Cash settlement amount for water damage to building and contents

FirmFinancial Firm (Unknown - Insurer)
Decided2017-10-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$27,186
Non-financial loss$1,500
Amount claimed$47,036
SourceAFCA PDF

Summary

After the FSP cash settled a water damage claim it had first elected to repair, the applicant said the settlement was insufficient for building and contents. AFCA increased the building settlement by $23,386 and contents by $3,800, with interest and $1,500 non-financial loss, but refused the full amounts claimed for kitchen cabinetry and other items.

Once an insurer switches from repair to cash settlement, the amount must fund the necessary repairs, including allowance for variations, discounts the insurer would have had and the lost lifetime guarantee.

Issues

Subjects and remedies

pay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 446234 Determination Page 1 of 12 Case number: 446234 3 October 2017 1 Overview 1.1 Dispute The applicant held a home and contents insurance policy with the financial services provider (FSP). She lodged a claim under the policy after her home suffered water damage caused by a burst dishwasher hose in May 2016. The FSP accepted the applicant’s claim and sought to arrange for the repair of the property. However, after the parties were unable to agree on a scope of works, the FSP cash settled the applicant for $27,624, being the estimated cost of repairs less the policy excess. The FSP also paid the applicant $22,557 for damage to her contents, reflecting the estimated cost of replacing the damaged items less the policy excess. The applicant says the FSP forced her to accept a cash settlement. She says the amount paid by the FSP is not sufficient to address all of the damage to her home and contents caused by the escape of water and the subsequent actions of the FSP and its contractors. The applicant also seeks compensation for losses suffered as a result of the manner in which the FSP handled her claim. 1.2 Issues and key findings Was the FSP entitled to cash settle the claim? Given the circumstances in which the FSP departed from its initial election to repair the property, it is important to ensure the cash settlement amount is sufficient to enable the applicant to complete the necessary repairs. Is the FSP required to increase the cash settlement for building repairs? The cash settlement amount for building repairs should be increased by $ 23,386 to reflect the fair and reasonable cost of repairing the damage to the property caused by the escape of water. Is the FSP required to increase the cash settlement for damaged contents? The cash settlement amount for contents damage should be increased by $3,800 to reflect a fair and reasonable estim ate of the damage to the applicant’s con tents items resulting from the escape of water. Case No: 446234 Determination Page 2 of 12 Is the applicant entitled to compensation? The applicant is entitled to compensation of $1,500 for non-financial loss due to the manner in which the FSP has managed her claim. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is to pay the applicant an additional amount of $27,186. The FSP is to pay interest on this amount at the rate calculated under section 57 of the Insurance Contracts Act 1984 (the Act) from 28 July 2016 until the payment date. The FSP is to pay the applicant an additional amount of $1,500 as compensation for non-financial loss. Case No: 446234 Determination Page 3 of 12 2 Reasons for determination 2.1 Was the FSP entitled to cash settle the claim? FSP has accepted liability for escape of water The applicant’s policy provides cover for damage t o her property caused by the sudden and unexpected escape of liquid from her dishwasher, subject to the conditions set out in the policy. The FSP accepts that the a pplicant’s property was damaged by water from a broken dishwasher hose in the kitchen in May 2016. The burst pipe occurred overnight and the damage was discovered by the applicant the following morning. The cash settlement amount of $27,624 for building repairs was based on an updated quotation provided by the FSP’s builder (RB) in July 2016. Th e FSP says this amount reflects the fair and reasonable cost of repairing the damage caused by the burst pipe. However, the applicant says she was forced to accept an amount which was not sufficient to repair all of the damage to her property. Insurer is generally bound by election to repair Under the terms of the policy, the FSP may settle a claim for damage to the insured property by repairing the damaged property (to the same standard as when it was new) or paying her the cost of doing so. It is clear from the terms of the policy that the FSP has the discretion to decide which settlement method to adopt. However, FOS expects an insurer to act reasonably in exercising its discretion, having regard to the circumstances of the claim. Once an insurer makes an election to repair the insured property (rather than to cash settle the policyholder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, particular circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the insurer to seek to settle the claim by way of a cash settlement, provided the settlement amount is sufficient to allow the policyholder to engage a builder to complete the necessary repairs. FSP changed settlement method during claim process The FSP’s claim notes reflect that it was initially intending to repair the damage to the applicant’s property caused