Home / Financial Firm (Unknown - Insurer) / Determination 445225
Determination 445225
claim_denial
Summary
The applicant's pool popped out of the ground after a storm and he claimed $62,025 for replacement. AFCA found the damage was caused by hydrostatic pressure from a retaining wall not built to approved plans, which is excluded, so the FSP was entitled to deny the claim.
The insurer must establish an exclusion once a prima facie claim is shown, and the proximate cause here was an inherent defect in the wall rather than the storm.
Issues
- Claim denial primary · not upheld“The FSP is entitled to maintain its denial of the applicant's claim and is not required to take any further action.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 445225 Determination Page 1 of 10
Case number: 445225 8 May 2017
1 Overview
1.1 Dispute
The applicant’s pool popped damaging the pool and its surrounds. The applicant
says this occurred due to the inundation of storm water. He lodged a claim with the
financial services provider (FSP) for the replacement of the pool and surrounding
landscaping.
The FSP declined the claim. It says the cause of the damage was due to hydrostatic
pressure which caused the uplift of the pool and this cause of damage is excluded
from cover. It also says it is entitled to rely on further policy exclusion as the damage
occurred because of the faulty construction of the retaining wall.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The applicant established a prima facie claim. However the FSP is not liable for the
claim because the material provided established on the balance of probabilities the
damage was caused because the wall was not built in accordance with approved
plans. This in turn allowed rain and run-off to saturate the soil around the pool
leading to the pool popping as a result of hydrostatic pressure. As there is no cover
for inherent defects and hydrostatic pressure, the FSP is entitled to deny the claim.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to maintain its denial of the applicant’s claim and is not required
to take any further action in relation to the claim or the dispute.
Case No: 445225 Determination Page 2 of 10
2 Reasons for determination
2.1 Is the FSP entitled to deny the claim?
The applicant has established a prima facie claim
There is no dispute the applicant’s pool and surrounds were damaged because of a
storm event.
In the claim form submitted by the applicant he stated:
there was a severe storm event on 5 December 2015
there was 45mm of rainfall in ten minutes
extensive water flowed into the property and covered the pool area
the pool was cleaned up that night and was full at bedtime
the occupier noticed the pool had popped out of the ground when she awoke
the next day
The applicant maintains the proximate cause of the loss is the high flow of water in a
short duration following a severe storm event.
He provided a quotation for the replacement of the existing pool and surround paving
for $62,025.00.
The applicant’s policy provides cover for accidental damage subject to relevant
exclusions.
The policy does not define the word “accidental”. However, the Courts have defined
“accidental” damage in an insurance context to mean damage which is caused by
something which is “unintended and unexpected.”
In the circumstances, regardless of whether the pool popped because of the high
flow of water, or was caused by something else, I am satisfied the damage was
caused by something which was unintended and unexpected. I am satisfied therefore
the applicant has established a prima facie claim under the policy.
The FSP must establish the application of a policy exclusion
The onus is therefore on the FSP to establish the application of an exclusion, if it is
refuse payment for the repair/replacement of the pool.
The FSP relies on two policy exclusions. The policy contains exclusions for loss or
damage caused by:
Hydrostatic pressure
Inherent defects, faulty design, structural defects
The FSP argues while there was heavy rain immediately prior to the loss, the faulty
design and/or construction of the retaining wall effectively allowed the wall to act as a
dam and hold back water. As a consequence, the p ool “popped” through hydrostatic
pressure causing the pipes to break and damage to the pool itself.
Case No: 445225 Determination Page 3 of 10
The applicant contends hydrostatic pressure was not the proximate cause of the loss
but was a consequence of the storm water and torrential rain which was so great as
to render ineffective the safeguards in place.
The applicant says the pool was in perfect working order prior to the storm. He says
the rainfall on the day of the claim event was exceeded many times since the pool
was installed without consequences. The applicant also argued the reported levels of
water run-off was an extraordinary event and more than the actual rainfall recorded in
this particular location on the day of the claim event.
He contends the cause of the loss was the short, high flow of water which exceeded
the site’s capability to absorb the water. The applicant relies on expert opinion which
states the excessive inundation was unable to drain away and the groundwater
damaged the pool.
