The applicant's pool popped out of the ground after a storm and he claimed $62,025 for replacement. AFCA found the damage was caused by hydrostatic pressure from a retaining wall not built to approved plans, which is excluded, so the FSP was entitled to deny the claim.

The insurer must establish an exclusion once a prima facie claim is shown, and the proximate cause here was an inherent defect in the wall rather than the storm.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 445225 Determination Page 1 of 10 Case number: 445225 8 May 2017 1 Overview 1.1 Dispute The applicant’s pool popped damaging the pool and its surrounds. The applicant says this occurred due to the inundation of storm water. He lodged a claim with the financial services provider (FSP) for the replacement of the pool and surrounding landscaping. The FSP declined the claim. It says the cause of the damage was due to hydrostatic pressure which caused the uplift of the pool and this cause of damage is excluded from cover. It also says it is entitled to rely on further policy exclusion as the damage occurred because of the faulty construction of the retaining wall. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The applicant established a prima facie claim. However the FSP is not liable for the claim because the material provided established on the balance of probabilities the damage was caused because the wall was not built in accordance with approved plans. This in turn allowed rain and run-off to saturate the soil around the pool leading to the pool popping as a result of hydrostatic pressure. As there is no cover for inherent defects and hydrostatic pressure, the FSP is entitled to deny the claim. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to maintain its denial of the applicant’s claim and is not required to take any further action in relation to the claim or the dispute. Case No: 445225 Determination Page 2 of 10 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim? The applicant has established a prima facie claim There is no dispute the applicant’s pool and surrounds were damaged because of a storm event. In the claim form submitted by the applicant he stated:  there was a severe storm event on 5 December 2015  there was 45mm of rainfall in ten minutes  extensive water flowed into the property and covered the pool area  the pool was cleaned up that night and was full at bedtime  the occupier noticed the pool had popped out of the ground when she awoke the next day The applicant maintains the proximate cause of the loss is the high flow of water in a short duration following a severe storm event. He provided a quotation for the replacement of the existing pool and surround paving for $62,025.00. The applicant’s policy provides cover for accidental damage subject to relevant exclusions. The policy does not define the word “accidental”. However, the Courts have defined “accidental” damage in an insurance context to mean damage which is caused by something which is “unintended and unexpected.” In the circumstances, regardless of whether the pool popped because of the high flow of water, or was caused by something else, I am satisfied the damage was caused by something which was unintended and unexpected. I am satisfied therefore the applicant has established a prima facie claim under the policy. The FSP must establish the application of a policy exclusion The onus is therefore on the FSP to establish the application of an exclusion, if it is refuse payment for the repair/replacement of the pool. The FSP relies on two policy exclusions. The policy contains exclusions for loss or damage caused by:  Hydrostatic pressure  Inherent defects, faulty design, structural defects The FSP argues while there was heavy rain immediately prior to the loss, the faulty design and/or construction of the retaining wall effectively allowed the wall to act as a dam and hold back water. As a consequence, the p ool “popped” through hydrostatic pressure causing the pipes to break and damage to the pool itself. Case No: 445225 Determination Page 3 of 10 The applicant contends hydrostatic pressure was not the proximate cause of the loss but was a consequence of the storm water and torrential rain which was so great as to render ineffective the safeguards in place. The applicant says the pool was in perfect working order prior to the storm. He says the rainfall on the day of the claim event was exceeded many times since the pool was installed without consequences. The applicant also argued the reported levels of water run-off was an extraordinary event and more than the actual rainfall recorded in this particular location on the day of the claim event. He contends the cause of the loss was the short, high flow of water which exceeded the site’s capability to absorb the water. The applicant relies on expert opinion which states the excessive inundation was unable to drain away and the groundwater damaged the pool. He argues the subsoil drainage was adequate for normal rainfall events. When built, he says the pool