by the escape of water. Accordingly, the FSP arranged for its contractors (AB and RB) to attend the property, prepare a scope of works and provide a quotation for the necessary repairs. Case No: 446234 Determination Page 4 of 12 Further reinspections were arranged after concerns were raised about damage having been omitted from the initial scope of works, which resulted in additional items being added. The FSP appointed its building company (RB) to carry out the necessary repairs. However, after undertaking a further inspection on 11 July 2016, DW (an employee of RB) recommended that the claim be cash settled. DW advised that:  during his inspection, he had witnessed the applicant’ s tradespeople completing works at the property  the applicant had arranged for new plaster board wall linings to be installed to three walls in the living room area and a new plaster board ceiling installed in the living, dining and kitchen areas  the applicant had advised she preferred to use her own electrician, flooring contractor layer and plasterer to complete the repairs. The applicant denies undertaking any significant repairs to the property following the burst pipe. She says the only action she took was to engage a painter to apply an anti-bacterial paint to the affected areas in an attempt to prevent the spread of mould. The applicant has provided an email from the painter (TB) in support of her position. FSP did not fully explore options before deciding to cash settle The statements made by DW about the extent of repairs undertaken at the property are inconsistent with the information provided by the applicant. The applicant says no reliance should be placed on any information provided by DW because he does not have his own builder’s licence. The applicant says RB (and DW) have provided fraudulent and misleading information about their licensing and qualifications. While I acknowledge the applicant’s concerns, the available information establishes that RB is a licenced building company, of which DW is a long-term employee. In these circumstances, I consi der DW’s views should be given some weight. Having said that, DW’s report does not include any photographic evidence of the additional works which he says the applicant had undertaken at the property. Such information would have been useful in resolving the opposing positions of the parties and assessing the extent to which any such works would have impacted the FSP’s ability to undertake repairs. Further, to the extent the applicant took steps in an attempt to mitigate further damage to the property, it would be unreasonable for the FSP to rely on her actions to justify a cash settlement (unless the works could be shown to have materially prejudiced the FSP’s interests). The FSP should have taken the applicant’s interests into account before seeking to cash settle the claim, in circumstances where it had already elected to repair the property (and the applicant had reaffirmed her preference for the FSP to undertake the repairs). Case No: 446234 Determination Page 5 of 12 It is clear that the parties had differing views about the extent of the damage caused by the escape of water and the items which should be included in the scope of repairs. However, there were other options open to the FSP to address this issue, such as arranging an independent assessment or formally inviting the applicant to submit her own builder’s report. FSP is required to ensure cash settlement is sufficient to fund repairs The FSP’s decision to cash settle the claim (based on the quotation provided by its builder) left the applicant potentially exposed to increased costs, including as a result of:  any variations to the repairs required once they had commenced  any additional damage which may have become apparent during the course of the repairs (a situation which is not uncommon in claims for water damage)  any subsequent rectification works required (for which the FSP would have been liable had its contractors completed the repairs). The applicant was also required to fund any additional amounts payable as a result of being unable to access any volume based discounts and rebates available to the FSP and its contractors. The applicant has used the cash settlement amount paid by the FSP (together with other funds) to undertake the repairs to her property. Accordingly, she no longer wants the FSP to authorise the repairs but seeks an increase in the cash settlement amount. 2.2 Is the FSP required to increase the cash settlement for building repairs? Parties disagree about scope of repairs required The escape of water was caused by a burst dishwasher hose in the kitchen on the fourth level (Level 4) of the applicant’s five level property. Photographs provided by the applicant show water running down the walls and into the light fittings of the level below (Level 5). The parties disagree about the extent of the damage to the property caused by the escape of water and the scope of repairs required. The FSP says the damage was limited to the areas in the immediate vicinity of the water leak. However, the applicant says the water caused extensive damage to the kitchen, living/dining area and cinema room located on Level 4, as well as many of the rooms on Level 5. The FSP cash settled the applicant for $27,624, being the estimated cost of the repairs based on an updated quotation provided by its builder (RB) in July 2016. This quotation was prepared by RB based on a scope of works initially prepared by AB and subsequently updated