He argues the subsoil drainage was adequate for normal rainfall events. When built,
he says the pool was certified as a competent structure meeting the general
principles outlined in Australian Standards. A hydrostatic relief valve was not installed
as valves were not usually installed in a raised sand environment. He says the pool
was professionally excavated with appropriate surface drainage under and around it.
The applicant submits the defects relied on by the FSP are either not defects or
would not have affected the outcome. He says even if the retaining wall weep holes
were not omitted and if a hydrostatic valve was installed, the result would have been
the same. He also relies on expert opinion which says the lack of a bond beam had
no bearing on the event.
Both parties rely on expert reports
Both parties provided reports and photographs in relation to the damage and
condition of the property generally. A summary of the reports is contained in section
3.1 of this determination.
Both parties’ experts agree:
there was a heavy downpour of rain
storm water surrounded the earth around the pool
the retaining wall does not have any drainage holes
a bond beam and hydrostatic relief valve were not installed
the pool was still in position when the occupier went to bed on the night of the
storm but wh en she awoke the next morning the pool had “popped” about
300mm and popped again that afternoon by a further 150mm
the pool had popped/floated out of the ground due to the water under the pool
The experts disagree on:
the extent of damage caused by the heavy rain and storm water
the extent of damage the lack of drainage holes in the wall caused, noting the
applicant’s argument the entire area behind the wall and all the pool
surrounding area was laid with permeable sand.
Case No: 445225 Determination Page 4 of 10
Cause of damage was lack of drainage in the wall and hydrostatic pressure
The FSP’s expert said the pool construction was defective for a number of reasons.
The applicant’s expert agrees the pool did not have a bond beam or hydrostatic
valve. The FSP’s expert acknowledges there is no sta tutory requirement for valves or
bond beam if the local soils are free draining.
However, the FSP’s expert asserts it is up to the engineer providing the design
certification to make appropriate calculations and determine whether a valve or bond
beam is r equired for the specific site. Although a Plan is attached to the applicant’s
expert report, it is not identified as the Plan used for the construction of the pool.
The material provided also establishes the local council told the FSP’s assessor
permits were obtained for the installation of the pool and the construction of the wall
in May 2008.
The material provided establishes attempts were made to provide a copy of the
plans, specifications and engineering certification for the retaining wall and pool but
they were not obtained.
Nonetheless, in his second report, the applicant’s expert notes the retaining wall,
while submitted to the Shire for a building licence, was not built in accordance with
the approved plans as the backfill was carried out with sand but the rear drain and
weep holes at the junction of the reactive natural ground were omitted.
Accordingly, even if I were to accept the bond beam and lack of hydrostatic valve had
no bearing on the event, I am satisfied on the information provided the retaining wall
was not built in accordance with the approved plans.
The FSP’s engineer says as the water cannot escape then when there is excessive
rainfall and run- off, the soil around the pool becomes saturated. The applicant’s
expert agrees. He says in these soil conditions the wall created a reservoir when
flooded.
The FSP’s expert says hydrostatic pressure builds on the saturated soil which in turn
caused the pool to pop and the damage to occur.
The applicant’s expert says if a drain and weep holes ha d been placed on the wall as
approved, the drainage from around the site would have been more effective and the
second movement of the pool shell may not have occurred. However, he says this is
conjecture. He continues to maintain the site was flooded by high flow of short
duration which exceeded the site’s capability to absorb the water.
Both the expert and the applicant make the point that it is significant the pool was not
affected by previous high rainfall events.
The applicant and his expert both arg ue even if the retaining wall had adequate
drainage holes, the water would still have pooled because of the high flow of water in
the short duration of time.
However, I am not satisfied the information available supports the applicant’s
position. In the timeline given by the applicant, he states the pool did not immediately
pop up after the inundation of the stormwater. In these circumstances, on the
information provided, I accept it probable the pool popped because the water could
Case No: 445225 Determination Page 5 of 10
not escape. The water could not escape because the wall was not constructed in
accordance with the approved plans. As the water could not escape, or could
escape, but very slowly, hydrostatic pressure was exerted on the pool which
overnight damaged the pool.
I have considered the argument the pool shell was not affected by previous high
rainfall events. However, it is not known on previous occasions, whether there was
the confluence of both high rainfall and blocked drains in the street.