was certified as a competent structure meeting the general principles outlined in Australian Standards. A hydrostatic relief valve was not installed as valves were not usually installed in a raised sand environment. He says the pool was professionally excavated with appropriate surface drainage under and around it. The applicant submits the defects relied on by the FSP are either not defects or would not have affected the outcome. He says even if the retaining wall weep holes were not omitted and if a hydrostatic valve was installed, the result would have been the same. He also relies on expert opinion which says the lack of a bond beam had no bearing on the event. Both parties rely on expert reports Both parties provided reports and photographs in relation to the damage and condition of the property generally. A summary of the reports is contained in section 3.1 of this determination. Both parties’ experts agree:  there was a heavy downpour of rain  storm water surrounded the earth around the pool  the retaining wall does not have any drainage holes  a bond beam and hydrostatic relief valve were not installed  the pool was still in position when the occupier went to bed on the night of the storm but wh en she awoke the next morning the pool had “popped” about 300mm and popped again that afternoon by a further 150mm  the pool had popped/floated out of the ground due to the water under the pool The experts disagree on:  the extent of damage caused by the heavy rain and storm water  the extent of damage the lack of drainage holes in the wall caused, noting the applicant’s argument the entire area behind the wall and all the pool surrounding area was laid with permeable sand. Case No: 445225 Determination Page 4 of 10 Cause of damage was lack of drainage in the wall and hydrostatic pressure The FSP’s expert said the pool construction was defective for a number of reasons. The applicant’s expert agrees the pool did not have a bond beam or hydrostatic valve. The FSP’s expert acknowledges there is no sta tutory requirement for valves or bond beam if the local soils are free draining. However, the FSP’s expert asserts it is up to the engineer providing the design certification to make appropriate calculations and determine whether a valve or bond beam is r equired for the specific site. Although a Plan is attached to the applicant’s expert report, it is not identified as the Plan used for the construction of the pool. The material provided also establishes the local council told the FSP’s assessor permits were obtained for the installation of the pool and the construction of the wall in May 2008. The material provided establishes attempts were made to provide a copy of the plans, specifications and engineering certification for the retaining wall and pool but they were not obtained. Nonetheless, in his second report, the applicant’s expert notes the retaining wall, while submitted to the Shire for a building licence, was not built in accordance with the approved plans as the backfill was carried out with sand but the rear drain and weep holes at the junction of the reactive natural ground were omitted. Accordingly, even if I were to accept the bond beam and lack of hydrostatic valve had no bearing on the event, I am satisfied on the information provided the retaining wall was not built in accordance with the approved plans. The FSP’s engineer says as the water cannot escape then when there is excessive rainfall and run- off, the soil around the pool becomes saturated. The applicant’s expert agrees. He says in these soil conditions the wall created a reservoir when flooded. The FSP’s expert says hydrostatic pressure builds on the saturated soil which in turn caused the pool to pop and the damage to occur. The applicant’s expert says if a drain and weep holes ha d been placed on the wall as approved, the drainage from around the site would have been more effective and the second movement of the pool shell may not have occurred. However, he says this is conjecture. He continues to maintain the site was flooded by high flow of short duration which exceeded the site’s capability to absorb the water. Both the expert and the applicant make the point that it is significant the pool was not affected by previous high rainfall events. The applicant and his expert both arg ue even if the retaining wall had adequate drainage holes, the water would still have pooled because of the high flow of water in the short duration of time. However, I am not satisfied the information available supports the applicant’s position. In the timeline given by the applicant, he states the pool did not immediately pop up after the inundation of the stormwater. In these circumstances, on the information provided, I accept it probable the pool popped because the water could Case No: 445225 Determination Page 5 of 10 not escape. The water could not escape because the wall was not constructed in accordance with the approved plans. As the water could not escape, or could escape, but very slowly, hydrostatic pressure was exerted