Determination 447123

Insurer denied sewer failure repair and claim preparation costs as gradual wear and tear

FirmFinancial Firm (Unknown - Insurer)
Decided2017-09-13
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded$81,143
Non-financial loss—
Amount claimed$109,043
SourceAFCA PDF

Summary

A sewer pipe failure damaged a backpacker hostel building and the insurer offered $31,307.73 while denying the rest as gradual wear. AFCA found a catastrophic failure, rejected the exclusions and ordered a further $81,143.01 plus interest.

The panel found on the evidence of the plumbers who attended site that the damage came from a sudden catastrophic failure, so the wear-and-tear and settling exclusions did not apply, and claim preparation costs were recoverable under the policy.

Issues

Subjects and remedies

home or building damagesmall businesspay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 447123 Determination Page 1 of 7 Case number: 447123 5 September 2017 1 Overview 1.1 Dispute The applicant, a Corporate Trustee earns a mixed business backpackers hostel. On 11 September 2015, the applicant lodged a claim with the financial services provider (FSP) after the building was damaged when a broken sewerage pipe led to the development of a sink hole under the boiler room of the building. The FSP offered to settle the claim for the resulting water damage for $31,307.73. The FSP otherwise denied liability for the rectification works and damage to the building on the grounds the damage was caused by gradual deterioration and wear and tear. The applicant disputes the FSP’s decision and seeks payment of the rectification and professional costs which the FSP has denied. 1.2 Issues and key findings Was the sewer failure caused as a result of gradual deterioration and wear and tear? The panel is satisfied that most likely the damage was caused by a sudden catastrophic failure of the main sewer most likely caused by a blockage. The panel is satisfied that the FSP is liable for the resultant damage and consequential loss. What is the extent of the FSP’s liability? In addition to the settlement already paid of $29,707.73, the FSP is liable to meet the FSP’s further claim as set out under section 2.2 of this determination. Is the applicant entitled to costs incurred in preparation of the claim? The panel is satisfied that the applicant is entitled to be paid the professional fees and reasonable expenses incurred in preparation of the claim as set out in paragraph 2.3 of this determination. 1.3 Determination This determination is in favour of the applicant. The FSP is to pay the applicant in addition to the amount already paid a further sum of $81,143.01 being the total liability as calculated under sections 2.2 and 2.3 of this determination. The FSP is to pay interest on the sum $67,711.96 from 16 July 2016 being the date of the FSP’s final decision letter to date of payment of the claim pursuant to Section 57(1) of the Insurance Contracts Act 1984 (the Act). Case No: 447123 Determination Page 2 of 7 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. In view of the complexities involved in this dispute, the dispute has been referred to a panel for determination. The FSP has raised issues as to the jurisdiction of the Service to determine this dispute as the policy is titled ‘ industrial special risk policy ’ The FSP has previously been notified that the Service can consider a dispute about a small business insurance product to the extent that the dispute relates to cover in respect to one or more of the matters listed under the definition of ‘Small Business Insurance Product’ in paragraph 20.1 of our Terms of Reference. The panel is satisfied that the policy or part of the policy provides insurance cover for accidental damage and general property. As such the policy falls within the definition of a ‘small business insurance product’ under the Terms of Reference. This determination follows consideration of all of the information exchanged. It is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Has the FSP established exclusions apply to limit the extent of its liability? Damage caused by the failure of the sewerage pipe There is no dispute that the applicant’s property was damaged by leaking sewer pipes that led to the development of a deep sink hole, which in turn undermined and damaged the slab at the rear of the applicant’s property. There is no dispute that initial investigations identified a sewer pipe had dislodged and discharged into the ground resulting in the supporting sand bed for the entire building being washed away. The FSP says that whilst it accepts the sewerage pipe failed causing water damage for which liability is accepted, the rectification works to the pipes, the extent of damage associated with the failure of the pipe and the cost of reasonable repairs was not covered under the policy. The FSP, relying upon the reports from its consultant CR and AE, claims the sewer pipes failed due to progressive failure and settlement of the supporting material over time. It says the damage was not caused by a catastrophic failure of the sewerage pipe. The FSP seeks to rely upon the perils exclusions contained in the policy as set out in section 3.1 of this determination. Case No: 447123 Determination Page 3 of 7 Damage most likely caused by a catastrophic failure of the main sewer service The panel does not accept that the exclusions apply. The panel is persuaded by the information provided by the applicant and in particular the applicant’s plumbers, GP, AS and PJ. PJ had been employed by the applicant for 24 years and performed regular inspections and routine work. PJ found the floor of the boiler room had collapsed and identified the cause as being the erosion of sand from under the passage way as a result of the broken sewer