Text of the determination
Determination
Case No: 446234 Determination Page 1 of 12
Case number: 446234 3 October 2017
1 Overview
1.1 Dispute
The applicant held a home and contents insurance policy with the financial services
provider (FSP). She lodged a claim under the policy after her home suffered water
damage caused by a burst dishwasher hose in May 2016.
The FSP accepted the applicant’s claim and sought to arrange for the repair of the
property. However, after the parties were unable to agree on a scope of works, the
FSP cash settled the applicant for $27,624, being the estimated cost of repairs less
the policy excess.
The FSP also paid the applicant $22,557 for damage to her contents, reflecting the
estimated cost of replacing the damaged items less the policy excess.
The applicant says the FSP forced her to accept a cash settlement. She says the
amount paid by the FSP is not sufficient to address all of the damage to her home
and contents caused by the escape of water and the subsequent actions of the FSP
and its contractors.
The applicant also seeks compensation for losses suffered as a result of the manner
in which the FSP handled her claim.
1.2 Issues and key findings
Was the FSP entitled to cash settle the claim?
Given the circumstances in which the FSP departed from its initial election to repair
the property, it is important to ensure the cash settlement amount is sufficient to
enable the applicant to complete the necessary repairs.
Is the FSP required to increase the cash settlement for building repairs?
The cash settlement amount for building repairs should be increased by $ 23,386 to
reflect the fair and reasonable cost of repairing the damage to the property caused by the
escape of water.
Is the FSP required to increase the cash settlement for damaged contents?
The cash settlement amount for contents damage should be increased by $3,800 to
reflect a fair and reasonable estim ate of the damage to the applicant’s con tents items
resulting from the escape of water.
Case No: 446234 Determination Page 2 of 12
Is the applicant entitled to compensation?
The applicant is entitled to compensation of $1,500 for non-financial loss due to the
manner in which the FSP has managed her claim.
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is to pay the applicant an additional amount of $27,186. The FSP is to pay
interest on this amount at the rate calculated under section 57 of the Insurance
Contracts Act 1984 (the Act) from 28 July 2016 until the payment date.
The FSP is to pay the applicant an additional amount of $1,500 as compensation for
non-financial loss.
Case No: 446234 Determination Page 3 of 12
2 Reasons for determination
2.1 Was the FSP entitled to cash settle the claim?
FSP has accepted liability for escape of water
The applicant’s policy provides cover for damage t o her property caused by the
sudden and unexpected escape of liquid from her dishwasher, subject to the
conditions set out in the policy.
The FSP accepts that the a pplicant’s property was damaged by water from a broken
dishwasher hose in the kitchen in May 2016. The burst pipe occurred overnight and
the damage was discovered by the applicant the following morning.
The cash settlement amount of $27,624 for building repairs was based on an
updated quotation provided by the FSP’s builder (RB) in July 2016. Th e FSP says
this amount reflects the fair and reasonable cost of repairing the damage caused by
the burst pipe.
However, the applicant says she was forced to accept an amount which was not
sufficient to repair all of the damage to her property.
Insurer is generally bound by election to repair
Under the terms of the policy, the FSP may settle a claim for damage to the insured
property by repairing the damaged property (to the same standard as when it was
new) or paying her the cost of doing so.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt. However, FOS expects an insurer to act reasonably in
exercising its discretion, having regard to the circumstances of the claim.
Once an insurer makes an election to repair the insured property (rather than to cash
settle the policyholder for the cost of the repairs), it is generally obliged to complete
the repairs in accordance with the terms of the policy.
However, particular circumstances may arise which make the conduct of repairs by
an insurer untenable.
In such cases, it is reasonable for the insurer to seek to settle the claim by way of a
cash settlement, provided the settlement amount is sufficient to allow the policyholder
to engage a builder to complete the necessary repairs.
FSP changed settlement method during claim process
The FSP’s claim notes reflect that it was initially intending to repair the damage to the
applicant’s property caused by the escape of water.
Accordingly, the FSP arranged for its contractors (AB and RB) to attend the property,
prepare a scope of works and provide a quotation for the necessary repairs.
Case No: 446234 Determination Page 4 of 12
Further reinspections were arranged after concerns were raised about damage
having been omitted from the initial scope of works, which resulted in additional items
being added.
