The FSP accepted the storm claim but declined the applicant's further claim for moisture, mould and wall damage, attributing it to a failed damp course. AFCA found the moisture was primarily caused by stormwater and ordered the FSP to cash settle 60% of the reasonable repair costs, excluding the damp course itself.

The storm was the proximate cause of the moisture damage so the gradual deterioration exclusion applies only to the damp course, with the FSP's liability discounted by 60% for the likely contribution of the failed damp course.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 445847 Determination Page 1 of 6 Case number: 445847 4 September 2017 1 Overview 1.1 Dispute The applicant made a claim under his home buildings policy with the financial services provider (FSP) after stormwater damaged his home in April 2015. The FSP accepted the claim and repaired certain damage. However, the applicant also wants the FSP to deal with the high moisture level in the internal rendered walls , and the associated mould issue, which is causing paint to peel and the walls to deteriorate. The FSP declined that part of the claim on the basis that the issues were the result of the original slate damp course failing over time. It says this failure was caused by wear and tear, and gradual deterioration, which are excluded from cover under the policy. The applicant does not agree. 1.2 Issues and key findings What is the proximate cause of the damage? The moisture in the internal rendered walls, and associated mould and damage, was on balance, primarily the result of stormwater penetration of the walls. However, it is likely that the state of the damp course has contributed to the on-going residual moisture issues. Can the FSP rely on an exclusion to deny liability for the claim? The FSP is entitled to rely on ‘gradual deterioration’ to decline cover for the damp course itself; but not in respect of the broader moisture issues and damage. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is required to cash settle the applicant 60% of the reasonable costs of removing residual moisture from rendered walls, remediating associated mould, and repairing the related damage (but not replacement of the damp course itself). The cash settlement amount is to be determined based on the quote of the applicant’s builder, AHR , (updated, as necessary, to cater for reasonable market increases since February 2016) and is otherwise to be paid in accordance with the terms of the policy and having regard to relevant considerations such as those set out in section 2.1 of this Determination. Case No: 445847 Determination Page 2 of 6 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of/complexities involved in this dispute, it has been referred to a Panel for determination. This determination follows consideration of all the information exchanged, and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous FOS decisions where applicable. 2.1 What is the proximate cause of the damage? No dispute there was damage from the insured event of ‘storm’ The policy covers loss or damage to the home caused by the insured event of ‘storm (including cyclone), snow o r hail’. There is no dispute that the applicant’s home was damaged in a storm. The Panel is satisfied that the applicant has established he has a prima facie claim under the policy. In seeking to decline the claim, the onus is on the FSP to show, on balance, that an exclusion applies, or that it is otherwise entitled to do so. The FSP says that not all the damage was caused by the storm itself. Instead it submits that ‘wear and tear’ and ‘gradual deterioration’ of the damp course are what caused the continuing moisture problems. Loss or damage caused by either of these is excluded under the policy. Proximate cause of the damage was, on balance, storm water It is well-established law that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause. The courts have said that if one cause would have resulted in the harm in any case, and the other would not have done so in the absence of the first, then the first is the proximate cause. There may also be circumstances where it is reasonable to conclude that there were two causes which were equal or concurrent in their efficiency in bringing about the damage. If one of those causes was an insured event, and the other an excluded event, then the excluded event would prevail. There is no dispute that the stormwater levels in the house rose above the damp course, and stayed elevated for several hours before subsiding. Repair work was being undertaken when it became apparent there was ongoing moisture, specifically in the front (older) part of the house, and this was causing mould growth. A drying process was arranged and carried out by specialist restorer, Case No: 445847 Determination Page 3 of 6 RP, who also noted signs of pre-existing moisture, but made no specific comment to suggest this was significant or problematic. The applicant says he had no issues with moisture or mould in the house before the April 2015 storm event, referring to a pre-purchase building report, which however has not been able to be provided. It is also not clear that moisture issues or readings were specifically considered in that pre-purchase inspection. However, given the obvious severity of the issues now, and the recent rate of deterioration (together with a lack of other compelling evidence showing material pre-existing moisture problems), the Panel considers it reasonable to accept that the high moisture levels and damage had not been occurring before the storm event. The 9 February 2016 report of AHR, the applicant’s expert, says moisture levels from a failed damp course usually rise in waves, never in a straight line ; and it is a straight line which is identified on the walls of the property by the red dots, which are understood to have been placed on the walls by a previous builder. RP states, in its inspection on 12 August 2015 and before the drying process was undertaken:  ‘the brick piers are saturated, as is the majority of the external brick work from the ground up to the damp course and above’  inside at the front of the house ‘the rende red walls are saturated, [and] at skirting board level water staining is beginning to show through the newly painted walls’  ‘moisture is trapped in the dry pressed brick, [and] render and paint can prevent escape of moisture… we will know after 1 week of d rying if we have to remove layers of paint’. RP’s job update email of 7 September 2015 says the moisture levels, after 1 week of drying, remained the same. However, there is no further mention of the earlier suggestion of removing layers of paint to assist the drying process in the rendered walls, and so it is not clear if that was undertaken. RP also says, in that update, that it tested moisture levels in the rear (new) part of the house and found them to be 100% WME below the damp course there, and 14% WME above it. They also tested in