on the pool which overnight damaged the pool. I have considered the argument the pool shell was not affected by previous high rainfall events. However, it is not known on previous occasions, whether there was the confluence of both high rainfall and blocked drains in the street. While I accept on this occasion the high rainfall and blocked drains resulted in a high flow of water for a short duration, on the information provided, I am satisfied on the balance of probabilities that the effective and therefore proximate cause of the damage to the pool and surrounding area was the inherent defect in the retaining wall. I am satisfied the proximate cause of the damage to the swimming pool and the surrounding area was because of the hydrostatic pressure from the water retained in the soil behind the wall without drainage holes. The policy does not cover damage caused by inherent defects or hydrostatic pressure. As the cause of damage is excluded, the FSP is entitled to decline the claim. Case No: 445225 Determination Page 6 of 10 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. In this dispute, the applicant has been represented by another person. For the purposes of this determination , submissions made by the applicant’s representative have been treated as if they had been made by the applicant It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 25 July 2016. Both the policy document and the Notice have been e xchanged with the applicant. When we will not pay a claim under Part A – Buildings and/or Contents This policy does not cover loss, liability, injury or damage: … 13. caused by or arising from hydrostatic pressure … Parts A and B When we will not pay a claim under your policy This policy does not cover loss, liability, injury or damage: … g. Inherent defects caused directly or indirectly through inherent defects, faulty design, structural defects or poor workmanship; Case No: 445225 Determination Page 7 of 10 3.3 Key records Record Key points Bureau of meteorology records Daily rainfall 5 December 2015 7.4mm 6 December 2015 29.5mm Claim form 7 December 2015 Storm hit... About 3pm on Saturday 5 December. 45mls in 10 minutes. Extensive water flowed into property and filled up pool area comple t ely. Cleaned up that night. Pool full when I went to bed and when I woke up next day pool had popped out of the ground. Pavers brok en. All pipes broken. Date of loss 5/6 Dec 12 - 8am. FSP’s assessor 29 December 2015  Attended property with engineer 17 De cember 2015  O ccupant advised after the house was built in 2008 a retaining wall about 3 m high was constructed at the rear of the premises and backfilled with yellow sand to a dept h of about 2 m  Confirmed pool had popped out of the ground on the shallow end causing damage to the inlet and outlet plumbing, paving and fibreglass shell has cracked  Described scope of works and estimated costs to be about $40,000 - $50,000. FSP’s assessor 4 January 2016  Local council advised permits were issued for the installation of the pool on 29 May 2008 and construction of the retaining wall on 5 May 2008 FSP’s expert ( MC ) Report and photographs 22 - 12 - 2015  Relevant weather station h ad a reading of 29. 5mm on the 6 December 2015.  Fibreglass pool sides and surrounds d o not have a bond beam and do not meet regulations  No formal surface drainage around the pool side or through the block wall  No material was provided by the pool installer or the local council  Water seepage stains on the outside of the block retaining wal l shows the backed up groundwater around and under the pool for a longer time than just the storm event  Describes clay and rocky ground around the retaining wall which has been built on three sides and on original clay soils without drainage behind or thr ough. Describes creation of a dam affect for the area behind containing the pool area which is sand filled on top of the original clay ground  R etaining wall around the pool does not have any weep holes or drainage holes to relieve hydrostatic pressure beh ind and hence around the pool.  R etaining wall around the entirety of the pool and adjacent grass area, does not possess any means of escape of water to lower lying surrounding earth around the outside of the Case No: 445225 Determination Page 8 of 10 retaining wall. This then acts, as in the case o f this recent rain event, like a massive batht ub.  Concluded: Whilst the storm conditions which prevailed at the time of the popping of the pool may have been considerable, it is my opinion that the failure of the pool is a combination of the above mention ed defective constructions issues. In my opinion, had the above items been appropriately constructed to Australian Standards and in place, it would have been very unlikely for the event to have caused the damage sighted. FSP’s expert ( MC ) response to request from assessor  No statutory requirements for hydrostatic valves or bond beams to be mandatory and some manufacturers rely on the free draining local soils as a reason to not include them in some installations  Up to the engineer providing the desig n certific ation to make these reasonable calculations and determine whether one is required for the pool or the specific site.  