The FSP appointed its building company (RB) to carry out the necessary repairs.
However, after undertaking a further inspection on 11 July 2016, DW (an employee
of RB) recommended that the claim be cash settled.
DW advised that:
during his inspection, he had witnessed the applicant’ s tradespeople completing
works at the property
the applicant had arranged for new plaster board wall linings to be installed to
three walls in the living room area and a new plaster board ceiling installed in
the living, dining and kitchen areas
the applicant had advised she preferred to use her own electrician, flooring
contractor layer and plasterer to complete the repairs.
The applicant denies undertaking any significant repairs to the property following the
burst pipe. She says the only action she took was to engage a painter to apply an
anti-bacterial paint to the affected areas in an attempt to prevent the spread of mould.
The applicant has provided an email from the painter (TB) in support of her position.
FSP did not fully explore options before deciding to cash settle
The statements made by DW about the extent of repairs undertaken at the property
are inconsistent with the information provided by the applicant.
The applicant says no reliance should be placed on any information provided by DW
because he does not have his own builder’s licence. The applicant says RB (and
DW) have provided fraudulent and misleading information about their licensing and
qualifications.
While I acknowledge the applicant’s concerns, the available information establishes
that RB is a licenced building company, of which DW is a long-term employee. In
these circumstances, I consi der DW’s views should be given some weight.
Having said that, DW’s report does not include any photographic evidence of the
additional works which he says the applicant had undertaken at the property.
Such information would have been useful in resolving the opposing positions of the
parties and assessing the extent to which any such works would have impacted the
FSP’s ability to undertake repairs.
Further, to the extent the applicant took steps in an attempt to mitigate further
damage to the property, it would be unreasonable for the FSP to rely on her actions
to justify a cash settlement (unless the works could be shown to have materially
prejudiced the FSP’s interests).
The FSP should have taken the applicant’s interests into account before seeking to
cash settle the claim, in circumstances where it had already elected to repair the
property (and the applicant had reaffirmed her preference for the FSP to undertake
the repairs).
Case No: 446234 Determination Page 5 of 12
It is clear that the parties had differing views about the extent of the damage caused
by the escape of water and the items which should be included in the scope of
repairs.
However, there were other options open to the FSP to address this issue, such as
arranging an independent assessment or formally inviting the applicant to submit her
own builder’s report.
FSP is required to ensure cash settlement is sufficient to fund repairs
The FSP’s decision to cash settle the claim (based on the quotation provided by its
builder) left the applicant potentially exposed to increased costs, including as a result
of:
any variations to the repairs required once they had commenced
any additional damage which may have become apparent during the course of
the repairs (a situation which is not uncommon in claims for water damage)
any subsequent rectification works required (for which the FSP would have
been liable had its contractors completed the repairs).
The applicant was also required to fund any additional amounts payable as a result
of being unable to access any volume based discounts and rebates available to the
FSP and its contractors.
The applicant has used the cash settlement amount paid by the FSP (together with
other funds) to undertake the repairs to her property. Accordingly, she no longer
wants the FSP to authorise the repairs but seeks an increase in the cash settlement
amount.
2.2 Is the FSP required to increase the cash settlement for building
repairs?
Parties disagree about scope of repairs required
The escape of water was caused by a burst dishwasher hose in the kitchen on the
fourth level (Level 4) of the applicant’s five level property. Photographs provided by
the applicant show water running down the walls and into the light fittings of the level
below (Level 5).
The parties disagree about the extent of the damage to the property caused by the
escape of water and the scope of repairs required.
The FSP says the damage was limited to the areas in the immediate vicinity of the
water leak.
However, the applicant says the water caused extensive damage to the kitchen,
living/dining area and cinema room located on Level 4, as well as many of the rooms
on Level 5.
The FSP cash settled the applicant for $27,624, being the estimated cost of the
repairs based on an updated quotation provided by its builder (RB) in July 2016. This
quotation was prepared by RB based on a scope of works initially prepared by AB
and subsequently updated by RB to include additional items.
Case No: 446234 Determination Page 6 of 12
However, the applicant says RB failed to include further items of damage which had
been identified by AB and/or the FSP’s assessor (DS).
The applicant has provided a relatively detailed report from her builder (WG) which
concludes that the water damage to the property is significantly more extensive than
is reflected in the FSP’s approved scope of works.