While I accept on this occasion the high rainfall and blocked drains resulted in a high
flow of water for a short duration, on the information provided, I am satisfied on the
balance of probabilities that the effective and therefore proximate cause of the
damage to the pool and surrounding area was the inherent defect in the retaining
wall. I am satisfied the proximate cause of the damage to the swimming pool and the
surrounding area was because of the hydrostatic pressure from the water retained in
the soil behind the wall without drainage holes.
The policy does not cover damage caused by inherent defects or hydrostatic
pressure.
As the cause of damage is excluded, the FSP is entitled to decline the claim.
Case No: 445225 Determination Page 6 of 10
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
In this dispute, the applicant has been represented by another person. For the
purposes of this determination , submissions made by the applicant’s representative
have been treated as if they had been made by the applicant
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated
25 July 2016. Both the policy document and the Notice have been e xchanged with
the applicant.
When we will not pay a claim under Part A – Buildings and/or Contents
This policy does not cover loss, liability, injury or damage:
…
13. caused by or arising from hydrostatic pressure
…
Parts A and B
When we will not pay a claim under your policy
This policy does not cover loss, liability, injury or damage:
…
g. Inherent defects
caused directly or indirectly through inherent defects, faulty design, structural defects or poor
workmanship;
Case No: 445225 Determination Page 7 of 10
3.3 Key records
Record Key points
Bureau of meteorology
records
Daily rainfall
5 December 2015 7.4mm
6 December 2015 29.5mm
Claim form
7 December 2015
Storm hit... About 3pm on Saturday 5 December. 45mls in 10
minutes. Extensive water flowed into property and filled up pool
area comple t ely. Cleaned up that night. Pool full when I went to
bed and when I woke up next day pool had popped out of the
ground. Pavers brok en. All pipes broken. Date of loss 5/6 Dec
12 - 8am.
FSP’s assessor
29 December 2015
Attended property with engineer 17 De cember 2015
O ccupant advised after the house was built in 2008 a
retaining wall about 3 m high was constructed at the rear of
the premises and backfilled with yellow sand to a dept h of
about 2 m
Confirmed pool had popped out of the ground on the shallow
end causing damage to the inlet and outlet plumbing, paving
and fibreglass shell has cracked
Described scope of works and estimated costs to be about
$40,000 - $50,000.
FSP’s assessor
4 January 2016
Local council advised permits were issued for the installation
of the pool on 29 May 2008 and construction of the retaining
wall on 5 May 2008
FSP’s expert ( MC )
Report and photographs
22 - 12 - 2015
Relevant weather station h ad a reading of 29. 5mm on the
6 December 2015.
Fibreglass pool sides and surrounds d o not have a bond
beam and do not meet regulations
No formal surface drainage around the pool side or through
the block wall
No material was provided by the pool installer or the local
council
Water seepage stains on the outside of the block retaining
wal l shows the backed up groundwater around and under the
pool for a longer time than just the storm event
Describes clay and rocky ground around the retaining wall
which has been built on three sides and on original clay soils
without drainage behind or thr ough. Describes creation of a
dam affect for the area behind containing the pool area which
is sand filled on top of the original clay ground
R etaining wall around the pool does not have any weep holes
or drainage holes to relieve hydrostatic pressure beh ind and
hence around the pool.
R etaining wall around the entirety of the pool and adjacent
grass area, does not possess any means of escape of water
to lower lying surrounding earth around the outside of the
Case No: 445225 Determination Page 8 of 10
retaining wall. This then acts, as in the case o f this recent rain
event, like a massive batht ub.
Concluded: Whilst the storm conditions which prevailed at the
time of the popping of the pool may have been considerable,
it is my opinion that the failure of the pool is a combination of
the above mention ed defective constructions issues. In my
opinion, had the above items been appropriately constructed
to Australian Standards and in place, it would have been very
unlikely for the event to have caused the damage sighted.
FSP’s expert ( MC )
response to request from
assessor
No statutory requirements for hydrostatic valves or bond
beams to be mandatory and some manufacturers rely on the
free draining local soils as a reason to not include them in
some installations
Up to the engineer providing the desig n certific ation to make
these reasonable calculations and determine whether one is
required for the pool or the specific site.
