Text of the determination
Determination
Case No: 447611 Determination Page 1 of 11
Case number: 447611 13 December 2017
1 Overview
1.1 Dispute
On 17 May 2016, the applicant lodged a claim under his home building insurance
policy for the collapse of a section of a concrete block wall, which is part of a
structure supporting a parking deck.
The financial services provider (FSP) denied the claim on the basis the damage was
not caused by an insured event such as a storm event but was due to causes
excluded from cover under the policy.
The applicant disagrees with this outcome. He argues the damage was due to a
storm event occurring in the days before his tenants noticed and reported the
damage. He seeks settlement of the claim in full, as well as payment of other costs.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP.
The FSP accepted the recommendation but it was not accepted by the applicant. In
the circumstances, the dispute has been referred to me for determination.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The material provided does not establish on the balance of probabilities the
proximate cause of the loss was a storm event. Therefore, as the applicant has not
established a prima facie claim, the FSP is entitled to deny the claim.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation for consequential financial loss. This is
because the information provided does not establish a loss was c aused by the FSP’s
conduct.
The material provided does not establish the applicant sustained an unusual amount
of physical inconvenience, time taken to resolve a situation, or interference with the
applicant’s expectation of enjoyment or peace of mind caused by the FSP’s conduct.
In these circumstances, the applicant is not entitled to non-financial compensation.
The FSP is not required to pay for the engineer’s reports as the reports did not assist
the resolution of this dispute. The FSP is also not required to pay the applicant his
representative’s fees as the nature of this dispute did not warrant this assistance.
Case No: 447611 Determination Page 2 of 11
1.3 Determination
This determination is in favour of the FSP.
The FSP need take no further action in relation to the claim or the dispute.
Case No: 447611 Determination Page 3 of 11
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and afte r the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
Both parties provided new material after the recommendation
After the recommendation was rejected, both parties made further submissions and
provided further expert reports and photographs. Where relevant, these reports will
be referred to in the determination.
2.1 Is the FSP entitled to deny the claim?
Applicant must establish claimed damage was caused by storm
The applicant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
The FSP’s policy provides cover for loss and damage caused by storm. In this claim,
the applicant must establish the claimed damage was caused by a storm event.
The insured property is tenanted and the applicant was notified of the damage by his
property manager. The tenants said they notified the property manager on 14 May
2016 saying part of the lower wall holding the parking deck had collapsed, leaving
gravel inside exposed. The tenants identified the cause of damage as recent heavy
rain and strong winds.
The parties have provided material from the Bureau of Meteorology (BOM). They
have also provided numerous photographs and many expert reports from engineers.
FSP’s assessor did not agree damage was caused by storm
The FSP’s assessor inspected and photographed the wall on 19 May 2016. The
applicant told him the wall had blown over in a storm. The assessor noted the end
wall of the parking deck at the front boundary of the property had fallen out.
He described it as a retaining wall built from Besser slimline blocks. He said the
blocks had not been core filled and no reo bars were fitted through the blocks. He did
not agree the damage was caused by wind or storm as the void behind the retaining
wall was backfilled with clay and shale debris. He also thought the wall had been
rotating for some time noting the nature of the cracking damage and previous repairs.
FSP’s engineer said damage caused by inadequate building methods
The FSP’s structural engineer inspected and photographed the damage on 2 June
2016. He also confirmed a section of the masonry on the eastern end of the wall had
Case No: 447611 Determination Page 4 of 11
failed allowing fill materials to escape. He also noted the wall had not been core filled
or reinforced. He said there was no evidence of engaged piers near the failed corner.
The engineer noted the slab had been poured directly on the fill and on top of the
retaining wall. The engineer noted a void between the underside of the slab and the
fill, indicating some settlement of the fill.
The engineer described the grated stormwater pits controlling surface run-off. He
said the only water affecting the parking deck is the rain which lands on it and any
seepage which may get through or under the driveway retaining wall.
He also observed the fill under the parking deck slab was relatively dry. He said there
was no evidence which showed significant volumes of water had impacted the fill
under the slab.