the front (old) part of the house and found levels both above and below the damp course there to be 100% WME. RP concludes from this that the damp course at the front of the house might be malfunctioning (while saying further drying needs to be undertaken to determine whether that is in fact the case). It appears that RP’s final update of 10 October 2015 has not been provided in full. Instead t he FSP’s consultants, PBC, reported on 1 March 2016 that the drying process ca rried out by RP was effective in reducing the moisture levels, but that they increased again after the drying process stopped. PBC said ‘the only cause of this increase in moisture would be the failure of the original slate damp - proof course with rising da mp penetrating up the wall’. However, the drying process was not able to run uninterrupted (since it had to be turned off at night when the applicant was in the house), and the applicant has also said there was an issue with the available power supply not being able to Case No: 445847 Determination Page 4 of 6 accommodate the drying machinery. As well, the applicant has pointed out that damaged gyprock walls had already been replaced after the storm and before the drying process (because the water damage was immediately obvious in them), whereas the ‘saturated’ rendered walls had not. That suggests it would not be fair to use the presumed state of the respective damp courses in the different parts of the house as the sole factor in explaining why the drying process was not entirely effective. Given the available evidence, the Panel is satisfied it is more likely than not that the proximate cause of the damage was stormwater, and not a failure of the damp course. 2.2 Can the FSP rely on an exclusion to deny liability for the claim? The FSP believes the cause was rising damp due to a failed damp course. The FSP said it would not pay to replace the damp course itself because it was a maintenance issue, and because ‘gradual deterioration’ was excluded under the policy. The evidence indicates that a slate damp course can break down after about 60 years, and the FSP noted that the older section of the applicant’s house was over 100 years old. While there has not been a specific technical assessment of this particular damp course , it is reasonable to accept that its current efficacy is likely to have be en affected by its age . The Panel is satisfied, on balance, that the exclusions reasonably apply to the damp course itself , which is where much of the FSP’s evidence and arguments ha ve been focused. The Panel is not persuaded, though, that it is reasonable in the circumstances to extend the application of that exclusion to the high moisture levels and resulting damage which arose following the storm. That is because, even accepting that the state of the damp course might have contributed in part to the damage, the evidence does not establish that it was the dominant or operative cause. FSP is partly liable for damage to the internal rendered walls The Panel does consider, however, that the FSP’s liability for the costs of repairing the damage caused by the high moisture levels in the internal rendered walls should be discounted to take account of the likelihood that the on-going damage is partly attributable to the failure of the original slate damp course. On this basis, the Panel considers it is fair in all the circumstances that the FSP be required to cash settle the applicant for 60% of the repair/reinstatement costs, including any additional costs related to the treatment of associated mould. The cash settlement amount should be determined based on AHR ’s quote (together with a separate quote, from an appropriately qualified provider, for mould remediation if necessary), but should also take proper account of all relevant considerations and associated benefits to which the applicant is entitled under the policy in relation to such work. Those relevant considerations should cater for policy benefits such as removal of debris, as well as including an allowance for the possibility of other damage being Case No: 445847 Determination Page 5 of 6 identified and requiring repair in the course of or as a result of the work. The AHR quote specifically excludes the replacement of any water rotted timber on the basis that that is an ‘unknown until it gets removed’. However, it see ms fair that some allowance should be made for that possibility. AHR said the rectification work needed (to remove all moisture from the rendered walls) is broadly to remove all render to a level 500mm above where the damp level is shown on the moisture meter, then re-render, re-instate skirting boards and power- points, and re-paint. Their original quote (current as at 10 February 2016) also included a new chemical damp-course, which the applicant said he does not require (and which the Panel considers should not be covered in any case) , as well as certain other work which does not appear to relate to the moisture in the walls. The remaining component of the quote which the Panel reasonably considers relates to the moisture issues totals approximately $50,526 (plus GST). It is fair that the quote be revised and adjusted to reasonably account for increased costs (if any) in the 18 month period since it was first issued. It is a matter for the applicant as to whether and whe n he might decide to accept AHR’s suggestion of incorporating (at his own cost) a chemical damp course in the old part of the house to help minimise future damage. Case No: 445847 Determination Page 6 of 6 3 Supporting information 3.1 Experts’ reports Record Key points FSP’s expert (RP) Report/email 17 August 2015  The brick piers are saturated, as is the majority of the external brick work from th e ground up to the damp course and above.  …in the front [of the house] we recorded high moisture levels throughout, the rendered walls are sat urated, at skirting board level water staining is beginning to show through the newly painted walls and there was evidence of mould growth…  Moisture is trapped in the dry pressed brick, render and paint can prevent the escape of moisture . FSP’s expert ( RP) Job update email 0 7 September 2015  It appears the damp course is malfunctioning however we believe the only way to determine if the damp course has failed is to install dryers in 1 or 2 of the bedrooms, if moisture levels reduce after 2 weeks then it’s possible the rendered/dry pressed bric kwork above the damp course is holding bound water from April storms 2015. Applicant’s expert (AHR) Report 09 February 2016  …typical rising damp levels from a failed slate damp course usually rises in waves, never in a straight or continuous line….  In this case the damp on the walls indicated by our moisture meter shows the damp finishing at the same even level as the red sticker dots where the previous builder ran his moisture meter. This is usually a sign of a flood line not rising damp.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.