Insurer denied sewer failure repair and claim preparation costs as gradual wear and tear
Text of the determination
Determination
Case No: 447123 Determination Page 1 of 7
Case number: 447123 5 September 2017
1 Overview
1.1 Dispute
The applicant, a Corporate Trustee earns a mixed business backpackers hostel. On 11
September 2015, the applicant lodged a claim with the financial services provider (FSP)
after the building was damaged when a broken sewerage pipe led to the development of a
sink hole under the boiler room of the building.
The FSP offered to settle the claim for the resulting water damage for $31,307.73. The
FSP otherwise denied liability for the rectification works and damage to the building on the
grounds the damage was caused by gradual deterioration and wear and tear.
The applicant disputes the FSP’s decision and seeks payment of the rectification and
professional costs which the FSP has denied.
1.2 Issues and key findings
Was the sewer failure caused as a result of gradual deterioration and wear and tear?
The panel is satisfied that most likely the damage was caused by a sudden catastrophic
failure of the main sewer most likely caused by a blockage. The panel is satisfied that the
FSP is liable for the resultant damage and consequential loss.
What is the extent of the FSP’s liability?
In addition to the settlement already paid of $29,707.73, the FSP is liable to meet the
FSP’s further claim as set out under section 2.2 of this determination.
Is the applicant entitled to costs incurred in preparation of the claim?
The panel is satisfied that the applicant is entitled to be paid the professional fees and
reasonable expenses incurred in preparation of the claim as set out in paragraph 2.3 of
this determination.
1.3 Determination
This determination is in favour of the applicant. The FSP is to pay the applicant in addition
to the amount already paid a further sum of $81,143.01 being the total liability as
calculated under sections 2.2 and 2.3 of this determination.
The FSP is to pay interest on the sum $67,711.96 from 16 July 2016 being the date of the
FSP’s final decision letter to date of payment of the claim pursuant to Section 57(1) of the
Insurance Contracts Act 1984 (the Act).
Case No: 447123 Determination Page 2 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has had
the opportunity of addressing the issues that arise from the information exchanged.
In view of the complexities involved in this dispute, the dispute has been referred to a
panel for determination.
The FSP has raised issues as to the jurisdiction of the Service to determine this dispute as
the policy is titled ‘ industrial special risk policy ’
The FSP has previously been notified that the Service can consider a dispute about a
small business insurance product to the extent that the dispute relates to cover in respect
to one or more of the matters listed under the definition of ‘Small Business Insurance
Product’ in paragraph 20.1 of our Terms of Reference.
The panel is satisfied that the policy or part of the policy provides insurance cover for
accidental damage and general property. As such the policy falls within the definition of a
‘small business insurance product’ under the Terms of Reference.
This determination follows consideration of all of the information exchanged. It is based on
what is fair in all the circumstances, having regard to the relevant legal principles, terms of
the policy, good industry practice including codes of practice and prior determinations
where applicable.
2.1 Has the FSP established exclusions apply to limit the extent of its
liability?
Damage caused by the failure of the sewerage pipe
There is no dispute that the applicant’s property was damaged by leaking sewer pipes that
led to the development of a deep sink hole, which in turn undermined and damaged the
slab at the rear of the applicant’s property.
There is no dispute that initial investigations identified a sewer pipe had dislodged and
discharged into the ground resulting in the supporting sand bed for the entire building
being washed away.
The FSP says that whilst it accepts the sewerage pipe failed causing water damage for
which liability is accepted, the rectification works to the pipes, the extent of damage
associated with the failure of the pipe and the cost of reasonable repairs was not covered
under the policy.
The FSP, relying upon the reports from its consultant CR and AE, claims the sewer pipes
failed due to progressive failure and settlement of the supporting material over time. It says
the damage was not caused by a catastrophic failure of the sewerage pipe. The FSP
seeks to rely upon the perils exclusions contained in the policy as set out in section 3.1 of
this determination.
Case No: 447123 Determination Page 3 of 7
Damage most likely caused by a catastrophic failure of the main sewer service
The panel does not accept that the exclusions apply. The panel is persuaded by the
information provided by the applicant and in particular the applicant’s plumbers, GP, AS
and PJ.
PJ had been employed by the applicant for 24 years and performed regular inspections
and routine work. PJ found the floor of the boiler room had collapsed and identified the
cause as being the erosion of sand from under the passage way as a result of the broken
sewer pipe. He considered that sewerage from the entire building would have cascaded
down under the boiler room area causing the erosion. PJ also noted that the existing
separated pipes were in good condition and concluded that the sewer pipe must have
burst.
AS completed the work for GP. AS completed the temporary repair of the collapsed sewer
and then was responsible for the repair and construction of the sewer system. In a detailed
response to the FSP’s allegations, AS identified information which he believes the FSP’s
engineers misunderstood.