pipe. He considered that sewerage from the entire building would have cascaded down under the boiler room area causing the erosion. PJ also noted that the existing separated pipes were in good condition and concluded that the sewer pipe must have burst. AS completed the work for GP. AS completed the temporary repair of the collapsed sewer and then was responsible for the repair and construction of the sewer system. In a detailed response to the FSP’s allegations, AS identified information which he believes the FSP’s engineers misunderstood. H e disagreed with the FSP’s findings that the pipe had been leaking for up to 10 years and notes the following:  the event had only just taken place  in his 24 years as a plumber, he had only seen a similar incident twice  there was no evidence of sewerage seeping into the ground for a prolonged period. If there had been the ground would have been blackened by decomposing matter . This was not the case.  there was insufficient evidence to associate long term settlement as being the cause of the plumbing failure  the sink hole and subsequent collapse of the sewerage service was caused by the initial dislodgement of a 150m earthen ware sewer pipe under the side path located on the southwest corner of the building.  the dislodgement of the sewer pipe occurred after a catastrophic failure in the main sewer service, most likely caused by a blockage.  the amount of waste identified coming from the building was such that there was no way the sink hole had happened over a period of time. Photographs supplied by AS and PJ support these comments. The FSP has not responded to the findings. The panel has considered the reports provided by both parties. The panel notes the FSP has not through its experts challenged the comments of PJ or AS. In particular, the FSP has not responded to the comments by AS that he did not say the pipes had been leaking for up to 10 years. The panel is persuaded by the reports from GP, AS and PJ. They were on the site and conducted the repairs. The panel is satisfied that most likely the damage sustained to the property was due to the catastrophic failure of the sewer pipe most likely as a result of a blockage in the sewer system. The panel is satisfied that the FSP is liable to meet the cost to effect the repairs to the pipes, repairs to the building and reinstatement of the property. Case No: 447123 Determination Page 4 of 7 2.2 What is the extent of the FSP’s liability? The applicant says he has paid $95,671.53 to reinstate the building and incurred further liability of $13,371.05 in claim preparation costs. He also paid $7,000 for painting but does not claim this amount. The FSP have advised that they have settled part of the applicant’s claim for $31,307.73. The panel notes some of the invoices claimed by the applicant have been included in the amount paid by the FSP. Having considered the various invoices provided by the applicant and the settlement details provided by the FSP i n the panel’s view, the FSP is liable to meet the following additional costs: PJ Plumbing – Invoice 27 February 2016 - $1,650 inclusive of GST The cost incurred to PJ Plumbing were associated with the initial investigation, overseeing and advice plus attending various meetings with contractors, the applicant and the FSP’s agent. The panel is satisfied these are reasonably incurred costs. GP Plumbing – Invoice 22 September 2015 – outstanding $13,109.36 The FSP has already paid $8,165 with respect to this invoice. There remains an outstanding $13,109.36. The outstanding amounts relate to the repair the part of the sewer pipe that actually failed of $675. The FSP says it is not liable as it was a defective part. The panel is satisfied the pipe was not defective but damaged by the catastrophic failure of the sewerage service. The FSP is liable to meet the cost of repair of the sewer pipe of $675. The FSP also denied the amount of $12,434.36 being the cost related to the replacement of services damaged by the erosion. The panel is satisfied that the pipes needed to be replaced when the sewer failed with the resultant erosion of soil. The panel is satisfied that this damage is resultant damage covered under the terms of the policy. GP Plumbing 28 October 2015 - $5,684.10 inclusive of GST This invoice relates to replacement of the building’s hot water system. The panel notes the slab in the boiler room needed to be replaced. The hot water system was located in the boiler room. Engineers for both parties agree that it was necessary to move the hot water service. According to the invoice, the unit had leaked perhaps because the pipes had been stretched. It was decided it was more economical to replace the unit. In the circumstances, the panel is satisfied that the FSP is liable under the terms of the policy for the work associated with the replacement and removal of the hot water service. SW Architect – Invoice 23 February 2016 - $8,112.50 inclusive GST The applicant says the architect was employed to liaise with the plumbers and oversee the works. The panel notes that at the time, the applicant had recently had surgery and was not capable of providing the supervision required. Case No: 447123 Determination Page 5 of 7 Given the age, location of the building and nature of the damage it is not unreasonable to have an architect involved in consulting with the various parties providing advice and supervision. The policy provides cover for reasonable professional fees and expenses necessarily incurred. In the panel’s view, the costs incurred by the applicant for the services of the architect were necessarily incurred and are fair in the circumstances. AS Plumbing 19 January 2016 - $3,980 AS initially worked with GP Plumbing. After he went out on his own, he invoiced the applicant separately for the work he had undertaken