Some of the key items identified in WG’s report which are not provided for in the
FSP’s scope of works include:
the particle board flooring in the kitchen and dining area on Level 4 of the
property
all of the kitchen cabinetry on Level 4
the plaster walls, ceilings and cornices in several rooms on Level 5.
WG provided a quotation for $64,217 to complete the necessary repairs. The
applicant also obtained quotations of $64,300 and $74,525, based on similar scopes
of work.
RB re viewed WG’s report but maintained that the FSP’s scope of works was
adequate to address all of the damage.
Photographs provided do not clearly illustrate extent of damage
Based on the information provided, it is difficult to determine with certainty the extent
of the damage to the property caused by the water leak.
The FSP’s builder (RB) says the volume of water affecting the property would have
been limited to around 90 litres (being equivalent to one cycle of the dishwasher).
However, the applicant’s builder (WG) says the escape of water was ongoing for
approximately 12 hours.
Regardless of which view is correct, I am satisfied that the photographs provided
establish that the property was affected by a significant amount of water.
However, the extent to which various rooms of the property were affected (and in
what manner) is not readily discernible from the limited photographic evidence
available. Neither party has provided a room by room photographic catalogue which
clearly illustrates the extent of the damage caused.
The report provided by the FSP’s builder (RB) includes a relatively limited number of
photographs, most of which have been taken from a distance and many of which
appear to be underexposed.
The re port provided by the applicant’s builder (WG) includes a greater number of
higher quality photographs. However, many of these photographs are taken in close-
up and therefore show only small areas of the property, which makes it difficult to
determine the nature of the damage throughout.
Cash settlement amount does not reflect cost of repairs
Having carefully reviewed the available information, I am not satisfied that the cash
settlement paid by the FSP represents the fair and reasonable cost of repairing all of
the damage to the property caused by the escape of water.
Case No: 446234 Determination Page 7 of 12
In particular, I consider that WG’s report (and the photographs included therein)
clearly demonstrate that the particle board flooring on Level 4 was affected by water,
to the extent that it required replacement.
The photographs provided clearly show staining and swelling of the flooring, which is
consistent with the escape of water which occurred. The applicant has also provided
a report from a flooring specialist (CC) which confirms that additional damage to the
surface would occur when the damaged cork overlay was removed.
While the FSP’s builder (RB) considered the water staining to the flooring was minor,
other contractors engaged by the FSP had previously expressed concerns about the
extent of the damage to the floor. Further, I am not satisfied there was any pre-
existing water damage to the flooring (as advised by RB).
The applicant’s builder (WG) provided a standalone quotation of $8,317 for the
replacement of the particle board flooring. The available information does not
establish there was any more extensive damage (for example, to the timber joists
and bears). Accordingly, I am satisfied that this amount is appropriate.
Based on the information included in WG’s report, I am also satisfied that the extent
of the damage to the walls, ceilings and cornices on both affected levels of the
property is likely to have been more extensive than allowed for in the FSP’s scope of
works.
In water damage claims of this nature, it is not uncommon for variations to the scope
of works to be required due to additional damage to plasterboard which becomes
apparent during the course of repairs (for example, due to the spread of mould).
The FSP’s contractors appear to have relied on a visual assessment of mould growth
only, even when this was specifically raised by the applicant as a concern.
Accordingly, the cash settlement amount should be increased to reflect these
matters.
However, I am not satisfied that all of the addi tional items identified in WG’s scope of
works are necessarily required. In particular, I am not satisfied that the kitchen
cabinetry required replacement as a result of the water damage.
The applicant’s builder (WG) says the kitchen cabinets have sagged and buckled and
become mould ridden, due to holes made in the base frame to facilitate the drying
process.
However, I am not satisfied that the information supplied substantiates the extent of
the damage to the cabinetry claimed.
While WG’s report includ es close-up photographs depicting minor splits in the bench
top joins and small fractures in the laminate, these photographs do not show
extensive sagging and buckling. Nor do the photographs illustrate extensive mould
damage to the cabinets.
Further, it is not clear that the damage was such that it was not capable of being
repaired, but required the replacement of the kitchen cabinets in their entirety (at an
estimated cost of $10,000 to $12,000).
