Home / Financial Firm (Unknown - Insurer) / Determination 446693
Determination 446693
Partial decline of storm damage claim to roof and veranda wall; marble table damage denied
Summary
The applicant's landlord insurer accepted part of a storm claim but declined roof and veranda wall damage and denied liability for a marble table. AFCA found the roof damage storm-related, required the FSP to repair it and pay half the veranda wall cost, and rejected the table claim.
The insured bears the onus of showing an insured event, and pre-existing poor condition of the veranda wall justified a shared 50% contribution.
Issues
- Claim denial primary · upheld
“The FSP is required to repair the roof damage as highlighted by the applicant, and pay half the cost of repairs for the veranda wall.”
- Repairs or contractors secondary · not upheld
“There is no persuasive evidence the FSP or its agents damaged the marble table and it is not required to cover this damage.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Determination
Case No: 446693 Determination Page 1 of 3
Case number: 446693 17 October 2017
1 Overview
1.1 Dispute
The applicant made a claim under her landlord home and contents insurance policy
with the financial services provider (FSP) after her investment property was damaged
during a storm in April 2014. The FSP accepted part of the claim, but declined to
cover areas of the roof and veranda, saying the damage was from wear and tear,
failure to keep the property in good condition, and poor workmanship/construction.
The applicant also claimed the FSP’s repairers damaged her marble table while in
the house conducting repairs. The FSP says there is no evidence of this and has
refused to accept liability for any damage to the table.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was partially in favour of the applicant: it found that the
damage to the roof was from the storm, while the wall damage was attributable in
part to the storm. However, the case manager found there was no persuasive
evidence to show the marble table was damaged by the FSP’s repairers .
A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
No further persuasive evidence has been provided by the applicant to show the
FSP’s repairers damaged her marble table.
The case m anager’s recommended outcome is fair in all the circumstances.
1.3 Determination
This determination is partially in favour of the applicant.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome.
If this determination is accepted by the applicant, the FSP is required to repair the
roof damage as highlighted by the applicant, and pay half the cost of repairs for the
veranda wall.
Case No: 446693 Determination Page 2 of 3
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager’s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
The FSP is not required to pay for the applicant’s table
The applicant has provided a number of photographs of her marble table which she
says was damaged by the FSP’s builders. I have reviewed the photographs, but it is
very difficult to identify any damage. Even if there was obvious damage, there is no
evidence to show that was as a result of the FSP’s builders’ actions.
The applicant had not inspected the property for some time prior to the storm event,
and I consider that reasonably allows for the possibility the table had been damaged
prior to the builders’ attendance at the property.
The applicant has provided a letter from her neighbour who claims to have checked
on the table after the storm and found it intact. While I am not questioning the
credibility of the neighbour, I am also not persuaded the available evidence is
sufficient to establish, on balance, that the FSP or its builders should be held
responsible for any damage to the table.
The FSP should repair the damage to the ceiling identified by the applicant
During the storm event, a window on the southern side of the applicant’s property
blew in, allowing wind and rain into the property. As a result of the pressure
differential, an internal separating wall was damaged. The FSP accepted this as
being caused by the storm, and repaired the separating wall.
The applicant has since identified further damage to the southern wall in this room
where the roof rafters have been lifted from the wall supports.
As set out in the case m anager’s recommendation, I agree it is more likely than not
this damage was caused by the storm. As a result, the FSP should organise to repair
this, including reinstatement of the electrical wiring as reasonably required.
The FSP should contribute to the costs to repair the veranda wall
I agree with the case m anager’s recommende d outcome with regard to the damaged
veranda wall.
The information available suggests its overall condition before the storm would have
contributed to the extent of the damage. That means the FSP should not reasonably
Case No: 446693 Determination Page 3 of 3
be liable for the full amount of the repair costs. I consider it fair in the circumstances
that the FSP meets half the cost of repairing the veranda wall.
Recommendation
Case No: 446693 Recommendation Page 1 of 6
Case number: 446693 5 December 2016
3 Overview
3.1 Dispute
The applicant lodged a claim on her landlord home and contents insurance policy for
cyclone/storm damage to her investment property on or about 11 April 2014.
The financial services provider (FSP) accepted the claim, although a dispute
developed as to its refusal to cover part of the roof and/or the verandah wall damage.
The FSP is of the view this damage was not caused by the storm and was due to
wear and tear and other factors.
Whilst the applicant believes the FSP’s repairer also caused damage to her marble
table, the FSP says there is no evidence of this and has refused to indemnify the
applicant.
3.2 Issues and key findings
Was the roof or the verandah wall damage caused by the insured event?
