Text of the determination
Determination
Case No: 444076 Determination Page 1 of 8
Case number: 444076 14 August 2017
1 Overview
1.1 Dispute
The applicant made a claim for storm damage to his property under the home and
contents insurance policy he held with the financial services provider (FSP).
The FSP accepted the claim and paid $13,152.18 as cash settlement for the internal
property damage. The applicant says that is insufficient, particularly in respect of the
flooring. He also says there is roof damage caused by the storm event which was not
included in the settlement.
The case analyst recommended that the FSP was not required to increase its
settlement offer, but the applicant did not accept that. The FSP has since offered to
pay to replace the adjoining undamaged section of flooring so that it matches the
area for which payment has already been made.
1.2 Issues and key findings
Was the original cash settlement reasonable?
The FSP ’ s original cash settlement amount was reasonable at the time of payment,
to the extent that it covered the internal storm damage, including 55m2 of damaged
floor area. However, it is fair that , in accordance with the FSP’s subsequent offer, a
further payment be made to reflect the cost of removing and replacing the
continuously joined damaged and undamaged flooring.
The FSP also acted reasonably in giving the applicant the option of taking a cash
settlement (which the applicant agreed to do), or having the FSP arrange for repairs
to the property.
Is the FSP entitled to decline the claim for damage to the roof?
The FSP can deny that part of the claim relating to the damaged roof because:
the applicant has not established, on balance, that the roof was damaged by
the storm, or by any other insured event
the evidence shows instead that there was wear and tear and deterioration, as
well as general maintenance issues affecting the roof and skylight
these are not covered under the policy.
1.3 Determination
This determination is substantially in favour of the FSP.
Case No: 444076 Determination Page 2 of 8
As it has offered to do, the FSP is required to pay the amount reasonably required to
remove and replace the total area of adjoining damaged and undamaged flooring,
less the amount already paid in respect of the flooring.
Case No: 444076 Determination Page 3 of 8
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 Was the original cash settlement reasonable?
Damage was caused by an insured event
In making the claim, the applicant has the responsibility of establishing that the
damage falls within the cover provided by the policy.
There is no dispute the applicant’s property was dama ged in the storm. ‘Storm’ is an
insured event under the policy. However, the cover offered by the policy is subject to
certain conditions and exclusions.
The FSP has accepted that the internal damage to walls, ceilings and flooring (as
identified by its assessor, C and confirmed by the FSP’s and the applicant’s builders) ,
was the result of water entering the property from the storm.
Cash settlement already paid for damaged areas was reasonable
The FSP obtained a quote from builder, AB, for the repairs to the bathroom, and
downstairs lounge room walls, ceiling and 55 square metres of damaged floating
flooring to match the existing flooring. AB costed the flooring at $5,225. The FSP
then obtained a quote from CF who said they could replace the damaged flooring on
a like for like basis for $7,204.18.
The applicant’s builder, DDH, quoted $14,680 to match existing flooring as closely as
possible. (The applicant also obtained a quote from CTC totalling $21,356 to cover
the work downstairs, but that included the costs of gyprock, painting and other
elements, and it is not clear how much of that related solely to the flooring.)
The FSP has pointed out that all the flooring quotes were based on the removal and
replacement of 55 square metres of floating timber flooring to match the existing
flooring. The FSP’s cash settlement offer in respect of the damaged flooring reflected
CF’s quote of $7,204.18 . On the available evidence, I consider that was a reasonable
offer at the time. I understand this was paid to the applicant in April 2016.
Cash settlement to be made for undamaged adjoining floor area as well
The applicant remained concerned that the flooring could not be matched. The policy
provides that where matching materials are not available, either the insured can
contribute the cost to replace undamaged materials to a match or it will cash settle its
liability. The FSP is not generally obliged to replace undamaged materials.