Case No: 446234 Determination Page 8 of 12
WG’s scope of works (and quotation) also includes the repla cement of a floor to
ceiling wardrobe which has been cash settled by the FSP as a contents item for
$3,396.80 (based on a quotation provided by the applicant).
In her submissions, the applicant has raised concerns about additional damage to
the property re sulting from the failure of the FSP’s contractors to undertake proper
make safe works.
However, given the scopes of work were prepared following the make safe repairs, I
am satisfied that any additional damage has been properly taken into account.
Settlement for building repairs should be increased to $51,000
For the reasons outlined above, I consider the cash settlement amount paid by the
FSP for building repairs should be increased to reflect some (but not all) of the
additional damage identified by the applicant’s builder (WG).
In circumstances where the FSP elected to cash settle part way through the claim
process, the cash settlement amount should be sufficient to provide for:
any necessary variations to the scope of works for additional damage identified
during the course of the repairs
the effect of any discounts or rebates which may have been available to the
FSP through the use of a panel builder
the additional risk to which the applicant was exposed as a result of being
unable to rely on the lifetime guarantee provided under the policy.
Having regard to the various factors outlined above, I consider it is fair in all the
circumstances that the cash settlement amount be increased to $51,000 (ie by an
additional amount of $23,386).
This amount reflects the fair and reasonable cost of repairing the damage caused by
the escape of water, including an allowance for the additional costs incurred and
risks assumed by the applicant as a result of the cash settlement.
As compared to the cash settlement paid by the FSP, the increased amount reflects:
an allowance of $8,000 for additional plastering and any other necessary
variations
an uplift of approximately 20% to account for discounts or rebates and the loss
of the benefit of the lifetime guarantee
the estimated cost of replacing the particle board flooring .
The increased amount also reflects the approximate amount of the quotation
provided by the applicant ’s builder, reduced by the cost of replacing the kitchen and
the floor to ceiling wardrobe.
The FSP is required to pay interest on the increase in the settlement amount at the
rate calculated under section 57 of Act from 28 July 2016 until the payment date.
Case No: 446234 Determination Page 9 of 12
2.3 Is the FSP required to increase the amount paid for contents
damage?
Applicant says cash settlement for contents items is insufficient
The FSP paid the applicant $22,557 for the estimated cost of replacing her water
damaged contents items (less the policy excess).
The applicant says the cash settlement amount paid is not sufficient to cover the cost
of replacing the damaged items. The applicant has estimated the cost of replacing all
of the damaged items at between $33,000 and $38,000.
The applicant says the amount paid by the FSP is insufficient because, among other
things:
it does not include all of the water damaged items
there is no allowance for costs of postage, handling and delivery
the amounts for electrical items are based on discounted prices
the amounts for certain other items do not reflect the quality of the original
items.
Policy sets out how contents claims will be settled
The policy provides that the FSP may settle contents claims by replacing the
damaged items with the nearest equivalent available or paying the applicant the cost
of doing so (based on the retail price less any trade discounts to which the FSP is
entitled). The policy clearly states that the FSP has the right to choose the supplier.
The cash settlement amount paid by the FSP was based on a schedule of non-
replaceable items prepared by the FSP’s restoration compa ny (OP) following an
inspection of the property. The FSP then sought quotations for the cost of replacing
the items.
FSP was entitled to settle electrical items based on discounted prices
In determining the cash settlement amount for damaged electrical items, the FSP
relied on quotations provided by its preferred supplier (JB). The FSP’s schedule of
loss includes an allowance for delivery of these items.
The claim notes reflect that the FSP initially sought to replace the electrical items
through its supplier (JB). The FSP explained that, under the terms of the policy it was
entitled to choose to replace (rather than cash settle) these items.
However, the applicant advised that she would not accept replacement by JB.
In these circumstances, I am satisfied the FSP was entitled to cash settle the
applicant for the cost of the electrical items (as quoted by JB).
Cash settlement amount should be increased by $3,800
The applicant says the FSP ’s schedule of loss omits a number of items which were
damaged and needed to be replaced.
Case No: 446234 Determination Page 10 of 12
Having reviewed the photographs provided, I consider it is reasonable that the FSP
cash settle the applicant for the replacement cost of a television mounted on the wall
of the bedroom in Level 5, directly below the kitchen. The applicant says the
television was taken down before the FSP’s contractors attended the property.
The applicant also seeks cover for additional furniture and contents items, including a
six piece fabric lounge suite and two guitars which were located in the cinema room.
