An individual claimed for roof damage and a shortfall on the shed cash settlement after bushfire and storm damage, and said she was bullied into settling. AFCA found the roof damage was due to wear and tear and maintenance, the $145,750 shed settlement was fair, and the bullying claim unsubstantiated.

Once the insured shows a prima facie covered loss, the insurer must prove an exclusion applies; here the panel accepted the roof damage was excluded wear and tear and the shed settlement reflected like-for-like replacement under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 444785 Determination Page 1 of 10 Case number: 444785 30 November 2017 1 Overview 1.1 Dispute The applicant lodged a claim for damage to her property caused by a bushfire in January 2013 and storm damage in May 2013. The FSP accepted part of the claims and carried out assessments and repairs. The applicant raises a number of concerns about the qualifications of the FSP‟s assessor and the quality of repairs which have been carried out. The FSP has re-attended the property on several occasions and a number of outstanding issues between the parties have been resolved. After a conciliation conference, two significant outstanding issues remained. The applicant contends:  the roof of the home has been repaired several times and still leaks  the cash settlement amount offered to replace the fire damaged shed is insufficient. The applicant also contends she was bullied into accepting the cash settlement. The FSP does not accept the applicant‟s roof was damaged by the fire or the storm and has declined the applicant‟s claim to replace the roof. It says the cash settlement offer is fair as it represents an amount to replace the shed to a standard better than it was before it was damaged in the fire. It denies the applicant was bullied into accepting the cash settlement and contends the remaining outstanding matters raised at the conciliation have been resolved since the conciliation. 1.2 Issues and key findings Is the FSP entitled to deny the claim for damage to the roof? The information provided does not establish on the balance of probabilities the damage to the roof was caused by an insured event. Rather, the information provided establishes the damage to the roof was caused by wear and tear and lack of maintenance. As these causes of damage are excluded from cover, the FSP is entitled to deny the claim for damage to the roof. Case No: 444785 Determination Page 2 of 10 Is the cash settlement amount paid for the shed fair? The information provided establishes the cash settlement was fair as it was based on plans which provided for a substantial upgrade of the shed, rather than a like for like replacement as required by the policy and the offer was supported by detailed quotes. Have other issues raised at the conciliation resolved fairly? The information provided establishes the other issues raised at the conciliation have resolved fairly as the FSP has carried out satisfactory repairs or is not liable to take any further action. Is the applicant ent itled to compensation for the FSP’s claims management? The applicant is not entitled to compensation for the FSP‟s claims management as the material provided does not establish the applicant was bullied into accepting the cash settlement which was fair. The FSP continually engaged with the applicant and sought to accommodate her concerns. 1.3 Determination This determination is in favour of the FSP. The FSP need take no further action in relation to the claims or the dispute. Case No: 444785 Determination Page 3 of 10 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim for damage to the roof? Applicant must establish roof damaged by fire or storm The applicant must establish, on the balance of probabilities, she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. The FSP says the a pplicant‟s home suffered only minor radiant heat damage and there is no evidence of storm or fire damage to the roof. It says any damage to the roof is because of maintenance issues. The FSP settled the claim for resultant damage inside the property (plaster and paint repairs in the amount of $14,126) but does not accept an insured event damaged the roof itself. In the circumstances of this dispute, the applicant must establish the claimed damage to the roof was caused by fire or storm. Once the applicant was advised the FSP would not indemnify her in relation to t he claimed damage to the roof, the applicant engaged a roofing contractor to undertake repairs to the roof. The repairs were required before the resultant water damage to the interior could be undertaken. Parties rely on contrary information provided by the applicant’s roofer The applicant provided a report from the roofer indicating there was “noticeable fire damage” to the roof and under the eaves of the master bedroom. Contrary to the above, the FSP obtained a signed statement from the roofer in which he stated he does not support the information in the report relied on by the applicant. He states the report was written by the applicant and was printed on his company letterhead by administrative staff a t the applicant‟s request. The applicant says she did not change the report. In his statement, the roofer also says there was no fire damage to the roof. He says the cause of damage to the applicant‟s roof was poor maintenance and he had advised the applicant the entire roof would eventually require replacing due to age and deterioration. The FSP says the roofer only partially repaired the roof and any subsequent leaking was because of the poor condition of the remainder of the roof and unsatisfactory joining between the new and