In this case the pool was placed wit hin an area of soil
retained by a retaining wall that lacks appropriate apparent
drainage (t hat is any appropriate means for water to escape
the higher ground which surrounds the pool to external
extremities of the retaining wall such as weep holes) is
defective construction.
Applicant’s expert
(B C )
1 st Report
22 - 2 - 2016
Inspected pool 15 February 2016
Heavy downpour of rain on 6 December 2015
Next morning, the shallow end of the pool had floated out of
backfill approximately 400mm, rotating anticlockwise about
the deep end bowl.
Damage was caused by flooding mainly fro m outside the
property – overflow from roadside drain, flow from inside the
property and from opposite gravel driveway.
B ackfill would be fully saturated and flotation would have
occurred before water reduced to operating level at the
skimmer. Floating at the shallow end is typical. In these soils
conditions the wall created a reservoir when flooded.
The retaining wall has 3 contraction joints, and it has cracked
in the NW corner in two places, indicating settlement in that
corner. This may not have been c aused by the event.
Drainage holes in the wall at the base do not seem to have
been installed. The wall for the enclosure should have weep
holes in the long northern face.
Attached to the report is a Plan from the pool manufacturer
saying the pool is manu factured in accordance wit h AS 1838
and is suitable for installation in soils of the following
categories including sand, sandy silt and slightly reactive clay
but installations in other conditions refer to the Engineer
The Plan is certified by BC on 17 Fe bruary 2016
The report does not identify the Plan as the Plan used in the
original installation of the pool.
Case No: 445225 Determination Page 9 of 10
Correspondence
between FSP and
assessor
March 2016
Reviewed BC report and noted agreement regarding
rainwater run - off from the road; soil characteristics: and lack
of drainage with reference to limestone ret aining wall
“ This would tend to agree with both (FSP engineer) and my
earlier advice in that the lack of drainage to the retaining wall
has created a dam which has allowed the intense rai nfall and
run off to saturat e the soils around the pool. With nowhere for
the saturated soils to drain too, due to the Moderat e to Highly
Reactive Clay below the base of the pool, the pool has
"popped" out of the ground at the shallow end as a result of
hy drostatic pressure being the end with least vertical
resistance due to its shallow depth .”
Applicant’s expert
(B C )
2 nd Report
2 8 - 6 - 2016
Report prepared after a meeting on - site with the tenants and
the assessors
BC noted the surrounding limestone wall was submitted to
the Shire for a building licence but was not built in
accordance with the approved plans. The back fill was carried
out with sand but the rear drain and weep holes at the
junction of the reactive natural ground were omitted
Doubtful if the wh ole area was flooded to a depth of 100mm
but flow would be dramatic and of short duration
Significant that the pool shell was not affected by previous
high rainfall events and discusses the effect of sheet flow
from blocked street drains
AS codes are only a guide to best practice and appropriately
qualified engineers can certify documents as structurally
competent for the soil classes and to meet the general
principles outlined in the Code
The bond beam had no bearing on the event
Provis ion of a hydrostatic valve may have prevented flotation
but no need to consider this item in a raised sand
environment
Subsoil drains are installed in the backfill where the shell is
located in an impervious soil but the raised area of sand pan
and fill b ehind the wall in this installation is permeable sand.
Groundwater can drain away but more slowly than surface
flow but this area was the subject of high peak flow of short
duration
P roximate cause of damage to this pool shell has been the
abnormal diversi on of water ont o the property during a high
intensity rainfall event.
If a drain and weep holes had been placed in the wall as
approved, the drainage from around the site would have been
more effective and the second movement of the shell may not
have occu rred. This is however conjecture. The facts are that
the site was flooded by a high flow of short duration that
exceeded the sites capability to absorb
Case No: 445225 Determination Page 10 of 10
Applicant’s expert (AT)
Report 21 December
2016
The pool has suffered from flooding res ulting in the pool
having a hydrostatic upsurge
Quote to replace pool $62,025
3.4 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause
of the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.5 Other relevant material considered and relied on
Parties’ submissio ns and all attachments to submissions including reports,
emails and photographs
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.