He described the relevant Australian Standards. As the wall was a single skin without
engaged piers, the engineer said it did not have the structural capacity to retain the
height of fill behind it. He said the wall did not fail because of a storm but because of
the inadequate building methods used.
Applicant’s engineer identified runoff from stormwater pits as possible cause
of damage
The applicant also arranged for the wall to be inspected by a structural engineer on
8 June 2016. He agrees the wall was inadequately built. Relevantly, he said:
‘ The block work foundation wall is unreinforced, is not tied to either its supporting
concrete foundation or the concrete deck slab that it supports, and therefore has very
little capacity to withstand lateral pressure. No drainage holes were visible at the base
of the foundation wall. ’
He also inspected the stormwater pits near the parking deck and considered this as a
low point for the flow of surface water. Although the pit was not blocked at the time of
inspection, as there were a number of leaves from nearby trees, he said it was
possible the pit may have become blocked and the subsequent flow of water could
have easily discharged above and below the car parking deck and saturated the
gravel underneath. He went on to say:
‘ This sudden build up of lateral pressure on the block foundation wall from the excess
stormwater flow, could easily cause lateral displacement and failure of the wall as the
block work has minimal lateral capacity to safely support these resultant forces. ’
Engineers reviewed each other’s opinions before and after recommendation
The FSP arranged for its engineer to review the applicant’s engineer’s report. The
FSP’s engineer also obtained information from the Council and reinspected and
surveyed the site. He also took a number of photographs which he annotated.
He described the storm water system and said it was unlikely any significant volume
of water escaped which would impact the parking deck.
It rained when he was at the site on this second occasion and he inspected and
assessed the actual surface flow which he said confirmed water flowed past the
insured property to the low point next door.
Case No: 447611 Determination Page 5 of 11
Further, he said there was no evidence of flow of water under the deck and no visible
scouring of the fill materials.
On the basis of his investigations, he disagreed the wall collapsed because of lateral
pressure as there was no evidence of water under the deck. Rather, his
investigations confirmed the surface run-off flows away from the deck.
The applicant’s engineer was asked to co mment again. He relied on statements from
the tenant, and a statement from the owner. The owner said when he attended the
site on 17 May 2016, the stormwater pits were blocked and full of leaves and debris,
which he removed.
The applicant’s engineer also r eferred to BOM reports for the month of May noting
extremely high winds and high rainfall events at the time the wall collapsed. The
applicant’s engineer makes the observation neither he nor the FSP’s engineer
actually inspected the material below the slab nor the stormwater pits at the time of
the wall collapse.
The applicant’s engineer said the block wall supporting the concrete deck slab had
been in service for more than 40 years without incident. He said there is no
explanation as to why the collapse occurred at the time of several storm events.
He also noted the observations made by the FSP’s engineer indicate the path for
water ingress below the car parking slab and its presence at the base of the wall
seeping out and says the engineer’s own site leve ls show the finished slab is 7mm
lower than the stormwater pit level.
He reiterates it is his opinion the build up of leaves above ground level would direct
water onto the deck and through the slab via the failed slab infills.
In a further report in Nove mber 2016, the applicant’s engineer says even if the
material under the slab was dry when the claim was made, he accepts this because
of the physical properties of the material which he says would dry within 24 hours.
All these arguments were rebutted by the FSP’s engineer in his report dated
9 December 2016. He provided photographs of the soil under the slab and continued
to assert there was no evidence of any washing or erosion of the fill consistent with
the build up of water under the slab before the wall failed.
After the recommendation, more expert reports and photographs were provided by
both parties.
The applicant’s engineer asserts the lie of the land is such that if the stormwater pit
was flooded, the void between the underside of the concrete slab deck and the fill
material could fill with water and build up causing collapse.
He continued to assert the lowest pit was blocked and not draining freely. He said the
section of wall which had failed was the single block wall skin only and seepage
water would not produce the sudden build up of lateral pressure required to push
over the wall.
He provided a sketch of water ent ering the structure through an ‘ existing cracking in
the slab ’ flowing through the gap between the slab and the fill and build up against
the failed section of wall. He continues to assert the fill cannot absorb all the water
Case No: 447611 Determination Page 6 of 11
and will flow over the top of the fill as the storm event and volume of water flow
continues.