by RB to include additional items. Case No: 446234 Determination Page 6 of 12 However, the applicant says RB failed to include further items of damage which had been identified by AB and/or the FSP’s assessor (DS). The applicant has provided a relatively detailed report from her builder (WG) which concludes that the water damage to the property is significantly more extensive than is reflected in the FSP’s approved scope of works. Some of the key items identified in WG’s report which are not provided for in the FSP’s scope of works include:  the particle board flooring in the kitchen and dining area on Level 4 of the property  all of the kitchen cabinetry on Level 4  the plaster walls, ceilings and cornices in several rooms on Level 5. WG provided a quotation for $64,217 to complete the necessary repairs. The applicant also obtained quotations of $64,300 and $74,525, based on similar scopes of work. RB re viewed WG’s report but maintained that the FSP’s scope of works was adequate to address all of the damage. Photographs provided do not clearly illustrate extent of damage Based on the information provided, it is difficult to determine with certainty the extent of the damage to the property caused by the water leak. The FSP’s builder (RB) says the volume of water affecting the property would have been limited to around 90 litres (being equivalent to one cycle of the dishwasher). However, the applicant’s builder (WG) says the escape of water was ongoing for approximately 12 hours. Regardless of which view is correct, I am satisfied that the photographs provided establish that the property was affected by a significant amount of water. However, the extent to which various rooms of the property were affected (and in what manner) is not readily discernible from the limited photographic evidence available. Neither party has provided a room by room photographic catalogue which clearly illustrates the extent of the damage caused. The report provided by the FSP’s builder (RB) includes a relatively limited number of photographs, most of which have been taken from a distance and many of which appear to be underexposed. The re port provided by the applicant’s builder (WG) includes a greater number of higher quality photographs. However, many of these photographs are taken in close- up and therefore show only small areas of the property, which makes it difficult to determine the nature of the damage throughout. Cash settlement amount does not reflect cost of repairs Having carefully reviewed the available information, I am not satisfied that the cash settlement paid by the FSP represents the fair and reasonable cost of repairing all of the damage to the property caused by the escape of water. Case No: 446234 Determination Page 7 of 12 In particular, I consider that WG’s report (and the photographs included therein) clearly demonstrate that the particle board flooring on Level 4 was affected by water, to the extent that it required replacement. The photographs provided clearly show staining and swelling of the flooring, which is consistent with the escape of water which occurred. The applicant has also provided a report from a flooring specialist (CC) which confirms that additional damage to the surface would occur when the damaged cork overlay was removed. While the FSP’s builder (RB) considered the water staining to the flooring was minor, other contractors engaged by the FSP had previously expressed concerns about the extent of the damage to the floor. Further, I am not satisfied there was any pre- existing water damage to the flooring (as advised by RB). The applicant’s builder (WG) provided a standalone quotation of $8,317 for the replacement of the particle board flooring. The available information does not establish there was any more extensive damage (for example, to the timber joists and bears). Accordingly, I am satisfied that this amount is appropriate. Based on the information included in WG’s report, I am also satisfied that the extent of the damage to the walls, ceilings and cornices on both affected levels of the property is likely to have been more extensive than allowed for in the FSP’s scope of works. In water damage claims of this nature, it is not uncommon for variations to the scope of works to be required due to additional damage to plasterboard which becomes apparent during the course of repairs (for example, due to the spread of mould). The FSP’s contractors appear to have relied on a visual assessment of mould growth only, even when this was specifically raised by the applicant as a concern. Accordingly, the cash settlement amount should be increased to reflect these matters. However, I am not satisfied that all of the addi tional items identified in WG’s scope of works are necessarily required. In particular, I am not satisfied that the kitchen cabinetry required replacement as a result of the water damage. The applicant’s builder (WG) says the kitchen cabinets have sagged and buckled and become mould ridden, due to holes made in the base frame to facilitate the drying process. However, I am not satisfied that the information supplied substantiates the extent of the damage to the cabinetry claimed. While WG’s report includ es close-up photographs depicting minor splits in the bench top joins and small fractures in the laminate, these photographs do not show extensive sagging and buckling. Nor do the photographs illustrate extensive mould damage to the cabinets. Further, it is not clear that the damage was such that it was