In this case the pool was placed wit hin an area of soil retained by a retaining wall that lacks appropriate apparent drainage (t hat is any appropriate means for water to escape the higher ground which surrounds the pool to external extremities of the retaining wall such as weep holes) is defective construction. Applicant’s expert (B C ) 1 st Report 22 - 2 - 2016  Inspected pool 15 February 2016  Heavy downpour of rain on 6 December 2015  Next morning, the shallow end of the pool had floated out of backfill approximately 400mm, rotating anticlockwise about the deep end bowl.  Damage was caused by flooding mainly fro m outside the property – overflow from roadside drain, flow from inside the property and from opposite gravel driveway.  B ackfill would be fully saturated and flotation would have occurred before water reduced to operating level at the skimmer. Floating at the shallow end is typical. In these soils conditions the wall created a reservoir when flooded.  The retaining wall has 3 contraction joints, and it has cracked in the NW corner in two places, indicating settlement in that corner. This may not have been c aused by the event. Drainage holes in the wall at the base do not seem to have been installed. The wall for the enclosure should have weep holes in the long northern face.  Attached to the report is a Plan from the pool manufacturer saying the pool is manu factured in accordance wit h AS 1838 and is suitable for installation in soils of the following categories including sand, sandy silt and slightly reactive clay but installations in other conditions refer to the Engineer  The Plan is certified by BC on 17 Fe bruary 2016  The report does not identify the Plan as the Plan used in the original installation of the pool. Case No: 445225 Determination Page 9 of 10 Correspondence between FSP and assessor March 2016  Reviewed BC report and noted agreement regarding rainwater run - off from the road; soil characteristics: and lack of drainage with reference to limestone ret aining wall  “ This would tend to agree with both (FSP engineer) and my earlier advice in that the lack of drainage to the retaining wall has created a dam which has allowed the intense rai nfall and run off to saturat e the soils around the pool. With nowhere for the saturated soils to drain too, due to the Moderat e to Highly Reactive Clay below the base of the pool, the pool has "popped" out of the ground at the shallow end as a result of hy drostatic pressure being the end with least vertical resistance due to its shallow depth .” Applicant’s expert (B C ) 2 nd Report 2 8 - 6 - 2016  Report prepared after a meeting on - site with the tenants and the assessors  BC noted the surrounding limestone wall was submitted to the Shire for a building licence but was not built in accordance with the approved plans. The back fill was carried out with sand but the rear drain and weep holes at the junction of the reactive natural ground were omitted  Doubtful if the wh ole area was flooded to a depth of 100mm but flow would be dramatic and of short duration  Significant that the pool shell was not affected by previous high rainfall events and discusses the effect of sheet flow from blocked street drains  AS codes are only a guide to best practice and appropriately qualified engineers can certify documents as structurally competent for the soil classes and to meet the general principles outlined in the Code  The bond beam had no bearing on the event  Provis ion of a hydrostatic valve may have prevented flotation but no need to consider this item in a raised sand environment  Subsoil drains are installed in the backfill where the shell is located in an impervious soil but the raised area of sand pan and fill b ehind the wall in this installation is permeable sand. Groundwater can drain away but more slowly than surface flow but this area was the subject of high peak flow of short duration  P roximate cause of damage to this pool shell has been the abnormal diversi on of water ont o the property during a high intensity rainfall event.  If a drain and weep holes had been placed in the wall as approved, the drainage from around the site would have been more effective and the second movement of the shell may not have occu rred. This is however conjecture. The facts are that the site was flooded by a high flow of short duration that exceeded the sites capability to absorb Case No: 445225 Determination Page 10 of 10 Applicant’s expert (AT) Report 21 December 2016  The pool has suffered from flooding res ulting in the pool having a hydrostatic upsurge  Quote to replace pool $62,025 3.4 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.5 Other relevant material considered and relied on  Parties’ submissio ns and all attachments to submissions including reports, emails and photographs  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.