Home / Financial Firm (Unknown - Insurer) / Determination 445239
Determination 445239
Scope of flood damage remediation and claim refusal under landlord policy
Summary
The applicants claimed under their landlord insurance after a 2014 weather event damaged a pool area, retaining wall, granny flat and tiling. The FSP accepted the claim but limited its liability to the scope of works from its consultant report.
The policy covers only damage caused by the insured event and pays only for damaged parts, so the FSP may rely on the consultant's report and scope of works.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to deny the applicants' claim in regard to the retaining wall and the cracks on the outside of the granny flat.”
- Product terms interpretation secondary · not upheld
“The FSP is only required to pay for the part of the building that has been damaged; it is not required to pay for undamaged parts to achieve a uniform appearance.”
- Repairs or contractors secondary · not upheld
“The FSP is entitled to rely upon the report from the building consultant and engineers CRD and the scope of works.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 445239 Determination Page 1 of 5
Case number: 445239 17 March 2017
1 Overview
1.1 Dispute
This matter involves a claim by the applicants under their Landlord Cover Insurance
Policy, held with the financial service provider (FSP), following damage at the
premises.
The F SP has accepted the applicants’ claim but a dispute has arisen as to the extent
of the FSP’s liability under the terms and conditions of the policy.
1.2 Issues and key findings
What is the extent of the FSP’s liabi lity under the terms and conditions of the
policy?
The FSP is entitled to rely upon the report prepared by building consultants and
engineers CRD and the scope of works provided with that report.
The FSP is not required to replace tiles which were not damaged in the flood event or
to attend to the cracks the applicants say are outside the granny flat.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to rely upon the report from the building consultant and engineers
CRD and the scope of works to meet its obligations under the terms and conditions
of the policy.
Case No: 445239 Determination Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 What is the extent of the FSP’s obligations under the terms and
conditions of the policy?
Coverage of the policy
The coverage provided by the applicants’ Landlord Cover Insurance Policy is in
relation to loss or damage caused by an insured event listed in the policy.
This means that not all loss and damage is automatically covered, but rather only
loss and damage caused by an insured event listed in the policy.
The coverage provided by the policy is detailed within the Product Disclosure
Statement (PDS).
The PDS details:
‘…
…
…
…’
The PDS also details how the FSP will settle a claim:
…
Case No: 445239 Determination Page 3 of 5
…
... ’
It is settled insurance law that the insured carries the onus to establish that the loss
and damage at the premises is covered by the terms and conditions of the policy.
Circumstances of the loss and the claim
The premises were impacted by a significant weather event in October of 2014.
As stated, the FSP has accepted the applica nts’ claim but a dispute has arisen as to
the extent of the FSP’s obligations under the terms and conditions of the policy.
The parties have provided reports to support their respective positions.
Following discussions the FSP engaged building consultant a nd engineers CRD who
provided a report dated 10 November 2016, together with a scope of works.
The report from CRD is logical and thorough and its conclusions are compelling.
The report is supported by helpful photographs.
The applicants have provided a report from a pool specialist, which supports the
need for further review and work in the pool area.
The FSP seeks to meet its obligations under the terms and conditions of the policy,
on the basis of the report from CRD.
By letter dated 20 January 2017, the FSP advised the applicants that CRD had been
instructed to obtain remediation quotations with a view to undertaking the stabilising
of the pool and the surround, including repairing the tiling and concrete as required.
The work to be undertaken includes a full inspection by a builder in accordance with
the scope of works provided by CRD, with the applicants being provided with a copy
of the inspection, for review.
The FSP confirms that the scope of works also allows for additional works should, in
the course of rectification, it be identified that such additional works be required to
satisfactorily reinstate the damage.
Having reviewed all of the exchanged material, I am satisfied that the FSP is entitled
to meet its obligations under the policy, by reference its letter to the applicants of 20
January 2017 and to the report and the scope of works provided by CRD, which
includes works to the pool area.
Case No: 445239 Determination Page 4 of 5
Retaining wall
The applicants made a claim in relation to a retaining wall at the front of the property
but have since said that they reluctantly accept the FSP’s position that it is entitled to
rely on an exclusion within the policy for retaining walls.
Having reviewed the exchanged material I am satisfied not only does the exchanged
material confirm that the retaining wall was not damaged as part of the significant
weather event in October 2014, but also the exclusion within the policy and detailed
above, entitled the FSP to deny the applicants’ claim in regard to the retaining wall.
The cracks on the outside of the granny flat
The applicants have made a claim in regard to the cracks on the outside of the
granny flat.
Having reviewed all of the exchanged material I am no t satisfied that the applicants
have established that any damage to the granny flat is caused by the significant
weather event from October 2014.
The FSP is entitled to deny the applicants’ claim in this regard.
Tiling in the area of the southern patio and the front street access stairs
The applicants have made a claim in relation to tiling in these areas so as to match
the tiles that are required to be replaced around the front porch area and the pool.
The policy provisions are clear and unambiguous (detailed above) and provide that
the FSP is only required to pay for the part of the building that has been damaged
and the FSP is not required to pay for undamaged parts of the building in order to
achieve a uniform appearance.
Where building materials are unavailable or it is not possible to match them, the FSP
has the right to pay for the nearest equivalent or similar materials.
Whilst this is partially a subjective assessment, I accept that the FSP must make
reasonable efforts to match the materials with the nearest equivalent where the
original is not available.
Further, it is appropriate that the applicants’ participate in the tile selection to ensure
quality and matching as far as possible.
Further discussion
Finally, the FSP advised the applicants that upon evaluation of a timeline for
remediation, compensation and loss of rent in accordance with the provisions of the
policy would be estimated.
In this regard, the FSP seeks to record that it has previously offered a settlement for
24 weeks loss of rent to finalise its obligations under the policy.
I am satisfied it is appropriate that the FSP makes a final decision regarding the
question of compensation and loss of rent, once a final timeline for remediation has
been prepared.
Case No: 445239 Determination Page 5 of 5
Conclusion
Upon acceptance by the applicants of this determination, the applicants are required
to provide the FSP with permission to proceed with the scope of works as detailed by
CRD.