old work. The applicant says she did not replace the whole roof on the advice of the FSP and the roofer. Case No: 444785 Determination Page 4 of 10 The FSP says the only instructions it gave to the applicant was to have her roof repaired by an independent suitably qualified contractor. It submits it did not advise her about non-insurance related repairs. The applicant was provided with the roofer‟s statement but maintains her position the damage was caused by fire and refers to swirl and ash marks on the removed roof sheeting. In support of this position, the applicant provided photographs of the roof and of the resultant damage. Aside from the disputed report from the roofer, the applicant has provided no further expert evidence. The applicant relies on photographs of the roof which she says support her contentions about the cause of damage to the roof. She also contends if there were maintenance issues, then repairs were not properly carried out. Damage caused by wear and tear and lack of maintenance The panel has considered the available information and photographs of the roof. The photographs show the poor condition of the roof and rusted sections of the roof. The panel considers the objective evidence does not establish the damage to the roof was caused by fire or storm. While the applicant relies on a report from the roofer saying there was noticeable fire damage, this evidence is refuted in the later signed statement by the roofer. The applicant asserts the roof was poorly repaired and she relied on advice from t he FSP and the roofer. The panel considers the information provided does not establish these assertions. Rather, the roofer says he told the applicant she needed to replace the whole roof. Further, the panel accepts an insurer would not provide advice concerning repairs for which it did not provide indemnity. Taking into account all the information, the panel does not accept the applicant has established on the balance of probabilities the claimed damage to the roof was caused by an insured event. Rather, the panel is satisfied the damage to the roof and any need for replacement is due to wear and tear and lack of maintenance which causes of damage are excluded from cover. On the information provided, and for the reasons stated, the panel is satisfied the FSP is entitled to deny the claim for damage to the roof. 2.2 Is the cash settlement amount paid for the shed fair? FSP paid $145,750 to replace the shed on a like-for-like basis As a result of the fire claim, the FSP accepted the claim for damage to the garage and workshop (also referred to as the shed). It paid the applicant a total of $145,750 to replace the shed and says the cash settlement was adequate to allow for full replacement of the shed on a like-for-like basis as supported by detailed quotes. The applicant says the settlement sum is inadequate. Case No: 444785 Determination Page 5 of 10 FSP says cash settlement replaces the shed to a better standard The FSP provided photographs of the shed taken before the bushfire and plans for the proposed reconstruction of the garage and workshop prepared by a builder (MC). According to the FSP, the plans provided for a substantial upgrade, rather than a like for like replacement as required by the policy. The FSP says it relied on these plans in the calculation of its cash settlement for the workshop of $145,750. The FSP contends the final cash settlement allowed for a replacement shed of similar but better construction to the original shed. The FSP refers to a site meeting on 11 June 2014. At the site meeting the FSP says agreement was reached that the FSP would arrange for a quote to reinstate the shed to include hardwood, and to include demolition and reinstatement of the existing concrete slab, removal of the concrete water tank, inclusion of windows and doors similar to original and also an allowance for a kitchenette. The FSP lists the items included in the cash settlement including the removal of the old concrete slab and concrete water tank and construction of a 170 square meter shed with hardwood frame and cladding with a corrugated iron roof. It says the settlement allowed for the structure to be lined with plaster and included an allowance for a kitchenette, windows, and entrance and roller doors. The FSP says the July 2014 cash settlement paid was adequate to allow for full replacement of the shed and was supported by detailed quotes. Applicant relies on quote to construct shed in the amount of $286,882.53 The applicant refutes the assertion the plans drawn up by the FSP were a substantial upgrade particularly in view of the fact that half the shed was hardwood and lined with hardwood planks. She asserts the FSP sought to cash settle the claim as it could not get that kind of hardwood anymore. The FSP‟s recollection of the settlement discussions is that it was the applicant‟s preference to demolish the slab and concrete tank and clear the site and that the applicant did not want to proceed with reinstatement but preferred a cash settlement. The applicant says she cannot build the same quality shed for $145,750. She says plumbing and electrical work were not taken into account by the FSP. She provides a detailed description of the shed as it was before the fire saying it was substantial. At first, the applicant provided a quote for replacement of the shed from FD Sheds. This document was received by email and, initially, could not be opened. Subsequently, a document was received from FD Sheds dated 16 September 2015 being a quotation for a Class 10A shed. The quotation indicated a deposit had been paid. The quote totalled $19,413.75. The panel notes the dimensions