not capable of being repaired, but required the replacement of the kitchen cabinets in their entirety (at an estimated cost of $10,000 to $12,000). Case No: 446234 Determination Page 8 of 12 WG’s scope of works (and quotation) also includes the repla cement of a floor to ceiling wardrobe which has been cash settled by the FSP as a contents item for $3,396.80 (based on a quotation provided by the applicant). In her submissions, the applicant has raised concerns about additional damage to the property re sulting from the failure of the FSP’s contractors to undertake proper make safe works. However, given the scopes of work were prepared following the make safe repairs, I am satisfied that any additional damage has been properly taken into account. Settlement for building repairs should be increased to $51,000 For the reasons outlined above, I consider the cash settlement amount paid by the FSP for building repairs should be increased to reflect some (but not all) of the additional damage identified by the applicant’s builder (WG). In circumstances where the FSP elected to cash settle part way through the claim process, the cash settlement amount should be sufficient to provide for:  any necessary variations to the scope of works for additional damage identified during the course of the repairs  the effect of any discounts or rebates which may have been available to the FSP through the use of a panel builder  the additional risk to which the applicant was exposed as a result of being unable to rely on the lifetime guarantee provided under the policy. Having regard to the various factors outlined above, I consider it is fair in all the circumstances that the cash settlement amount be increased to $51,000 (ie by an additional amount of $23,386). This amount reflects the fair and reasonable cost of repairing the damage caused by the escape of water, including an allowance for the additional costs incurred and risks assumed by the applicant as a result of the cash settlement. As compared to the cash settlement paid by the FSP, the increased amount reflects:  an allowance of $8,000 for additional plastering and any other necessary variations  an uplift of approximately 20% to account for discounts or rebates and the loss of the benefit of the lifetime guarantee  the estimated cost of replacing the particle board flooring . The increased amount also reflects the approximate amount of the quotation provided by the applicant ’s builder, reduced by the cost of replacing the kitchen and the floor to ceiling wardrobe. The FSP is required to pay interest on the increase in the settlement amount at the rate calculated under section 57 of Act from 28 July 2016 until the payment date. Case No: 446234 Determination Page 9 of 12 2.3 Is the FSP required to increase the amount paid for contents damage? Applicant says cash settlement for contents items is insufficient The FSP paid the applicant $22,557 for the estimated cost of replacing her water damaged contents items (less the policy excess). The applicant says the cash settlement amount paid is not sufficient to cover the cost of replacing the damaged items. The applicant has estimated the cost of replacing all of the damaged items at between $33,000 and $38,000. The applicant says the amount paid by the FSP is insufficient because, among other things:  it does not include all of the water damaged items  there is no allowance for costs of postage, handling and delivery  the amounts for electrical items are based on discounted prices  the amounts for certain other items do not reflect the quality of the original items. Policy sets out how contents claims will be settled The policy provides that the FSP may settle contents claims by replacing the damaged items with the nearest equivalent available or paying the applicant the cost of doing so (based on the retail price less any trade discounts to which the FSP is entitled). The policy clearly states that the FSP has the right to choose the supplier. The cash settlement amount paid by the FSP was based on a schedule of non- replaceable items prepared by the FSP’s restoration compa ny (OP) following an inspection of the property. The FSP then sought quotations for the cost of replacing the items. FSP was entitled to settle electrical items based on discounted prices In determining the cash settlement amount for damaged electrical items, the FSP relied on quotations provided by its preferred supplier (JB). The FSP’s schedule of loss includes an allowance for delivery of these items. The claim notes reflect that the FSP initially sought to replace the electrical items through its supplier (JB). The FSP explained that, under the terms of the policy it was entitled to choose to replace (rather than cash settle) these items. However, the applicant advised that she would not accept replacement by JB. In these circumstances, I am satisfied the FSP was entitled to cash settle the applicant for the cost of the electrical items (as quoted by JB). Cash settlement amount should be increased by $3,800 The applicant says the FSP ’s schedule of loss omits a number of items which were damaged and needed to be replaced. Case No: 446234 Determination Page 10 of 12 Having reviewed the photographs provided, I consider it is reasonable that the FSP cash settle the applicant for the replacement cost of a television mounted on the wall of the bedroom in Level 5, directly below the kitchen. The applicant says the television was taken down before the FSP’s contractors attended the