On balance, the damage to the roof was likely caused by the storm. A minor fix to the
affected area highlighted by the applicant should be arranged by the FSP. It is
acknowledged the verandah wall was damaged in the cyclone, although its condition
was not ideal. The FSP should attend to 50% of the costs to reinstate this wall, with
the applicant to pay the balance.
Is the FSP liable for the damage to the marble table?
There is no persuasive evidence the FSP or its agents damaged the marble table
and it is not required to cover this damage.
Is an award of compensation appropriate?
There is no need for the FSP to pay compensation to the applicant.
3.3 Recommendation
This recommendation is partially in favour of the applicant.
Should the parties accept this recommendation, the FSP should attend to the
additional minor damage to the roof, highlighted in the applicant’s photos and pay
50% towards the repair of the verandah wall. On the basis these repairs are
conducted and not cash settled, there is no need for the FSP to pay interest.
The FSP is not obliged to cover the other aspects of the claim raised by the
applicant.
Case No: 446693 Recommendation Page 2 of 6
4 Reasons for recommendation
4.1 Was the roof or the verandah damage caused by the storm?
Onus on the applicant to show the loss was caused by an insured event
Insurance policies do not provide cover for all risks. Each policy document sets out
the terms of the contract between the parties and the parameters under which cover
is provided.
In order to claim under her policy, a common law onus rests with the applicant to
establish her loss was caused by an event covered under the terms of her policy.
This is known as establishing an insured event or a prima facie claim.
There is no dispute in this instance that the applic ant’s investment property was
damaged by storms related to Cyclone Ita.
The FSP attended to fairly extensive repairs at the home but does not agree this
weather event was the proximate cause of the damage inflicted to the damaged area
of the roof claimed by the applicant or the verandah wall of the home.
To this end, the applicant must establish on balance that this damage is somehow
cyclone related.
Only after such an onus is discharged, is the FSP required to show why it should not
cover the loss.
The property was in below average condition
The applicant’s property was a rental property, with a long term tenant at the time of
the loss.
Amongst the materials in the home were some of the applicant’s possessions,
including a marble table.
Based on photographs of the property pre-dating the loss, it appears that some of the
walls were not plastered and the home was not in ideal condition. It was an old
construction, dating back to around 80 years ago.
The FSP’s loss adjuster noted after the incident the insured property was in a “very
poor” pre - loss condition and that much of the damage observed inside “cannot be
attributed” to the cyclone. Builder SE also noted the home was “generally considered
to be in poor condition for its age”.
These points aside, there is no disputing the insured home was impacted and
damaged by the cyclone.
Roof damage was to be covered by the FSP
The applicant notes the roof area had partially lifted and alleged a specific area of the
roof damaged in the cyclone was missed by the FSP on inspection and/or through
the repair process.
Case No: 446693 Recommendation Page 3 of 6
After reviewing and considering this area of damage, the FSP suggested the damage
was not related to the cyclone event and was indicative of a “lack of general
maintenance at the property”.
On 12 May 2014, building consultant SE ventured:
“I am of the opinion that strong winds generated during Cyclone Ita have caused the timber wall
framing top plate to lift and detach from the securing nail fixings resulting in the damage to the
bedroom partition wall.”
At the time, SE considered this aspect of the damage to be cyclone related.
Later on 9 June 2015, SE noted:
“I am of the opinion that the roof and/or roof framing have not been adversely affected by the
event and that following the repairs outlined within my Scope of Works… the structural integrity
of the roof framing members above the bedroom partition wall will be restored. ”
In viewing photos provided from the applicant, I accept there has been some
movement in the support beam for the roof. Based on the earlier commentary from
SE, it appears the intent of the repairs was to address these issues. The highlighted
area of damage does not appear major.
The FSP considers the damage is not storm related but noting the extent of damage
and the nature of the home, I consider it more than likely was. The home was not
built to modern standards but this is not an impediment to cover. It simply meant the
home was more susceptible to this type of event.
I note SE (and the FSP) has offered no commentary in relation to the specific photos
provided by the applicant showing damage. Given the commitment to repairing much
of the damage, I consider it is not unreasonable the highlighted section should be
included.
I consider the FSP should ensure the roof damage highlighted by the applicant in the
provided photos be addressed to ensure the roof is secure.
Verandah wall was not ideal but it was damaged in the storm
The applicant says the verandah wall was also damaged in the cyclone event. The
FSP accepts this was the case but says it was generally in poor condition prior to the
loss, with the proximate cause of its failure being the condition of the wall prior to the
event.
SE noted on 16 October 2014 he believed if the verandah wall was in “good condition
and well maintained” prio r to the storm, it would not have sustained any damage in
the event. He did not specify what should of work was required to ensure this would
be the case.