Case No: 444076 Determination Page 4 of 8
However, the policy also provides for extra to be paid to replace continuously joined
undamaged floor coverings of the same material in the same room where the
damage occurred. On that basis (given the configuration of the affected areas), the
FSP has offered to arrange for a new measurement and quote from CF, to cater for
the full adjoining (damaged and undamaged) floor area which it now says it will pay
to have replaced.
Under the circumstances, I consider is it fair for the FSP to make a further cash
settlement based on current costs for removal and replacement of the full continuous
floor area (and deducting the amount already paid in respect of the flooring). In
calculating the cash settlement amount, the FSP should consider all reasonable
factors, including whether the cash settlement will adequately ensure the applicant
can complete the work for the full area, and an allowance for contingencies.
Available information does not establish overall scope of works is inadequate
The applicant believes that due to the time period since the original scope of works
was drawn up, there was likely to be a need for a revised quote for the internal
works, and this would have identified additional costs.
AB had attended the property and drawn up a scope of works for the internal repairs.
A revised scope was also prepared by CF, based on dimensions provided by the
assessor, C, and AB. The FSP also points out that it increased the allowance for the
bathroom ceiling, to match the applicant’s quote to re -sheet the ceiling together with
extra to remove, replace and repaint the skirting boards.
The applicant’s quotes from DDH and CTC were based on a similar scope of works,
although they reflect a significantly higher price than AB’s. T he applicant has not
provided any compelling independent evidence which establishes that either AB and
CF’s assessment was inadequate or that additional repairs were required, or likely to
arise.
In the absence of persuasive evidence to suggest otherwise, I am satisfied that the
scope of works represents a reasonable basis for the quotes provided, and for the
original cash settlement.
It is also worth noting that throughout the claims process, the FSP reminded the
applicant that he had the option, if he was unhappy with the cash settlement, of
having the FSP’s repairers undertake the repair work instead.
The terms of the policy allow the FSP to cash settle the claim
The policy allows the FSP to decide how it can settle a claim: it can repair, replace or
cash settle the damage. In this case, it has elected to cash settle. However, it must
act reasonably in doing so, and in calculating the settlement amount.
Given the difficulties in bringing this matter to a conclusion, it was reasonable in the
circumstances for the FSP to make its cash settlement offer, both at the initial stage
and more recently to include the adjoining undamaged areas of flooring.
Case No: 444076 Determination Page 5 of 8
2.2 Is the FSP entitled to decline the claim for damage to the roof?
Evidence shows, on balance, damage to the roof due to general deterioration
While the FSP accepted the internal property damage should be covered, it has not
accepted the external issues with the roof itself. Its builder, AB, first attended in May
2014 and identified that a waterproofing membrane had been applied to the roof
around the skylight, but that it had started to deteriorate in some places. In AB’s
professional opinion, the breaking down of the sealant over time was the reason the
water was entering from the top floor of the house into the ceiling and walls.
A further report and photographs from AB, after its inspection in October 2016, as
well as confirming the first inspection report, indicate there were a number of
maintenance-related issues:
the existing gutters at the front and rear should be removed and replaced as its
falling to both sides of the dwelling and four new downpipes should be installed
2 at the front and 2 at the rear to adequately disburse storm water away from
the roof in a heavy weather event
the waterproofing membrane applied around the skylight is deteriorating
allowing water ingress during heavy rain
the sealant in the top storey floor has broken down over time and allowing water
to enter the down stairs ceiling and wall
rusted and corroded fixings
unsealed ridge flashings
flashing barge laps to rear balcony roof has been over sealed and incorrectly
installed
and, specifically, no visible storm damage.
The applicant has not provided any expert evidence to support his position that the
roof damage itself was caused by the April 2014 storm event. The evidence that is
available points to general deterioration as being the cause of the damage
associated with the roof/skylight. That means the FSP was not required to pay for
repairs to the roof itself.
FSP not liable for further damage occurring because of roof ’s condition
The applicant has said that, since the claim was made, the internal damage from the
storm has worsened, and more damage has occurred from water coming in through
the roof. The FSP’s assessor , C, reported, after their visit to the property in
December 2015 when the applicant raised that concern, that he was advised he
would need to take the necessary steps to fix the roof himself to stop further damage
occurring.