H e disagreed with the FSP’s findings that the pipe had been leaking for up to 10 years and
notes the following:
the event had only just taken place
in his 24 years as a plumber, he had only seen a similar incident twice
there was no evidence of sewerage seeping into the ground for a prolonged period. If
there had been the ground would have been blackened by decomposing matter . This
was not the case.
there was insufficient evidence to associate long term settlement as being the cause
of the plumbing failure
the sink hole and subsequent collapse of the sewerage service was caused by the
initial dislodgement of a 150m earthen ware sewer pipe under the side path located
on the southwest corner of the building.
the dislodgement of the sewer pipe occurred after a catastrophic failure in the main
sewer service, most likely caused by a blockage.
the amount of waste identified coming from the building was such that there was no
way the sink hole had happened over a period of time.
Photographs supplied by AS and PJ support these comments. The FSP has not
responded to the findings.
The panel has considered the reports provided by both parties. The panel notes the FSP
has not through its experts challenged the comments of PJ or AS. In particular, the FSP
has not responded to the comments by AS that he did not say the pipes had been leaking
for up to 10 years.
The panel is persuaded by the reports from GP, AS and PJ. They were on the site and
conducted the repairs. The panel is satisfied that most likely the damage sustained to the
property was due to the catastrophic failure of the sewer pipe most likely as a result of a
blockage in the sewer system.
The panel is satisfied that the FSP is liable to meet the cost to effect the repairs to the
pipes, repairs to the building and reinstatement of the property.
Case No: 447123 Determination Page 4 of 7
2.2 What is the extent of the FSP’s liability?
The applicant says he has paid $95,671.53 to reinstate the building and incurred further
liability of $13,371.05 in claim preparation costs. He also paid $7,000 for painting but does
not claim this amount.
The FSP have advised that they have settled part of the applicant’s claim for $31,307.73.
The panel notes some of the invoices claimed by the applicant have been included in the
amount paid by the FSP.
Having considered the various invoices provided by the applicant and the settlement
details provided by the FSP i n the panel’s view, the FSP is liable to meet the following
additional costs:
PJ Plumbing – Invoice 27 February 2016 - $1,650 inclusive of GST
The cost incurred to PJ Plumbing were associated with the initial investigation, overseeing
and advice plus attending various meetings with contractors, the applicant and the FSP’s
agent.
The panel is satisfied these are reasonably incurred costs.
GP Plumbing – Invoice 22 September 2015 – outstanding $13,109.36
The FSP has already paid $8,165 with respect to this invoice. There remains an
outstanding $13,109.36.
The outstanding amounts relate to the repair the part of the sewer pipe that actually failed
of $675. The FSP says it is not liable as it was a defective part.
The panel is satisfied the pipe was not defective but damaged by the catastrophic failure of
the sewerage service. The FSP is liable to meet the cost of repair of the sewer pipe of
$675.
The FSP also denied the amount of $12,434.36 being the cost related to the replacement
of services damaged by the erosion. The panel is satisfied that the pipes needed to be
replaced when the sewer failed with the resultant erosion of soil. The panel is satisfied that
this damage is resultant damage covered under the terms of the policy.
GP Plumbing 28 October 2015 - $5,684.10 inclusive of GST
This invoice relates to replacement of the building’s hot water system.
The panel notes the slab in the boiler room needed to be replaced. The hot water system
was located in the boiler room. Engineers for both parties agree that it was necessary to
move the hot water service. According to the invoice, the unit had leaked perhaps because
the pipes had been stretched. It was decided it was more economical to replace the unit.
In the circumstances, the panel is satisfied that the FSP is liable under the terms of the
policy for the work associated with the replacement and removal of the hot water service.
SW Architect – Invoice 23 February 2016 - $8,112.50 inclusive GST
The applicant says the architect was employed to liaise with the plumbers and oversee the
works. The panel notes that at the time, the applicant had recently had surgery and was
not capable of providing the supervision required.
Case No: 447123 Determination Page 5 of 7
Given the age, location of the building and nature of the damage it is not unreasonable to
have an architect involved in consulting with the various parties providing advice and
supervision.
The policy provides cover for reasonable professional fees and expenses necessarily
incurred. In the panel’s view, the costs incurred by the applicant for the services of the
architect were necessarily incurred and are fair in the circumstances.
AS Plumbing 19 January 2016 - $3,980
AS initially worked with GP Plumbing. After he went out on his own, he invoiced the
applicant separately for the work he had undertaken under the new entity.
The invoice relates directly to the damage caused by the burst sewer and are associated
with various site meetings and supply of expert reports. The panel accepts these costs are
fair and reasonable.
