Home / Financial Firm (Unknown - Insurer) / Determination 443786

Determination 443786

Ensuite shower damage claim denied as poor installation

FirmFinancial Firm (Unknown - Insurer)
Decided2017-03-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$250
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed for shower tile and base damage that he attributed to a roof leak; the insurer denied it as poor installation. AFCA found a prima facie claim was established, the insurer had not proved faulty workmanship, and ordered the claim indemnified with statutory interest, the cost of the expert report and $250 for claims-handling delay.

Once the insured establishes a prima facie loss from an insured event, the insurer bears the onus of proving that an exclusion such as poor workmanship applies.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 443786 Determination Page 1 of 7 Case number: 443786 28 February 2017 1 Overview 1.1 Dispute The applicant held a home insurance policy with the FSP. This provides cover for loss or damage to his home caused by insured events set out in the policy, subject to conditions and exclusions. The applicant lodged a claim for tiles lifting in the ensuite shower recess. He believes this was caused by a leak in the roof. The FSP denied the claim on the basis it was due to poor installation. 1.2 Issues and key findings Can the FSP deny the claim? The FSP cannot deny the claim because:  the evidence shows there is a leak affecting the area – this establishes a prima facie claim  the evidence does not show the cause of the damage was poor workma nship Is the applicant entitled to compensation due to his claims experience? The FSP committed an error and did not immediately appoint a builder to inspect the damage. As this would have unduly inconvenienced the applicant, the FSP must pay $250 in non-financial loss. 1.3 Determination This determination is in favour of the applicant. The FSP is required to indemnify the applicant for this claim. The FSP is to pay interest on any amount paid to the applicant under the claim pursuant to the statutory rate from 28 April 2016 until payment is made. The FSP is to pay for the cost of PS’s report subject to the applicant producing an invoice. The FSP is to pay $250 in non-financial loss to the applicant. Case No: 443786 Determination Page 2 of 7 2 Reasons for determination 2.1 Can the FSP deny the claim? Applicant must establish a prima facie claim The applicant is required to demonstrate that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. Once the applicant establishes a prima facie claim, the FSP is liable for the loss unless it shows an exclusion applies. The FSP has the onus of proof in establishing the application of the exclusion. Evidence shows there was a leak The applicant’s policy covers him for l oss or damage caused by an insured event. This includes storm and escape of liquid. The applicant says the damage was due to the roof leaking above the ensuite shower and master bedroom. There is no dispute the roof was leaking above these areas. Further, the evidence shows this leak has caused damage to the flooring and wall adjacent to the ensuite. Therefore, I accept the applicant has established a prima facie claim. Expert PS is preferred The FSP says this leak did not cause the damage to the shower in the ensuite. It has relied on its experts who say the damage was caused by the poor installation of the tiles. The applicant has provided expert evidence challenging this. All of the relevant expert evidence has been summarised at the back of this decisi on. I have carefully reviewed all the available evidence. I am not satisfied the FSP has established the cause of the damage was faulty workmanship for the following reasons. The evidence demonstrates there is a leak within the area affected. For instance, there is a high level of moisture affecting the timber floor, skirting boards and timber framed structure that backs onto the ensuite shower. According to PS, this leak has resulted in rot to the timber flooring in both the ensuite and master bedroom. This in turn has caused the shower base and substrate to fail and resulted in the failed waterproofing and damage. This explanation is plausible and consistent with the available evidence. The FSP’s experts maintain the tiles were poorly installed and this w as the cause of damage. They did not accept the applicant’s reasoning on the basis: Case No: 443786 Determination Page 3 of 7  the water ingress preceded a January 2016 storm event  the deterioration occurred prior to the roof leaking  the leak had a negligible effect There is no evidence showing when the roof first started leaking. The applicant said this could have occurred prior to the January 2016 event. Given this, the FSP’s experts’ conclusion that the shower was deteriorating and affected before the roof was leaking is not substantiated. In terms of the negligible effect of this leak, this is neither apparent nor supported by the available evidence. For instance, PS observed the high level of moisture in the flooring and wall adjacent to the shower. PS also believed the timber flooring of both to be affected. The FSP’s experts have not refuted these observations or explained why they would have had negligible effect on the shower. Given this, I do not accept their reasoning for disagreeing with the applicant’s position is established on the available evidence. FSP liable for the damage I accept the applicant has established the damage to the shower was due to the leaking roof. I am not satisfied the FSP has established the damage was caused by the poor installation of the tiles. Therefore, the FSP is liable to indemnify the applicant for the shower. The FSP is also to pay interest on any amount paid to the applicant pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from 28 April 2016, being the date it denied the claim, until payment is made. In addition, the FSP is to pay for the cost of PS’s report given this substantively assisted the applicant. This is subject to the applicant providing an invoice of its cost. 2.2 Is the applicant entitled to compensation FOS awards non-financial loss conservatively The