property. The applicant also seeks cover for additional furniture and contents items, including a six piece fabric lounge suite and two guitars which were located in the cinema room. The FSP’s restorer (OP) assessed these items as undamaged. The applicant says the lounge suite smelt of mould and the seams of the wooden guitars had started to split after being exposed to the wet carpet. The applicant also disputes the estimated replacement cost adopted by the FSP for the various items listed on the schedule of loss (including the dishwasher which was removed by the FSP’s contractors without her consent) . Given the dishwasher required replacement due to the unauthorised actions of the FSP’s contractor, the amount payable for its replacement should not be limited by the terms of the policy. In relation to the other items, the FSP has not provided copies of the supplier quotations on which its calculations were based. For her part, the applicant has not provided copies of quotations to support the higher amounts she is seeking (or information establishing the purchase costs and/or specifications of the original items). In these circumstances, the applicant is entitled to an amount which reflects a fair and reasonable estimate of the damage to her contents caused by the escape of water. Based on the information provided, and having regard to the factors outlined above, I consider it is fair in the circumstances that the cash settlement amount for contents damage be increased by an additional amount of $3,800. The FSP is required to pay interest on the increase in the settlement amount at the rate calculated under section 57 of the Act from 28 July 2016 until the payment date. 2.4 Is the applicant entitled to compensation? FOS may award compensation for financial and non-financial losses Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or exte nt of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The fact that the applicant’s policy excludes cover for consequential losses does not preclude the award of compensation where such losses have occurred as a result of the way in which the FSP has handled her claim, rather than as a result of the insured event itself. Case No: 446234 Determination Page 11 of 12 However, FOS adopts a conservative approach to the award of compensation for non-financial loss. Applicant is dissatisfied with FSP’s claims handling The applicant is dissatisfied with the manner in which the FSP has handled her claim. Among other things, the applicant say the FSP and its contractors:  failed to undertake adequate make safe works at the property in the immediate aftermath of the claim  misrepresented their qualifications, lied to her and produced fraudulent documents  unreasonably delayed the resolution of her claim  failed to provide her and her family with temporary accommodation  forced her to accept a cash settlement. Applicant is entitled to compensation for non-financial loss Given the nature of the claim, I do not consider that the FSP unduly delayed the assessment process. It is not uncommon for several inspections to be required to finalise the scope of works. I am also satisfied that the FSP’s consultants discussed with the applicant the possibility of seeking temporary accommodation. However, the claim notes indicate that each time the issue was raised, the applicant advised she would remain in the property. However, having carefully reviewed the claim history, I am satisfied that some aspects of the make safe works undertaken by the FSP’s contractors were inadequate. Among other matters, the FSP’s contractors removed the (undamaged) dishw asher without the applicant’s consent and failed to take up the water logged carpet in the media room. For the reasons outlined in sections 2.1 and 2.2 above, I also consider the FSP:  did not explore all reasonable options to resolve the dispute about the scope of works so it could authorise the repairs  sought to cash settle the applicant for an amount which did not fully reflect the cost of repairing all of the damage to the property. I am satisfied that the actions of the FSP and its contractors caused the applicant stress and inconvenience. Having regard to the various factors outlined above, I consider that an award of compensation for non-financial loss in the amount of $1,500 is appropriate. Case No: 446234 Determination Page 12 of 12 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS preliminary view and has proceeded directly to determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice, and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Settlement of claims If we agree to pay a claim for loss, theft or damage to your home, contents or personal effects, we will decide whether to:  repair the damaged property to the same standard, specification or quality as it was when it was new, or  repla ce the damaged property with the nearest equivalent property available, or  pay you the amount it would cost us to repair or replace the property to “as new” condition. The cost to us is:  the retail price of an item less any trade discount we are entitled to, or  the cost to us to repair or replace the property, allowing for any trade discount we are entitled to. We reserve the right to choose the repairer or supplier to be used … We will NOT pay:  to rebuild or repair undamaged property in order to achieve a match with repaired or replaced property  any additional costs to replace materials that are not damaged …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.