1 Overview
1.1 Dispute
The applicant lodged a claim under her Home and Contents Policy with the financial
services provider (FSP) for damage sustained to the property as a result of road
works arranged by the local council, storm damage whilst the property awaited make
safe repairs, escape of water from broken/burst pipes and pigeon infestation due to
inadequate make safe repairs by the FSP.
The building was insured for $292,136 and contents for $233,200 subject to an
excess of $500. The policy covered defined insured events with accidental damage
optional cover taken by the applicant.
On the FSP‟s advice, the applicant lodged two more claims for the above event s.
After several plumbers, builders and engineers attended the property and submitted
their findings, the FSP accepted most parts of the claim, denied some parts and
requested the applicant contribute towards some repair costs.
The applicant disputes the FSP‟s offer of settlement and expects it to pay for the full
quote for repairs, pay for temporary accommodation and compensation for delays.
1.1 Issues and key findings
Whether the FSP has established some of the damage is excluded from cover?
The applicant has established a valid claim under the policy. The FSP is obliged to
indemnify the applicant for damages caused by the insured events. The applicant is
however required to contribute towards damage that was caused by other factors
excluded under the policy.
Whether the FSP’s settlement offer is fair in the circumstances?
The FSP‟s current offer of settlement is not fair in the circumstances because:
the FSP has chosen to cash settle the applicant for the loss
the FSP‟s builder‟s (J) quote is not complete and current
J‟s quote is to be adjusted to reflect the scope of works prepared by builder S.
the applicant is entitled to cover for pet accommodation
the applicant is entitled to cover for storage outside the site.
However, the panel is satisfied the FSP‟s offer of settlement for temporary
accommodation is reasonable and the FSP is not required arrange storage for motor
vehicles and a boat.
Case No: 443179 Determination Page 2 of 19
Whether the applicant is entitled to compensation?
The FSP is not obliged to reimburse the applicant for loss of wages and the cost of
any expert reports.
The FSP has refunded some parts of the premium and allowed a portion of the living
expenses already, out of consideration for the applicant‟s circumstances.
The panel is aware of the complex nature of the claim. However considering the
circumstances and the FSP‟s initial assessment of the loss and the applicant having
to live at the property with unsatisfactory make safe repairs and other complications
from pigeon infestation, the panel is satisfied the applicant and her young family
would have experienced an unusual degree of physical inconvenience.
The panel is therefore satisfied the FSP should pay compensation for non-financial
loss in the amount of $2,000.
1.2 Determination
This determination is substantially in favour of the applicant.
The FSP should settle the claim as explained in section 2.2.
The FSP should pay compensation of $2,000.
Case No: 443179 Determination Page 3 of 19
2 Reasons for determination
2.1 Whether the FSP has established some of the damage is excluded
from cover?
The applicant is required to establish cover under the policy
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy.
The applicant‟s policy is a defined events policy which includes cover for da mage
caused by escape of liquid and accidental damage. Accidental damage cover does
not extend to include loss or damage caused by any defined events and is still
subject to the policy's general exclusions.
The panel is satisfied the applicant has established a claim under the policy as the
property sustained damage as a result of several 'escape of liquid' events.
In these circumstances, the FSP is required to show that, on the balance of
probabilities, it is entitled to rely on an exclusion under the policy to deny the
applicant‟s claim.
The FSP accepted most parts of the applicant‟s claim. However, issues remain about
the following:
the FSP only allowed 50% of the repair costs for the middle slab of the house
and slab of the shed, on the basis the damage to these parts of the building
was caused/ contributed to by other events excluded under the policy and
some damage was most likely pre-existing
the extent of the scope of works
the cost of repairs
the cover for additional benefits.
The proximate cause of damage to the property
In order to determine whether the applicant‟s claim falls within an insured event, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is a question of fact depending upon the circumstances of each case.