applicant has complained about the delay in settling his claim. Under paragraph 9.3(b)(i) of FOS’s Terms of Reference, I can award up to $3,000 for non-financial loss if the FSP caused the applicant to suffer an unusual degree or extent of inconvenience, delay or interference. FOS awards non-financial loss conservatively. This is because applicants are expected to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. The FSP must pay $250 compensation for delay in claims handling I accept there was an unusual delay in processing the claim. In particular, the FSP committed an error and did not immediately appoint a builder to inspect the damage. Case No: 443786 Determination Page 4 of 7 The evidence does not show the FSP’s conduct caused any other unusual delay, inconvenience or interference. Given this, and FOS’s conservative approach to compensation, the FSP should pay the applicant $250 of non-financial loss. Case No: 443786 Determination Page 5 of 7 3 Supporting information 3.1 Expert Evidence Re cord Key points FSP’s expert ( RP ) Report 18 April 2016  No leaks were found to the ensuite plumbing.  Static water test to the shower base and spray test to shower wall tiles failed  The primary cause of the water ingress appears to be a failure of the waterproof membrane to the insitu shower recess  Water appears to be penetrating the wall and floor tiling for an extended period of time  Substrate to the shower rec ess is in very poor condition FSP’s expert ( ML ) Report 12 May 2016  Shower base around the waste has been removed exposing poor construction of the shower base  Two cracked wall tiles identified just above the base  Substrate is water damaged – this is causing rot and other floor tiles within the shower to become loose  Carpet and flooring under it has also sustained water damage  Informed customers that main cause of shower and bedroom issues is due to shower base construction FSP’s expert (RP) Report 13 May 201 6  There are ve rtical and horizontal joints on the sisilation paper above the ensuite and master bedroom making it susceptible to water ingress  There are several noticeable areas where the sisilation paper has been torn and water has also been dripping into the ceiling cavity  Roof tiles are not extended forward enough into the gutter line – water appears to have been entering under heavy rain conditions  A number of tiles above the ensuite and master bedroom have broken water courses – this is also contributing to the wat er ingress FSP’s expert (RP) Amended Report 13 May 201 6  Floor of the shower recess contains several dislodged tiles  A close inspection of the area where tiles have been dislodged show waterproof membrane and tile substrate to be in very poor condition  Tiler has not installed a mortar screed to provide required fall before commencing tiling  An excessive layer of adhesive used – inhibited the tile adhesive from curing correctly and avoiding tile movement  Window packers were used to restrict newly laid tiles movement  Primary cause of damage is poor manner of installation  Damage to the shower recess has occurred over an extended period of time Case No: 443786 Determination Page 6 of 7  Unable to conclude whet her the leaking roof added to the deterioration – this is moot as the primary cause was t he manner of installation FSP’s expert (ML) Report 25 May 201 6  Roof inspection identified small water ingress occurring  This has resulted in damage to the base of the int ernal wall in the master bedroom adjacent to the ensuite  Resulting damages to the sh ower are not as a result of this ingress  Damage to shower due to poor workmanship which allowed the shower base to deteriorate and break up App’s expert (DS) Letter Undated  Water damage in the wall between main bedroom, ensuite and ensuite shower area  Fe els the damage was caused by storm water entering the roof above this area and down the wall cavity  This has possibly caused damage to sub floor and wall frames – this in turn caused the plaster skirting to rot and the carpet to det eriorate with mould on t he bedroom side  Possible rot and movement on the bathroom side may have caused the tiles and wat erproofing to crack and deteriorate – this in turn caused tiles on the shower floor to heave App’s expert (PS) Report 13 November 2016  Dwelling was subject to a makeover and refurbishment in 2004 - 2005  There was a damp “musky” smell in the master bedroom – skirting board is distorted and appeared swollen  The MDR skirting is clearly wat er affected and the carpet is stained and damp  Lifting the carpet reveals rotte n timber – this extends out from the wall approximately 45cm  Water proof agent in ensuit e shower was not intact  Tile installation appeared irregular as there were plastic packers supporting the floor tiles  Two significant items stood out – timber floorboa rds were spongy and showing signs of wood rot and cracks were seen in several wall tiles at the bottom of the wall  This is typical of the wall frame compressing due to moisture related deterioration of the timber frame Conclusions  Pooling water from the ro of has leaked int o the wall cavity  Moisture inside the wall cavity caused the timber flooring to rot in both the master bedroom and ensuite shower  The rotting timber floor caused the shower bas e to become spongy and the eventual substrate failure – this ca used the tiles to crack and the waterproof membrane to be affected  No manner of installation could have withstood the timber being constantly wet – the shower base failure was a secondary event Case No: 443786 Determination Page 7 of 7 FSP’s expert (PR) Report 25 January 2016  Applicant’s property has incurred resultant damage to two areas (master bedroom and ensuite) for two different reasons  Master bedroom suffered damage due to wat er ingress from the roof lining  Ensuite has incurred signific ant long term water damage due to p oor installation  Water ingress to the adjacent bedroom wall would have had negligible effect as the shower recess already had significant inherent damage from the poor installation  No secondary damage to the shower recess was due to the roof leak

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.