Determination 443389
Storm and flood building damage claim denied after initial acceptance; exclusions relied on
Summary
The applicant's home insurance claim for storm and flood damage was accepted, repairs began, and then the FSP denied the building damage claim on exclusion grounds. AFCA found the FSP had not established the exclusions and ordered cash settlement of $67,098.46 with interest, 12 weeks temporary accommodation, expert report costs, and $3,000 non-financial loss.
Once the insured establishes a covered loss the insurer bears the onus of proving an exclusion applies, and the FSP failed to discharge that onus.
Issues
- Claim denial primary · upheld
“The Panel is not satisfied that the FSP has met its onus in this regard; the FSP is not otherwise entitled to deny the applicant's claim on the basis of exclusions.”
- Poor claim handling secondary · upheld
“The FSP originally accepted the claim, only to advise the applicant subsequently that the claim was to be denied, causing significant stress and inconvenience.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Text of the determination
Determination
Case No: 443389 Determination Page 1 of 9
Case number: 443389 7 December 2016
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his Home Insurance Policy, held
with the financial service provider (FSP), following damage to his home and contents.
The FSP originally accepted the applicant’s claim, commenced repairs and paid for
temporary accommodation.
The Service understands that the FSP has settled the applicant’s contents claim with
the applicant (and is therefore not the subject of this dispute).
Subsequently, the FSP denied the applicant’s claim in respect to the damage to the
building, on the basis:
the damage was not caused by a storm or an event in respect of which the
policy provides cover
the repairs for which the applicant has sought indemnity are long standing
issues of maintenance and faulty design which are excluded under the terms
and conditions of the policy.
1.2 Issues and key findings
Has the applicant established a claim under the terms and conditions of the
policy?
The applicant has established a claim under the terms and conditions of the policy.
Is the FSP otherwise entitled to deny the applicant’s claim on the basis of
exclusions within the policy?
The FSP is not otherwise entitled to deny t he applicant’s claim on the basis of
exclusions within the policy.
What are the FSP’s obligations for temporary accommodation?
The FSP is required to compensate the applicant for the cost of temporary
accommodation incurred by him for a total period of 12 weeks.
Is the applicant entitled to compensation?
The FSP is required to pay the applicant $3,000 by way of non-financial loss
compensation.
Case No: 443389 Determination Page 2 of 9
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to settle the applicant’s claim by way of cash settlement, based
on the scope of works prepared and costed by BB, in the amount of $67,098.46.
The FSP is also required to pay interest on this amount from the date on which this
costing was initially accepted by the FSP until the date of payment in line with section
2.2 below.
The FSP is required to reimburse the applicant for the cost of temporary
accommodation incurred by him for a total period of 12 weeks, in line with section 2.2
below.
The FSP is required to pay the applicant $3,000 for non-financial loss compensation.
The FSP is to reimburse to the applicant the reasonable cost of the expert report
obtained by the applicant, in line with section 2.2 below.
Case No: 443389 Determination Page 3 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Has the applicant established a claim under the terms and
conditions of the policy?
Coverage of the policy
The coverage provided by the applicant’s Home Insurance Policy is detailed within
the Product Disclosure Statement (PDS) and the Certificate of Insurance (COI).
The PDS details:
‘The events we cover
We cover your home or contents when certain things happen. These are known as
‘listed events’. You can make a claim if a listed event takes place and causes loss or
damage to your home or contents during the policy period.
In this section, we tell you what events you’re covered fo r and any specific exclusions
and conditions that apply to the event. General exclusions may also apply – see
Section 5.
Also, if you don’t meet your responsibilities when you make a claim you may put your
claim or cover at risk – see page 49.
…
Table 3.1 – Listed events
Listed events Buildings Insurance Contents Insurance
Storm
Flood ‘
‘ Storm
If loss or damage is caused by a storm.
For example damage caused when:
hail breaks your windows
a cyclone lifts the roof off your home.
Covered
violent wind, cyclone or tornado
rain, thunderstorm, hail or snow
landslide or subsidence that happens immediately as a result of a storm.
Not covered
Case No: 443389 Determination Page 4 of 9
loss or damage to:
retaining walls
…’
Flood
If loss or damage is caused by a flood.
For example damage caused when:
sustained rainfall causes a river or creek near you to overflow\
heavy rain causes a build up of water in the street gutters and the water enters
your home.
Covered
flood
landslide or subsidence that happens immediately as a direct result of a flood.
Flood means:
rain which results in water pooling on, flowing from or failing to drain away from:
a body of water
land
roads and streets
water that escapes or is released from a body of water.