It is well established that the proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency to determine the active,
efficient cause that sets the relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Case No: 443179 Determination Page 4 of 19
The Wayne Tank principle applies if there are two dominant causes
The FSP says by applying the Wayne Tank principle, it is entitled to deny liability for
some parts of the claim. However, it had accepted liability on a good will basis and
accordingly applied a contribution for some of the losses.
It is well established at law that if there are two dominant or proximate causes which
can be described as effective causes of a loss, then one should avoid straining to
find a dominant cause unless one cause is clearly more decisive than the other. In
the event of one proximate cause being an insured event and the other proximate
cause being an excluded event, then the excluded event prevails and the FSP is
entitled to refuse to pay the claim.
As explained below, although the panel accepts that excluded causes have
contributed to the damage, the panel is satisfied that the proximate cause, that is, the
dominant and effective cause of the loss, was most likely liquid escaping from the
subject pipes. In the circumstances, the panel is of the view the FSP is not entitled to
rely on the exclusions to refuse the claim.
The proximate cause of damage to the middle slab was water escaping events
The FSP has offered 50% towards the repair costs of the middle slab on the basis
that only part of the damage was caused by the escape of liquid event.
The engineer NJ identified the left hand side of the dwelling was saturated and there
was a small break in the base of the downpipe in the middle of the left hand side of
the dwelling.
NJ could not rule out the possibility the damage sustained to the front section of the
property was related to the previous council construction works. He suggested to wait
until the works were completed to assess the rate of deterioration. That is, if the
damage did not continue to deteriorate, it would be related to the works and if the
damage continued then the issue would not be related to the co nstruction works.
NJ found the issues with the roof, where the original dwelling joined the rear
extension, was related to the highly reactive soil and poor drainage conditions at the
site. However, roof plumber J who initially inspected the cause of the water entry
from the roof, noted the roof issue had commenced recently and was not a long -term
problem. His finding was based on the mould present in the area at the time.
NJ noted the drainage on the front left hand corner was poor and found water
ponding on the finished ground surface in this location.
The areas of the building floor in the vicinity of the kitchen were relatively level and
the upward movement of the building floor was confined to the rear extension and
became more significant at the rear right hand corner of the building.
At the time of NJ‟s inspection, the applicant showed him that the cracking to the
concrete pavements under the dwelling had occurred since the commencement of
the construction activity. This was confirmed by NJ with the builder AJ, who had
previously attended the property.
Case No: 443179 Determination Page 5 of 19
The July 2015 report of NJ says:
The applicant‟s partner after identifying ponding of the water at the front of the
property had dug holes around the dwelling and found the surface soils were wet
around the middle of the right and left side of the building.
There was a section of the pavement protruding from the external wall cladding to
the left side of the building. In the vicinity of the down pipe there is a void present
under sections of the slab.
In the vicinity of the cut steel columns during his initial inspection and during the
second inspection he saw new cracking was present on the surface of the
concrete pavements.
NJ was unable to confirm when the cracking had commenced.
The rear of the front section of the slab showed cracking at the base of the steel
column. This was evident in April 2015 and June 2015. However, it was noted the
severity of the cracking to the concrete pavements in the front of the sections at
the site, had increased in the time frame between the two site visits.
NJ was of the view that the cracking to the slab in the rear of the property was not
caused by the leaking front main. He was of the view the cause of the damage was
the poor site drainage in these areas.
However, the plumbing test by BT noted the following:
damage to the base of the down pipes on the left side of the property
breaks in the sewer pipe noted in the rear right hand corner of the dwelling (riser
to a disconnector gully, snapped bend near the junction of a stack located on
gully branch lines at the rear of the dwelling)
waste pipes discharging via a temporary line that ran down to the rear of the
lawn.
two disconnector gullies were disused.
The FSP says the front and rear slab repairs were accepted in full on a good will
basis but it is not required to accept the claim for the middle slab. The FSP says its
builders confirm that the middle slab is made up of multiple slabs and therefore
sections of slab can be removed and replaced. That is, not every section of the
middle slab needs to be replaced.