of this shed is 60 square metres. An email from FD Sheds dated 31 March 2017 refers to the price to install a suspended concrete slab in the sum of $55,600. Case No: 444785 Determination Page 6 of 10 The applicant has also provided a document from M Constructions dated 20 March 2017. The document is described as a preliminary offer to construct works in the amount of $286,882.53 as per drawings provided by MC. When comparing the photographs of the shed taken before the bushfire and the copy of the plans drawn by MC, the FSP says the plans provided for considerable betterment. It says the quote now relied on by the applicant is based on the plans drawn by MC which provided for this substantial betterment. It also asserts there was ample allowance for electrical and plumbing fit out in the square meterage rate on which the cash settlement was calculated. The FSP says the photographs of the shed taken before the fire show a clear representation of the standard of the shed then. It says the applicant‟s description of the shed is not supported by the photographs. As for the quote in relation to the concrete slab, the FSP says the original shed did not have a suspended slab and the applicant continues to seek settlement based on plans drawn by MC despite those plans providing for substantial betterment of the original structure. Plans drawn by MC and quote relied on by applicant represent betterment The FSP‟s policy says the cover it provides is new for old and it will pay the reasonable cost to restore the home to the same specifications it had when it was built or last renovated. The panel has considered the material provided by the parties in order to determine whether the amount of $145,750 represents the fair cost to restore the shed to the same specifications it had when it was built or last renovated. The panel has considered photographs of the shed before the fire. The panel accepts the plans drawn by MC represent betterment as it includes upgrades and additional facilities not previously in place. Further, the plans drawn by MC referred to both hydraulics and electrical plans. The panel reviewed all quotes provided. The offer from M Constructions is substantially more than all the other quotes. The panel reviewed the offer from M Constructions and is satisfied it includes betterment on various items including the windows, steel work, colour bond external cladding, internal lining and painting, stairs and handrails and includes two wood heaters. The panel notes the original shed appeared to be a wooden shed, open plan and on an on-ground slab, not a suspended one. The offer from M Constructions allows for over $60,000 for the preliminaries, site preparation and work associated with the slab and footings. While a new slab is required, the panel considers this is high for a s hed, even the shed the size of the applicant‟s shed. The panel has noted the building costs for a new shed on a per square metre basis provided by the FSP are consistent with the reported standard industry range, and in addition an allowance for a new slab, electricals and limited fit-out, as agreed. Further, the material provided shows the applicant agreed to accept the cash settlement sum of $145,750 to replace the shed and the final cash payment was Case No: 444785 Determination Page 7 of 10 made in July 2014 with no further contact between the parties about this issue until two years later. FSP’s settlement offer is in accordance with its policy and is fair Whatever the circumstances of the decision to cash settle the claim, the issue in dispute is the amount of the cash settlement. And, on the information provided, for the reasons stated, the panel is satisfied the FSP‟s settlement offer is in accordance with its policy terms and is fair. 2.3 Have other issues raised at the conciliation resolved fairly? FSP attended applicant’s property to review issues after conciliation Three other issues were unresolved prior to a conciliation conference between the parties in late November 2016. Before the conciliation, the parties provided information from the elect rician and the FSP‟s claims manager. After the conciliation, aside from the issues about the roof and the shed, the other issues remaining in dispute were summarised by the conciliator as follows:  the outside power point to the tank (the FSP agreed to consider under its repair guarantee)  the underground cable to the tank (the FSP indicated it would refund part of the electrician‟s costs as set out in an invoice dated 31 October 2016)  damage to the barbecue area caused by earlier works (the FSP indicated it would review). After the conciliation, the FSP attended the applicant‟s property and reviewed these issues with the applicant on 2 December 2016. Outside power point now repaired The FSP inspected the water damaged power point which its electrician had fitted adjacent to water tanks. It noted the power point was installed in a compliant water proof enclosure. When the plug for the water pump was installed, the cover on the waterproof enclosure could not close properly allowing water to enter the power point under extreme conditions. The FSP instructed its electrician to replace the power point with a more suitable unit. The applicant agreed the outside power point cable was repaired but said the electrician did not put a waterproof cover on the power points. The FSP agreed to replace the power point under the repair guarantee and contended the replacement power point fitted was a suitable weatherproof power point installed by a licensed electrician as established by a compliance notice. The panel has considered the material provided. The invoice from the