A body of water can include a river, lake, dam, stormwater channel or canal, but not the
sea.
…’
‘Options to increase the events we cover
We cover your home and contents when any of the 15 listed events shown in Table 3.1
on page 19 takes place. You can increase the events we cover by adding options to
your policy to cover you for:
Accidental damage
Burn out of electric motors – fusion.
Accidental damage
You can choose to cover your home and contents for accidental damage – that is,
mishaps around your home that are caused unintentionally.
…’
‘Not covered
…
damage that is covered under a listed event shown in Table 3.1 – see page 19
damage to:
retaining walls
Case No: 443389 Determination Page 5 of 9
…’
‘Exclusions for all cover
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
…
Subsidence or landslide unless it happens immediately as a result of:
an earthquake or explosion
a storm or flood.
…’
‘Maintaining and occupying your home
We don’t cover loss, damage, injury or death arising from:
faulty design or workmanship
…
you not maintaining your home in good repair and condition. This means your
home must be watertight, structurally sound, secure and well maintained.
…’
‘Definitions
The following words have special meaning.
…
Accidental Damage
Is damage that is caused unintentionally to your home or contents. Accidental damage
is not covered under any of the listed events (see table 3.1 – page 19).
You can purchase this as an optional cover.
…’
‘Incident
Is a single occurrence, or a series of occurrences arising out of the one event.
…’
The COI confirms that ‘accidental damage’ is part of the policy coverage.
It is accepted insurance law that the applicant carries the initial onus to establish that
he has suffered loss and damage which is covered by the terms and conditions of the
policy.
The app licant’s obligation to establish the claim is covered by the policy extends to
establishing that the loss and damage occurred in circumstances consistent with the
other known and confirmed evidence and the applicant’s version of the loss is
credible.
The F SP’s onus to show the basis on which it otherwise seeks to deny the claim,
including the exclusions within the policy, only arises once the applicant has
Case No: 443389 Determination Page 6 of 9
established that the loss and damage claimed is covered by the terms and conditions
of the policy.
Circumstances of the loss
The applicant says that as a result of heavy rain late on 28 January 2016, water
entered his property and caused damage.
The applicant says that the home is approximately 40 years old and he has lived
there for some seven years without any previous problems.
The applicant has provided a statutory declaration from a neighbour who says that on
29 January 2016 he entered the applicant’s home at the applicant’s request and
noted extensive water damage and the smell of dampness emanating from the lower
level of the home. He also described the flooring as being soaked and starting to
deform. The neighbour also confirmed that on the evening of 28 January 2016 he
was woken by heavy and persistent rainfall.
An assessor attended the applicant’s home at the request of the FSP and reported:
‘ Cause of Damage:
Upon inspection of the resultant damage, we believe the damage is consistent with
flooding from the street as the insured’s property sits on the low side of the road in an
elevated area which in our opinion will cause any overflow of their street drainage
system will effect the insured’s property.’ (sic)
The builder engaged by the FSP who re attended the property on 8 March 2016
reported:
‘ … the rear section of the house has dried out, and in doing so various damages have
become apparent… All of these damag es are consistent with inundation of water as
described by the insured.’
Further and as previously noted, the FSP originally accepted the applicant’s claim.
Having considered the exchanged material, the Panel is satisfied that the applicant
has established a claim under the terms and conditions of the policy.
The onus now transfers to the FSP to establish the basis on which it otherwise seeks
to deny the applicant’s claim, including the application of an exclusion within the
policy.
2.2 Is the FSP otherwise ent itled to deny the applicant’s claim on the
basis of an exclusion within the policy?
In support of their respective positions, the FSP and the applicant have engaged
engineers to report.
The engineer engaged by the FSP (JM) essentially says that there was i nsufficient
rainfall on the evening of 28 January 2016 to cause the damage at the applicant’s
home and there are significant defects at the home including the problems with
drainage, combined with problems with maintenance, which have led to the damage
at the home.
The engineer engaged by the applicant (TY) has provided two reports which
significantly challenge specifically the report from JM and the submissions being
made by the FSP generally.
Case No: 443389 Determination Page 7 of 9
The FSP has not provided any response from JM in relation to the commentary and
conclusions from TY.
JM stated that the Bureau of Meteorology data indicates that the weather event on
the evening of 28 January 2016 was insufficient to cause damage at the property.
However, the Panel is satisfied that TY has provided a plausible explanation in
respect to the damage arising from the storm event.
The Panel is satisfied that the rainfall in the immediate catchment area of the home,
plus the likelihood of a blocked/faulty drain immediately above the applicant’s
property together with the run-off from the road and neighbouring properties led to
the inundation of water at the home on the balance of probabilities.