The panel does not agree. Builder S, in its scope of works, suggested the
replacement of the entire slab. The panel prefers the view of builder S.
NJ in its report dated 12 April 2016, says the 35 year age of the building pre dates
the first edition of the building standard quoted by it. As such, the FSP cannot deny
liability for the claim, on the basis the slab in dispute was not built in accordance with
the building code.
NJ says the formation of concrete shrinkage cracks is unrelated to the water
leakages, however, the cracks may have been widened or extended to some degree
by the reactive 'clay – related' slab movements.
NJ also says that whilst the differential movements across the joints in the slabs are
a result of reactive clay related ground movements, it is possible water leakages may
have contributed to these movements to some degree, in combination with poor
surface drainage conditions and seasonal moisture content variations.
Case No: 443179 Determination Page 6 of 19
After considering all this evidence, the panel is satisfied (as also noted by NJ) that
the original building, including the middle slab, most likely withstood many weather
events despite the poor drainage currently identified by the experts.
It is therefore difficult to conclude that the damage to the slab was not caused by the
various insured events, including the discharge of water.
The panel is therefore satisfied that the FPS should accept the claim for the
replacement cost of the middle slab in full, as per the scope of works prepared by
builder S.
Damage to the shed was caused by several factors
Two weeks after the applicant‟s partner moved in, he found cracking to the slab in
the shed.
NJ says the cracking to the shed was caused by long term concrete drying/
shrinkage and worsened by the movement of the footing caused by the highly
reactive clay soil due to changes in moisture conditions.
Even though NJ did not have adequate data to compare the shed slab, as this was
not previously inspected in April 2015, he was of the view significant movement had
not occurred between his two visits.
The section close to the front entry of the shed showed heaving and most cracking
was observed in this area.
Considering the location of the shed in comparison to the front water main, NJ
concluded the damage to the slab of the shed was not related to the identified
insured events, but was due to long-term concrete drying and reactive clay
movement adjacent to the front entry of the s hed.
The applicant says:
the maximum level difference measured across the floor of the shed is 37mm
higher levels are evident to the floor of the shed adjacent to the front entry, which
also corresponds with the location of the most significant cracking in the floor of
the shed
movement and heaving in the shed slab is making it difficult to open and close
the main doors and lock up securely, as the doors do not align with the locks
due to this heaving, water is now entering and pooling within the front right hand
internal area.
The applicant is of the view that the damage to the house slab, shed and slab along
with the bathroom and toilet, tie directly into the two claims and damage sustained.
On 9 May 2016, based on further investigations carried out by BT plumbing, NJ
identified issues with the water that may be discharged from an agricultural pipe
(slotted aggie line) connected from the junction (starts at the plumbing junction under
the front shed pavement), which ran under the slab of the shed to the easement at
the rear of the shed.
Further, NJ found poor drainage issues on both sides of the shed caused damage to
the shed slab.
Case No: 443179 Determination Page 7 of 19
There is a lack of information that would enable the panel to form a firm conclusion
on the pre-existing condition of the shed slab. However, the panel accepts the
location of the shed is too far removed from the burst water pipe at the front main.
On the other hand, it is relatively closer to the sewer pipe breaks which may have
contributed to the damage.
It is also unclear how the water that discharged from the broken storm water pipes on
the left side of the building may have impacted the slab of the shed. Considering the
function of the aggie pipe line, the panel accepts it is not a suitable addition and
would have contributed to the damage sustained to the shed slab.
Considering all of the above, the panel is satisfied that the FSP‟s offer to contribute
50% towards this repair cost, is fair in the circumstances.
2.2 Whether the FSP’s settlement offer is fair in the circumstances?
The FSP’s current scope of works is inadequate
The applicant remains unhappy with the FSP‟s scope of works and expects the FSP
to settle the claim according to her builder‟s (C) repair quote which amounts to
$370,000.
The FSP says C‟s quote covers repairs to the entire property and does not limit the
scope to the damage caused by the 'escape of liquid event' covered under the policy.