under the new entity. The invoice relates directly to the damage caused by the burst sewer and are associated with various site meetings and supply of expert reports. The panel accepts these costs are fair and reasonable. JC Constructions – Invoice 8 October 2015 - $27,536 inclusive of GST The invoice of 8 October 2015 relates to works specified by the applicant’s engineer and the repair of the damage to the building caused by the failed sewer. The invoice includes invoicing for brick laying, rendering, demolition works etc. The FSP believes the repairs relate to pre -existing damage. The panel accepts the building is quite old and may have had some pre-existing damage. However give the nature of the incident, the panel is satisfied that most if not all of the repairs identified in the invoice were necessarily incurred as the result of damage caused to by the sewer failure. The FSP is liable to meet these costs. JC Corporations – Invoice dated 29 January 2016 - $7,700 inclusive GST This invoice relates to works specified by the applicant’s engineer and appears to be related to remedial works after the initial footings had been repaired. In the panel’s view, as the works were required due to the damage caused by the failed sewer, these works should be covered under the terms of the policy. Additional Invoices The applicant has also claimed payment of the following invoices:  22.09.2015 – PM Engineer - $795  20.11.2015 - PM Engineer - $775  26.09.2015 - PJ Plumbing - $1,600  28.10.2015 - JC Constructions - $20,500 The panel is satisfied that these invoices were included and settled as part of the FSP’s settlement payment of $31,307.73. The panel notes that the applicant says he has not received the $1,600 with respect to PJ Plumbing invoice of 26 September 2015. If the FSP has not already paid this amount directly to the applicant, it should do so. Case No: 447123 Determination Page 6 of 7 Having considered the issues in dispute, the panel is satisfied that the FSP is to pay the applicant the sum of $67,771.96 with respect to the damage sustained as a result of the sewer pipe. Interest is payable on this amount. 2.3 Is the FSP liable for claim preparation costs? Use of LMI in claim preparation was reasonable The applicant has also claimed $13,371.05 (inclusive of GST) as the costs incurred in arranging for LMI to assist in the preparation of the applicant’s claim. LMI have not been involved in preparing any submissions to FOS. LMI’s invoice relates to the claim preparation services provided. The applicant engaged LMI after the FSP denied the claim. The applicant maintains that LMI provided a portfolio of photographs in their submission to the FSP and continually liaised with the FSP and others to lodge the claim on behalf of the applicant. As indicated earlier, at the time, the applicant was recovering from surgery and not able to handle a lot of these matters himself. Policy allows for reasonable costs and professional fees in claim preparation Section 2 of the policy provides that reasonable professional fees may be payable plus such reasonable expenses as necessarily incurred and not otherwise recoverable for the preparation of the claim. The panel notes the applicant made a request to the FSP that LMI be appointed to his claim. The FSP advised the applicant’s broker that they would appoint one of their panel and made certain comments as to the suitability of LMI. The panel accepts that LMI have assisted the applicant in the preparation of the claim. As the FSP denied most of the applicant’s claim, the assistance from LMI has helped resolve this dispute. The material produced by them is of high quality and the panel accepts significant work is gone into their preparation. Whilst the FSP claims these costs were excessive, it has not provided any supporting information for reaching such a conclusion or any information to suggest what it would consider were reasonable costs. In the circumstances, the panel is satisfied that the applicant is entitled to recover the costs incurred by LMI of $13,371.05. No interest is payable as this invoice has not as yet been paid by the applicant. Case No: 447123 Determination Page 7 of 7 3 Supporting information 3.1 Relevant terms of the policy ‘ Section 1: Material Loss or Damage The Indemnity ... The Insurer will, subject to the provisions of this Policy including the limitation of The Insurer liability, indemnify The Insured in accordance with the applicable Basis of Settlement. ... The Insurer will also indemnify The Insured for: 1. Architects, surveyors, consulting engineers, legal and other fees and clerks of works salaries for estimates, plans, specifications, quantities, tenders and supervision necessarily incurred in reinstatement consequent upon Damage to property hereby insured, but not such costs, fees and salary for preparing any claim hereunder; SECTION 2: Consequential Loss The Indemnity Item No. 2 The insurance under this item is to cover such reasonable professional fees as may be payable by The Insured and such other reasonable expenses necessarily incurred by The Insured and not otherwise recoverable, for preparation of claims under The Insured's Material Damage and Consequential Loss insurance policies and The Insurer shall indemnify The Insured for such reasonable fees and expenses. Perils Exclusions The Insurer shall not be liable under Sections 1 and/or 2 in respect of: (b) wear and tear, fading, scratching or marring, gradual deterioration or developing flaws, normal upkeep or making good; (c) error or omission in design, plan or specification or failure of design; (d) normal settling, seepage, shrinkage or expansion in buildings or foundations, walls, pavements, roads and other structural improvements, creeping, heaving and vibration; (e) faulty materials or faulty workmanship; ’