Dispute over repair versus replacement of storm-damaged timber floor
Summary
The applicant's home was damaged by Tropical Cyclone Marcia and the FSP paid a $193,700 cash settlement. The applicant claimed the whole timber floor must be replaced, but AFCA found the floor could be repaired and the FSP had met its obligations, so no further payment was ordered.
Expert evidence, weighed by the panel, showed the floor was structurally sound and could be rectified by repair rather than replacement, so the existing cash settlement allowance was sufficient.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 443709 Determination Page 1 of 5
Case number: 443709 12 April 2017
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his Home Insurance Policy, held
with the Financial Service Provider (FSP), following damage to his home in the
significant weather event Tropical Cyclone Marcia.
The FSP has accepted the applicant’s claim but a dispute has arisen as to the
repairs required to meet the FSP’s obligations under the terms and conditions of the
policy.
1.2 Issues and key findings
Has the FSP met its obligations under the terms and conditions of the policy?
The FSP has met its obligations under the terms and conditions of the policy.
1.3 Determination
This determination is in favour of the FSP.
The FSP has met its obligations under the terms and conditions of the policy and is
not required to make any further payment to the applicant.
Case No: 443709 Determination Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
Whilst all of the information exchanged has been considered by the panel, only that
information relevant to the final outcome will be referred to in this determination.
2.1 Has the FSP met its obligations under the terms and conditions of
the policy?
Coverage of the policy
The applicant ’ s Home Insurance Policy provides coverage in the event of loss or
damage caused by an insured event which is detailed within the policy.
This means that not all loss or damage is covered, but only loss or damage caused
by an insured event detailed within the policy and subject to the conditions of the
policy.
The details of the coverage are contained within the Product Disclosure Statement
(PDS).
The PDS details:
What you are covered for – Insured events
If you have a Classic, Classic Extras or Classic Advantages insurance policy, we
cover your home and contents when covered under this policy for loss or damage at
the insured address caused by an insured event during the period of insurance.
There are some things we do not cover and these are shown on the ‘We do not cover’
section of the following tables on pages 17 to 25 and in the ‘General exclusions’ on
pages 58 to 62.
….
Storm
We cover
Loss or damage by a storm.
The coverage is subject to the general exclusions which are detailed within the PDS.
The PDS details:
General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal
liability that is caused by, arises from or involves:
….
Case No: 443709 Determination Page 3 of 5
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as but not limited to:
– tiles and their adhesive or grouting breaking down;
– weathering of roof tiles or roof ridge capping;
– gradual weathering and breakdown of bricks, mortar or concrete
It is accepted insurance law that the applicant carries the onus to show the loss is
covered by the terms and conditions of the policy.
Circumstances of the loss
The applicant’s home was subject to the significant weather event Tropical Cyclone
Marcia, on or about 20 February 2015.
The home suffered damage and the FSP accepted the claim and paid the applicant
the sum of $193,700 by way of cash settlement for damage to the home.
The FSP says that this amount includes the cost for what the FSP says is the
necessary repair to the floor.
The applicant does not agree and says that the entire to ngue and groove timber floor
needs replacing as it was damaged by water entering the residence.
This dispute relates to whether the timber floor can be repaired or needs to be
completely replaced.
The parties have provided reports from various experts who support their respective
positions.
The applicant relies upon a report from structural engineer (D), however, the panel is
not satisfied that this report supports the applicant’s position.
D noted that the significant water damage throughout the home included damage
experienced by the flooring timbers which had impacted on the integrity and
serviceable condition of the flooring system.
D observed warping, cupping and shrinkage of floor boards, resulting from their
saturation and drying, which had loosened the nailed fixings and caused minor
splitting around the nailed fixings and weakened the tongue and grooved interlock.
Further, D observed gaps between boards of up to 4 to 5 millimetres in some places,
which were significantly greater than would be expected for a building of this age and
construction.
D notes that these factors contribute to excessive flexure and deformation of
individual boards, when under normal foot traffic loading.