Furthermore, it says the damage to the property was significantly contributed to by
the poor site drainage.
The FSP has revised the scope of works several times whilst its experts and builders
attended the applicant‟s property over a period of 18 months assessing the damage
that continued to develop and the condition of the property deteriorated. In addition,
the property was infested by pigeons which exacerbated the situation.
Having reviewed all of the exchanged material, the panel is satisfied that the poor
site drainage is a contributing factor to the loss and damage. Poor site drainage is
not an insured event under the policy.
The panel is satisfied the applicant is obliged to attend to the issues relating to poor
site drainage.
Builder S recommended the applicant engage a suitably qualified plumber to install
surface water drainage systems around the perimeter of the building to divert ground
surface water away from the building‟s footing systems to prevent continual
saturation of the reactive clay foundation material and subsequent building
movement.
The panel is satisfied that the FSP is not liable to reimburse the applicant for this
work. The installation of surface water drainage systems, as recommended by
builder S, is a maintenance issue.
The FSP‟s final amended scope of works was reviewed by builder S in December
2016. Builder S addressed the concerns raised by the applicant about the scope of
works being inadequate.
Case No: 443179 Determination Page 8 of 19
Builder S was satisfied the scope was adequate except for the following:
Remove and replace external cladding if cracked, also extra bottom cladding
when lifted to conform with the applicable code:
o Builder S confirmed his scope of works made no allowance for the
replacement of the external cladding because at the time of his inspection
he did not observe any cracking or damage to the external cladding from
the claimed events that required replacement
o Builder S agrees the external cladding may suffer movement cracking
during re-levelling of the floor frame but it may not suffer any damage
during the rectification works
o He observed no evidence that would suggest that the bottom row of
cladding requires removal to re-level the existing floor frame or steel post
supports
o Builder S recommended that the rectifying builder supply photographic
evidence of any movement cracking to the e xternal cladding that occurs
during the rectification works and a variation be submitted to repair/replace
any damaged external cladding caused during the rectification works to
the FSP for consideration.
Remove & replace paling fence approx.15lm x 1lm
o Builder S accepted the scope of works made no allowance to replace any
fencing.
o The applicant‟s builder C has allowed to replace the fencing adjacent to
the shed to facilitate replacement of the shed cladding, concrete slab and
install scaffolding.
o Builder S recommended the FSP consider this additional cost to replace
the fencing adjacent to the shed to facilitate the rectification works to the
detached shed structure.
Builder S confirmed the total area of the concrete shed slab and driveway slab
access to shed is 132m². The FSP's builder J had allowed for a total of only
95.0m² of concrete slab which states in part the following:
o “2.2 Supply and install a new concrete slab to the entire ground floor area
of the residence in accordance with a Structural Engineer's design and
detail. [95.0m²] Note: The Structural Engineer‟s design and detail is not
provided with this scope and is to be commissioned by the rectifying
builder. Some variations to slab requirements, determined by Engineer,
may alter cost price”
o There would appear to be a 37m² difference in the total replacement
allowance for the shed slab and shed driveway access concrete paving.
o Builder S accepts the quote should include the disconnection and
reconnection of fixed shelving and work benches within the shed.
The FSP offered to contribute 50% towards the removal and replacement cost of the
paling fence.
The FSP is satisfied with builder J‟s quote for the repairs relating to the insured
events as per the scope of works prepared by Builder S.
However, on 20 January 2017 the FSP's builder J observed:
Case No: 443179 Determination Page 9 of 19
the quotes for this job have become extremely confusing which most likely
accounts for the applicant querying the completeness of same
the most recent series of quotes sent through provide a fair and reasonable
costing for the works and are inclusive of all items requested (dated in June
2016 and valid for only 60 days)
since the initial quote was submitted, several changes have been made to the
quotes including the content of the quotes and the allocation of items between
specific quotes
J has allowed for Spanline insulated panel roof replacement to the dining area
which incorporates a pre-finished ceiling side. Installation of additional lining is
unnecessary
no allowance was made for the reinstatement of the solar panels as it was
removed during the make safe. An additional $1, 031 including builder‟s margi n
to cover this item (with GST)
roof damage (caused by tarps if any) to be assessed when the tarps are
removed. Make- safe tarps have been screwed through existing holes except
on the Hunter Douglas roof (scoped for replacement) where an alternative was
not possible
non-significant claimed missing items are intrinsically included in the scoped
works
site specific comments advising of “no allowance made” are self-explanatory
(important).
