Home / Financial Firm (Unknown - Insurer) / Determination 447369

Determination 447369

Storm damage: additional roof, deck, retaining wall and drainage works and sump pump declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-06-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$158,000
SourceAFCA PDF

Summary

After April 2015 storm damage was repaired, the applicant sought cover for further roof, deck, retaining wall and drainage works and a replacement sump pump. AFCA found the additional works were caused by deterioration and design faults, not the storm, but ordered the FSP to review her further repair concerns.

The policy excludes gradual deterioration, wear and tear and design or structural faults, and the works were needed to remedy those rather than storm damage.

Issues

Subjects and remedies

home or building damagenatural disasterreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 447369 Determination Page 1 of 7 Case number: 447369 14 June 2017 1 Overview 1.1 Dispute The applicant lodged a claim under her home insurance policy with the financial services provider (FSP) after her home was damaged by severe storms in April 2015. The FSP accepted the claim and arranged for its builder (JC) to repair the property. After the applicant expressed concern about the quality of the repairs, the FSP arranged for rectification works to be completed. However, the applicant says the FSP has failed to repair all of the damage to her property caused by the storm. In particular, she seeks cover for the costs of replacing the roof and deck above her garage and installing a new concrete retaining wall and sub-surface drainage system. The applicant also seeks cover for the costs of replacing a sump pump installed in the sub- floor of her property, which she says was damaged by the FSP’s engineer (DW) during his inspection. 1.2 Issues and key findings Is the FSP liable for the disputed damage? The available information establishes that the additional works for which the applicant seeks cover are being undertaken for the purpose of addressing damage which was caused by gradual deterioration and/or design and construction faults (and/or for the purpose of improving the property). The policy does not provide cover for works of this nature. The FSP is not liable for the costs of replacing the sump pump as the available information does not establish the issues with the pump were caused by the FSP or its contractors. 1.3 Determination This determination is in favour of the FSP. The FSP is not liable for the additional works set out in the quotation provided by the applicant’s builder (PB) or the replacement of the sump pump . The applic ant is to provide the FSP’s claims department with details of her addition al concerns about the initial repairs, following which the FSP is to review whether additional rectification works are required. Case No: 447369 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP liable for the disputed damage? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The a pplicant’ s policy provides cover for accidental loss or damage to her property (including damage caused by storm), subject to the conditions and exclusions set out in the policy. The policy excludes cover for damage caused by a defect, structural fault or design fault that the policyholder knew about (or should reasonably have known about) and did not fix before the damage occurred. Where an unknown defect causes or contributes to damage which would otherwise be covered, the FSP is liable for the resulting damage to the property only (unless the defective part is damaged by the same incident). The policy also contains a general exclusion for damage caused by wear, tear and gradual deterioration. Dispute concerns FSP’s liability for additional damage As out lined above, the FSP does not dispute that the applicant’s property was damaged by the severe storms in April 2015. The FSP accepted the applicant’s claim for the repair of storm damage to her property, including:  water damage to the downstairs lounge, which had flooded when the sump pump failed due to a power outage during the storm; and  water staining to two of the ceiling joists in the garage. However, the applicant seeks cover for further damage which she says was caused by the storms in April 2015. The applicant has provided a quotation from her builder (PB), which provides for significant additional works at the property, including:  renovations to the roof of the garage to address ‘existing design failing[s]’, including raising the roof, re-sheeting and waterproofing the deck above the garage and modifying the drainage arrangements (at an estimated cost of over $25,000);  the replacement of a failing timber retaining wall with a new concrete block retaining wall, together with the installation of agricultural pipes to provide sub- surface drainage (at an estimated cost of over $130,000); and Case No: 447369 Determination Page 3 of 7  battering back the sub-floor soil to reduce deterioration (at an estimated cost of over $3,000). The FSP says it is not liable for the additional works set out in PB’s quotation as the relevant damage was not caused by the storm in April 2015, but by factors which are excluded from cover under the policy (such as design faults and/or gradual deterioration). Ongoing water entry to garage was not caused by storm in April 2015 As noted above, two of the timber ceiling joists in the applicant’s garage were sanded and sealed as part of the initial repairs carried out by the FSP’s contractor (JC). After the applicant notified the FSP that water was continuing to enter her garage, the FSP appointed an engineer (DW) to determine the cause of the ongoing water entry issues. After carrying out an inspection in January 2016, DW concluded that water had been entering the garage through the roof due to the inadequate waterproofing of the deck which had been installed above it, as well as various construction deficiencies. Among other matters, DW reported that:  the liquid waterproofing membrane applied over the compressed fibre cement (CFC) sheeting used to construct the roof/deck did not extend to the edge of the sheeting and/or had deteriorated in this area;  the pitch of the roof was not adequate to ensure adequate drainage;  a suitable ‘drip edge’ had not been installed to the edge of the roof sheeting, so as to prevent water from tracking back under the sheeting; and  water was escaping from weep holes in the planter box and discharging directly onto the outer edge of the roof sheeting. Based on his observations, DW reported that the water entry to the applicant’s garage had not been caused by the storm in April 2015 but had occurred over an extended period of time due to the factors identified above. The Panel is satisfied that, as an engineer, DW is suitably qualified to determine the cause of water entry to the applicant’s garage. The