The Panel also notes that JM conceded that the duration of the rainfall on the
evening may have been short, confirming intense rainfall.
Having dealt with numerous similar claims in respect to storm and flood, the Panel is
conscious of the fact that the intensity of rainfall can vary significantly from one
location to another.
Noting that the nearest recording station for the Bureau of Meteorology data was
some four kilometres from the applicant’s home, the Panel accepts that that
recording may not be accurate for the applicant’s home.
Further, noting the applicant’s evidence to the effect that he has lived at the pr operty
for some seven years and there have not been previous problems, the Panel has
difficulty accepting that the damage was caused by long term seepage issues.
Further, both the assessor and building consultant concluded that the noted damage
was entirely consistent with the claimed event. Given that evidence and the reports
from TY, the panel is of the view that JM’s report is not sufficiently persuasive to
refute the applicant’s claim that the rainfall caused the inundation.
There is no evidence that when the home was built, some 40 years earlier, it was not
compliant with the building codes applicable to the time.
Further, the Panel is not satisfied that the FSP has established that any maintenance
issues such as blocked vents or the hole in the brickwork had played a significant, if
any, role in the loss.
As stated, the onus is on the FSP to establish the basis on which it seeks to apply
the exclusions within the policy and the Panel is not satisfied that the FSP has met its
onus in this regard.
However, the Panel does accept that there are some issues which likely were not
caused by the storm event but rather are unrelated to the storm event.
In particular, the Panel notes that the longer term settlement of the foundations is
likely unrelated to this single storm event and the drainage work required at the
property is unrelated to the storm event.
The panel has reviewed all of the evidence of damage and is of the view that BB’s
initial scope of works and costing dated 16 March 2016 is a fair summary of the
works which needed to be undertaken to repair the damage caused by the storm.
Indeed the FSP itself had initially accepted that position, prior to its withdrawal of
acceptance.
Therefore in the panel’s view BB’s costing at $67,098.46 is a fair basis on which to
settle the dispute, however the panel also notes that the costing was provided almost
9 months ago and as such interest should be payable on that amount.
Case No: 443389 Determination Page 8 of 9
The FSP is therefore required to pay interest on this amount at the statutory rate from
the date it first accepted this costing until the date of payment of this settlement.
Temporary accommodation
It appears from the material submitted that the applicant has had to make
arrangements for temporary accommodation while work has been carried out at his
home, either for repair of the damage incurred or for remedial work for non-claim
related work.
While the need for some temporary accommodation would likely have arisen
resulting from the claimed damage and/or repair, such costs would only be available
for the reasonable time for the FSP to assess the loss and carry out the related
repairs. The panel also notes that by withdrawing its initial acceptance, the FSP
would have caused some delay in the applicant undertaking steps to further mitigate
his loss.
In the panel’s view it would be fair in all the circumstances for the FSP to bear the
cost of 12 weeks temporary accommodation, being a reasonable time for the initial
assessment, allowing some delay and then undertaking the repair work. The period
of 12 weeks therefore includes any payments already made to or on behalf of the
applicant.
The FSP is to reimburse the reasonable cost of 12 weeks temporary
accommodation, upon provision by the applicant of appropriate evidence of the costs
incurred.
Expert report
The applicant has incurred the costs of engaging the engineer TY.
The Panel is satisfied that the reports from TY have assisted greatly in the resolution
of this dispute.
The FSP is to meet the reasonable costs of those reports, upon provision by the
applicant of the appropriate receipt/invoice for the reports.
2.3 Is the applicant entitled to compensation?
The FSP originally accepted the claim, only to advise the applicant subsequently that
the claim was to be denied; during that time the parties had been working together.
When acceptance had been withdrawn that caused the applicant significant stress
and inconvenience.
It is unusual for an FSP to accept a claim based on its own sound expert evidence
and subsequently withdraw that. It would seem to the panel that such a decision
would only be made where the later evidence clearly invalidated its previous expert
reports.
In this instance the early experts found the loss was entirely consistent with the
claimed event and the later report from JM sought to refute this based primarily on
his conclusions that the amount of rainfall could not have caused the level of
inundation. Although JM may be extensively qualified in issues of structural
engineering, it appears that the issue of rainfall behaviour and accumulation is more
suited to the domain of hydrology.
Case No: 443389 Determination Page 9 of 9
As noted the FSP’s withdrawal of its acceptance of the claim would have caused the
applicant significant distress and delay. The Panel is satisfied that in the
circumstances of this claim and this dispute, the FSP is to pay the applicant $3,000
for non-financial loss compensation.