The FSP says it is entitled to choose how a claim is settled, whether this is by way of
cash settlement or authorising of repairs and that it is entitled to settle a claim on the
most competitive quotation available. It sa ys the claim settlement methods and the
FSP‟s rights in this regard are clearly explained in the policy.
However, the panel is of the view the repair quote should reflect the scope of works
prepared by builder S and most importantly, the quote should be actionable by a
qualified builder actually prepared to do the work. In other words, the applicant
should be able to independently appoint J to complete the necessary works for
damage caused by the insured events.
Generally, when the FSP elects to manage a re -build itself, rather than cash settle,
this will include a revised scope of works, revised quotes and additional costs
charged to the FSP by its preferred builder, referred to as variances to the original
quote, during the course of repairs.
Further, the panel is conscious that by cash settlement, the FSP transfers all of these
risk associated with the repairs, to the applicant.
In these circumstances, it is only fair that any cash settlement is adjusted to reflect
this significant risk.
The panel is also concerned that J‟s quote does not include the following, some of
which could significantly impact the cost of repairs:
Items of concern are:
Mould assessment (photos submitted by applicant).
Remediation plan.
Case No: 443179 Determination Page 10 of 19
Approval by hygienist.
Cleaning of the building and contents (spread of spores).
Cleaning of carpets and the mould impacted areas.
Further issues with pigeons, removal of fecal matter, etc.
No builder's margin allowed or allowance for contingencies and variations.
The panel is further concerned that the following have been excluded under J‟s
proposed repair quote, indicating further costs may be incurred after the
commencement of repairs; namely the obtaining of further expert opinion, additional
scope of works, council applications/permits, e tc.
Items not detailed in the scope of works:
Fees or work associated with upgrading required by any authority including BAL
and Energy Rating.
Removal or work associated with environmentally hazardous materials and
provision of clearance certificates.
Fees or costs associated with negotiation or application to the Town Planning
authority.
No allowance has been made for the removal of any asbestos containing
materials in the areas indicated by builder S. Builder S included the same in the
scope of works because he suspected certain sections of the building most
likely contained asbestos material which requires planned and careful removal
from the site. The panel is aware that this could be expensive.
No allowance has been provided for QLeave. If multiple scopes are authorised,
QLeave may be required. This is a levy imposed by the QLD government for
construction work in QLD costing more than $150,000.
No allowance has been provided to replace the ceiling panels below the Hunter
Douglas aluminum roof covering the dining area.
No allowance has been provided to update or upgrade any plumbing fittings or
installation. If an upgrade is required for installation to comply with current
codes, a variation will be necessary.
No allowance has been provided to remove or replace under slab plumbing. A
reserve should be set for underground plumbing replacement should it be
required due to slab/footing works.
No allowance has been provided to update or upgrade any item. If an upgrade
is required for installation to comply with current codes, a variation will be
necessary.
No allowance has been provided to remove or replace under slab or overhead
electrical items.
No allowance has been provided for any works to the existing roof. A roof report
will be needed upon completion of re-leveling. The FSP's builder J
recommended a reserve be set in relation to the roof to accommodate
rectification if required. A variation will be necessary if any roofing work is
required.
The estimate allows for the removal of the existing slab / footings and
replacement by similar only. No allowance has been provided for underpinning
or provision of additional footings. Affected elements of this estimate will require
revision upon receipt of engineering details and working plans.