A quote from MC on 5 June 2014 suggested the wall was damaged and its
replacement was critical and no ted the “house will not be structurally sound if the
front wall [is] not Removed [and] replaced to Australian Standards”. The FSP rejected
this view and used another builder.
To further consider the matter, the FSP retained building consultant FN to inspec t the
property. Its report of 4 September 2014 relevantly noted:
Case No: 446693 Recommendation Page 4 of 6
the home was thought to be about 80 years old and until recently kept in fairly
poor condition
discussions with the caretaker revealed the home had some cyclone damage
but had been allowed to get “run down” over the years and white ants had
infiltrated in places
the winds involved with the cyclone were not generally destructive to modern
cyclone-designed structures but this was an older property
the insured home incurred minor damage to the western verandah wall, which
was displaced. FN suggested if the wall had been adequately secured, this
would not have occurred
the degradation and lack of maintenance of this wall over time left it “exposed to
premature failure from this event”.
FN noted the construction was not in alignment with building codes but this is hardly
surprising for a building/wall that has been in place for many years.
No specific commentary appears to have addressed the functionality of the wall – it
appears to have stood for some time prior to the incident and the fact it was not
cyclone-proof is not evidence it was not structurally sound.
The applicant was invited to obtain independent expert evidence as to the cause of
the damage by the FSP and FOS. She has not done so.
In the circumstances, I accept the wall may have been of less than perfect structure,
although it appears to have stood for some time. The evidence of the experts casts
doubt on the suitability and security of the structure prior to the loss.
Noting there is no contrary evidence from the applicant but allowing for the fact the
wall has stood for some time without apparent incident, I consider a compromise
would be a fair outcome.
To this end, I consider the FSP should cover 50% of the cost of replacing the wall,
with the applicant to pay the balance. Should the applicant not agree to this, the FSP
may cash settle her for its half of the cost.
4.2 Is the FSP liable for the damage to the marble table?
No persuasive evidence the FSP is responsible for the table
The appli cant says the marble table was moved by the FSP’s repairers to attend to
other work at the home. It always sat in a central position in the home, situated
between two walkways, which the applicant believes was the only practical place for
it.
In the scope of works from SE, I note allowance is specifically made to gain access
to the bedrooms.
Upon returning to the property to inspect it after the cyclone, the applicant noticed the
table had been moved. She says this was not done by the tenant and could only
have been done by representatives of the FSP to allow for better access to attend to
other repairs.
Case No: 446693 Recommendation Page 5 of 6
In the course of moving the table, the applicant says the repairers damaged the table
and should be liable for it.
The applicant believes the damage caused extends to about $8,000 but also notes
the type of marble used is no longer available. It is possible the marble table is not
repairable.
To support her claim, the applicant relies upon a letter from the neighbour to the
property (CZ) suggesting she had access to the home at the time and noticed the
table had not been damaged in the cyclone. She notes the home was at all times
locked and only opened to allow access for the FSP’s tradesmen/assessors.
The FSP referred the issue to its repairer, who reportedly said it had not been moved
by him or any employees. The repairer noted the applicant had not inspected the
property for several years.
The tenant, KF, suggested said she had not moved the table at all and the only
people that could have were the FSP’s age nts on site to inspect and repair damage.
Several pieces of furniture had been moved.
Both KF and the applicant say there was only one area where the marble table could
practically sit. It was not moved from this location. The applicant believes the FSP’s
agents moved it but there remains no specific evidence of this.
The applicant lives about 2,000km from the insured property and therefore does not
regularly visit or inspect it. The FSP suggests she had not personally inspected the
property for about six years prior to the event.
In my view, there is no persuasive evidence to suggest the table was damaged by
the repairer or the cyclone. There is no evidence to establish how it came to be
damaged at all. I accept there are any number of possibilities.
As the onus rests with the applicant to establish such a loss, I am not persuaded this
aspect of the claim should be covered.
4.3 Is an award of compensation appropriate?
No grounds for compensation
The applicant generally sought compensation for the handling of the matter.
FOS has the power to grant compensation in certain circumstances. Typically, it is
acknowledged an insured person will experience a degree of inconvenience in the
handling of a claim. FOS generally expects an applicant to take a robust approach to
this.
In relation to this matter, I am satisfied the FSP’s approach has been reasonable,
even if I accept it should attend to some additional costs. I am satisfied no
compensation is payable.
Case No: 446693 Recommendation Page 6 of 6
5 Supporting information
5.1 FOS approach to this dispute
General information
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions to FOS. For the purpose of this
recommendation, commentary is restricted to only those issues considered relevant
to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.