electrician dated 12 December 2016 confirms the FSP‟s assertion. The panel is satisfied the FSP need take no further action in re lation to this item. Case No: 444785 Determination Page 8 of 10 FSP need take no further action in relation to underground cable The applicant says the FSP disconnected the underground cable to the tank. The FSP says it did not disconnect the underground cable but the applicant arranged for the electrician to do this. The electrician said the live extension cable he disconnected was to the shed and the cable was not safely or legally connected to the shed. In these circumstances, the FSP says the cost of the connection to the shed would have alwa ys been at the applicant‟s cost. The material provided shows the FSP paid the applicant $231.00 for reimbursement of the components of the electrician‟s invoice which related to the power point and the disconnection of the cable. On the information provided, the panel is satisfied the FSP need take no further action in relation to this item. Electrical mains moved and BBQ area repaired On 2 December 2016 and 25 January 2017, the FSP inspected the BBQ area and the electrical power mains riser and connection. The FSP said the BBQ area and the connection are both substandard and non- compliant. It said there was no fire or storm damage. The FSP noted installation of two timber braces on the eastern wall of the BBQ area by way of bracing to restrict the movement of the structure when under tension from the power main. The applicant said the power pole was damaged by the fire and the mains had to be reconnected following the fire. The applicant claims the damage to the BBQ structure occurred at this time, when the power utility tensioned the power main. The applicant also said one of the FSP‟s contractors erected the bracing. The FSP instructed an electrician to advise on the possibility of relocating the power mains to an alternate mounting point and upgrade requirements to the mains and the power board in order to resolve this issue. The electrician attended the insured property on 12 December 2016 and provided a proposal to replace the power point at the water tanks and relocate the power mains in the amount of $2,530. While the mains connection and the BBQ area were not damaged by the 2013 bushfires, the FSP said the mains had to be reconnected as a result of damage to the electrical infrastructure as a result of the fires. The FSP said if the attaching point was built to a reasonable standard then the problem would not have occurred. Nonetheless, it also said, had it been aware of the problem at the time of the fires, it would have carried out the necessary work to ensure the power connection could be reinstated to the current requirements. On this basis it accepted these costs as a part of the claim and asked the electrician to proceed with the works. Sometime in January 2017, the electrical mains were moved to a new location at the FSP‟s cost. Case No: 444785 Determination Page 9 of 10 The FSP and its builder also met the applicant on site on 25 January 2017 to discuss repair works to the BBQ structure. The FSP says the parties agreed on the method and extent of repairs. The builder attended to repairs in February 2017. In March 2017, the applicant indicated she was satisfied with repairs to the BBQ area. On the information provided, the panel is satisfied the FSP need take no further action in relation to this item. 2.4 Is the applicant entitled to compensation for the FSP’s claims management? Compensation paid only in some circumstances The applicant says she was bullied by the FSP to accept the cash settlement to rebuild the shed. The applicant also asserts the claim and dispute with the FSP has been very stressful. The Terms of Reference allow payment of compensation (capped at $3,000) for non- financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant‟s expectation of enjoyment or peace of mind. The applicant has not provided persuasive material to substantiate her assertion she was „bullied‟ into accepting the cash settlement. The panel has carefully considered the information provided including the FSP‟s claims notes and statements from its claims officer. The panel concludes the FSP‟s settlement figure was fair an d the material provided does not support the applicant‟s assertion she was bullied into accepting the cash settlement. On the basis the offer was fair, the panel accepts the FSP handled the claims and disputes reasonably, including agreeing to conciliatio n, accepting further repairs despite its reservations as to liability, and its attempts to keep communications open with a view to concluding the dispute. The applicant has provided a facsimile from the Hobart Clinic indicating she was an inpatient in February 2017. However, the material from the Clinic does not indicate why the applicant was an inpatient at the Clinic. The panel accepts insurance claims and disputes are stressful but, in all the circumstances of this dispute, the panel does not accept th e FSP‟s conduct justifies an award of compensation. Case No: 444785 Determination Page 10 of 10 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination by a panel. The panel consists of an ombudsman and two panel members with extensive experience in insurance industry matters and consumer complaints. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the parties‟ submissions and in the FSP‟s Notice of Response dated 24 October 2016. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties‟ submissions, emails, photographs, reports, invoices, plans and all attachments to all submissions  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.