Case No: 443179 Determination Page 11 of 19
Lack of evidence the FSP’s repair quote is current and actionable
Upon carefully reviewing the FSP‟s quote, the panel is not satisfied it is current and
complete for the reasons explained above.
The FSP‟s quote, even though reshuffled to fit the different parts of the claim, i s
dated June 2016 and it was over 8 months old, before the FSP cash settled the
applicant with its current offer of settlement, based on that quote.
The FSP has agreed to cash settle the remaining parts once this panel makes a final
decision about the matters in dispute.
The FSP, in defence of its approach says:
It has added a 5% variation on the original settlement offered for each
component of the claims to allow for any additional items.
J was the main builder involved in doing the make safe and attending the site
most recently to complete quotes, so its quotes are considered the most up to
date and reasonable for the repairs.
There were parts of the claimed damage that the consultants advised were
likely to be unrelated to the damage, however, due to the close proximity of the
damage to accepted claimed damage the FSP gave the benefit of the doubt
and accepted those items.
With the other items it offered a 50% contribution, despite the overwhelming
evidence in the engineers' reports that this damage either pre dated the loss
and was made worse or is as a result of other factors unrelated to the event
claimed, occurring over an extended period of time.
The panel's conclusions in this regard will be provided at the conclusion of this
determination.
The FSP should pay for temporary accommodation in August 2015
The applicant says the following expenses incurred for temporary accommodation
and living expenses remain outstanding.
Out Of Pocket expenses:
Accommodation Q – 27-29 July 16 - $974.40 – Paid in full.
Accommodation B – 29-31 July 16 - $710.00 - Paid in full.
Accommodation O - 31 July - 5 August 16 - $1,691.00 - $1,666.00 Paid and
$25.00 remaining.
Accommodation O 5-7 August 16 - $529.85 – remaining.
Accommodation O - 7-10 August 16 $1,032.25 – remaining.
The FSP says the property was in a liveable condition by 5 August 2016. However,
the applicant has detailed the reasons why it was not ready.
Upon carefully reviewing her concerns the panel is satisfied it is reasonable the
applicant is granted temporary accommodation for the above period as the panel is
of the view the insured property was not in a liveable state for a young family with
children.
Case No: 443179 Determination Page 12 of 19
T he activity report from the FSP‟s cleani ng company R clearly shows the property
was not ready for the applicant to move back, at least not until 9 August 2016. The
make safe findings from J also clearly show the property was not ready for
occupation until at least 11 August 2016.
The FSP should therefore pay $1,587.10 in this regard.
The applicant also seeks the FSP to pay $25 per person daily, for living costs during
the above period, amounting to $1,750. The FSP has allowed $375. The panel is
satisfied the FSP is not required to pay the remaining amount as the policy does not
extend cover for these expenses and the applicant would generally be expected to
meet these expenses.
Temporary accommodation allowance during repairs
The applicant seeks the full entitlement for temporary accommodation during repairs.
The FSP says it has allowed 6 months of temporary accommodation assessed at a
total cost of $9,100, even though its builder estimates the repair works would be
completed in 12 weeks.
Since the FSP is proposing a rental accommodation, the panel is of the view that it is
fair in the circumstances that allowances are made to move the contents to the rental
property and return them after the repairs are completed.
The FSP has provided contact details of real estate agents whom it had contacted
and who have confirmed availability of suitable accommodation. The FSP is not
obliged to arrange accommodation in a serviced apartment. However, the
accommodation allowed for, should be reasonable and suitable to the applicant‟s
needs.
Upon reviewing the scope of works provided by the applicant's builder C, it appears
the expected time frame to complete the building works is 20 weeks. As such, it
appears the FSP‟s offer of 26 weeks is reasonable.
It appears the applicant expects the FSP to advance the bond for the rental property
and the panel is satisfied the FSP is not required to advance the bond. The applicant
is obliged to forward this payment and once the rental is completed, this amount will
be refunded if the property is returned to the landlord in an acceptable condition.