The FSP’s engineer continues to assert the stability of the supp orting retaining walls
was in question for an extended period of time. He relies on photographs showing
lateral movement of the deck slab and other photographs which he says show
footings supporting the retaining wall had been failing for some time as evidenced by
the gap between the slab and the wall and cracks in mortar joints.
He also refutes the allegations water would flow from the photographed pit because
he says the levels downstream of the pit are lower than the edge of the deck.
Finally, he points out if water was falling on the deck and flowing towards the gap to
drain under the slab then the applicant contributed to the problem by failing to
undertake adequate maintenance to prevent water entering under the slab this way.
The engineers also continue to disagree about the properties of the fill material.
It is not in dispute structure of car parking deck was damaged
It is not in dispute there is damage to the structure of the car parking deck of the
insured property. The dispute relates to the cause of the damage.
In order to succeed, the applicant must establish the claimed damage is caused by
storm. If that is established, then the FSP must establish the damage was not caused
by a single storm event but was caused gradually over time and/or by faulty design or
workmanship or other excluded event.
I have reviewed the photographs taken contemporaneous with the claim. I accept
part of the wall supporting the deck has collapsed.
Proximate cause of claimed damage was not a storm event
Having carefully considered all the material provided both before and after the
recommendation, I am not persuaded on the balance of probabilities the proximate
cause of the claimed damage was a storm event.
The property is tenanted. The applicant relies on the tenants’ contentions about how
the damage occurred. I have considered the emails from the tenants and the
property manager. The tenants believe the lower wall collapse ‘ has been caused by
the recent heavy rain and strong winds that occurred a few days ago. ’
The applicant contends therefore the damage occurred sometime in a few days
before 14 May 2016. The applicant relies on material from the BOM indicating May
was a very wet month in Tasmania. However, what is relevant is the amount of
rainfall pro ximate to the applicant’s property. Material from the BOM for Hobart does
not support the proposition there was heavy rain in the few days before 14 May 2016.
The relevant records establish there was some rain on 13 May 2016 and rain fell also
on 9, 10, and 11 May 2016. I am satisfied at the relevant time there was rainfall in the
area of the property although the rainfall was not significant.
Case No: 447611 Determination Page 7 of 11
I also note it was windy at this time. Of note is a maximum wind gust of 111 km/h on
12 May 2016. A wind of this nature is number 11 ‘ violent storm ’ on the Beaufort
scale.
The FSP’s assessor says a wind gust did not cause the damage as the void behind
the retaining wall was backfilled with clay and shale debris from excavation works.
Having considered the site of the damage and the photographs of the damage, I
agree a wind gust on 12 May 2016 was not, on the balance of probabilities, the
proximate cause of the damage.
In any event, this is not the applicant’s expert’s contention. He contends it is water
which caused the damage. Specifically, he says the wall supporting the deck failed
due to a sudden build up of lateral pressure on the unrestrained block wall. He
contends the most likely cause of the pressure is water from the stormwater pit
directing water below the slab and against the wall.
Photographs show two pits in the road. One is adjacent to the car parking deck and
the other is located down the sloping road slightly past the deck.
Both engineers agree the pits are positioned in order to catch the flow of surface
water down the road. When the applicant’s engineer inspected the damage he said
the pit was heavily contaminated with leaves from nearby trees although it was not
blocked. The applicant contends the pits were blocked.
The applicant’s engineer furth er contends the pit may have become blocked in the
storm and the subsequent flow of water could easily have discharged above and
below the deck and saturated the gravel below, building up pressure on the wall
causing the wall to fail.
Having considered the material provided, including photographs of the scene of the
damage and material from the Bureau of Meteorology, I do not accept the information
provided establishes on the balance of probabilities the stormwater pit was blocked in
a storm. The material provided is insufficiently persuasive in this regard. The
applicant produced no photographs showing a blocked pit. The applicant’s engineer
concedes that when he inspected the pits they were not blocked.
FSP is entitled to deny the claim
But even if I was to accept this mechanism for the collapse of the wall, I do not
accept the real or effective cause of the damage was rain from a storm or stormwater
runoff.