Panel considers DW’s report provides a logical explanation of how the water entry occurred, which is consistent with the observed facts. DW’s report includes a number of close -up, colour photographs which clearly show the various issues identified. As noted above, the initial quotation provided by the applicant’s builder (PB) in July 2016 describes the proposed works to the garage roof area as being necessary to address existing design failings. This is consistent with DW’s findings. The applicant has subsequently provided a short report from PB dated November 2016, in which he states that all of the works included in his quotation are related to excessive rainwater or moisture issues. PB notes that he is unable to confirm whether the damage has occurred due to a single storm of several event over time. Case No: 447369 Determination Page 4 of 7 PB’s conclusion that damage has occurred due to moisture entering the garage is not inconsistent with DW’s findings. However, unlike DW, PB has not provided any further explanation as to how and why the moisture entry occurred. FSP is not liable for repairs to garage roof and deck For the reasons outlined above, the Panel is satisfied that the ongoing water entry to the applicant’s garage has been caused by inadequate and deteriorated waterproofing, together with construction and design defects. The applicant’s policy excludes cover for damage caused by gradual deterioration and wear and tear. The policy also excludes cover for the cost of addressing structural defects and design faults, unless the defective part has been damaged by an incident which is otherwise covered under the property (such as storm). The works to the roof and deck for which the applicant seeks cover are required primarily to remedy existing design faults, rather than to repair damage caused by a storm. Accordingly, the FSP is not liable for the cost of these works. The policy provides cover for resulting damage caused by a design fault, where the policyholder could not reasonably have been expected to be aware of the fault. In the present case, there is also water damage to the timber joists in the garage caused by water entering through the roof. However, the available information (in particular, DW’s report) indicates this damage has occurred over an extended period of time, in circumstances where the water stained timbers would have been visible to the applicant. DW also refers to evidence of moisture pooling at the base of the block walls, which would have occurred on a regular basis. In these circumstances, the FSP is not liable for the claimed damage to the garage roof and deck. FSP is not liable for additional works included in BP’s quotation As outlined above, the applicant also seeks cover for extensive works required to replace a timber retaining wall, install effective sub-surface drainage at her property and compact sub-floor soil. Other than a reference to the retaining wall as having ‘failed’ and the sub -soil compacting as necessary to ‘reduce deterioration’, BP’s quotation does not provide any further information about the reason why these works are required. In his subsequent report, BP refers to the works being required due to the effects of excessive moisture. However, he does not provide any further indication as to whether (and if so, how) moisture has affected the retaining wall and sub -floor area. In his report, the FSP’s engineer (DW) identified ‘obvious, long term moisture issues’ with the basement area, which was located below the level of the sub -floor. DW noted that the basement was prone to ongoing water inundation (as shown by the presence of the sump pump). Case No: 447369 Determination Page 5 of 7 Having regard to the above, the Panel is not satisfied that the retaining wall and drainage works included in PB’s quotation are required to repair damage caused by an insured event, rather than for the purpose of improving the drainage arrangements at the property so as to address long-term issues. The applicant’s policy does not provide cover for works carried out for this purpose. For the reasons outlined above, the FSP is not liable for the cost of the additional works included in PB’s quotation. FSP is not liable for replacement of sump pump The applicant says the sub- floor sump pump was damaged by the FSP’s engineer (DW) when he inspected the property in January 2016. The applicant initially advised that DW had caused the basement to flood by turning off the sump pump. However, after being advised by emergency services personnel that the pump had failed due to the presence of sand, the applicant now believes DW poured sand into the pump. DW strenuously denies having tampered with the applicant’s sump pump. He says he inspected the pump by lifting the cover, which he replaced immediately after. DW has provided photographs taken during his inspection of the property, which show the sump pump covered by nothing other than the plastic cover. However, when the FSP’s assessor (DH) attended the property in February 2016, he found the sump pump to be surrounded by poorly sealed sand bags, which had apparently been placed there to muffle the sound. In light of the available information, the Panel is not satisfied that the FSP or its contractors where liable for the issues with the sump pump. Accordingly, the FSP is not liable for the costs of replacing the pump. Applicant has not established FSP is liable for rectification repairs In her recent submissions, the applicant has raised further concerns about repairs carried out by the FSP’s contractors in mid -2015. Specifically, the applicant is concerned about the quality of painting repairs to the window sills and the repair of the damaged pergola roof. The applicant has not provided any independent information (for example, photographs or a report from her own builder) which establishes that the initial repairs to these items were inadequate. The initial repairs were reinspected by the FSP’s assessor (MG) in December 2015, following which additional rectification works were carried out. Other than noting a window sill which the builder had omitted to paint, the reinspection did not identify any concerns about the additional items which the applicant has now raised. The FSP has advised that the applicant should contact its claims team directly, following which it will review whether any rectification repairs are required, in accordance with the life time guarantee provided under the policy. Case No: 447369 Determination Page 6 of 7 Given the applicant’s additional concerns were raised at a relatively late stage in the dispute process, the Panel is satisfied that this approach is appropriate. Should the applicant be dissatisfied with the outcome, she may lodge a further dispute with FOS. Case No: 447369 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this dispute based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only.