The policy covers the reasonable cost of pet accommodation
The policy covers the reasonable alternative accommodation for pets if they are
unable to live at the insured address.
The applicant has claimed for expenses for kennels for the 2 dogs for the period from
27th July - 10th August, amounting to $784. As the dogs could not be left at the
insured address during this period, the panel is satisfied the FSP should reimburse
this cost to the applicant.
The applicant says her rental agents indicated most owners of rental properties
would not allow pets.
Case No: 443179 Determination Page 13 of 19
In relation to the applicant‟s request for future kennel expenses, the FSP refuses to
allow any benefit towards accommodation for pets because the local real estate
agents had indicated they will be able to source rental properties which allow pets to
be accommodated.
There is no dispute among the parties the pets cannot live at the insured address
whilst repairs are conducted. If the real estate agents are able to source a property
which allows pets, then the cost of rental would be considered as temporary
accommodation and the cost of housing domestic pets. In the circumstances, the
FSP is not required to make any additional payment for domestic pet cover.
In the event the applicant is unable to find a rental property which allows for domestic
pets, then the FSP is to assess the applicant‟s claim for alternate accommodation for
her pets. The applicant is entitled to reasonable pet accommodation costs providing
invoices and payment confirmation is submitted to the FSP up to a limit of $3,000.
The FSP is not obliged to cash settle this amount to the applicant as a benefit.
The FSP’s offer for storage costs is not reasonable
The applicant has presented several quotes from storage companies for storage of
items off site whilst the repairs are conducted.
The FSP‟s builders have suggested a solution which involves renting a pod and
storing some of the items under the building, after it is boarded up whilst the repairs
occur.
The policy extends cover for storage as follows and the panel is satisfied the FSP is
entitled to choose the most economic method.
Case No: 443179 Determination Page 14 of 19
The FSP would also need to consider the cost of moving any items stored under the
building whilst different sections of the property are being repaired.
Even though the FSP has chosen the most economical method of storage to cash
settle the applicant, the panel is concerned as to whether the builder chosen by the
applicant would be agreeable to the FSP‟s suggested storage solutions.
Since the FSP has decided not to allow the applicant to live in a serviced apartment,
it should then arrange to move all of the required furniture and contents after cleaning
them (current pigeon and mould issues highlighted by the applicant).
The panel considers this course of action is reasonable, considering the applicant
and children will be away from the property for at least six months. The FSP should
also allow for the cost of returning these items from the rental accommodation back
to the insured building.
Considering the current condition of the property (noting it is unclear whether there
are further issues caused by pigeon infestation, mould and possible asbestos
contamination during repairs), it may be more appropriate if storage is offered off site,
even though the FSP prefers storage on site, for cost saving reasons.
The applicant says the FSP should pay for the storage of two vehicles and a boat.
The panel is, however, satisfied the FSP is not obliged to arrange storage for same
because the policy covers removal of contents and these do not fall within the
definition of contents insured under the policy.
Case No: 443179 Determination Page 15 of 19
The applicant should therefore arrange to move these items off the site during repairs
and the FSP is not required to pay for same.
2.3 Whether the applicant is entitled to compensation?
The applicant has suffered an usual degree of inconvenience
The applicant seeks compensation for nonfinancial loss for inconvenience for the
time taken by the FSP to assess the claim. Furthermore, she also requests the FSP
to reimburse her lost wages and other expenses.
It is unclear whether the FSP reimbursed the applicant for her engineer‟s report. As
the panel has not relied on the applicant‟s engineer‟s findings in finalising this
determination, the panel is satisfied the FSP is not obliged to reimburse the applicant
for this expense.
The panel is also satisfied the FSP is not required to reimburse the applicant for loss
of wages.
FOS takes a conservative approach to compensation. For non-financial loss (eg, for
intangible things like stress and inconvenience) the maximum amount is $3,000 per
claim.
The maximum amount of compensation for consequential loss (out of pocket
expenses o r other liabilities, which are caused directly as a result of the FSP‟s
conduct) is $3,300 per claim.