However, rather than call for the replacement of the floor, D recommended the repair
of the affected floorboards and their fixings to reduce the risk of further deterioration
of the joints and to restore the integrity of the flooring system to avoid overstressing
and/or failure of floorboards.
In addition, D said that some timbers may require replacement and/or re-fixing
beyond re-punching of the existing nails.
Case No: 443709 Determination Page 4 of 5
In the panel’s view, the opinion of D supports the position that the floor can be
repaired rather than needs to be replaced.
The FSP relies upon the opinion of the consulting engineer (JHA).
JHA has provided a report following his site inspection on 26 April 2016.
Of significance, JHA noted that the timber used in the floor is of a utility grade and
never intended to be polished and exposed, but simply forming a subfloor for future
coverings.
In this regard the panel has considered the damage to the floor and its repair and/or
replacement from both a cosmetic aspect and a structural integrity aspect.
Given the available evidence, which included a number of helpful photographs from
various people, the panel is satisfied that the floors were always intended to be
covered and thus any cosmetic deterioration in the floor itself would not justify its
replacement.
JHA noted large gapping in between the adjacent floorboards but disagreed with the
opinion of D that the gapping is significantly greater than would be expected from a
building of this age and construction.
JHA noted that with this type of floor, having being used as a platform type
construction with a utility grade timber that would have had minimal seasoning prior
to installation, floorboard shrinkage in the well ventilated location would be expected.
JHA noted the evidence which indicates some expansion of the floorboards likely
occurred during the water inundation, but was of the view that subsequent shrinkage
would not be greater than the pre event condition.
According to JHA the photographs, whilst not clear, indicated the gapping between
the boards was not as significant as suggested and the evidence indicates that the
appearance of the lack of gapping is likely due to many years of debris between the
boards solidifying and that this is a very common occurrence.
JHA was of the view that the water inundation would have cleared out this debris
creating appearance of the current large gapping.
Inspection of the floorboards by JHA noted a slight cupping and it was reasonable to
expect that some cupping occurred as a consequence of the water penetration.
JHA was of the view that any staining was the result of iron from the old nails
reacting with tannic acid in wood creating a dark colour and the addition of water has
drawn the marks to the surface.
Also noted within JHA’s inspection was splitting of floorboards adjacent to nail fixing
locations. However, JHA was of the view that it was utility grade flooring and no
consideration to the splitting of the boards would have been taken into account when
installing the floor and that this splitting is typical of what would be expected in the
utility type floor.
JHA concluded that the splitting of floorboards was unrelated to the water penetration
and the shrinkage gapping between individual boards has not been caused by the
Case No: 443709 Determination Page 5 of 5
water penetration, but is as a result of long term shrinkage due to the grade of the
flooring used.
Further and significantly, JHA was of the view that the floor is in a structurally sound
condition and whilst some cupping of the floorboards is likely a result of the
penetration, it can be rectified by the punching of nails, additional nailing if required
and the sanding of the floor to create a straight platform.
As a result, the panel is satisfied that the opinion of JHA supports the view expressed
by D to the effect that repairs can be affected to the floorboards to resolve the
damage suffered during the course of the significant weather event.
Whilst the applicant has provided an additional undated report from a builder (KC) to
the effect that he highly recommends that the floorboards be replaced due to the
extreme weather event, the panel prefers the opinions expressed by the structural
engineer D and the consulting engineer JHA.
The reports from D and JHA are far more thorough and logical, supported by helpful
photographs and their conclusions are compelling.
Finally, the panel notes the additional report from the flooring experts ATFA to the
effect that the general condition of the floor is not considered to be caused by the
weather event and rectification work is not required, other than re punching of nails.
Having reviewed all of the exchanged material, the panel is satisfied that the FSP’s
allowance within the cash settlement amount, for repairs to the flooring, is sufficient
to meet the FSP’s obligations under the terms and conditions of the policy.
The FSP is not required to make any further payment to the applicant.