It is not clear at this time what, if anything, the applicant has done to mitigate his loss
in this respect. While it is understandable that he was waiting for this dispute to be
resolved, it is also reasonable to expect that he might have applied the cash
settlement he has already received to deal proactively with existing and worsening
areas of damage.
Case No: 444076 Determination Page 6 of 8
The FSP is not responsible for any additional damage to the property arising
because the applicant has not repaired the areas of the roof identified by the FSP as
having deteriorated, and requiring repair.
Case No: 444076 Determination Page 7 of 8
3 Supporting information
3.1 Expert s’ reports
Date Action
FSP’s expert (AB)
Builder’s report and quote
27 May 2014
Report
25 October 2016
the skylight near the bathroom had waterproofing
membrane applied to the roof around the skylight as a
form of flashing
in some areas this has started to deteriorate and would
allow water ingress during heavy rain
the roof over the front of the house was visually in good
condition
water enter ing to the downstair s area through the top
stor e y has had sealant applied over it. This has broken
down over time and is allowing water to enter down stairs
and ceiling and wall
remove and replace 55m2 floating floor to match existing -
$5,225
patch water damage to ceiling an d wall
stain, seal, repaint bathroom ceiling
the heavily blocked gutter to the front of the house above
where the internal damaged surfaces has overflowed
water staining the eaves and caused water to ingress
inside the building envelope
rusted fixings
unsealed ridge flashings
flashing barge laps to rear balcony roof has been over
sealed and incorrectly installed
FSP’s expert (CF)
Flooring quote
7 October 2015
quote to remove and replace 55m2 of floating floors on a
like for like basis - $7,204.18
quoted based on dimensions provided by the assessor
and AB
Applicant’s expert (DDH)
R epair quote and
supplementary email
28 May 2015
remove, replace, paint bathroom ceiling lining
quote to remove and replace 55m2 of floating timber floors
to match existing ‘as close as possible’ - $14,680
could not match the colour to the existing
remove, reinstate, paint skirting boards
repair and patch damaged plasterboard external wall
Applicant’s expert (CTC)
Builder ’ s repair quote
19 August 2015
the flooring will have to be replaced as cannot match
existing
the g yprock needs to be repaired and patched on the
ceiling and some walls as well
remove and replace skirting
remove and replace bathroom ceiling
roof above bathroom ceiling has water ingress through
skylight
Case No: 444076 Determination Page 8 of 8
3.2 Terms of the policy
Record Key points
How we settle your claim We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to your
home, contents or landlord’s fixtures and fittings, we will decide
if we will:
repair damage new for old or
replace home or contents new for old or
pay you what it would cost us to repair or replace your
home or contents new for old.
We will not:
pay extra to replace your home, contents or landlord’s
fixtures and fittings to a better standard, specification or
quality than it was before the loss or damage occurred
except as stated in ‘new for old’ below
fix a fault that existed before the loss or damage occurred.
When we cannot match
materials
If we cannot find new materials to match undamaged parts, we
will use the closest match available to us.
If you are not satisfied with the materials we find as the closest
match:
if we agree, you can pay the extra cost of replacing
undamaged parts of your home to achieve a uniform
appearance
or, we will pay you what it would have cost us to repair or
rebuild the damaged part.
We do not cover Wear, tear, rust or mould
Loss or damage caused by wear, tear, …gradual
deterioration…unless this is covered und er:
insured event 1 (storm and flood)
insured event 2 ( burst pipes, leaks and overflows)
When we will repair or
rebuild undamaged parts
If we cannot match the new materials with the undamaged
parts, if necessary, we will only pay extra
to create a uniform appearance when:
… floor coverings are damaged (including tiles)
we will pay extra to replace continuously joined undamaged
floor coverings of the same material in the same room, stairs,
hallway or passageway where the damage occurred…