policy contains a general exclusion for damage caused by gradual
deterioration, including wear and tear, rust and corrosion. The policy also states that
the applicant must keep his property in good condition and repair, and any damage
caused by poor maintenance will not be covered.
Applicant says damage was caused by storm in November 2014
The applicant purchased his property in or around June 2014 and took out his policy
with effect from 29 September 2014.
In September 2015, the applicant lodged a claim for storm damage to the roof of his
property, after noticing mould growing on the internal walls. The applicant was
advised by his builder that his roof had been damaged by hail.
When the applicant told his broker he did not know the exact date of the storm which
had caused the damage, he was advised to specify the date he first became aware
of the damage and/or decided to lodge a claim. As a result of the broker’s advice, t he
applicant’s date of loss was initially specified as May 2015.
Accordingly, the FSP initially assessed the applicant’s claim on the basis that the
damage to his roof had been caused by a storm on 1 May 2015. However, the
available information establishes that, although severe, the May 2015 storm did not
generate any hail stones.
The applicant says that, in that case, the damage to his roof must have been caused
by the severe hailstorm which occurred in late November 2014. The applicant says
that, due to the nature of the damage, several months passed before it became
apparent.
I accept that the applicant would not necessarily have been aware of exactly when
the damage occurred. I also accept that the applicant’s initial advice that the damage
occurred in May 2015 was based on a genuine error.
Accordingly, for the purposes of this determination, the applicant’s claim should be
considered as arising from the hailstorm in November 2014.
Case No: 447806 Determination Page 3 of 7
FSP has accepted liability for some damage only
During the course of this dispute, both parties have engaged several contractors to
inspect the applicant’s roof and determine the cause of the damage.
Each of the contractors has identified hail damage, in the form of indentations to the
metal roof sheets which are clearly visible in the photographs included in the reports
provided. Additional damage in the form of corrosion and loose (or missing) roof
sheet fixings has also been noted.
As outlined above, the FSP initially denied liability for the entirety of the applican t’s
claim, based on a report from its builder (CB) which concluded that:
the hail damage was not caused by the storm in November 2014 but occurred
prior to the commencement of the policy in September 2014; and
the remaining damage to the roof was caused by factors which are excluded
from cover under the policy, such as gradual deterioration and poor
maintenance.
However, after engaging a building consultant (MB) to carry out a further inspection,
the FSP subsequently accepted liability for certain minor hail damage to the whirly
bird, fly screen, spot light and sensors, vent pipe and garden shed . MB advised that
the nature of this hail damage was consistent with it having been caused by the
storm in November 2014.
However, the FSP maintained its position that it was not liable for the bulk of the
damage, based on MB’s advice that this damage had occurred prior to September
2014 and/or had been caused by excluded factors.
FSP is required to establish an exclusion applies
In circumstances where the FSP has accepted that some of the damage to the
applicant’s roof was caused by the storm in November 2014 , I am satisfied the
applicant has established a prima facie claim for accidental damage under the policy.
Accordingly, the FSP bears the onus of establishing tha t, on the balance of
probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny
the applicant’s claim.
Contractors have provided differing opinions
As outlined above, the FSP’s building consultant s (CB and MB) concluded that the
bulk of the damage to the roof of the applicant’s home was not caused by the storm
in November 2014.
In his report, MB advised that:
the large hail indentations in the metal sheeting which were visible in several
areas of the roof had occurred before the roof was last painted at least six years
earlier. MB based his conclusion on his view that the paint around these
indentations had not fractured or splintered;
there was evidence that the paint was lifting and flaking in various parts of the
roof and patches of rust on the metal roof sheeting which were bleeding through
the painted surface. There were also popped (missing) roof fixings, signs of
Case No: 447806 Determination Page 4 of 7
previous patch repairs and the gutters had rusted through in some areas.
However, these issues were not caused by the storm in November 2014 but
were due to the age of the roof (which was estimated to be approximately 60
years old).
As noted above, MB identified some hail damage to various fixtures (the whirly bird,
vents etc) which he considered was consistent with having been caused by the storm
in November 2014. However, the nature and appearance of this damage (referred to
as ‘splatter’ damage was qualitatively different from the large hail indentations which
are the primary subject of the applicant’s claim.
MB noted that the areas which he considered had been affected by the November
2014 storm were made out of softer materials than the metal sheets from which the
roof was constructed.
Both MB and CB reported that other, newer structures at the property did not show
signs of hail damage consistent with the large indentations to the roof of the
applicant’s home. In particular, MB noted that there was minimal (if any) hail damage
to the asbestos roof of the carport and the aluminium roof of the garage shed.
MB and CB considered the absence of damage to newer structures indicated that the
bulk of the hail damage to the roof of the main property was not recent.