JC Constructions – Invoice 8 October 2015 - $27,536 inclusive of GST
The invoice of 8 October 2015 relates to works specified by the applicant’s engineer and
the repair of the damage to the building caused by the failed sewer. The invoice includes
invoicing for brick laying, rendering, demolition works etc.
The FSP believes the repairs relate to pre -existing damage. The panel accepts the
building is quite old and may have had some pre-existing damage.
However give the nature of the incident, the panel is satisfied that most if not all of the
repairs identified in the invoice were necessarily incurred as the result of damage caused
to by the sewer failure. The FSP is liable to meet these costs.
JC Corporations – Invoice dated 29 January 2016 - $7,700 inclusive GST
This invoice relates to works specified by the applicant’s engineer and appears to be
related to remedial works after the initial footings had been repaired.
In the panel’s view, as the works were required due to the damage caused by the failed
sewer, these works should be covered under the terms of the policy.
Additional Invoices
The applicant has also claimed payment of the following invoices:
22.09.2015 – PM Engineer - $795
20.11.2015 - PM Engineer - $775
26.09.2015 - PJ Plumbing - $1,600
28.10.2015 - JC Constructions - $20,500
The panel is satisfied that these invoices were included and settled as part of the FSP’s
settlement payment of $31,307.73.
The panel notes that the applicant says he has not received the $1,600 with respect to PJ
Plumbing invoice of 26 September 2015. If the FSP has not already paid this amount
directly to the applicant, it should do so.
Case No: 447123 Determination Page 6 of 7
Having considered the issues in dispute, the panel is satisfied that the FSP is to pay the
applicant the sum of $67,771.96 with respect to the damage sustained as a result of the
sewer pipe. Interest is payable on this amount.
2.3 Is the FSP liable for claim preparation costs?
Use of LMI in claim preparation was reasonable
The applicant has also claimed $13,371.05 (inclusive of GST) as the costs incurred in
arranging for LMI to assist in the preparation of the applicant’s claim. LMI have not been
involved in preparing any submissions to FOS. LMI’s invoice relates to the claim
preparation services provided. The applicant engaged LMI after the FSP denied the claim.
The applicant maintains that LMI provided a portfolio of photographs in their submission to
the FSP and continually liaised with the FSP and others to lodge the claim on behalf of the
applicant.
As indicated earlier, at the time, the applicant was recovering from surgery and not able to
handle a lot of these matters himself.
Policy allows for reasonable costs and professional fees in claim preparation
Section 2 of the policy provides that reasonable professional fees may be payable plus
such reasonable expenses as necessarily incurred and not otherwise recoverable for the
preparation of the claim.
The panel notes the applicant made a request to the FSP that LMI be appointed to his
claim. The FSP advised the applicant’s broker that they would appoint one of their panel
and made certain comments as to the suitability of LMI.
The panel accepts that LMI have assisted the applicant in the preparation of the claim. As
the FSP denied most of the applicant’s claim, the assistance from LMI has helped resolve
this dispute. The material produced by them is of high quality and the panel accepts
significant work is gone into their preparation.
Whilst the FSP claims these costs were excessive, it has not provided any supporting
information for reaching such a conclusion or any information to suggest what it would
consider were reasonable costs.
In the circumstances, the panel is satisfied that the applicant is entitled to recover the
costs incurred by LMI of $13,371.05. No interest is payable as this invoice has not as yet
been paid by the applicant.
Case No: 447123 Determination Page 7 of 7
3 Supporting information
3.1 Relevant terms of the policy
‘ Section 1: Material Loss or Damage
The Indemnity
...
The Insurer will, subject to the provisions of this Policy including the limitation of The Insurer
liability, indemnify The Insured in accordance with the applicable Basis of Settlement.
... The Insurer will also indemnify The Insured for:
1. Architects, surveyors, consulting engineers, legal and other fees and clerks of works salaries
for estimates, plans, specifications, quantities, tenders and supervision necessarily incurred
in reinstatement consequent upon Damage to property hereby insured, but not such costs,
fees and salary for preparing any claim hereunder;
SECTION 2: Consequential Loss
The Indemnity
Item No. 2
The insurance under this item is to cover such reasonable professional fees as may be payable by
The Insured and such other reasonable expenses necessarily incurred by The Insured and not
otherwise recoverable, for preparation of claims under The Insured's Material Damage and
Consequential Loss insurance policies and The Insurer shall indemnify The Insured for such
reasonable fees and expenses.
Perils Exclusions
The Insurer shall not be liable under Sections 1 and/or 2 in respect of:
(b) wear and tear, fading, scratching or marring, gradual deterioration or developing flaws,
normal upkeep or making good;
(c) error or omission in design, plan or specification or failure of design;
(d) normal settling, seepage, shrinkage or expansion in buildings or foundations, walls,
pavements, roads and other structural improvements, creeping, heaving and vibration;
(e) faulty materials or faulty workmanship; ’