The FSP’s restorer (OP) assessed these items as undamaged. The applicant says
the lounge suite smelt of mould and the seams of the wooden guitars had started to
split after being exposed to the wet carpet.
The applicant also disputes the estimated replacement cost adopted by the FSP for
the various items listed on the schedule of loss (including the dishwasher which was
removed by the FSP’s contractors without her consent) .
Given the dishwasher required replacement due to the unauthorised actions of the
FSP’s contractor, the amount payable for its replacement should not be limited by the
terms of the policy.
In relation to the other items, the FSP has not provided copies of the supplier
quotations on which its calculations were based.
For her part, the applicant has not provided copies of quotations to support the higher
amounts she is seeking (or information establishing the purchase costs and/or
specifications of the original items).
In these circumstances, the applicant is entitled to an amount which reflects a fair
and reasonable estimate of the damage to her contents caused by the escape of
water.
Based on the information provided, and having regard to the factors outlined above, I
consider it is fair in the circumstances that the cash settlement amount for contents
damage be increased by an additional amount of $3,800.
The FSP is required to pay interest on the increase in the settlement amount at the
rate calculated under section 57 of the Act from 28 July 2016 until the payment date.
2.4 Is the applicant entitled to compensation?
FOS may award compensation for financial and non-financial losses
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or exte nt of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The fact that the applicant’s policy excludes cover for consequential losses does not
preclude the award of compensation where such losses have occurred as a result of
the way in which the FSP has handled her claim, rather than as a result of the
insured event itself.
Case No: 446234 Determination Page 11 of 12
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss.
Applicant is dissatisfied with FSP’s claims handling
The applicant is dissatisfied with the manner in which the FSP has handled her claim.
Among other things, the applicant say the FSP and its contractors:
failed to undertake adequate make safe works at the property in the immediate
aftermath of the claim
misrepresented their qualifications, lied to her and produced fraudulent
documents
unreasonably delayed the resolution of her claim
failed to provide her and her family with temporary accommodation
forced her to accept a cash settlement.
Applicant is entitled to compensation for non-financial loss
Given the nature of the claim, I do not consider that the FSP unduly delayed the
assessment process. It is not uncommon for several inspections to be required to
finalise the scope of works.
I am also satisfied that the FSP’s consultants discussed with the applicant the
possibility of seeking temporary accommodation. However, the claim notes indicate
that each time the issue was raised, the applicant advised she would remain in the
property.
However, having carefully reviewed the claim history, I am satisfied that some
aspects of the make safe works undertaken by the FSP’s contractors were
inadequate.
Among other matters, the FSP’s contractors removed the (undamaged) dishw asher
without the applicant’s consent and failed to take up the water logged carpet in the
media room.
For the reasons outlined in sections 2.1 and 2.2 above, I also consider the FSP:
did not explore all reasonable options to resolve the dispute about the scope of
works so it could authorise the repairs
sought to cash settle the applicant for an amount which did not fully reflect the
cost of repairing all of the damage to the property.
I am satisfied that the actions of the FSP and its contractors caused the applicant
stress and inconvenience.
Having regard to the various factors outlined above, I consider that an award of
compensation for non-financial loss in the amount of $1,500 is appropriate.
Case No: 446234 Determination Page 12 of 12
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the Terms of Reference, due to the nature of the dispute.
Accordingly, this dispute has not been the subject of a FOS preliminary view and has
proceeded directly to determination.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice, and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered. While the parties have raised numerous issues in their submissions, for
the purposes of this determination, commentary has been restricted to those issues
which are considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Settlement
of claims
If we agree to pay a claim for loss, theft or damage to your home, contents or
personal effects, we will decide whether to:
repair the damaged property to the same standard, specification or quality as it
was when it was new, or
repla ce the damaged property with the nearest equivalent property available, or
pay you the amount it would cost us to repair or replace the property to “as new”
condition.
The cost to us is:
the retail price of an item less any trade discount we are entitled to, or
the cost to us to repair or replace the property, allowing for any trade discount
we are entitled to.
We reserve the right to choose the repairer or supplier to be used …
We will NOT pay:
to rebuild or repair undamaged property in order to achieve a match with
repaired or replaced property
any additional costs to replace materials that are not damaged …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.