This is because both engineers agree the block foundation wall is unreinforced. It is
not tied to the supporting concrete foundation or the concrete deck slab which it
supports. The applicant’s engineer admits it has very little capacity to withstand
lateral pressure. Therefore, I am satisfied if, in the unlikely event there was lateral
pressure to th e wall as described by the applicant’s engineer, the proximate cause of
the collapse of the wall was its faulty design as it had ‘ minimal lateral capacity ’ to
withstand the lateral pressure.
As this cause of damage is excluded from cover, the FSP is entitled to deny the
claim.
Case No: 447611 Determination Page 8 of 11
Further, even if I were to accept rain water did not flow down the road and into the
stormwater pits but entered the structure under the car parking deck as described by
the applicant’s engineer through ‘ existing cracking ’ in the slab, then this cause of
damage is excluded from cover as well. This is because the policy clearly excludes
cover where the loss or damage is caused by wear and tear.
Therefore, on the information provided and for the reasons stated I am satisfied the
FSP is entitled to deny the applicant’s claim.
2.2 Is the applicant entitled to compensation?
Any financial loss not caused by FSP’s conduct
Under paragraph 9.3(a) of the Terms of Reference, FOS may award compensation
where an applicant has suffered consequential financial loss or damage because of
the FSP’s conduct.
The material provided shows the FSP responded to the claim in a timely fashion. The
claim was assessed promptly. An engineer was appointed to provide expert opinion.
The claim was then denied. Any consequential financial loss has not been caused by
the FSP’s conduct but by the applicant’s refusal to accept the FSP’s decision.
In the circumstances, on the information provided, I am not satisfied the applicant is
entitled to an award of consequential financial loss.
Compensation for non-financial loss paid in limited circumstances
Compensation for non-financial loss is limited. FOS may decide an FSP should
compensate an applicant for such loss only where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference
with the applicant’s expectation of enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss. In any
event, I am not satisfied from the material prov ided the FSP’s conduct in this claim or
dispute warrants an award of compensation. The FSP promptly assessed the claim,
promptly obtained advice from an engineer and advised the applicant of its claims
decision in a timely fashion.
FSP not obliged to pay other costs
FOS may decide the FSP contribute to the legal or other professional costs incurred
by the applicant in the course of the dispute.
FOS provides a service which is free for applicants. It is not usually necessary for a
party to be represented. If the applicant chooses to be represented, they will usually
cover their fees themselves.
FOS decides whether the FSP should make such a contribution by considering what
is fair in the circumstances, taking into account the complexity of the dispute and
whether the applicant genuinely required expert assistance.
Case No: 447611 Determination Page 9 of 11
Having considered all the material provided, I am not satisfied the nature of the
dispute was sufficiently complex to justify expert assistance.
Further, I am not satisfied the applicant’s engineer’s reports assisted the applicant in
the resolution of the dispute.
Taking all matters into account, I am not satisfied the circumstances of the claim or
the dispute warrant payment of the representative’s fees or the engineer’s fees.
Case No: 447611 Determination Page 10 of 11
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is represented. For the sake of clarity and brevity in this determination,
I have referred to the applicant and his representative as ‘ the applicant ’ .
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in correspondence between the parties
and in the FSP’s Notice of Response dat ed 25 October 2016. Both the policy
document and the Notice have been exchanged with the applicant.
HOME INSURANCE COVER
…
2. INSURED EVENTS
Your Home is covered for loss or damage caused by:
a) Storm
…
What is NOT covered under any policy
1. YOU ARE NOT COVERED UNDER ANY POLI CY FOR:
a) Loss, damage or liability which aris es gradually over time, not as a result of a single
event or occurrence.
…
j) Loss, damage or liability caused by or arising directly or indirectly from or in any way
connected with faulty design or workmanship.
…
n) Erosion or subsidence caused by or as a result of erosion, vibration, subsidence,
landslip, landslide, mudslide, collapse, shrinkage or any other earth movement.
Case No: 447611 Determination Page 11 of 11
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance a nd efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.4 Other relevant material considered and relied on
Parties’ submissions, emails, engineers’ and assessor’s reports and
photographs, material from the Bureau of Meteorology and all attachments to all
submissions both before and after the recommendation.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.