The applicant disputes MB’s findings and has provided reports from his own roofing
contractors (AM, RS and GC). Each of the applicant’s contractors confirmed that
there was hail damage to the roof (which is consistent with the findings of the FSP’s
contractors).
However, GC concluded that the damage to the roof had been caused by the storm
in November 2014, on the basis that:
aerial photographs taken between November 2013 and November 2015
indicated the condition of the roof had deteriorated between those dates, with
areas of peeling paint becoming apparent. Further, photographs of the property
taken in May 2014 showed the roof to still be serviceable as at that date;
some of the rust patches on the roof were circular in shape, suggesting they
had been caused by water pooling in indentations caused by hail stones; and
some of the roof sheets had loosened which was consistent with the sheets
having been lifted by the strong winds experienced during the storm.
GC considered that the roofs of the other structures at the applicant’s property would
have been less susceptible to hail damage, given the nature of the materials used.
Accordingly, GC advised that the relative lack of damage to these roofs was not
inconsistent with the damage to the roof of the applicant’s home having occurred
during the period of cover under the policy.
The applicant has also provided an email from the real estate agent (GJ) who
managed the sale of the property to the applicant in 2014 (as well as a n earlier sale).
In his email, GJ states he was not aware of any pre-existing damage to the roof.
GJ also notes that a pre-sale inspection was undertaken (although a copy of this
document has not been provided).
Case No: 447806 Determination Page 5 of 7
Disputed damage was not caused by the storm in November 2014
Having reviewed the available information (including the reports provided by the
various consultants), I consider that, on the balance of probabilities, the bulk of the
hail damage to the applicant’s roof occurred before the commencement of cover in
September 2014.
In reaching this view, I have carefully considered the considerable number of close
up, colour photographs of the hail indentations to the roof contained in the reports
prepared by the various consultants.
These photographs clearly show a significant number of large indentations, which all
of the consultants accept have been caused by hail. However, I am satisfied that the
photographs also support the findings of the FSP’s building consultant (MB) that the
paint in the immediate vicinity of many of the indentations appears largely unaffected.
The aerial photographs of the applicant’s prope rty establish that the current paint was
applied at least six years ago (and therefore well before the inception of the policy in
September 2014). Accordingly, the absence of damage to the paint in the immediate
area of the indentations establishes that the damage occurred prior to policy
inception.
While there are a number of areas where the roof paint is flaking or peeling, these
areas do not correlate with the large hail indentations observed. On this basis, I
consider the damage to the paint is more likely to have occurred as a result of
gradual deterioration and ordinary wear and tear, than due to hail damage caused by
the storm in November 2014.
In this regard, I consider the close up photographs included in the various reports are
of far greater assistance in determining the cause of damage than the much less
detailed information provided by the aerial images and the real estate photographs.
I am also satisfied that the other damage identified during the roofing inspections
(namely, rust patches, corrosion and loose fixings) is consistent with having been
caused by gradual deterioration due to the age of the roof, rather than by the storm in
November 2014.
The available information indicates that the roof was already in an aged condition
when the applicant purchased the property in June 2014, as shown by the signs of
extensive corrosion and evidence of prior repairs.
Photographs taken by the FSP’s contractor (CB) also show an area where the roof
has been ‘short sheeted’, causing the roof sheets to lift.
Further, there is no clear link between the storm in November 2014 and the date the
damage became apparent approxima tely six months later. The applicant has
confirmed that there were not leaks or other internal issues apparent immediately
after the storm in November 2014.
I accept that neither the applicant nor the real estate agent (GJ) were aware of the
condition of the roof at the time the applicant purchased the property, given the coat
of paint which had been applied.
Case No: 447806 Determination Page 6 of 7
However, the exclusion on which the FSP seeks to rely operates based solely on the
cause of the damage, regardless of whether or not the applicant was aware of the
issues affecting the roof.
FSP’s cash settlement offer is fair and reasonable
For the reasons outlined above, I am satisfied that the FSP is not liable for the bulk of
the damage to the applicant’s roof because this damage occurred in circumstances
which are not covered under the policy.
Based on the findings in MB’s detailed repor t, the FSP has accepted liability for hail
damage to certain areas of the roof, which MB considered had been caused by the
hail storm in November 2014.
The FSP has offered to cash settle the applicant for $6,000, being the estimated cost
of repairing this damage based on a scope of works and estimate provided by its loss
adjuster (AS).
Having reviewed the photographs of the relevant damage and the scope of works
provided, I am satisfied the FSP’s offer of $6,000 reflects the fair and reasonable cost
of repairing the damage for which it has accepted liability.
Accordingly, if it has not already done so, the FSP is required to pay the applicant the
amount of $6,000, together with interest on this amount at the rate determined in
accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 31
January 2016 until the payment date.
Case No: 447806 Determination Page 7 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) on 28 February 2017. The recommendation was
rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.