In determining this, there must be an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with your
expectation of enjoyment or peace of mind.
Regardless of the maximum amount of compensation it can award, the panel will not
provide compensation for consequential or non-financial loss in a dispute resulting
from a claim on a policy which expressly excludes cover for it.
The policy excludes cover for consequential losses and loss of profit.
However, if the applicant has suffered consequential losses or loss of profit as a
result of the FSP‟s actions, then the panel may award compensation.
Case No: 443179 Determination Page 16 of 19
There is no dispute the losses suffered by the applicant in respect of her insured
home was complicated by several causes of losses operating from various locations
at the property.
The FSP proactively appointed several experts to address the claims and the
concerns raised by the applicant. The complex nature of the damage to the insured
home was ultimately identified as being caused by several factors.
The applicant remained unhappy with the FSP proposed scope of works and offer of
settlement and it took several scopes an d revised quotes to determine the FSP‟s final
offer of settlement.
Even though the FSP reasonably managed the claim, considering the complex
nature of the issues and expert findings over a period of time, nevertheless, having to
live at the property with ongoing issues would have caused an unusual degree of
inconvenience to the applicant and her young family.
The FSP has allowed a portion of the applicant‟s living expenses and has offered to
waive the excess and refund part of the premium.
However, considering the overall handling of the claim, the panel is satisfied the
applicant is entitled to an award of compensation for non-financial loss of $2,000.
CONCLUSION
Proposed settlement by the panel
The FSP‟s current offer of settlement is as follows:
Claim 1 - Front water main - $51,842.11 (including 5% variance)
Claim 2 - Rear sewer pipe - $89,295.27 (including 5% variance)
Shed - 50% contribution - $23,440.63 (including 5% variance)
Ground floor slab – 50% contribution - $24,940.79 (including 5% variance)
Additional Items
Accommodation - $9,100.00
Removalist costs $3,000.00
Storage - $2,002.90
$580.80 Electricity costs
Reinstallation of solar panel - $1,031.00
50% contribution for fence replacement $903.10
$602.90 for hoarding of downstairs area to make secure while work is completed.
In respect of the adequacy of the FSP's offer outlined above, the panel notes:
Firstly, as identified earlier, the panel is concerned the applicant may be left out of
pocket if the cash settlement amount by the FSP, as per t he FSP‟s builder J‟s quote,
does not adequately cover or address the scope of works prepared by builder S.
Secondly, the applicant has submitted evidence to show the carpets have been
damaged by mould and would require cleaning or replacement.
Thirdly, once the repairs are completed the site would need to be cleared by a
hygienist and asbestos specialist (if asbestos is found in the walls).
Case No: 443179 Determination Page 17 of 19
And finally, the panel notes the FSP‟s experts have not visited the site recently.
Considering all of these concerns, the panel is of the view the FSP should request
builder S and J to visit the property and prepare a final scope of works and quote with
current costs, to repair the property on the basis that J was going to perform the re-
build as the applicant's contractor. The quote is to include the various items listed
above that are reasonably required in order for the applicant to commence repairs
(including and not limited to addressing the cost of planning, engineering works,
mould assessment and removal, asbestos).
This ensuing quote is to be adjusted to include an identified 'builder's margin' costing.
This will then be considered the 'Final Cost'.
The 'Final Cost' is then to be presented to the applicant for her consideration. In this
regard the panel notes the building sum insured is $292,136. However, the panel
also notes the policy provision for „Gap Cover‟ , of up to a further 25% on top of the
sum insured:
In the interim the panel notes the applicant has been rendered an account by IAD
dated 6 March 2017, for 'makesafe' of the risk address, in the amount of $5,430. The
FSP is directed to urgently settle payment of this account, either directly to the
supplier, or to the applicant if she has already attended to same.
Case No: 443179 Determination Page 18 of 19
3 Supporting Information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
The Panel consists of an Ombudsman and two representatives with consumer and
insurance experience.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Product Disclosure Statement